EP4298711A1 - Transfereinheit, system und verfahren zum durchführen eines batterieinternen ausgleichsvorgangs - Google Patents
Transfereinheit, system und verfahren zum durchführen eines batterieinternen ausgleichsvorgangsInfo
- Publication number
- EP4298711A1 EP4298711A1 EP22710513.7A EP22710513A EP4298711A1 EP 4298711 A1 EP4298711 A1 EP 4298711A1 EP 22710513 A EP22710513 A EP 22710513A EP 4298711 A1 EP4298711 A1 EP 4298711A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- battery
- bus
- charge
- racks
- transfer unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/50—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries acting upon multiple batteries simultaneously or sequentially
- H02J7/52—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries acting upon multiple batteries simultaneously or sequentially for charge balancing, e.g. equalisation of charge between batteries
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/44—Methods for charging or discharging
- H01M10/441—Methods for charging or discharging for several batteries or cells simultaneously or sequentially
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/40—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries characterised by the exchange of charge or discharge related data
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/50—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries acting upon multiple batteries simultaneously or sequentially
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/80—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries including monitoring or indicating arrangements
- H02J7/82—Control of state of charge [SOC]
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
- H01M2010/4271—Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2207/00—Details of circuit arrangements for charging or discharging batteries or supplying loads from batteries
- H02J2207/20—Charging or discharging characterised by the power electronics converter
Definitions
- a plurality of battery racks can be connected to an inverter bridge via a first DC bus.
- Battery inverter systems can include a number of battery racks connected in parallel via a DC bus, which can exchange power with a connected AC grid via an inverter bridge.
- a battery rack refers to an arrangement of individual cells or cell sections - also called a module or pack - which are connected in series and possibly also in parallel, and can optionally be managed by a battery management system.
- Inverter bridges can be included in inverters that can be used in battery inverter systems as both grid-forming and grid-commutated inverters.
- Cell sections can have several cells, which can be connected in series and/or in parallel within the cell section.
- the affected battery rack has a state of charge that differs from the state of charge of the other racks.
- a direct connection of this battery rack to the DC bus with the other battery racks should therefore be avoided because of the equalizing currents that then occur. It is therefore advantageous to match the state of charge of the battery rack in question to the state of charge of the other battery racks before it is switched back to the DC bus in parallel with the other battery racks.
- Such an adjustment process relates to the adjustment of states of charge between different battery racks.
- An equalization process relates to the battery-internal equalization process of charge states of cells or cell sections of a battery rack. After an equalization process within the battery, an adjustment process to the state of charge of the other battery racks and subsequent connection to the DC bus, the battery rack is operational again.
- the inverter bridge In some cases it is useful or in many cases even necessary to supply additional energy to the battery rack for the equalization process, for example to fully charge all cells and carry out the equalization process at the same time. In this case, it is not enough to remove a battery rack from the network, but energy must be actively supplied by the inverter bridge. This can be done for an entire group or alternatively for a part of the battery system. In both cases, the inverter bridge or the inverter is not available for regular operation of the battery inverter system.
- DC direct current or direct current
- AC alternating current
- a transfer unit for a battery inverter system has a first DC bus, via which a plurality of battery racks can be connected to an inverter bridge for a first power exchange with an AC grid.
- the transfer unit also has a second DC bus, which is connected to the first DC bus via a DC/DC converter, the DC/DC converter having a nominal power that is at least a factor of 5 lower than the nominal power of the inverter bridge.
- the transfer unit is set up to separate at least one battery rack of the plurality of battery racks from the first DC bus and to connect it to the second DC bus in order to carry out a battery-internal balancing process.
- a battery rack may include multiple cells or cell sections, which may be connected in series or in parallel.
- the transfer unit thus has two separate DC buses for battery racks.
- the battery racks connected to the first DC bus can secure operation, the first DC bus serves as the so-called main rail.
- a battery rack or a few battery racks can be temporarily coupled to the second DC bus, for example for the purpose of the battery-internal equalization process.
- the second DC bus serves as a so-called side rail.
- the first DC bus and the second DC bus each have a DC+ and a DC- conductor.
- the first DC bus and the second DC bus can share one of the conductors, the DC+ or the DC- conductor.
- the inverter bridge of an inverter is intended to be connected to and interact with the transfer unit.
