EP3450281B1 - Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system - Google Patents

Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system Download PDF

Info

Publication number
EP3450281B1
EP3450281B1 EP17188959.5A EP17188959A EP3450281B1 EP 3450281 B1 EP3450281 B1 EP 3450281B1 EP 17188959 A EP17188959 A EP 17188959A EP 3450281 B1 EP3450281 B1 EP 3450281B1
Authority
EP
European Patent Office
Prior art keywords
block
route
protection system
section
based protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP17188959.5A
Other languages
German (de)
French (fr)
Other versions
EP3450281A1 (en
EP3450281B8 (en
Inventor
Rolf Pensold
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Rail GTS Deutschland GmbH
Original Assignee
GTS Deutschland GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=59761814&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP3450281(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Priority to DK17188959.5T priority Critical patent/DK3450281T3/en
Priority to PL17188959.5T priority patent/PL3450281T3/en
Priority to EP17188959.5A priority patent/EP3450281B8/en
Priority to ES17188959T priority patent/ES3002310T3/en
Priority to FIEP17188959.5T priority patent/FI3450281T5/en
Application filed by GTS Deutschland GmbH filed Critical GTS Deutschland GmbH
Priority to PT171889595T priority patent/PT3450281T/en
Publication of EP3450281A1 publication Critical patent/EP3450281A1/en
Publication of EP3450281B1 publication Critical patent/EP3450281B1/en
Publication of EP3450281B8 publication Critical patent/EP3450281B8/en
Application granted granted Critical
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L19/00Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
    • B61L19/06Interlocking devices having electrical operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • B61L21/04Electrical locking and release of the route; Electrical repeat locks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/22Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
    • B61L23/30Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails using automatic section blocking
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/70Details of trackside communication

Definitions

  • the invention concerns a method for vital coupling (in particular coupling which complies with SIL4) of a first protection system and a second protection system for railway traffic on a railway track
  • the first protection system is a route-based protection system and comprises a route capable interlocking and wherein the second protection system is incompatible with the first protection system
  • the railway track comprises block protected track sections and route protected track sections, wherein each track section can assume several states, the states of the block protected track sections being represented by line block sections and the states of the route protected track sections being represented by route sections.
  • a method for coupling of a route-based protection system and a block-based protection system is known from existing interlocking and line bock systems, e.g. ESTW Simis W/D, ESTW L90/L90 5, ESTW EBILOCK 950, central block system EB L2000, block system NSI-63/NSB-87, SbL60, RbII60.
  • existing interlocking and line bock systems e.g. ESTW Simis W/D, ESTW L90/L90 5, ESTW EBILOCK 950, central block system EB L2000, block system NSI-63/NSB-87, SbL60, RbII60.
  • Prior art document EP2090492A2 discloses a system for universal interfacing between a block-based protection system and an incompatible neighbouring protection system.
  • Train movements can be protected by using route-based protection or block-based protection technology.
  • Adaptation between a route-based protection system and a block-based protection system is complex because of the different approaches of protecting train movements which are used in the different protection systems.
  • the known ESTW L90/L 90 5 interlocking system for example is a route-based protection system. It can be coupled to a legacy block-based protection system via a line interface, which is the last element of an outgoing route of the route-based interlocking system.
  • the physical adaptation of the route-based protection system to the block-based protection system is done at a block interface element, wherein a line interface element and the block interface element are positioned in a serial order.
  • a disadvantage of this kind of coupling is that the outgoing route (from a station to a line) has to be adapted every time to a specific version of the block interface element and the legacy block-based protection system which has to be adapted.
  • ESTW L90/L90 5 interlocking system which is a route-based protection system
  • EB L2000/ZbS600 block-adapted protection system is known from [4] and [7].
  • Adaption elements of ESTW L90 and adaption elements of EB L2000/ZbS600 work together in a serial order and also require specific adaptions.
  • the known adaption methods for coupling a route-based protection system and a block-based protection system define special outgoing and incoming routes which are specific to the requested external block-based protection system to which the route-based protection system is to be adapted, thus in each case individual settings are required.
  • At least one route section and at least one line block section is provided for a transition section.
  • the route section is provided by means of a block adaption device.
  • the line block section is provided by means of the block based protection system.
  • the block adaption device communicates with the route-capable interlocking (in particular an electronic interlocking) and with the second protection system.
