Leveling control device, rolling equipment provided with same, and leveling control methodInfo
- Publication number
- EP4374983B1 EP4374983B1 EP21956708.8A EP21956708A EP4374983B1 EP 4374983 B1 EP4374983 B1 EP 4374983B1 EP 21956708 A EP21956708 A EP 21956708A EP 4374983 B1 EP4374983 B1 EP 4374983B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- rolling mill
- leveling
- rolling
- mill stand
- amount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/58—Roll-force control; Roll-gap control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2273/00—Path parameters
- B21B2273/04—Lateral deviation, meandering, camber of product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/68—Camber or steering control for strip, sheets or plates, e.g. preventing meandering
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B38/00—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
- B21B38/02—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product for measuring flatness or profile of strips
Definitions
- the present invention relates to a leveling control apparatus, a rolling facility including the leveling control apparatus, and a leveling control method.
- Patent Document 1 describes a strip curvature control method in a tandem mill in which method a plurality of rolling mill stands perform rolling of a strip simultaneously by successively passing the strip through a plurality of rolling mill stands arranged in series, and left and right tension deviations of the strip between the rolling mill stands are removed by adjusting the left and right screw-down amounts of each of the rolling mill stands on the basis of the detected values of left and right tension deviations of the strip between the rolling mill stands, to thereby perform strip curvature control.
- the adjustment of the screw-down amount at a rolling mill stand is performed in front of the position where the left and right tension deviation of the strip is detected, on the basis of the detected value of the left and right tension deviation of the strip that has exited from the rolling mill stand, and the adjusting operation is performed progressively toward a rolling mill stand on the entry side.
- Patent Document 1 JP-S63-29605-A
- WO 2012/086043 A1 discloses a control device for hot rolling equipment with the features in the preamble of present claim 1 and control method with the features in the preamble of present claim 8.
- Methods of preventing a strip curvature include the method disclosed in Patent Document 1, for example.
- screw-down control is performed at the rolling mill stand in front of the tension detecting position on the basis of the left and right tension deviations of the strip between the rolling mill stands, and the control is brought progressively toward the entry side.
- a leveling control apparatus a rolling facility including the leveling control apparatus, and a leveling control method that are capable of increasing, compared with the conventional art, the accuracy of screw-down control for each rolling mill stand of a hot rolling line that includes an array of rolling mill stands.
- the present invention solves the above problems by the leveling control apparatus defined in claim 1 and the leveling control method defined in claim 8.
- the dependent claims relate to preferred embodiments.
- Leveling control apparatuses, rolling facilities including the leveling control apparatuses, and leveling control methods according to embodiments of the present invention will be described hereinbelow with reference to the drawings.
- materials to be rolled according to the present invention are not limited to steel strips, but may be metal strips that can generally be rolled, and are not restricted to any particular types, but may be nonferrous materials such as aluminum and copper other than steel strips.
- a leveling control apparatus, a rolling facility including the leveling control apparatus, and a leveling control method according to a first embodiment of the present invention will be described below with reference to FIGS. 1 through 3 .
- FIG. 1 is a schematic view illustrating the configuration of the rolling facility incorporating the leveling control apparatus according to the first embodiment.
- a rolling facility 200 in FIG. 1 is a finishing rolling facility for rolling a steel strip 1, and includes an F1 rolling mill stand 10, an F2 rolling mill stand 20, an F3 rolling mill stand 30, an F4 rolling mill stand 40, an F5 rolling mill stand 50, an F6 rolling mill stand 60, an F7 rolling mill stand 70, cameras 81, 82, 83, 84, 85, and 86, shapemeters 91, 92, 93, 94, 95, and 96, a leveling control apparatus 150, etc.
- the rolling facility 200 is not limited to the configuration including the seven rolling mill stands as illustrated in FIG. 1 , but may include a minimum of three rolling mill stands or more.
- a rolling mill is provided with the F1 stand 10, the F2 stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70 each includes: a top work roll and a bottom work roll; a top backup roll and a bottom backup roll that support the top work roll and the bottom work roll, respectively, by contacting them; screw-down devices 11, 21, 31, 41, 51, 61, and 71 disposed above the respective top backup rolls; and load detectors 12, 22, 32, 42, 52, 62, 72.
- the information on rolling loads measured by the load detectors 12, 22, 32, 42, 52, 62, and 72 is transmitted via communication line 110 to the leveling control apparatus 150.
- Each of the rolling mill stands may be configured as a six-high rolling mill including top and bottom intermediate rolls disposed between the top and bottom work rolls and the top and bottom backup rolls.
- the roll configuration of the rolling mill is not limited to the above configurations, but may include a minimum of top and bottom work rolls.