- the transfer unit and the inverter bridge are designed to interact with one another for the first power exchange.
- the power exchanged via the DC/DC converter is small compared to the power exchanged via the inverter bridge.
- a DC/DC converter with a relatively small power rating may be sufficient.
- a maximum of 20% of the rated power of the inverter bridge can be provided. This can be provided, for example, for a system with ten battery racks, which is intended to enable a simultaneous equalization process for two battery racks on the second DC bus.
- the ratio between the nominal power of the DC/DC converter and the nominal power of the inverter bridge can be selected to be less than or equal to the ratio between the number of battery racks that can be connected to the second DC bus at the same time and the total number of battery racks.
- the ratio between the nominal power of the DC/DC converter and the nominal power of the inverter bridge can be selected to be less than or equal to the reciprocal of the total number of battery racks.
- the DC/DC converter can be bidirectional. With a higher number of battery racks in the system, a lower power rating of the DC/DC converter may be required.
- the transfer unit comprises a control unit which is set up to separate at least one battery rack of the plurality of battery racks from the first DC bus and to connect it to the second DC bus via a switching unit in order to carry out the battery-internal equalization process.
- the control unit is also set up to initiate the battery-internal balancing process after the at least one battery rack has been connected to the second DC bus, with a second power exchange between the first DC bus and the second DC bus during and/or after the battery-internal balancing process takes place via the DC-DC converter in order to match the state of charge of the at least one battery rack with the state of charge of the battery racks connected to the first DC bus and to supply any additional energy required for this compensation process.
- the control unit is also set up to disconnect the at least one battery rack from the second DC bus and to connect it to the first DC bus via a switching unit after the state of charge has been adjusted.
- the control unit of the transfer unit is set up to determine a need for the at least one battery rack to carry out the balancing process or to receive a notification about this.
- a battery rack preferably has a battery management system that can determine the need to carry out the balancing process and can transmit a message about this to the control unit of the transfer unit.
- the control unit can take on the tasks of a battery management system and, for example, determine the need to carry out the compensation process.
- a forecast for a time course of the first power exchange can be taken into account, for example, to a need for Execution of the clearing process to be brought forward or to be postponed to a later date.
- the battery management can also take place centrally for all racks or in stages, with an individual battery management for each rack and a higher-level battery management for the battery system.
- a system includes a plurality of converter-free battery racks and a transfer unit, wherein the plurality of battery racks can be connected to an AC grid via the first DC bus with the inverter bridge for the first power exchange.
- the first DC bus can, for example, serve as the main rail and, for example, secure the operation.
- the second DC bus can serve, for example, as a side rail to which one or a few battery racks can be temporarily coupled for the purpose of the battery-internal balancing process.
- a DC/DC converter allows a targeted second power exchange between the DC buses, which can serve several purposes depending on the situation.
- the state of charge of cell sections of at least one battery rack is equalized in a system with a transfer unit.
- the at least one battery rack is disconnected from the first DC bus and connected to the second DC bus.
- the battery-internal balancing process is initiated.
- a second power exchange takes place between the first DC bus and the second DC bus via the DC-DC converter in order to adjust the state of charge of the at least one battery rack to the state of charge of the first DC
- the at least one battery rack is separated from the second DC bus and connected to the first DC bus.
- the method is preferably carried out individually for at least one battery rack.
- the method is performed for each of the plurality of battery racks in sequence.
- the method can be carried out for individual battery racks or in groups. In this way, all battery racks of the plurality of battery racks can be balanced in their internal battery state of charge and then matched to the state of charge of the other battery racks. This enables the system to be continuously ready for operation.
- the second exchange of power is selected at least temporarily in such a way that the compensation process is accelerated. It enables one faster equalization process and faster renewed operational readiness of at least one battery rack.
- This embodiment can be combined, for example, with an embodiment of the method in which the second power exchange takes place at least temporarily during the balancing process.
- the balancing process then takes place during the second power exchange between the first and second DC bus via the DC/DC converter, and the balancing process and second power exchange can thus be matched to one another.
- the second power exchange takes place at least temporarily in such a way that the first power exchange of the system with the AC grid is supported.