  • the route-based first protection system and the (in particular block-based) second protection system are part of a train movement protection system.
  • the second interlocking is a block-based interlocking
  • the inventive method can be used for a railway track, which is limited by the route capable first interlocking and the second interlocking.
  • the railway track comprises a multitude of track sections, in particular block protected track sections and route protected track sections.
  • the block protected track sections as well as the route protected track sections are arranged in sequence.
  • the track comprises not only block-protected track sections but also route-protected track sections, which can assume different states.
  • the states of the route sections and line block sections can be changed (manipulated) during operation.
  • Route protected track sections are secured by means of the route-based protection system, which sets the state of the specific track section.
  • Information concerning the state of a route protected track section is provided in form of (represented by) a route section.
  • a route section comprises route section information (incl. the information concerning the state of the respective track section, e.g. "free” or "occupied” and information concerning the direction of a set route for this track section).
  • a route comprises one or more route sections, i.e. concerns one or more track sections.
  • Block protected track sections are secured by means of the block based protection system, which sets the state of the specific track section.
  • Information concerning the state of a block protected track section is provided in form of (represented by) a line block section.
  • a line block section comprises line block section information (incl. information concerning the state of the respective track section, e.g. "not blocked” or “blocked” and information concerning the direction of the overall line for this track section).
  • a line block comprises one or more line block sections, i.e. concerns one or more track sections.
  • the block protected track section which is adjacent to the route protected track sections is called "transition section", since the protection system changes from block based protection to route based protection or vice versa.
  • the transition section is block-protected by means of the second protection system. In case the block adaption device is located adjacent to the station of the second interlocking the transition section is a block protected track section of length 0.
  • the inventive block adaption device represents a functional connection between the second interlocking and the route-capable first interlocking. Therefore, route sections for the transition section are stored in the block adaption device. For the same transition section line block sections are provided.
  • the transition section is a track section, which is secured by means of the route-incapable interlocking and the block adaption device, which communicates with the block based protection system as well as with the route-capable first interlocking.
  • the transition section (and thus the border between block based protection and route based protection) may be located anywhere along the railway track.
  • the location of the transition section can be defined according to existing equipment, topology and/or customer wishes and is independent from the location of the equipment (e.g. at the start station just behind the respective interlocking, at the destination station just before the respective interlocking or somewhere else along the track).
  • the inventive method provides at least one route section for the transition section as well as a line block section for the same transition section.
  • two securing principles (block based protection and route based protection) are associated with the transition section at the same time, thereby providing a "parallelization" of route section and line block section for the transition section.
  • Information concerning protection of train movement at the transition section will be transformed/translated from route based train movement protection principles to block-based train movement protection principles or the other way around (depending on the direction of movement) by means of the block adaption device.
  • the block adaption device thereby serves as an interlocking "emulato r".
  • route section information and line block section information concerning the transition section are coupled by parallelization of logical views at the transition section from perspective of the route-based protection system and of the block-based protection system.
  • the inventive method allows a route-based coupling between the interlocking of the route-based protection system and the block adaption device while using a standardized interface for coupling external train moving protection systems.
  • the block adaption device receives line block section information concerning the transition section from the second protection system.
  • Line block section information are transmitted from the second protection system to the block adaption device, in particular continuously or event-driven.
  • the block adaption device for securing a railbound vehicle from the second protection system to the route-based first protection system (safe movement in direction towards route based protected track sections) it is preferred that the block adaption device sends a route request to the route-capable interlocking if, preferably only if, the line block section information received by the block adaption devices has changed.
  • the route request is send to the route-capable first interlocking in order to receive a route for the route-based protected track sections to be used for movement of the railbound vehicle.
  • the block adaption device receives a route request from the route-capable interlocking.
  • Route requests are exchanged between the route-based first protection system and the block adaption device.
  • the block adaption device thereby enables a route-route-coupling of the route-based protection system and the second protection system along the transition section.
  • the block adaption device can set the state of the line block section of the transition section in dependence of the route request received from the route based protection system in case the block section information does not comply with the route request.
  • the line block section information is manipulated by changing the state of the line block section such that the manipulated line block section information complies with the route request.
  • the block adaption sets the state of the route section provided by the block adaption device in dependence of the received line block section information. Therefore, the block adaption device checks whether the conditions required for the route section provided by the block adaption device are met.