- the shapemeters 91, 92, 93, 94, 95, and 96 are disposed between the F1 rolling mill stand 10, the F2 rolling mill stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70, respectively, and are measuring instruments for measuring torques on the steel strip 1.
- the shapemeters 91, 92, 93, 94, 95, and 96 are capable of detecting a tension distribution on the steel strip 1 along the widthwise direction thereof, and are also capable of detecting the position of the steel strip 1.
- the information on a surface shape, measured by the shapemeter 91, of the steel strip 1 on the exit side of the F1 rolling mill stand 10 (the entry side of the F2 rolling mill stand 20) is transmitted via the communication line 110 to the leveling control apparatus 150.
- the information on a surface shape, measured by the shapemeter 92, of the steel strip 1 at the exit side of the F2 rolling ill stand 20 (the entry side of the F3 rolling mill stand 30) is transmitted via the communication line 110 to the leveling control apparatus 150.
- the information on a surface shape, measured by the shapemeter 93, of the steel strip 1 at the exit side of the F3 rolling mill stand 30 (the entry side of the F4 rolling mill stand 40) is transmitted via the communication line 110 to the leveling control apparatus 150.
- the information on a surface shape, measured by the shapemeter 94, of the steel strip 1 at the exit side of the F4 rolling mill stand 40 (the entry side of the F5 rolling mill stand 50) is transmitted via the communication line 110 to the leveling control apparatus 150.
- the information on a surface shape, measured by the shapemeter 95, of the steel strip 1 at the exit side of the F5 rolling mill stand 50 (the entry side of the F6 rolling mill stand 60) is transmitted via the communication line 110 to the leveling control apparatus 150.
- the information on a surface shape, measured by the shapemeter 96, of the steel strip 1 at the exit side of the F6 rolling mill stand 60 (the entry side of the F7 rolling mill stand 70) is transmitted via the communication line 110 to the leveling control apparatus 150.
- a shapemeter 97 is also a measuring instrument for measuring a surface shape of the steel strip 1 as with the shapemeter 91, etc., and is disposed on the exit side of the F7 rolling mill stand 70.
- the information on a surface shape, measured by the shapemeter 97, of the steel strip 1 at the exit side of the F7 rolling mill stand 70 is transmitted via the communication line 110 to the leveling control apparatus 150.
- the camera 81 is disposed in a position where it can photograph an image including the steel strip 1 on the exit side of the F1 rolling mill stand 10 and the entry side of the F2 rolling mill stand 20.
- the camera 82 is disposed in a position where it can photograph an image including the steel strip 1 on the exit side of the F2 rolling mill stand 20 and the entry side of the F3 rolling mill stand 30.
- the camera 83 is disposed in a position where it can photograph an image including the steel strip 1 on the exit side of the F3 rolling mill stand 30 and the entry side of the F4 rolling mill stand 40.
- the camera 84 is disposed in a position where it can photograph an image including the steel strip 1 on the exit side of the F4 rolling mill stand 40 and the entry side of the F5 rolling mill stand 50.
- the camera 85 is disposed in a position where it can photograph an image including the steel strip 1 on the exit side of the F5 rolling mill stand 50 and the entry side of the F6 rolling mill stand 60.
- the camera 86 is disposed in a position where it can photograph an image including the steel strip 1 on the exit side of the F6 rolling mill stand 60 and the entry side of the F7 rolling mill stand 70.
- These cameras 81, 82, 83, 84, 85, and 86 photograph images including the steel strip 1 directly from above the steel strip 1 or obliquely from above the steel strip 1 at intervals shorter than 0.1 second, for example, preferably in a moving image format.
- the data on the photographed images are transmitted via the communication line 110 to the leveling control apparatus 150.
- the leveling control apparatus 150 is an apparatus configured with a computer for controlling operation of the various devices in the rolling facility 200, and has a torque acquisition unit 161, a primary component computing unit 162, a leveling correction amount computing unit 163, a leveling amount changing unit 164, an off-center amount computing unit 165, and a storage unit 166.
- the torque acquisition unit 161 calculates a toque distribution on the steel strip 1 along the widthwise direction thereof between the F1 rolling mill stand 10, the F2 rolling mill stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70 from the torques measured by the shapemeters 91, 92, 93, 94, 95, and 96 that are disposed respectively between the F1 rolling mill stand 10, the F2 rolling mill stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70.
- the torque acquisition unit 161 is preferably a main entity for carrying out a torque acquiring step.
- the torque acquisition unit 161 also calculates a toque distribution along the widthwise direction of the steel strip 1 on the rolling downstream side of the F7 rolling mill stand 70, from the torque on the steel strip 1 acquired by the shapemeter 97 disposed on the rolling downstream side of the last F7 rolling mill stand 70.