- the balancing process can be interrupted or slowed down to maintain the initial power exchange with the AC grid. This can be advantageous, for example, if the battery racks connected to the first DC bus cannot fully generate the power required for the first power exchange.
- the second power exchange is selected as a function of the first power exchange via the inverter bridge in such a way that the adjustment of the state of charge of the at least one battery rack with the battery racks connected to the first DC bus is completed at the time the Compensation process or as soon as possible is made possible thereafter.
- the compensation process and the adjustment process can be coordinated with one another, at best even synchronized, so that the time period in which the at least one battery rack is not available is kept as short as possible overall.
- the initiative to start an equalization process can come from the battery management system of the at least one battery rack or from the control unit of the transfer unit. Additional instances can be provided that enable the initiation of the compensation process. Such a further instance can be, for example, a controller of a higher-level system to which the battery inverter system is assigned.
- the at least one battery rack independently recognizes a need to carry out the balancing process and informs the transfer unit of this.
- the detection can be carried out, for example, by the battery management system.
- the communicated requirement includes information on the urgency of carrying out the balancing process.
- An urgency can, for example, be associated with an overall particularly low state of charge of the at least one battery rack or, for example, with particularly large inequalities in the charges of cell sections of the at least one battery rack.
- the course of charge/discharge cycles of the at least one battery rack can be taken into account.
- the history taken into account can be, for example, a specific historical history and/or an expected history of a specific battery rack type.
- the control unit of the transfer unit recognizes a suitable point in time for carrying out the balancing process and initiates the balancing process at this point in time.
- the urgency communicated by the individual battery racks and/or the capacity of the individual battery racks can be included in the recognition process.
- a course of charging/discharging cycles of individual battery racks and/or a number of battery racks can be taken into account.
- the current or predicted operating situation of the battery inverter system and/or a higher-level system can be taken into account.
- the battery management system of the at least one battery rack controls the course of the equalization process and communicates directly or indirectly with the control unit of the transfer unit and/or a controller of the DC/DC converter so that a desired converter power can be provided to support the equalization process can.
- battery racks can be switched from different first DC buses to a common second DC bus.
- This is conceivable, for example, for an inverter with 3 inverter bridges, in which each inverter bridge can be connected to a first DC bus.
- the transfer unit can then, for example, connect the second DC bus to one of the first buses via the DC/DC converter.
- the connection can be designed to be permanent or switchable between different first DC buses, or the second DC bus can be connected to several or all of the first DC buses via individual converters.
- the power exchanged via the DC/DC converter is small compared to the power exchanged via the inverter.
- the method thus enables different purposes to be pursued at different phases after or during the clearing process:
- Accelerated matching of the state of charge between the battery racks of the two buses can be made possible in order to be able to switch the at least one battery rack back on more quickly.
- the balancing process can be aborted, interrupted or delayed be made possible if the operating situation requires a power requirement that the battery racks of the first bus cannot fully meet.
- the required power is taken from or supplied to the battery rack by the DC/DC converter. After the end of this operating situation, the compensation process can be resumed.
- Fig. 1 shows an embodiment of a system with a transfer unit
- Figure 2 shows a method for performing an in-battery equalization process.
- the transfer unit 12 has a first DC bus 7 and a second DC bus 8 . 1 shows one of the two conductors of each DC bus. It is possible for the first DC bus 7 and the second DC bus 8 to use a common second conductor (not shown).
- the transfer unit 12 has a DC/DC converter 6 which is set up to transfer power between the first DC bus 7 and the second DC bus 8 . The power transfer via the DC/DC converter 6 can take place bidirectionally.
- a number of battery racks 1 can be connected to the transfer unit 12 via a switching unit 5 which has a number of switches. The battery racks 1 are connected in parallel to one another via the first DC bus 8 .
- Each battery rack 1 has a plurality of cell sections 2 and optionally a battery management system 3 .
- the cell sections 2 of a battery rack 1 are connected in series.
- the battery management system 3 manages the cell sections 2 and controls charging and/or discharging processes, for example.
- Cell sections 2 can have a plurality of cells which can be connected in series and/or in parallel within the cell section 2 .
- An inverter bridge 9 can be connected to the first DC bus 7 of the transfer unit 12 and can be used to exchange electrical power with an AC grid 10 .
- the inverter bridge 9 can be contained in an inverter which can be operated in grid-forming and/or grid-commutated mode.