  • the invention also concerns a train movement protection system for securing railbound vehicles on a railway track, in accordance with claim 7.
  • the block adaption device is adapted
  • the route-capable interlocking of the route-based first protection system is adapted/connected to the second protection system via the block adaption device.
  • the block adaption device handles the adaption autarkicly by using both railway protection principles: route based protection principles and block-based protection principles, i.e. the block adaption device is adapted to process data according to route-based technology and data according to block-based technology.
  • a line block section as well as a route section can be provided for the transition section in parallel with the inventive train movement protection system.
  • the block adaption device is adapted to carry out a transformation between route section information and line block section information. For doing this, the block adaption device sets the state of the route section of the transition section and/or the line block section according to the received route request.
  • the block adaption device comprises a driver device which is adapted to set the state of the at least one route section in dependence of the line block section information received from the second protection system.
  • the driver device is further adapted to set the state of the line block section of the transition section in dependence of the route request received from the route-capable interlocking in case the block section information does not comply with the route request.
  • the second protection system comprises block groups, which are connected to a route incapable second interlocking, the block groups being adapted for transmission of block information (e.g. direction of train movement, blocking information, signaling information).
  • block information e.g. direction of train movement, blocking information, signaling information.
  • the block-based protection system comprises an adaption groups line interface (Blockanpasse) which is part of a second interlocking, the adaption groups line interface being adapted for transmission of block information.
  • Blockanpasse an adaption groups line interface
  • the standardized interface is an SCI-ILS interface.
  • train movement protection system is adapted to carry out the method described before.
  • a track 1 is shown comprising track sections TS1, TS2, TS1', TS2', TS3'.
  • the track 1 is limited by a route-capable interlocking 2 of a route-based protection system 3 and a second (legacy) interlocking 4 which communicates with a block-based protection system 5.
  • the block-based protection system 5 further comprises block groups 6 for processing block information and for transmitting block section information.
  • the block groups 6 can be set up as external devices, as shown in Fig. 1 , 2 or can be integrated in the second interlocking 4 as an adaption groups line interface, if the second interlocking is a route based interlocking
  • a block adaption device 7 which connects the route-based protection system 3 and the block-based protection system 5.
  • the block adaption device 7 is connected to the route-capable interlocking 2 via a standardized interface 8 and to the block-based protection system 5 via in/out-interface 9.
  • track sections TS1, TS2 are block protected by means of the block-based protection system 5.
  • the block-based protection of the track 1 ends at an interface-point S.
  • the interface-point 5 is located directly at the border of route-capable interlocking 2 and track section TS1. Yet, this is not mandatory. In fact, between route-capable interlocking 2 and interface-point S route-based protected track sections can be present.
  • a line block section 10, 11 is generated by means of the block-based protection system 5, the line block sections 10, 11 comprising block section information for the respective track sections TS1, TS2.
  • Track section TS1 which is adjacent to the route-based protection system 3, is called "transition section".
  • the line block section 10 (comprising line block section information for the transition section TS1) which has been generated by the block-based protection system 5 is fed to the block adaption device 7 via the in/out-interface 9.
  • the block adaption device 7 additionally provides a route section 12 for the transition section TS1, wherein the route section 12 is generated by means of a driver device 13 of the block adaption device 7.
  • the block adaption device may comprise two driver devices for supporting different legacy protection systems.
  • a line block section 10 as well as a route section 12 are provided in parallel, thereby enabling transition from block-based protection to route-based protection and vice versa over the whole transition section TS1.
  • a vital coupling of different movement technologies is provided.
  • the route section 12 can adopt different states.
  • the state of the transition section TS1 is set by the block adaption device 7. By setting the state of the route section 12, block section information is translated into route section information and vice versa.
  • the track sections TS1', TS2' are route protected by means of the route-based protection system 3.
  • the route-based protection of the track 1 ends at an interface-point S'.
  • the interface-point S ⁇ is located directly at the border of second interlocking 2 and track section TS2'.
  • transition section TS3' which is adjacent to the route-based protection system 3 and within which the train is transferred from route based protection to block based protection and vice versa has the length 0 and is located at interface S'.
  • Route section 12' (comprising route section information for the transition section TS3') is provided by means of the block adaption device 7.