- the off-center amount computing unit 165 calculates deviations between the center of the steel strip 1 along the widthwise direction thereof and the rolling center between respective rolling mill stands of the F1 rolling mill stand 10, the F2 rolling mill stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70, from the results measured by strip position detectors disposed respectively between the F1 rolling mill stand 10, the F2 rolling mill stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70.
- the strip position detectors whose measured results are acquired by the off-center amount computing unit 165 are represented by the cameras 81, 82, 83, 84, 85, and 86 or the shapemeters 91, 92, 93, 94, 95, 96, and 97.
- the primary component computing unit 162 calculates a tension distribution on the steel strip 1 along the widthwise direction thereof from the torque distribution calculated by the torque acquisition unit 161.
- the primary component computing unit 162 also calculates a primary component of a polynomial that represents the tension distribution on the steel strip 1 from the calculated tension distribution.
- the primary component computing unit 162 can correct the torque distribution on the steel strip 1 along the widthwise direction thereof on the basis of the deviations (off-center amount ⁇ Yc in FIG. 2 ) calculated by the off-center amount computing unit 165.
- the primary component computing unit 162 is preferably a main entity for carrying out a primary component computing step.
- the leveling correction amount computing unit 163 calculates leveling correction amounts for the rolling mill stands 10, 20, 30, 40, 50, and 60 immediately preceding on the rolling upstream side, on the basis of the primary component calculated by the primary component computing unit 162.
- the leveling correction amount computing unit 163 should preferably calculate a leveling correction amount for the F7 rolling mill stand 70 on the basis of the primary component calculated by the primary component computing unit 162.
- the leveling correction amount computing unit 163 is preferably a main entity for carrying out a leveling correction amount computing step.
- the leveling correction amount computing unit 163 performs leveling correction on the F6 rolling mill stand 60 using the primary component of the tension distribution calculated from the torque on the steel strip 1 that has been measured by the shapemeter 96 disposed on the exit side of the F6 rolling mill stand 60. This processing is performed progressively toward the rolling upstream side.
- the shapemeter 96 of the F7 rolling mill stand 70 starts being lowered vertically downwardly (starts being spaced from the steel strip 1). From this timing, therefore, it is desirable to perform leveling correction on the F6 rolling mill stand 60 and the F7 rolling mill stand 70 using the off-center amounts of the steel strip 1 that have been input from the camera 85 on the entry side of the F6 rolling mill stand 60 and the camera 86 on the entry side of the F7 rolling mill stand 70.
- the leveling correction amount computing unit 163 can calculate leveling correction amounts such that the calculated primary component falls within an allowable range.
- FIG. 2 is a view illustrating an example of method of determining an allowable range for a primary component.
- FIG. 2 illustrates the timing when the trailing end of the steel strip 1 has left the F6 rolling mill stand 60.
- the F7 rolling mill stand 70 exerts lateral restraint forces on the steel strip 1, tending to allow the steel strip 1 to move off-center to a large extent.
- the average thickness of the steel strip 1 on the entry side of the F7 rolling mill stand 70 is indicated by H
- the difference between the thicknesses of both edges of the steel strip 1 on the entry side of the F7 rolling mill stand 70 is indicated by ⁇ H
- the average thickness of the steel strip 1 on the exit side of the F7 rolling mill stand 70 is indicated by h
- the difference between the thicknesses of both edges of the steel strip 1 on the exit side of the F7 rolling mill stand 70 is indicated by ⁇ h
- the difference between the center of the F7 rolling mill stand 70 along the widthwise direction thereof and the center of the steel strip 1 along the widthwise direction thereof, i.e., the off-center amount of the steel strip 1 is indicated by ⁇ Yc.
- the off-center amount ⁇ Yc of the steel strip 1 is calculated using the angular velocity of rotation of the tail end of the steel strip 1 and the speed at which the steel strip 1 moves in the widthwise direction thereof. Further, the angular velocity of rotation of the tail end of the steel strip 1 and the speed at which the steel strip 1 moves in the widthwise direction thereof are calculated using a change in the strip wedge ratio ( ⁇ h/h - ⁇ H/H).
- the primary component (elongation difference ratio) of the polynomial that represents the tension distribution on the steel strip 1 is correlated to the change in the strip wedge ratio ( ⁇ h/h - ⁇ H/H), and the leveling amount (difference between screw-down ratios) is also correlated to ⁇ H and ⁇ h, so that they can be calculated by way of calculation.
- the allowable maximum value of the off-center amount ⁇ Yc (for example, the off-center amount ⁇ Yc at the F7 rolling mill stand 70 at the time where the tail end of the steel strip 1 contacts a side guide (omitted from illustration))
- it can be calculated by way of calculation how much the primary component of the torque distribution on the steel strip 1 along the widthwise direction thereof on the exit side of the F7 rolling mill stand 70 at the allowable maximum value of the off-center amount ⁇ Yc will be.
