EP3703075A1 - Method for verifying measurement control system of nuclear power plant, and verification device therefor - Google Patents
Method for verifying measurement control system of nuclear power plant, and verification device therefor Download PDFInfo
- Publication number
- EP3703075A1 EP3703075A1 EP18869838.5A EP18869838A EP3703075A1 EP 3703075 A1 EP3703075 A1 EP 3703075A1 EP 18869838 A EP18869838 A EP 18869838A EP 3703075 A1 EP3703075 A1 EP 3703075A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- control system
- instrumentation
- validated
- simulator
- power plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0243—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults model based detection method, e.g. first-principles knowledge model
- G05B23/0254—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults model based detection method, e.g. first-principles knowledge model based on a quantitative model, e.g. mathematical relationships between inputs and outputs; functions: observer, Kalman filter, residual calculation, Neural Networks
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/001—Computer implemented control
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06G—ANALOGUE COMPUTERS
- G06G7/00—Devices in which the computing operation is performed by varying electric or magnetic quantities
- G06G7/48—Analogue computers for specific processes, systems or devices, e.g. simulators
- G06G7/54—Analogue computers for specific processes, systems or devices, e.g. simulators for nuclear physics, e.g. nuclear reactors, radioactive fall
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06G—ANALOGUE COMPUTERS
- G06G7/00—Devices in which the computing operation is performed by varying electric or magnetic quantities
- G06G7/48—Analogue computers for specific processes, systems or devices, e.g. simulators
- G06G7/66—Analogue computers for specific processes, systems or devices, e.g. simulators for control systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
Definitions
- the present invention relates to a method for validating an instrumentation and control system for a nuclear power plant, and an apparatus for validating the same.
- An existing simulator for a nuclear power plant is classified largely into two types.
- the first type is to realize both a plant machine model and a plant control model as software and simulate the same by a combination of computers
- the second type is to realize a plant machine model and a plant control model as software and operate only the plant control logic by a simulator controller.
- Both the two type process signal are not enabled to simulate a control signal in the same manner as in a work field in which signal is processed by a communication cable, and not similar to a configuration method of an actual instrumentation and control system in nuclear power plants.
- an object of the present invention is to provide a method for validating an instrumentation and control system of a nuclear power plant with high reliability, and an apparatus for validating the same.
- the object of the present invention can be accomplished by providing a method for validating an instrumentation and control system used in a nuclear power plant, the method including: connecting an instrumentation and control system to be validated and a simulator imitating the nuclear power plant; loading a control logic of a first system to the instrumentation and control system to be validated; and validating the instrumentation and control system to be validated while the first system operates in the instrumentation and control system to be validated and a second system operates in the simulator.
- the instrumentation and control system to be validated and the simulator may be connected through an I/O interface to thereby exchange information with each other.
- the instrumentation and control system to be validated may include a digital control system, and the validating may include performing at least one of a redundancy performance test on the digital control system, a unit test of a control system in nuclear power plant and an integration test of the control system in nuclear power plant.
- the method may further include validating the instrumentation and control system to be validated again by changing the first system.
- the validating may include generating an abnormal signal in the simulator.
- the validating may be performed when reaching a steady state after a transient state.
- the object of the present invention can be accomplished by providing an apparatus for validating an instrumentation and control system used in a nuclear power plant, the apparatus including: a simulator server comprising a simulator that imitates the nuclear power plant; an I/O interface connecting the simulator server and an instrumentation and control system to be validated; and a computer processing unit connected with the instrumentation and control system to be validated and configured to validate the instrumentation and control system to be validated.
- a simulator server comprising a simulator that imitates the nuclear power plant
- an I/O interface connecting the simulator server and an instrumentation and control system to be validated
- a computer processing unit connected with the instrumentation and control system to be validated and configured to validate the instrumentation and control system to be validated.
- the computer processing unit may be further configured to: load a control logic of a first system to the instrumentation and control system to be validated; and operate a second system through the simulator.
- the computer processing unit may be further configured to validate the instrumentation and control system to be validated with changing a system for a control logic to be loaded to the instrumentation and control system to be validated.