  • Line block section 11' for transition section TS3' is either generated by means of the block based protection system or can be provided by means of the driver device 13 of the block adaption device 7.
  • a line block section 11' as well as a route section 12' are provided in parallel, thereby enabling transition from block-based protection to route-based protection and vice versa within the transition section TS3'.
  • a vital coupling of different movement technologies can be realized.
  • Fig. 3 and Fig. 4 show the different steps for train movement protection for train movement from route-based protection system 3 to block-based protection system 5 ( Fig. 3 ) and vice versa ( Fig. 4 ).
  • the block adaption device 7 is interacting in the following way to transit the train from the route-based protection system 3 to the block based protection system 5:
  • the block adaption device 7 is interacting in the following way to transit the train from the block-based protection system 5 to the route-based protection system 3:

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Description

    Background of the invention
  • The invention concerns a method for vital coupling (in particular coupling which complies with SIL4) of a first protection system and a second protection system for railway traffic on a railway track wherein the first protection system is a route-based protection system and comprises a route capable interlocking and wherein the second protection system is incompatible with the first protection system, wherein the railway track comprises block protected track sections and route protected track sections, wherein each track section can assume several states, the states of the block protected track sections being represented by line block sections and the states of the route protected track sections being represented by route sections.
  • A method for coupling of a route-based protection system and a block-based protection system is known from existing interlocking and line bock systems, e.g. ESTW Simis W/D, ESTW L90/L90 5, ESTW EBILOCK 950, central block system EB L2000, block system NSI-63/NSB-87, SbL60, RbII60.
  • Prior art document EP2090492A2 discloses a system for universal interfacing between a block-based protection system and an incompatible neighbouring protection system.
  • Train movements can be protected by using route-based protection or block-based protection technology. Adaptation between a route-based protection system and a block-based protection system (mostly at the gateways to/from a station to a line) is complex because of the different approaches of protecting train movements which are used in the different protection systems.
  • The known ESTW L90/L 90 5 interlocking system for example is a route-based protection system. It can be coupled to a legacy block-based protection system via a line interface, which is the last element of an outgoing route of the route-based interlocking system. As disclosed in [1] - [5] the physical adaptation of the route-based protection system to the block-based protection system is done at a block interface element, wherein a line interface element and the block interface element are positioned in a serial order. A disadvantage of this kind of coupling is that the outgoing route (from a station to a line) has to be adapted every time to a specific version of the block interface element and the legacy block-based protection system which has to be adapted.
  • Further a relays/electronical-based adaption of ESTW L90/L90 5 interlocking system (which is a route-based protection system) to the centralized EB L2000/ZbS600 block-adapted protection system is known from [4] and [7]. Adaption elements of ESTW L90 and adaption elements of EB L2000/ZbS600 work together in a serial order and also require specific adaptions.
  • From [6] it is known to provide special adaption groups (block adaption, block group station) in order to adapt ESTW L90 to the automatic working block-based protection system SbL60. The adaption groups are working together in a serial order.
  • The known adaption methods for coupling a route-based protection system and a block-based protection system define special outgoing and incoming routes which are specific to the requested external block-based protection system to which the route-based protection system is to be adapted, thus in each case individual settings are required.
  • Object of the invention
  • It is therefore an object of the invention to suggest a method for vital coupling of a route-based protection system and a second protection system, which is incompatible to the first protection system without applying specific adaptions of the protection systems.
  • Description of the invention
  • This object is solved by a method according to claim 1 and a train movement protection system according to claim 7.
  • According to the invention at least one route section and at least one line block section is provided for a transition section. The route section is provided by means of a block adaption device. The line block section is provided by means of the block based protection system.
  • The block adaption device communicates with the route-capable interlocking (in particular an electronic interlocking) and with the second protection system.
  • The route-based first protection system and the (in particular block-based) second protection system are part of a train movement protection system. The second interlocking is a block-based interlocking
  • The inventive method can be used for a railway track, which is limited by the route capable first interlocking and the second interlocking. The railway track comprises a multitude of track sections, in particular block protected track sections and route protected track sections. The block protected track sections as well as the route protected track sections are arranged in sequence.
  • In general, the track comprises not only block-protected track sections but also route-protected track sections, which can assume different states. The states of the route sections and line block sections can be changed (manipulated) during operation.