- the leveling correction amount computing unit 163 can calculate, using a range of primary components of torque distributions capable of keeping the off-center amount ⁇ Yc within an allowable range as an allowable range, a leveling correction amount such that the primary component calculated by the primary component computing unit 162 falls within the allowable range.
- the leveling amount changing unit 164 changes the leveling amount progressively toward the rolling upstream side from a (last - 1)th rolling mill stand among the F1 stand 10, the F2 stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70, on the basis of the leveling correction amount calculated by the leveling correction amount computing unit 163. Moreover, it is desirable that the leveling amount changing unit 164 should change the leveling amount of the F7 rolling mill stand 70 before the leveling amount of the (last - 1)th rolling mill stand is changed.
- the leveling amount changing unit 164 is preferably a main entity for carrying out a leveling amount changing step.
- the leveling amount changing unit 164 outputs control parameter information on the calculated leveling amount to the screw-down devices 11, 21, 31, 41, 51, 61, and 71 via communication line 120.
- the screw-down devices 11, 21, 31, 41, 51, 61, and 71 then operate to realize the leveling amount having been input.
- the storage unit 166 is a storage device of the computer configuring the leveling control apparatus 150, and should preferably be an SSD or an HDD.
- Control of operation of the devices by the leveling control apparatus 150 and control of operation of the torque acquisition unit 161, the primary component computing unit 162, the leveling correction amount computing unit 163, the leveling amount changing unit 164, the off-center amount computing unit 165, and the storage unit 166 are carried out in accordance with various programs recorded in the storage unit 166.
- Control processing for controlling operation that is carried out by the leveling control apparatus 150 may be combined in one program or separated in a plurality of programs, or represented by a combination of those programs.
- the programs may be partly or wholly implemented by dedicated hardware or modularized.
- FIG. 3 is a flowchart illustrating an example of sequence of control for correcting a leveling amount in the leveling control apparatus according to the first embodiment.
- the shapemeter 97 measures the torque on the steel strip 1 on the exit side of the F7 rolling mill stand 70 (last rolling mill stand), and the torque acquisition unit 161 of the leveling control apparatus 150 calculates a torque distribution on the steel strip 1 along the widthwise direction thereof and the primary component computing unit 162 calculates a primary component along the widthwise direction of the steel strip 1 (step S101).
- the leveling correction amount computing unit 163 of the leveling control apparatus 150 computes a leveling correction amount for the F7 rolling mill stand 70 in view of the primary component calculated in step S101, and the leveling amount changing unit 164 changes the leveling amount (step S102).
- the primary component computing unit 162 calculates a primary component of a tension distribution on the steel strip 1 between the F6 rolling mill stand 60 and the F7 rolling mill stand 70 in the same manner as on the exit side of the F7 rolling mill stand 70 (last rolling mill stand) (step S103).
- the leveling correction amount computing unit 163 computes a leveling correction amount for the F6 rolling mill stand 60 in view of the primary component calculated in step S103, and the leveling amount changing unit 164 changes the leveling amount (step S104).
- step S101 and step S102 or step S103 and step S104 is carried out with respect to the F5 rolling mill stand 50, the F4 rolling mill stand 40, the F3 rolling mill stand 30, the F2 rolling mill stand 20, and the F1 rolling mill stand 10 (corresponding respectively to steps S105, S106, S107, S108, S109, S110, S111, S112, S113, and S114 (a leveling correction amount for F1 is computed in view of the primary component, and the leveling is changed)).
- step S121 it is desirable to compute a leveling correction amount for the F7 rolling mill stand 70 on the assumption that the leveling correction at the F6 rolling mill stand 60 represents a constant strip wedge ratio (step S121) and to reflect the computed leveling correction amount in the processing of step S102.
- step S121 is the same as with the F5 rolling mill stand 50, etc. It is thus possible to compute leveling correction amounts respectively for the F1 rolling mill stand 10, the F2 stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, and the F6 rolling mill stand 60 on the assumption that the leveling corrections at these rolling mill stands represent a constant strip wedge ratio (corresponding respectively to steps S122, S123, S124, S125, and S126) and to reflect the computed leveling correction amounts in the processing of step S102, etc.
- a constant strip wedge ratio corresponding respectively to steps S122, S123, S124, S125, and S126
- step S121 In order to avoid endless looping through step S121, etc., it is desirable to record the number of times that step S121 is performed, and, if step S121 has been performed a predetermined number of times, to stop performing steps S121, ⁇ , S126, or to stop performing steps S121, ⁇ , S126 after a predetermined time has passed after they had been performed for the first time, or to stop performing steps S121, ⁇ , S126 in a case where the corrections in those steps are lower than a prescribed value.