- the instrumentation and control system to be validated and the simulator may be connected through the I/O interface to thereby exchange information with each other.
- the simulator server may further include an association program unit configured to associate with a data signal between the instrumentation and control system to be validated and the simulator.
- a validation method for an instrumentation and control system in a nuclear power plant with high reliability and an apparatus for validating the same.
- the present invention is enabled to implement, modify, change, and delete only a specific instrumentation and control system, which is subject to simulate among control models of a nuclear power plant, in an instrumentation and control system comprised of a digital control system platform (hardware + system software) and application software (control logic), and therefore, the instrumentation and control system may be used to more practically educate or train a system operator or a maintenance personnel.
- a control logic of the instrumentation and control system of the nuclear power plant may be verified and validated, thereby improving efficiency and cutting off manufacturing costs.
- the present invention has configuration of the digital control system of the nuclear power plant and a control signal processing method, which are the same as implemented in real world, compared to an existing simulator, and thus the present invention is very practical. Therefore, the instrumentation and control system of the nuclear power plant may improve reliability and accuracy, compared to an existing simulator.
- the present invention relates to an apparatus for validating an instrumentation and control system, which is to be actually installed in a nuclear power plant, in association with a nuclear power plant simulator.
- a plant machine model of the nuclear power plant is implemented in a simulator, and a control model thereof is implemented in a digital control system installed in the nuclear power plant.
- a control cable is used for connection with an in-site signal transmitter, thereby improving reliability and accuracy of the instrumentation and control system in the nuclear power plant.
- the present invention may directly implement application software (a control logic) to be applied in a nuclear power plant, and may enable a test for validating characteristics of the system by applying various plant scenarios, and therefore, it is possible to prevent trials and errors when it comes to future design change and maintenance and to prevent a shutdown of the plant due to transient state, thereby bringing out considerable economic benefits.
- application software a control logic
- a digital control system platform for implementing an instrumentation and control system for a nuclear power plant, and application software (control logic) are applied in an environment identical to a real work field with normal and abnormal scenarios to thereby validate the design of the system and the logic before construction of the nuclear power plant.
- application software control logic
- it is possible to validate performance of a digital control system by associating an instrumentation and control system, identical to that of the power plant, with a simulator.
- FIG. 1 is a diagram illustrating configuration of an apparatus for validating an instrumentation and control system for a nuclear power plant according to an embodiment of the present invention.
- a validating apparatus 1 comprises a simulator server 10, an I/O interface 20, and a computer processing unit 30.
- the simulator server 10 implements a plant machine model of the nuclear power plant in a software manner, and includes a simulator 11 and an association program unit 12.
- the simulator 11 implements the plant machine model of the nuclear power plant in a software manner, and the association program unit 12 associates data signals between an instrumentation and control system subject to be validated and the simulator 11.
- the I/O interface 20 is a signal conversion/inversion apparatus for converting an electrical signal generated in an I/O module of the instrumentation and control system into a data signal and converting a data signal generated by the simulator server 10 into an electrical signal.
- the instrumentation and control system to be validated is connected with the simulator server 10 through the I/O interface 20 and connected with the computer processing unit 30 via Ethernet.
- the instrumentation and control system includes a digital control system, comprised of a redundant controller for executing a nuclear power plant control logic and an I/O module, and a control logic application software programs.
- the computer processing unit 30 includes an operating workstation 31 and an engineering workstation 32 for an operator and a maintainer of the instrumentation and control system for the nuclear power plant.
- the engineering workstation 32 is an engineering computer to establish and maintain the instrumentation and control system, for example, operating a control logic of a digital control system, uploading/downloading, configuring and implementation of a control screen, inputting I/O information, etc.
- the operating workstation 31 is an operating computer for monitoring, controlling, and operating the nuclear power plant through the implementation and control system.
- the aforementioned elements are connected by a control cable or an association cable.
- FIG. 2 is a flowchart showing a method for validating an instrumentation and control system in a nuclear power plant according to an embodiment of the present invention.
- an instrumentation and control system to be validated and the simulator 11 are connected (S100).