  • Route protected track sections are secured by means of the route-based protection system, which sets the state of the specific track section. Information concerning the state of a route protected track section is provided in form of (represented by) a route section. A route section comprises route section information (incl. the information concerning the state of the respective track section, e.g. "free" or "occupied" and information concerning the direction of a set route for this track section). A route comprises one or more route sections, i.e. concerns one or more track sections.
  • Block protected track sections are secured by means of the block based protection system, which sets the state of the specific track section. Information concerning the state of a block protected track section is provided in form of (represented by) a line block section. A line block section comprises line block section information (incl. information concerning the state of the respective track section, e.g. "not blocked" or "blocked" and information concerning the direction of the overall line for this track section). A line block comprises one or more line block sections, i.e. concerns one or more track sections.
  • The block protected track section which is adjacent to the route protected track sections is called "transition section", since the protection system changes from block based protection to route based protection or vice versa. The transition section is block-protected by means of the second protection system. In case the block adaption device is located adjacent to the station of the second interlocking the transition section is a block protected track section of length 0.
  • The inventive block adaption device represents a functional connection between the second interlocking and the route-capable first interlocking. Therefore, route sections for the transition section are stored in the block adaption device. For the same transition section line block sections are provided. Thus, the transition section is a track section, which is secured by means of the route-incapable interlocking and the block adaption device, which communicates with the block based protection system as well as with the route-capable first interlocking. The transition section (and thus the border between block based protection and route based protection) may be located anywhere along the railway track. The location of the transition section can be defined according to existing equipment, topology and/or customer wishes and is independent from the location of the equipment (e.g. at the start station just behind the respective interlocking, at the destination station just before the respective interlocking or somewhere else along the track).
  • In contrast to the state of the art, the inventive method provides at least one route section for the transition section as well as a line block section for the same transition section. Thereby two securing principles (block based protection and route based protection) are associated with the transition section at the same time, thereby providing a "parallelization" of route section and line block section for the transition section. Information concerning protection of train movement at the transition section will be transformed/translated from route based train movement protection principles to block-based train movement protection principles or the other way around (depending on the direction of movement) by means of the block adaption device. The block adaption device thereby serves as an interlocking "emulato r".
  • Thus, according to the invention route section information and line block section information concerning the transition section are coupled by parallelization of logical views at the transition section from perspective of the route-based protection system and of the block-based protection system. The inventive method allows a route-based coupling between the interlocking of the route-based protection system and the block adaption device while using a standardized interface for coupling external train moving protection systems.
  • According to the invention, the block adaption device receives line block section information concerning the transition section from the second protection system. Line block section information are transmitted from the second protection system to the block adaption device, in particular continuously or event-driven.
  • Preferred Variants
  • In a preferred variant, for securing a railbound vehicle from the second protection system to the route-based first protection system (safe movement in direction towards route based protected track sections) it is preferred that the block adaption device sends a route request to the route-capable interlocking if, preferably only if, the line block section information received by the block adaption devices has changed. The route request is send to the route-capable first interlocking in order to receive a route for the route-based protected track sections to be used for movement of the railbound vehicle.
  • For securing a railbound vehicle from the route-based first protection system to the second protection system, the block adaption device receives a route request from the route-capable interlocking.
  • In other words: Route requests are exchanged between the route-based first protection system and the block adaption device. The block adaption device thereby enables a route-route-coupling of the route-based protection system and the second protection system along the transition section.
  • For train movement from second protection system to route based first protection system the block adaption device can set the state of the line block section of the transition section in dependence of the route request received from the route based protection system in case the block section information does not comply with the route request. I. e. the line block section information is manipulated by changing the state of the line block section such that the manipulated line block section information complies with the route request.
  • In a preferred variant for train movement from route based first protection system to second protection system the block adaption sets the state of the route section provided by the block adaption device in dependence of the received line block section information. Therefore, the block adaption device checks whether the conditions required for the route section provided by the block adaption device are met.
  • The invention also concerns a train movement protection system for securing railbound vehicles on a railway track, in accordance with claim 7.