- step S130 it is determined whether the primary component of the tension distribution on the steel strip 1 at the exit side of each of all the rolling mill stands satisfies an allowable value or not. If it is determined that the primary component satisfies the allowable value, then the processing is completed (the control parameter information on the calculated leveling amount is output to the gear-down devices 11, 21, 31, 41, 51, 61, and 71). In contrast, if the primary component does not satisfy the allowable value with respect to even one of the rolling mill stands, then the processing goes back to step S101, and the processing is continued to calculate control parameters for the leveling amount until the primary component satisfies the allowable value at the exit sides of all the rolling mill stands.
- steps S101 and S103 correspond to the primary component computing step
- steps S102, S104, S114, and S126 correspond to the leveling correction amount computing step and the leveling amount changing step.
- the leveling control apparatus 150 of the rolling facility 200 includes: the torque acquisition unit 161 that calculates a toque distribution on the steel strip 1 along the widthwise direction thereof between the F1 rolling mill stand 10, the F2 rolling mill stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70 from the torques measured by the shapemeters 91, 92, 93, 94, 95, and 96 that are disposed between the F1 rolling mill stand 10, the F2 rolling mill stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70; the primary component computing unit 162 that calculates a tension distribution on the steel strip 1 along the widthwise direction thereof from the calculated torque distribution and that calculates a primary component of a polynomial that represents the tension distribution on the steel strip 1 from the tension distribution; the leveling correction amount
- the leveling correction amount computing unit 163 calculates leveling correction amounts so as to keep the calculated primary component within the allowable range, the primary component can be reduced and the strip wedge ratio becomes nearly constant. As the steel strip 1 can thus be rolled while holding its stripe wedge, the steel strip 1 can have its off-center movement reduced. Because of these advantages, the steel strip 1 can be rolled more stably.
- the torque acquisition unit 161 calculates a toque distribution on the steel strip 1 along the widthwise direction thereof on the rolling downstream side of the F7 rolling mill stand 70 from the torque on the steel strip 1 that has been acquired by the shapemeter 97 disposed on the rolling downstream side of the F7 rolling mill stand 70, and the leveling amount changing unit 164 changes the leveling amount at the F7 rolling mill stand 70 prior to the (last - 1)th rolling mill stand, thereby making the accuracy of screw-down control higher.
- the leveling control apparatus 150 further includes the off-center amount computing unit 165 that calculates deviations between the center of the steel strip 1 along the widthwise direction thereof and the rolling center between the F1 rolling mill stand 10, the F2 rolling mill stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70, from the results measured by the respective strip position detectors disposed between the F1 rolling mill stand 10, the F2 rolling mill stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70.
- the primary component computing unit 162 corrects the torque distribution on the steel strip 1 along the widthwise direction thereof on the basis of the deviations calculated by the off-center amount computing unit 165, thereby correcting the torque difference by the deviations, so that the primary component can be calculated with better accuracy. Consequently, the accuracy of screw-down control can further be increased.
- FIG. 4 is a schematic view illustrating the configuration of a rolling facility incorporating the leveling control apparatus according to the second embodiment of the present invention
- FIG. 5 is a flowchart illustrating an example of sequence of control for correcting a leveling amount.
- a rolling facility 200A in FIG. 4 includes a strip wedge amount measuring instrument 98 for measuring a strip thickness distribution of the steel strip 1 along the widthwise direction thereof, in place of the shapemeter 97 disposed on the exit side of the F7 rolling mill stand 70 of the rolling facility 200 according to the first embodiment described above.
- the strip wedge amount measuring instrument 98 may be a strip thickness meter or a profile meter as long as it can measure data from which a strip wedge amount can be calculated.
- a leveling control apparatus 150A further includes a strip wedge amount acquiring unit 167A in addition to the leveling control apparatus 150 according to the first embodiment.
- the strip wedge amount acquiring unit 167A calculates a strip wedge amount of the steel strip 1 on the rolling downstream side of the F7 rolling mill stand 70, from the strip thickness distribution of the steel strip 1 along the widthwise direction thereof that has been measured by the strip wedge amount measuring instrument 98 disposed on the rolling downstream side of the F7 rolling mill stand 70.
- a leveling correction amount computing unit 163A calculates a leveling correction amount for the F7 rolling mill stand 70 on the basis of the strip wedge amount calculated by the strip wedge amount acquiring unit 167A, and a leveling amount changing unit 164A also changes the leveling amount at the F7 rolling mill stand 70 prior to the (last - 1)th rolling mill stand.
- the transcription ratio of the strip wedge is considered to be essentially zero, and the strip wedge (strip wedge ratio) of the steel strip 1 before it is rolled is thought to be inherited as it is.