- the instrumentation and control system and the simulator 11 are connected through the I/O interface 20, and the instrumentation and control system is also connected with the computer processing unit 30.
- a control system necessary to operate an NSSS control system for a nuclear power plant is comprised of System 1 (reactor output control system), System 2 (feedwater control system), System 3 (pressurizer control system), ..., System n. If it is assumed that System 2 and System 3 among them, that is, a specific first system, are tested, systems other than System 2 and System 3, that is, second systems, operate in the simulator 11 and System 2 and System 3 operate in the instrumentation and control system. In this case, simulation information processed in the simulator 11 and control information processed in DCS are read/written in a counterpart system by the I/O interface 20 and the association program unit 12 to be utilized as a process value.
- a logic program of the feedwater control system and a logic program of the pressurizer control system should be loaded to the instrumentation and control system by the engineering workstation 32 and the simulator 11 should be ready to execute all control system logics excluding the logics of the feedwater control system and the pressurizer control system.
- the simulator 11 operates a plant environment in a 100% power mode of a normal state.
- a power plant scenario (operating at 70% power from 100% power) suitable to test the feedwater control system and the pressurizer control system loaded to the instrumentation and control system to be validated is selected in the simulator 11.
- a failure factor for stopping one main feedwater pump is applied (that is, an abnormal signal is generated) to verify if operation is performed properly according to system characteristics.
- This verifying process is to observe major variants showing characteristics (reactor output, reactor coolant average temperature, a water level of a steam generator, flow of the main feedwater pump header, a water level of a pressurizer, pressure of the pressurizer, a velocity of the main feedwater pump, etc.) and to verify if characteristics required by system design are well maintained.
- Stopping of one main feedwater pump leads to a stop signal from a simulator model, and this stop signal makes a feedwater control system logic program in the instrumentation and control system to receive a main feedwater pump stopped status, and then the other two main feedwater pump increase in velocity by a velocity control algorithm according to received information, and the two main feedwater pumps increases a flow rate instead of the stopped main water supply pump, thereby supplying a constant amount of water to the steam generator.
- Monitoring of a status of a feedwater control system and a pressurizer control system may make it possible to verify a change in trend and the state through the operating workstation 31, and, in the simulator 11, it is possible to easily monitor a change in the state of the plant due to control signals generated by the instrumentation and control system.
- the transition state refers to a period of time taken until a result value of control system performed by the simulator and a result value of the same control system performed by the implementation and control system are calculated to be equal.
- a plant machine model of a nuclear power plant is configured as a simulator implemented in a software manner and a control model thereof is implemented by the same instrumentation and control system of the nuclear power plant. Accordingly, a control logic of the nuclear power plant is performed by a controller, which is an actual digital control system, and a control signal between the controller and a work-field signal transmitter is transmitted and received using the same control cable used in the nuclear power plant, and environment is configured as the same as in the work field, and therefore, it is possible to validate the instrumentation and control system for the nuclear power plant more accurately and more reliably.
- an instrumentation and control system for the nuclear power plant by only selecting an instrumentation and control system for the nuclear power plant to be simulated, the same test environment as in the actual nuclear power plant is maintained. Further, the various implementation and control system for the nuclear power plant may be validated using only one digital control system as necessary, thereby cutting off manufacturing costs and improving efficiency. Besides, an actual controller, an I/O module, an operating workstation, and an engineering workstation are configured as the same as in the nuclear power plant, thereby providing a system optimal for training an operator and a maintenance personnel of the instrumentation and control system in the nuclear power plant.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Plasma & Fusion (AREA)
- High Energy & Nuclear Physics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Artificial Intelligence (AREA)
- Evolutionary Computation (AREA)
- Mathematical Physics (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
Description
- The present invention relates to a method for validating an instrumentation and control system for a nuclear power plant, and an apparatus for validating the same.
- An existing simulator for a nuclear power plant is classified largely into two types.
- The first type is to realize both a plant machine model and a plant control model as software and simulate the same by a combination of computers, and the second type is to realize a plant machine model and a plant control model as software and operate only the plant control logic by a simulator controller.