  • According to the invention, the block adaption device is adapted
    • ∘ to provide at least one route section for a transition section;
    • ∘ to receive information (in particular block section information and route requests) from the second protection system and the route-based first protection system and to transmit information (in particular route requests) to the second protection system and the route-based first protection system;
    • ∘ to set the state of the at least one route section or the at least one line block section (10'); and
  • The route-capable interlocking of the route-based first protection system is adapted/connected to the second protection system via the block adaption device. The block adaption device handles the adaption autarkicly by using both railway protection principles: route based protection principles and block-based protection principles, i.e. the block adaption device is adapted to process data according to route-based technology and data according to block-based technology. Thus, a line block section as well as a route section can be provided for the transition section in parallel with the inventive train movement protection system.
  • This has the effect that the first interlocking of the route-based first protection system does not need to be adapted to the specific block-based protection system. This involves a simplification for the route-capable first interlocking of the route-based protection system, since no line block technical, operational, safety specific stuff is required.
  • According to the invention, the block adaption device is adapted to carry out a transformation between route section information and line block section information. For doing this, the block adaption device sets the state of the route section of the transition section and/or the line block section according to the received route request.
  • In accordance with the invention the block adaption device comprises a driver device which is adapted to set the state of the at least one route section in dependence of the line block section information received from the second protection system. The driver device is further adapted to set the state of the line block section of the transition section in dependence of the route request received from the route-capable interlocking in case the block section information does not comply with the route request.
  • In a special embodiment, the second protection system comprises block groups, which are connected to a route incapable second interlocking, the block groups being adapted for transmission of block information (e.g. direction of train movement, blocking information, signaling information).
  • In an alternative embodiment the block-based protection system comprises an adaption groups line interface (Blockanpassgruppe) which is part of a second interlocking, the adaption groups line interface being adapted for transmission of block information.
  • In a highly preferred embodiment of the train protection system, the standardized interface is an SCI-ILS interface.
  • It is preferred that the train movement protection system is adapted to carry out the method described before.
  • Further advantages can be extracted from the description and the enclosed drawing. The features mentioned above and below can be used in accordance with the invention either individually or collectively in any combination within the scope defined by the appended claims.
  • The embodiments mentioned are not to be understood as exhaustive enumeration but rather have exemplary character for the description of the invention.
  • Drawings
  • The invention is shown in the drawing.
  • Fig. 1a
    shows a schematic depiction of a train movement protection system according to the invention with an interface between block based protection system and route base d protection system situated near the route capable first interlocking of the route based protection system (variant 1).
    Fig. 1b
    shows a schematic depiction of the train movement protection system of Fig. 1a in which parallelization of route section and line block section within the block adaption device is shown.
    Fig. 2
    shows a schematic depiction of a train movement protection system according to the invention with an interface between block based protection system and route base d protection system situated near the second interlocking of the block based protection system (variant 2).
    Fig. 3
    shows a detailed flow chart with the method steps of a method according to the invention for a train moving from a route-based protection system to a block-based protection system.
    Fig. 4
    shows a detailed flow chart with the method steps of a method according to the invention for a train moving from a block-based protection system to a route-based protection system.
  • In Fig. 1a , 1b , 2 a track 1 is shown comprising track sections TS1, TS2, TS1', TS2', TS3'. The track 1 is limited by a route-capable interlocking 2 of a route-based protection system 3 and a second (legacy) interlocking 4 which communicates with a block-based protection system 5.
  • The block-based protection system 5 further comprises block groups 6 for processing block information and for transmitting block section information. The block groups 6 can be set up as external devices, as shown in Fig. 1, 2 or can be integrated in the second interlocking 4 as an adaption groups line interface, if the second interlocking is a route based interlocking
  • According to the invention, a block adaption device 7 is provided which connects the route-based protection system 3 and the block-based protection system 5. The block adaption device 7 is connected to the route-capable interlocking 2 via a standardized interface 8 and to the block-based protection system 5 via in/out-interface 9.
  • In the embodiment shown in Fig. 1 track sections TS1, TS2 are block protected by means of the block-based protection system 5. The block-based protection of the track 1 ends at an interface-point S. The interface-point 5 is located directly at the border of route-capable interlocking 2 and track section TS1. Yet, this is not mandatory. In fact, between route-capable interlocking 2 and interface-point S route-based protected track sections can be present.
  • For each block protected track section TS1, TS2 a line block section 10, 11 is generated by means of the block-based protection system 5, the line block sections 10, 11 comprising block section information for the respective track sections TS1, TS2.