- the transfer unit 12 can be separated from the inverter bridge 9 by an isolating switch 13 .
- the power exchange of the transfer unit 12 with the AC grid 10 via the inverter bridge 9 can take place bidirectionally, so that the transfer unit 12 connected battery racks 1 can be charged via the inverter bridge 9 with electrical power from the AC grid 10 and/or can feed electrical power into the AC grid 10 via the inverter bridge 9 .
- the communication link can be in the form of a communication bus 4, for example, as shown in FIG.
- Other communication links, wired and/or wireless, are possible.
- the battery management systems 3 can be designed to recognize and/or carry out a balancing requirement of the associated battery rack 1 . Due to the recognized need, an affected battery rack 1 can be separated from the first DC bus 7 by the switching unit 5 and connected to the second DC bus 8 .
- the battery management system 3 can start and carry out the balancing process within the battery. In the process, the states of charge of the individual cell sections 2 are matched to one another.
- power can be exchanged with the first DC bus 7 via the DC/DC converter 6 in order to adjust the state of charge of the battery rack 1, which is connected to the second DC bus 8, to the state of charge to match those battery racks 1 that are connected to the first DC bus 7 and track energy that may be necessary for the compensation process.
- the rated power of the DC/DC converter 6 can be significantly lower than the rated power of the inverter bridge 9 and, for example, only be up to 20% of the same.
- the affected battery rack 1 can be separated again from the second DC bus 8 via the switching unit 5 and connected to the first DC bus 7 .
- the optional control unit 11 can be provided to receive a compensation requirement identified by the battery management systems 3 via the communication bus 4 and in turn to separate the affected battery rack 1 from the first DC bus 7 via the switching unit 5 and to the second DC bus 8 to connect.
- the compensation process and the adjustment process can also be matched to one another via the control unit 11 .
- control unit 11 can be connected to the switching unit 5 and the DC/DC converter 6 via the communication bus 4 and control them. After the compensation process and the adjustment process have been carried out, the control unit 11 can arrange for the affected battery rack 1 to be separated again from the second DC bus 8 via the switching unit 5 and connected to the first DC bus 7 .
- the inverter bridge 9 and/or the isolating switch 13 can also be connected to the communication bus 4 .
- the affected battery rack 1 can have a state of charge that differs from the state of charge of the remaining battery racks 1. Direct connection of this battery rack 1 to the first DC bus 7 with the other battery racks 1 should therefore be avoided because of the compensating currents that then occur. It is therefore advantageous to adjust the state of charge of the affected battery rack 1 to the state of charge of the other battery rack 1 in an equalization process via a power exchange via the DC/DC converter 6 before it is separated again from the second DC bus 8 and is connected to the first DC bus 7 in parallel with the other battery racks 1. Such an adjustment process relates to the adjustment of states of charge between different battery racks 1, and therefore the DC voltages.
- FIG. 2 shows an exemplary embodiment of a method for carrying out a battery-internal equalization process, in which the state of charge of cell sections 2 of at least one battery rack 1 can be equalized, for example in a system shown in FIG.
- the at least one battery rack 1 is disconnected from the first DC bus 7 and connected to the second DC bus 8 in S1. After the at least one battery rack 1 has been connected to the second DC bus 8, the battery-internal compensation process is initiated in S2.
- the control unit 11 shown in FIG. 1 can be designed and set up to carry out the method. For this purpose, it can communicate, for example, via the communication bus 4 with the battery management systems 3, the DC/DC converter 6, the inverter bridge 9 and/or the switching unit 5 and control the elements mentioned accordingly.
- the isolating switch 13 can be controlled by the control unit 11 in order to separate the transfer unit 12 from the inverter bridge. Alternatively, the switching state of the isolating switch 13 can be transmitted to the control unit 11 .