- Both the two type process signal are not enabled to simulate a control signal in the same manner as in a work field in which signal is processed by a communication cable, and not similar to a configuration method of an actual instrumentation and control system in nuclear power plants. Thus, there are many disadvantages in that it is not possible to test reliability of a digital control system and test whether the digital control system operates properly.
- Accordingly, an object of the present invention is to provide a method for validating an instrumentation and control system of a nuclear power plant with high reliability, and an apparatus for validating the same.
- The object of the present invention can be accomplished by providing a method for validating an instrumentation and control system used in a nuclear power plant, the method including: connecting an instrumentation and control system to be validated and a simulator imitating the nuclear power plant; loading a control logic of a first system to the instrumentation and control system to be validated; and validating the instrumentation and control system to be validated while the first system operates in the instrumentation and control system to be validated and a second system operates in the simulator.
- The instrumentation and control system to be validated and the simulator may be connected through an I/O interface to thereby exchange information with each other.
- The instrumentation and control system to be validated may include a digital control system, and the validating may include performing at least one of a redundancy performance test on the digital control system, a unit test of a control system in nuclear power plant and an integration test of the control system in nuclear power plant.
- The method may further include validating the instrumentation and control system to be validated again by changing the first system.
- The validating may include generating an abnormal signal in the simulator.
- The validating may be performed when reaching a steady state after a transient state.
- The object of the present invention can be accomplished by providing an apparatus for validating an instrumentation and control system used in a nuclear power plant, the apparatus including: a simulator server comprising a simulator that imitates the nuclear power plant; an I/O interface connecting the simulator server and an instrumentation and control system to be validated; and a computer processing unit connected with the instrumentation and control system to be validated and configured to validate the instrumentation and control system to be validated.
- The computer processing unit may be further configured to: load a control logic of a first system to the instrumentation and control system to be validated; and operate a second system through the simulator.
- The computer processing unit may be further configured to validate the instrumentation and control system to be validated with changing a system for a control logic to be loaded to the instrumentation and control system to be validated.
- The instrumentation and control system to be validated and the simulator may be connected through the I/O interface to thereby exchange information with each other.
- The simulator server may further include an association program unit configured to associate with a data signal between the instrumentation and control system to be validated and the simulator.
- According to the present invention, there are provided a validation method for an instrumentation and control system in a nuclear power plant with high reliability, and an apparatus for validating the same.
- The present invention is enabled to implement, modify, change, and delete only a specific instrumentation and control system, which is subject to simulate among control models of a nuclear power plant, in an instrumentation and control system comprised of a digital control system platform (hardware + system software) and application software (control logic), and therefore, the instrumentation and control system may be used to more practically educate or train a system operator or a maintenance personnel. In addition, before construction or operation of the nuclear power plant, a control logic of the instrumentation and control system of the nuclear power plant may be verified and validated, thereby improving efficiency and cutting off manufacturing costs.
- In particular, the present invention has configuration of the digital control system of the nuclear power plant and a control signal processing method, which are the same as implemented in real world, compared to an existing simulator, and thus the present invention is very practical. Therefore, the instrumentation and control system of the nuclear power plant may improve reliability and accuracy, compared to an existing simulator.
-
-
FIG. 1 is a diagram showing configuration of an apparatus for validating an instrumentation and control system for a nuclear power plant according to an embodiment of the present invention. -
FIG. 2 is a flowchart showing a method for validating an instrumentation and control system for a nuclear power plant according to the present invention. - The present invention relates to an apparatus for validating an instrumentation and control system, which is to be actually installed in a nuclear power plant, in association with a nuclear power plant simulator. A plant machine model of the nuclear power plant is implemented in a simulator, and a control model thereof is implemented in a digital control system installed in the nuclear power plant. For transmitting and receiving a control signal, a control cable is used for connection with an in-site signal transmitter, thereby improving reliability and accuracy of the instrumentation and control system in the nuclear power plant.