- a leveling correction amount for the F7 rolling mill stand 70 is computed from the measured value of the strip wedge after the steel strip 1 has been rolled, i.e., on the exit side of the F7 rolling mill stand 70, and the difference between oil columns of the screw-down device 71 on the drive side and the work side is adjusted.
- leveling control method preferably performed by the leveling control apparatus 150A according to the present embodiment, will be described below with reference to FIG. 5 .
- the strip wedge amount measuring instrument 98 and the strip wedge amount acquiring unit 167A of the leveling control apparatus 150A measure the strip wedge of the steel strip 1 on the exit side of the F7 rolling mill stand 70 (step S201).
- the leveling correction amount computing unit 163A of the leveling control apparatus 150A computes a leveling correction amount for the F7 rolling mill stand 70 in view of the strip wedge calculated in step S101, and the leveling amount changing unit 164 changes the leveling amount (S202).
- the leveling correction amount computing unit 163A may compute a leveling correction amount from the calculated strip wedge according to a known method.
- steps S203 through S230 is the same as the processing of steps S103 through S130 illustrated in FIG. 3 and will be omitted from detailed description.
- the leveling control apparatus, the rolling facility including the leveling control apparatus, and the leveling control method according to the second embodiment offer essentially the same advantages as those of the leveling control apparatus, the rolling facility including the leveling control apparatus, and the leveling control method according to the first embodiment described above.
- the leveling control apparatus 150A further includes the strip wedge amount acquiring unit 167A that calculates a strip wedge amount of the steel strip 1 on the rolling downstream side of the F7 rolling mill stand 70 from the strip thickness distribution of the steel strip 1 along the widthwise direction thereof that has been measured by the strip wedge amount measuring instrument 98 disposed on the rolling downstream side of the F7 rolling mill stand 70.
- the leveling correction amount computing unit 163A calculates a leveling correction amount for the F7 rolling mill stand 70 on the basis of the strip wedge amount calculated by the strip wedge amount acquiring unit 167A, and the leveling amount changing unit 164A also changes the leveling amount at the F7 rolling mill stand 70 prior to the (last - 1)th rolling mill stand, thereby making the accuracy of screw-down control higher even in case shape data on the exit side of the F7 rolling mill stand 70 cannot be used.
- FIG. 6 is a schematic view illustrating the configuration of a rolling facility incorporating the leveling control apparatus according to the third embodiment
- FIG. 7 is a flowchart illustrating an example of sequence of control for correcting a leveling amount.
- a rolling facility 200B in FIG. 6 is free of the shapemeter 97 in the rolling facility 200 according to the first embodiment and the strip wedge amount measuring instrument 98 in the rolling facility 200A according to the second embodiment, but is configured to provide calculated values representing a strip wedge amount of and a tension distribution on the steel strip 1 on the exit side of the last F7 rolling mill stand 70 if the data of such a strip wedge amount of and a tension distribution are not available.
- a leveling control apparatus 150B further includes a strip wedge amount computing unit 168B that calculates a strip wedge amount of the steel strip 1 on the rolling upstream side of the F7 rolling mill stand 70, on the basis of rolling loads and leveling amounts from an upstream rolling stand mill to the (last - 1)th rolling mill stand among the F1 stand 10, the F2 stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70.
- a leveling correction amount computing unit 163B of the leveling control apparatus 150B calculates a leveling correction amount for the F7 rolling mill stand 70 on the basis of the strip wedge amount calculated by the strip wedge amount computing unit 168B, and a leveling amount changing unit 164B also changes the leveling amount at the F7 rolling mill stand 70 prior to the (last - 1)th rolling mill stand.
- a strip wedge is formed substantially according to the leveling, i.e., transcription is dominant.
- a wedge (ratio) that enters a rolling mill stand also appears on the exist side, i.e., inheritance is dominant, in order to avoid deformations that are large in shape.
- a strip wedge on the exit side of each rolling mill stand can be predicted. Therefore, a strip wedge on the entry side of the F7 rolling mill stand 70 as the last stage can be calculated, and when the leveling at the F7 rolling mill stand 70 is changed on the basis of the calculated strip wedge amount on the exit side of the F6 rolling mill stand 60, its effect occurs at upstream rolling mill stands, changing tensions measured by the shapemeters 91, 92, 93, 94, 95, and 96. Subsequently, control for changing the leveling amount is performed progressively toward upstream as with the first and second embodiments.
- the leveling mount since when the leveling is changed at an upstream rolling mill stand, it affects the calculated value of the strip wedge on the entry side of the F7 rolling mill stand 70, it is desirable to control the leveling mount and calculate a strip wedge independently of each other at each rolling mill stand. For example, the strip wedge is computed at all times in steps S301 through S306, whereas the leveling change processing in steps S307 through S330 is carried out between the start and the end.