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102021104236.4A DE102021104236A1 (de) | 2021-02-23 | 2021-02-23 | Transfereinheit, system und verfahren zum durchführen eines batterieinternen ausgleichsvorgangs |
| PCT/EP2022/053857 WO2022179916A1 (de) | 2021-02-23 | 2022-02-16 | Transfereinheit, system und verfahren zum durchführen eines batterieinternen ausgleichsvorgangs |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP4298711A1 true EP4298711A1 (de) | 2024-01-03 |
Family
ID=80780954
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP22710513.7A Pending EP4298711A1 (de) | 2021-02-23 | 2022-02-16 | Transfereinheit, system und verfahren zum durchführen eines batterieinternen ausgleichsvorgangs |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20230396078A1 (de) |
| EP (1) | EP4298711A1 (de) |
| DE (1) | DE102021104236A1 (de) |
| WO (1) | WO2022179916A1 (de) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102956336B1 (ko) * | 2021-11-03 | 2026-04-24 | 주식회사 엘지에너지솔루션 | 배터리 랙 관리 장치 및 그것의 동작 방법 |
| US20240217366A1 (en) * | 2023-01-04 | 2024-07-04 | GM Global Technology Operations LLC | Battery pack balancing for multiple battery pack systems using active load management |
| WO2024226312A1 (en) * | 2023-04-27 | 2024-10-31 | Enphase Energy, Inc. | Storage system configured for use with an energy management system |
| US20250239868A1 (en) * | 2024-01-18 | 2025-07-24 | GM Global Technology Operations LLC | Battery charge balancing |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5529402B2 (ja) | 2008-08-13 | 2014-06-25 | 三菱重工業株式会社 | 蓄電システム |
| JP2011072153A (ja) * | 2009-09-28 | 2011-04-07 | Sanyo Electric Co Ltd | 車両用電源装置及びこれを備える車両並びに車両用電源装置の容量均等化方法 |
| JP5801176B2 (ja) * | 2011-12-19 | 2015-10-28 | 株式会社東芝 | 蓄電装置及びその保守方法 |
| JP2015532082A (ja) * | 2012-08-08 | 2015-11-05 | レッドフロー アールアンドディ プロプライエタリー リミテッドRedflow R&D Pty Ltd | 流動電解液電池保守バスシステムおよび方法 |
| KR20140128468A (ko) * | 2013-04-18 | 2014-11-06 | 에스케이이노베이션 주식회사 | 배터리 밸런싱 장치 및 방법 |
| DE102014208316A1 (de) | 2014-05-05 | 2015-11-05 | Siemens Aktiengesellschaft | Erfassen der Betriebsführung eines Batteriespeichers |
| CN112068017B (zh) * | 2019-05-24 | 2023-04-18 | 凹凸电子(武汉)有限公司 | 电池管理系统及电池管理系统中的断线检测方法 |
| JP7593711B2 (ja) * | 2020-06-25 | 2024-12-03 | ミルウォーキー エレクトリック ツール コーポレイション | マルチベイ電源の充電均衡 |
| GB2610000B (en) * | 2021-08-20 | 2024-02-07 | Cirrus Logic Int Semiconductor Ltd | Cell balancing |
| EP4160855A1 (de) * | 2021-09-29 | 2023-04-05 | Volvo Truck Corporation | Verfahren zum betrieb einer schaltanordnung |
| KR102956336B1 (ko) * | 2021-11-03 | 2026-04-24 | 주식회사 엘지에너지솔루션 | 배터리 랙 관리 장치 및 그것의 동작 방법 |
| KR20230081153A (ko) * | 2021-11-30 | 2023-06-07 | 주식회사 엘지에너지솔루션 | 배터리 장치 및 밸런싱 방법 |
| US20250337254A1 (en) * | 2022-06-06 | 2025-10-30 | Energywith Co., Ltd. | Battery pack charging method and power storage system |
| KR102938418B1 (ko) * | 2022-06-13 | 2026-03-12 | 스탠다드에너지(주) | 에너지 조절을 위한 배터리 관리 시스템 |
| US20250239868A1 (en) * | 2024-01-18 | 2025-07-24 | GM Global Technology Operations LLC | Battery charge balancing |
-
2021
- 2021-02-23 DE DE102021104236.4A patent/DE102021104236A1/de active Pending
-
2022
- 2022-02-16 EP EP22710513.7A patent/EP4298711A1/de active Pending
- 2022-02-16 WO PCT/EP2022/053857 patent/WO2022179916A1/de not_active Ceased
-
2023
- 2023-08-21 US US18/452,593 patent/US20230396078A1/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| WO2022179916A1 (de) | 2022-09-01 |
| DE102021104236A1 (de) | 2022-08-25 |