- The present invention may directly implement application software (a control logic) to be applied in a nuclear power plant, and may enable a test for validating characteristics of the system by applying various plant scenarios, and therefore, it is possible to prevent trials and errors when it comes to future design change and maintenance and to prevent a shutdown of the plant due to transient state, thereby bringing out considerable economic benefits.
- That is, a digital control system platform (hardware, system software) for implementing an instrumentation and control system for a nuclear power plant, and application software (control logic) are applied in an environment identical to a real work field with normal and abnormal scenarios to thereby validate the design of the system and the logic before construction of the nuclear power plant. In addition, it is possible to validate performance of a digital control system (a controller redundancy performance test, etc.) by associating an instrumentation and control system, identical to that of the power plant, with a simulator.
- Hereinafter, the present invention will be described in more details with reference to the accompanying drawings.
- The accompanying drawings correspond to merely an example shown to illustrate technical scope of the present invention more detail, and the scope of the present invention is not limited to the accompanying drawings. In addition, in the accompanying drawings, there may be difference in size and spacing from actual implementation for the description of a relationship between elements.
- With reference to
FIG. 1 , an apparatus for validating an instrumentation and control system for a nuclear power plant according to an embodiment of the present invention will be described.FIG. 1 is a diagram illustrating configuration of an apparatus for validating an instrumentation and control system for a nuclear power plant according to an embodiment of the present invention. - A validating apparatus 1 comprises a
simulator server 10, an I/O interface 20, and acomputer processing unit 30. - The
simulator server 10 implements a plant machine model of the nuclear power plant in a software manner, and includes asimulator 11 and anassociation program unit 12. Thesimulator 11 implements the plant machine model of the nuclear power plant in a software manner, and theassociation program unit 12 associates data signals between an instrumentation and control system subject to be validated and thesimulator 11. - The I/
O interface 20 is a signal conversion/inversion apparatus for converting an electrical signal generated in an I/O module of the instrumentation and control system into a data signal and converting a data signal generated by thesimulator server 10 into an electrical signal. - An instrumentation and control system to be validated is connected with the
simulator server 10 through the I/O interface 20 and connected with thecomputer processing unit 30 via Ethernet. The instrumentation and control system includes a digital control system, comprised of a redundant controller for executing a nuclear power plant control logic and an I/O module, and a control logic application software programs. - The
computer processing unit 30 includes anoperating workstation 31 and anengineering workstation 32 for an operator and a maintainer of the instrumentation and control system for the nuclear power plant. Theengineering workstation 32 is an engineering computer to establish and maintain the instrumentation and control system, for example, operating a control logic of a digital control system, uploading/downloading, configuring and implementation of a control screen, inputting I/O information, etc. Theoperating workstation 31 is an operating computer for monitoring, controlling, and operating the nuclear power plant through the implementation and control system. - The aforementioned elements are connected by a control cable or an association cable.
- Hereinafter, a validating method according to the present invention will be described.
-
FIG. 2 is a flowchart showing a method for validating an instrumentation and control system in a nuclear power plant according to an embodiment of the present invention. - First, an instrumentation and control system to be validated and the
simulator 11 are connected (S100). In this step, the instrumentation and control system and thesimulator 11 are connected through the I/O interface 20, and the instrumentation and control system is also connected with thecomputer processing unit 30. - Then, a control logic of a first system is loaded to the instrumentation and control system (S200) and then validated after stabilization (S300). This procedure will be described in more details.