- leveling control method preferably performed by the leveling control apparatus 150B according to the present embodiment, will be described below with reference to FIG. 7 .
- the strip wedge amount computing unit 168B of the leveling control apparatus 150B computes a strip wedge on the exit side of the F1 rolling mill stand 10 using a measured rolling load P, a predicted roll profile value Cw, and a measured leveling amount ⁇ S at the F1 rolling mill stand 10 (step S301).
- the strip wedge amount computing unit 168B computes a strip wedge on the exit side of the F2 rolling mill stand 20 using the calculated strip wedge value on the exit side of the F1 rolling mill stand 10 that has been calculated in step S301, a measured rolling load P, a predicted roll profile value Cw, and a measured leveling amount ⁇ S at the F2 rolling mill stand 20 (step S302).
- step S301 and step S302 are carried out with respect to the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, and the F6 rolling mill stand 60 (corresponding respectively to steps S303, S304, S305, and S306).
- the leveling correction amount computing unit 163B of the leveling control apparatus 150B computes a leveling correction amount for the F7 rolling mill stand 70 in view of the strip wedge (strip wedge ratio) on the exit side of the F6 rolling mill stand 60 that has been computed in a step corresponding to step S306 prior to the rolling, and the leveling amount changing unit 164B changes the leveling amount (step S307).
- Step S308 and subsequent steps are basically the same as the processing of steps S103 through S130 illustrated in FIG. 3 and will be omitted from detailed description, the difference being that if the primary component does not satisfy the allowable value with respect to even one of the rolling mill stands in step S330, then the processing goes back to step S307, and the processing is continued to calculate control parameters for the leveling amount until the primary component satisfies the allowable value at all of the rolling mill stands.
- the leveling control apparatus, the rolling facility including the leveling control apparatus, and the leveling control method according to the third embodiment offer essentially the same advantages as those of the leveling control apparatus, the rolling facility including the leveling control apparatus, and the leveling control method according to the first embodiment described above.
- the leveling control apparatus 150B further includes the strip wedge amount computing unit 168B that calculates a strip wedge amount of the steel strip 1 on the rolling upstream side of the F7 rolling mill stand 70, on the basis of rolling loads and leveling amounts from an upstream rolling stand mill to the (last - 1)th rolling mill stand among the F1 stand 10, the F2 stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70.
- the strip wedge amount computing unit 168B that calculates a strip wedge amount of the steel strip 1 on the rolling upstream side of the F7 rolling mill stand 70, on the basis of rolling loads and leveling amounts from an upstream rolling stand mill to the (last - 1)th rolling mill stand among the F1 stand 10, the F2 stand 20, the F3 rolling mill stand 30, the F4 rolling mill stand 40, the F5 rolling mill stand 50, the F6 rolling mill stand 60, and the F7 rolling mill stand 70.
- the leveling correction amount computing unit 163B calculates a leveling correction amount for the F7 rolling mill stand 70 on the basis of the strip wedge amount calculated by the strip wedge amount computing unit 168B, and the leveling amount changing unit 164B also changes the leveling amount of the F7 rolling mill stand 70 prior to the (last - 1)th rolling mill stand, thereby making the accuracy of screw-down control higher even in a case where various data cannot be used on the exit side of the F7 rolling mill stand 70.
- Some of the configurations of one of the embodiments may be replaced with some of the configurations of the other embodiments, and some of the configurations of one of the embodiments may be added to some of the configurations of the other embodiments within the scope defined by the appended claims. Moreover, some of the configurations of each of the embodiments may be added to, or deleted, or replaced with some of the configurations of the other embodiments within the scope defined by the appended claims.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2021/032839 WO2023037409A1 (ja) | 2021-09-07 | 2021-09-07 | レベリング制御装置、およびそれを備えた圧延設備、並びにレベリング制御方法 |