| US20230396078A1 (en) | 2023-12-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2022179916A1 (de) | Transfereinheit, system und verfahren zum durchführen eines batterieinternen ausgleichsvorgangs | |
| EP3521099B1 (de) | Ladesystem mit mindestens einer ladesäule für elektrofahrzeuge und verfahren zum laden eines oder mehrerer elektrofahrzeuge | |
| WO2019076480A1 (de) | Laden eines energiespeichers | |
| DE102017210611B4 (de) | Elektrische Energieliefervorrichtung mit einer Stromschienenmatrix sowie Verfahren zum Betreiben der Energieliefervorrichtung | |
| WO2021089281A1 (de) | Mehrspannungs-speichersystem für ein zumindest teilweise elektrisch angetriebenes fahrzeug | |
| EP2147495A2 (de) | Verfahren zur steuerung parallel geschalteter ersatzstromquellen und vorrichtung mit parallel geschalteten ersatzstromquellen | |
| EP4052321B1 (de) | Verfahren zum aufladen und/ oder entladen eines wiederaufladbaren energiespeichers | |
| EP3463968A1 (de) | Fahrzeugbordnetz mit wechselrichter, energiespeicher, elektrischer maschine und gleichstrom-übertragungsanschluss | |
| WO2018233956A1 (de) | Elektrische energieliefervorrichtung mit einer vielzahl von nutzeinheiten, die zu strängen verschaltet sind, sowie verfahren zum betreiben der energieliefervorrichtung | |
| DE102017210617A1 (de) | Elektrische Energieliefervorrichtung mit Stromschienenmatrix sowie Verfahren zum Betreiben der Energieliefervorrichtung | |
| DE102020209673A1 (de) | Ladesäule zum Laden eines Stromspeichers eines Elektrofahrzeugs | |
| DE102022212444A1 (de) | Gleichspannungswandleranordnung, Mehrspannungsnetz, elektrisches Fahrzeug und Verfahren zum Betreiben eines Mehrspannungsnetzes | |
| WO2020007809A1 (de) | Energieerzeugungsanlage, wechselrichter und verfahren zur vorladung von gleichspannungs-zwischenkreisen von wechselrichtern | |
| EP2777129B1 (de) | Ladeeinrichtung | |
| WO2018233952A1 (de) | Elektrische energieliefervorrichtung mit einer vielzahl von austauschbaren nutzeinheiten sowie verfahren zum betreiben einer solchen energieliefervorrichtung | |
| DE102020206520A1 (de) | Verfahren zum Betreiben eines Batteriesystems | |
| DE102015007264B4 (de) | Schnelles Übertragen von elektrischer Energie von einer Ladestation zu einem Verbraucher | |
| WO2021190917A1 (de) | Verfahren, system und vorrichtung zum versorgen eines verbrauchers mit elektrischer energie | |
| DE102010041028A1 (de) | Energieversorgungsnetz und Verfahren zum Laden mindestens einer als Energiespeicher für einen Gleichspannungszwischenkreis dienenden Energiespeicherzelle in einem Energieversorgungsnetz | |
| WO2015000725A1 (de) | Energiespeichersystem mit erhöhter abgegebener elektrischer leistung | |
| DE102019203517B4 (de) | Verfahren zur Energieversorgung von Verbrauchern eines Bordnetzes für ein Fahrzeug, sowie ein Bordnetz für ein Fahrzeug | |
| DE102020214760A1 (de) | Verfahren zum Betreiben eines Energiespeichersystems und Energiespeichersystem | |
| EP3832843A1 (de) | Batteriebetriebenes objekt und verfahren zum betreiben des batteriebetriebenen objekts | |
| DE102015200259B4 (de) | Batteriesystem mit einem oder mehreren Strängen, die jeweils mehrere in Reihe zuschaltbare Batteriemodule umfassen, wobei mindestens ein Batteriemodul jedes Stranges zum Versorgen eines Niedervoltnetzes mit elektrischer Energie vorgesehen ist | |
| DE102023123929B3 (de) | Verfahren zum Bereitstellen hoher Leistung am Nebenversorgungsabgriff eines modularen Multilevelkonverters |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20230830 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Free format text: PREVIOUS MAIN CLASS: H02J0007000000 Ipc: H02J0007500000 |