- Suppose that a control system necessary to operate an NSSS control system for a nuclear power plant is comprised of System 1 (reactor output control system), System 2 (feedwater control system), System 3 (pressurizer control system), ..., System n. If it is assumed that System 2 and System 3 among them, that is, a specific first system, are tested, systems other than System 2 and System 3, that is, second systems, operate in the
simulator 11 and System 2 and System 3 operate in the instrumentation and control system. In this case, simulation information processed in thesimulator 11 and control information processed in DCS are read/written in a counterpart system by the I/O interface 20 and theassociation program unit 12 to be utilized as a process value. - For example, if the feedwater control system and the pressurizer control system operate in the instrument and control system to be validated and all other control systems operate in the
simulator 11, a logic program of the feedwater control system and a logic program of the pressurizer control system should be loaded to the instrumentation and control system by theengineering workstation 32 and thesimulator 11 should be ready to execute all control system logics excluding the logics of the feedwater control system and the pressurizer control system. - Such system selection is performed through a selection function provided in the association program. The
simulator 11 operates a plant environment in a 100% power mode of a normal state. A power plant scenario (operating at 70% power from 100% power) suitable to test the feedwater control system and the pressurizer control system loaded to the instrumentation and control system to be validated is selected in thesimulator 11. - If a plant environment is formed according to a scenario, a failure factor for stopping one main feedwater pump is applied (that is, an abnormal signal is generated) to verify if operation is performed properly according to system characteristics. This verifying process is to observe major variants showing characteristics (reactor output, reactor coolant average temperature, a water level of a steam generator, flow of the main feedwater pump header, a water level of a pressurizer, pressure of the pressurizer, a velocity of the main feedwater pump, etc.) and to verify if characteristics required by system design are well maintained.
- Stopping of one main feedwater pump leads to a stop signal from a simulator model, and this stop signal makes a feedwater control system logic program in the instrumentation and control system to receive a main feedwater pump stopped status, and then the other two main feedwater pump increase in velocity by a velocity control algorithm according to received information, and the two main feedwater pumps increases a flow rate instead of the stopped main water supply pump, thereby supplying a constant amount of water to the steam generator.
- Monitoring of a status of a feedwater control system and a pressurizer control system (a control logic value) may make it possible to verify a change in trend and the state through the operating
workstation 31, and, in thesimulator 11, it is possible to easily monitor a change in the state of the plant due to control signals generated by the instrumentation and control system. - When the
simulator 11 and the instrumentation and control system are connected through the I/O interface 20, normal operation is not allowed immediately but allowed after a transition state for a predetermined period of time. Thus, in order to determine switch from the transition state to the normal state, critical parameters of a corresponding test system (for example, requirements for velocity settings of three main feedwater pumps, downcomer valve position requirements, economizer valve position requirements, etc.) are compared, and, if an error falls into, for example, 5% of a parameter value, the normal state is defined, and, in this normal state, information that test examination is ready to be performed is informed to an examiner through alarming on an MMI screen of an association program. - Here, the transition state refers to a period of time taken until a result value of control system performed by the simulator and a result value of the same control system performed by the implementation and control system are calculated to be equal.
- After the validating, another validation is performed again by changing the first system (S400).
- According to the present invention, a plant machine model of a nuclear power plant is configured as a simulator implemented in a software manner and a control model thereof is implemented by the same instrumentation and control system of the nuclear power plant. Accordingly, a control logic of the nuclear power plant is performed by a controller, which is an actual digital control system, and a control signal between the controller and a work-field signal transmitter is transmitted and received using the same control cable used in the nuclear power plant, and environment is configured as the same as in the work field, and therefore, it is possible to validate the instrumentation and control system for the nuclear power plant more accurately and more reliably.
- In addition, by only selecting an instrumentation and control system for the nuclear power plant to be simulated, the same test environment as in the actual nuclear power plant is maintained. Further, the various implementation and control system for the nuclear power plant may be validated using only one digital control system as necessary, thereby cutting off manufacturing costs and improving efficiency. Besides, an actual controller, an I/O module, an operating workstation, and an engineering workstation are configured as the same as in the nuclear power plant, thereby providing a system optimal for training an operator and a maintenance personnel of the instrumentation and control system in the nuclear power plant.
- The above-described embodiments are illustrative of the present invention, and the present invention is not limited thereto. Since numerous variations and modifications will become apparent to those skilled in the art once the above disclosure is fully appreciated, the scope and spirit of the invention come within the scope of the appended claims.
Claims (11)
- A method for validating an instrumentation and control system used in a nuclear power plant, the method comprising:connecting an instrumentation and control system to be validated and a simulator imitating the nuclear power plant;loading a control logic of a first system to the instrumentation and control system to be validated; andvalidating the instrumentation and control system to be validated while the first system operates in the instrumentation and control system to be validated and a second system operates in the simulator.