Publications (4)
| Publication Number | Publication Date |
|---|---|
| EP4374983A1 EP4374983A1 (en) | 2024-05-29 |
| EP4374983A4 EP4374983A4 (en) | 2024-10-23 |
| EP4374983C0 EP4374983C0 (en) | 2025-10-22 |
| EP4374983B1 true EP4374983B1 (en) | 2025-10-22 |
Family
ID=85507279
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP21956708.8A Active EP4374983B1 (en) | 2021-09-07 | 2021-09-07 | Leveling control device, rolling equipment provided with same, and leveling control method |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP4374983B1 (https=) |
| JP (1) | JP7716484B2 (https=) |
| WO (1) | WO2023037409A1 (https=) |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5785607A (en) * | 1980-11-14 | 1982-05-28 | Hitachi Ltd | Controlling method of plate bending in tandem mill |
| AT389433B (de) | 1986-07-14 | 1989-12-11 | Blum Gmbh Julius | Schublade |
| JPH04300010A (ja) * | 1991-03-29 | 1992-10-23 | Kobe Steel Ltd | タンデム圧延機における蛇行制御方法 |
| JPH1133615A (ja) * | 1997-07-18 | 1999-02-09 | Nkk Corp | タンデム圧延機における蛇行制御方法及び装置 |
| JPH11290921A (ja) * | 1998-04-09 | 1999-10-26 | Furukawa Electric Co Ltd:The | 圧延材の形状制御方法及び装置 |
| JP2005007423A (ja) * | 2003-06-18 | 2005-01-13 | Nippon Steel Corp | 熱間仕上圧延機の設備配列及び熱間圧延方法 |
| JP4504874B2 (ja) * | 2005-06-17 | 2010-07-14 | 三菱日立製鉄機械株式会社 | 形状検出装置及びその方法 |
| CN103269810B (zh) * | 2010-12-24 | 2015-03-25 | 三菱日立制铁机械株式会社 | 热轧设备以及热轧方法 |
| JP6044194B2 (ja) * | 2011-11-25 | 2016-12-14 | Jfeスチール株式会社 | レベリング制御装置、およびその制御方法 |
-
2021
- 2021-09-07 WO PCT/JP2021/032839 patent/WO2023037409A1/ja not_active Ceased
- 2021-09-07 JP JP2023546593A patent/JP7716484B2/ja active Active
- 2021-09-07 EP EP21956708.8A patent/EP4374983B1/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| WO2023037409A1 (ja) | 2023-03-16 |
| EP4374983A1 (en) | 2024-05-29 |
| JPWO2023037409A1 (https=) | 2023-03-16 |
| EP4374983C0 (en) | 2025-10-22 |
| JP7716484B2 (ja) | 2025-07-31 |
| EP4374983A4 (en) | 2024-10-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5734112B2 (ja) | 圧延機での板厚制御方法 | |
| US5722279A (en) | Control method of strip travel and tandem strip rolling mill | |
| EP4374983B1 (en) | Leveling control device, rolling equipment provided with same, and leveling control method | |
| JP2010540250A5 (https=) | ||
| JP3589226B2 (ja) | 被圧延材の蛇行制御方法 | |
| JPH1110215A (ja) | 熱間圧延材のウエッジ制御方法 | |
| JP4267609B2 (ja) | 金属板材の圧延方法および圧延装置 | |
| KR100929015B1 (ko) | 압연재 소성계수 보정에 의한 예측압연하중 보정방법 | |
| JP4288888B2 (ja) | タンデム圧延機におけるストリップの蛇行制御装置及び蛇行制御方法 | |
| JP5158772B2 (ja) | 圧延機の板厚制御装置及び圧延機の板厚制御方法 | |
| JP6760252B2 (ja) | 圧延機の制御装置および制御方法 | |
| JP3430065B2 (ja) | 厚鋼板圧延設備 | |
| JP7298019B2 (ja) | 圧延機および圧延方法 | |
| JP3599013B2 (ja) | 圧延金属帯のキャンバ形状測定方法、キャンバ形状測定装置及び圧延装置 | |
| JP2957402B2 (ja) | 熱間圧延における蛇行制御方法 | |
| EP4183496B1 (en) | Metal strip meandering amount detection method and meandering control method | |
| WO2026083469A1 (ja) | 圧延装置用の制御装置、圧延設備、圧延装置用の制御プログラム及び圧延装置の制御方法 | |
| JP3664067B2 (ja) | 熱間圧延鋼板の製造方法 | |
| CN113056337A (zh) | 轧制设备及轧制方法 | |
| JP3085212B2 (ja) | タンデム圧延機における圧延材の蛇行防止方法 | |
| JPS62137114A (ja) | 厚板の板幅制御方法 | |
| JPS6329605B2 (https=) | ||
| JPH0839123A (ja) | 熱間圧延における絞り込み防止方法 | |
| JP2002273510A (ja) | 連続圧延における被圧延材後端部分の絞り防止方法及び装置 | |
| JPS6380908A (ja) | 圧延材の蛇行及びキヤンバ−制御方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20240222 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20240919 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: B21B 38/02 20060101ALI20240913BHEP Ipc: B21B 37/68 20060101ALI20240913BHEP Ipc: B21B 37/58 20060101AFI20240913BHEP |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| INTG | Intention to grant announced |
Effective date: 20250711 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: F10 Free format text: ST27 STATUS EVENT CODE: U-0-0-F10-F00 (AS PROVIDED BY THE NATIONAL OFFICE) Effective date: 20251022 Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602021041085 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| U01 | Request for unitary effect filed |
Effective date: 20251027 |
|
| U07 | Unitary effect registered |
Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT RO SE SI Effective date: 20251031 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251022 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260122 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251022 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260122 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260222 |