- The method of claim 1, wherein the instrumentation and control system to be validated and the simulator are connected through an I/O interface to thereby exchange information with each other.
- The system of claim 1,
wherein the instrumentation and control system to be validated comprises a digital control system, and
wherein the validating comprises performing at least one of a redundancy performance test on the digital control system, a unit test of a control system in nuclear power plant and an integration test of the control system in nuclear power plant. - The method of claim 2, further comprising validating the instrumentation and control system to be validated again by changing the first system.
- The method of claim 2, wherein the validating comprises generating an abnormal signal in the simulator.
- The method of claim 2, wherein the validating is performed when reaching a normal state after a transition state.
- An apparatus for validating an instrumentation and control system used in a nuclear power plant, the apparatus comprising:a simulator server comprising a simulator that imitates the nuclear power plant;an I/O interface connecting the simulator server and an instrumentation and control system to be validated; anda computer processing unit connected with the instrumentation and control system to be validated and configured to validate the instrumentation and control system to be validated.
- The apparatus of claim 7, wherein the computer processing unit is further configured to:load a control logic of a first system to the instrumentation and control system to be validated; andoperate a second system in the simulator.
- The apparatus of claim 8, wherein the computer processing unit is further configured to validate the instrumentation and control system to be validated with changing a system for a control logic to be loaded to the instrumentation and control system to be validated.
- The apparatus of claim 8, wherein the instrumentation and control system to be validated and the simulator are connected through the I/O interface to thereby exchange information with each other.
- The apparatus of claim 8, wherein the simulator server further comprises an association program unit configured to associate with a data signal between the instrumentation and control system to be validated and the simulator.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020170137465A KR101859629B1 (en) | 2017-10-23 | 2017-10-23 | Method for validating instrumentation and control system of nuclear power plant and validating apparatus therefor |
| PCT/KR2018/007888 WO2019083126A1 (en) | 2017-10-23 | 2018-07-12 | Method for verifying measurement control system of nuclear power plant, and verification device therefor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP3703075A1 true EP3703075A1 (en) | 2020-09-02 |
| EP3703075A4 EP3703075A4 (en) | 2021-06-30 |
Family
ID=62453826
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP18869838.5A Withdrawn EP3703075A4 (en) | 2017-10-23 | 2018-07-12 | Method for verifying measurement control system of nuclear power plant, and verification device therefor |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20200201310A1 (en) |
| EP (1) | EP3703075A4 (en) |
| KR (1) | KR101859629B1 (en) |
| WO (1) | WO2019083126A1 (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111812998B (en) * | 2020-06-08 | 2023-07-14 | 中核武汉核电运行技术股份有限公司 | Nuclear power plant double-unit digital instrument control verification system and method thereof |
| CN112786227B (en) * | 2020-07-29 | 2022-07-29 | 中核检修有限公司 | Control system, control method, master control device, and storage medium |
| CN112164481B (en) * | 2020-08-17 | 2023-09-29 | 北京广利核系统工程有限公司 | Intelligent verification method and system for nuclear power safety control display equipment database |
| KR102240846B1 (en) | 2020-10-28 | 2021-04-16 | 주식회사 한빛파워 | Measurement control commercial grade item dedication apparatus of nuclear power plant |
| KR102558632B1 (en) * | 2020-12-14 | 2023-07-24 | 한국수력원자력 주식회사 | Simulation system of power plant for applying virtualization technique |
| CN113419494B (en) * | 2021-06-30 | 2022-07-22 | 台山核电合营有限公司 | Verification device and method for nuclear power DCS digital program |
| KR102761992B1 (en) * | 2021-11-10 | 2025-02-05 | 한국전기연구원 | Apparatus and method for simulating power generation system |
| CN113917902B (en) * | 2021-11-22 | 2024-09-06 | 北京广利核系统工程有限公司 | Control station substation method and device for nuclear power DCS engineering |
| KR102811165B1 (en) * | 2022-05-02 | 2025-05-21 | 한국수력원자력 주식회사 | Digital twin system of nuclear power plant and performance verification method using thereof |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2001053841A1 (en) * | 2000-01-24 | 2001-07-26 | Fluor Corporation | Control system simulation, testing, and operator training |
| KR100982774B1 (en) * | 2008-09-30 | 2010-09-16 | 한국전력기술 주식회사 | Performance validation apparatus and method for control systems of nuclear power plant |
| KR101030589B1 (en) * | 2009-10-30 | 2011-04-21 | 한국전력공사 | System and method for verifying integrated DCS |
| KR101837653B1 (en) * | 2011-09-30 | 2018-03-13 | 한국전력공사 | Power plant simulator |
| KR101335657B1 (en) * | 2012-05-09 | 2013-12-03 | 한국수력원자력 주식회사 | System and method using realtime simulator and programmed system switching for the validation of large-scaled dcs |
| JP6230255B2 (en) * | 2013-04-05 | 2017-11-15 | 株式会社東芝 | Severe event driving training simulator and severe event driving training simulation method |
-
2017
- 2017-10-23 KR KR1020170137465A patent/KR101859629B1/en not_active Ceased
-
2018
- 2018-07-12 US US16/609,870 patent/US20200201310A1/en not_active Abandoned
- 2018-07-12 WO PCT/KR2018/007888 patent/WO2019083126A1/en not_active Ceased
- 2018-07-12 EP EP18869838.5A patent/EP3703075A4/en not_active Withdrawn
Also Published As
| Publication number | Publication date |
|---|---|
| WO2019083126A1 (en) | 2019-05-02 |
| KR101859629B1 (en) | 2018-05-18 |
| EP3703075A4 (en) | 2021-06-30 |
| US20200201310A1 (en) | 2020-06-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3703075A1 (en) | Method for verifying measurement control system of nuclear power plant, and verification device therefor | |
| CN111665818B (en) | Digital instrument control verification system and method for nuclear power plant | |
| CN102412003B (en) | Nuclear power station DCS debugging system and method thereof | |
| CN109765860B (en) | Nuclear reactor DCS verification method, verification device and verification system | |
| CN114023477B (en) | A computerized procedure system and control system for nuclear power plants | |
| KR101865666B1 (en) | Apparatus and System for Simulating Core Protection system software | |
| US10198536B2 (en) | Simulation system, method for carrying out a simulation, control system, and computer program product | |
| JP2020052812A (en) | Engineering system and engineering method | |
| KR101797078B1 (en) | Apparatus and System for Simulating Core Protection system maintenance | |
| CN107577223B (en) | A verification system for digital improvement of nuclear power plant analog control systems | |
| US10295996B2 (en) | Test device for monitoring control device | |
| JP2015026129A (en) | Process control device and system, and soundness determination method thereof | |
| CN104635669A (en) | Instrument control system verification method | |
| CN113917901A (en) | Nuclear power plant full-range DCS simulation test system | |
| KR101469179B1 (en) | System for diagnosing communication error of nuclear power plant simmulator | |
| US20140222408A1 (en) | Simulation system, method of carrying out a simulation, guidance system and computer program product | |
| CN111044826B (en) | Detection method and detection system | |
| KR102558632B1 (en) | Simulation system of power plant for applying virtualization technique | |
| CN120105743A (en) | An intelligent testability design system and method for avionics equipment based on Matlab-Simulink joint model | |
| CN113924532A (en) | Method and system for monitoring the condition of a drive | |
| KR101006576B1 (en) | Simulator for steam turbine control system verification | |
| JP2020021109A (en) | Verification program, storage medium, verification device and verification method | |
| KR101792716B1 (en) | System and method with a analog signal simulator for testing dynamic positioning controller system of a marine vessel | |
| CN224081969U (en) | Nuclear power station TXS system device performance diagnosis platform | |
| CN114578773B (en) | A full range closed loop test method, system and device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20191022 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20210601 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: G21D 3/00 20060101AFI20210526BHEP Ipc: G05B 17/02 20060101ALI20210526BHEP |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|
| 18W | Application withdrawn |
Effective date: 20211213 |