  • Track section TS1, which is adjacent to the route-based protection system 3, is called "transition section". The line block section 10 (comprising line block section information for the transition section TS1) which has been generated by the block-based protection system 5 is fed to the block adaption device 7 via the in/out-interface 9. According to the invention, the block adaption device 7 additionally provides a route section 12 for the transition section TS1, wherein the route section 12 is generated by means of a driver device 13 of the block adaption device 7. In a special embodiment the block adaption device may comprise two driver devices for supporting different legacy protection systems. Thus, for the transition section TS1 both, a line block section 10 as well as a route section 12, are provided in parallel, thereby enabling transition from block-based protection to route-based protection and vice versa over the whole transition section TS1. Therewith a vital coupling of different movement technologies is provided. This is schematically depicted in Fig. 1b . The route section 12 can adopt different states. According to the invention, the state of the transition section TS1 is set by the block adaption device 7. By setting the state of the route section 12, block section information is translated into route section information and vice versa.
  • In the embodiment shown in Fig. 2 the track sections TS1', TS2' are route protected by means of the route-based protection system 3. The route-based protection of the track 1 ends at an interface-point S'. The interface-point S` is located directly at the border of second interlocking 2 and track section TS2'.
  • Here, the transition section TS3', which is adjacent to the route-based protection system 3 and within which the train is transferred from route based protection to block based protection and vice versa has the length 0 and is located at interface S'.
  • Route section 12' (comprising route section information for the transition section TS3') is provided by means of the block adaption device 7. Line block section 11' for transition section TS3' is either generated by means of the block based protection system or can be provided by means of the driver device 13 of the block adaption device 7. Thus, for the transition section TS3' both, a line block section 11' as well as a route section 12' are provided in parallel, thereby enabling transition from block-based protection to route-based protection and vice versa within the transition section TS3'. Therewith, a vital coupling of different movement technologies can be realized.
  • Fig. 3 and Fig. 4 show the different steps for train movement protection for train movement from route-based protection system 3 to block-based protection system 5 (Fig. 3) and vice versa (Fig. 4).
  • In case of an intended train movement from the route-based protection system 3 to the block based protection system 5 (Fig. 3), the block adaption device 7 is interacting in the following way to transit the train from the route-based protection system 3 to the block based protection system 5:
    1. 1. Block adaption device 7 receives block section information concerning line block section 10, 11' from block-based protection system 5 (Check_1).
    2. 2. The route capable interlocking 2 sends a route request to the block adaption device 7, thereby requesting to set a route from interface-point S into the transition section TS1, TS3' (Req_1).
    3. 3. The block adaption device 7 checks by means of driver 13 the compliance of the block section information received from the block groups 6 with the requested route from interface-point 5 into the transition section TS1, TS3' (Comp_1).
    4. 4. In case of an positive compliance, block adaption device 7:
      1. a. sets the state of line block section 10, 11' to state "blocked" (Block_1),
      2. b. sets the state (determination) of the route section 12, 12' to state "locked" (Set_1), and
      3. c. reports a locked route section 12, 12' from interface-point 5 into transition section TS1, TS3' to the route capable interlocking 2 (Report_1).
    5. 5. If the route capable interlocking 2 can set a route to interface-point 5 too, it is now allowed to open an outgoing traffic signal, for starting the train run.
    6. 6. As soon as the train occupies transition section TS1, TS3', driver 13 of the block adaption device 7:
      1. a. sets the state of line block section 10, 11' to "occupied" (Block_2), and
      2. b. reports state information concerning line block section 10, 11' to 2 (Report_5).
    7. 7. As soon as the train has completely left the route based protection system 2 (in Fig. 1a the station) the block adaption device 7:
      1. a. receives information about clearance and sets the state "unlocked" for the route section of the outgoing track section, i.e. the track section preceding the transition section TS1, TS3' outgoing from route capable interlocking 2 (Report_3), and
      2. b. stores the information that the outgoing route section of the track section preceding the transition section TS1, TS3' is set to state "unlocked" (Set_3).
    8. 8. As soon as the train left the transition section TS1, TS3' completely, block adaption device 7:
      1. a. removes the state "occupied" from line block section 10, 11' (set state "unblocked") (Block_3), and
      2. b. reports clearance of transition section TS1, TS3' to the route capable interlocking 2 (Report_5).
    9. 9. Further, block adaption device 7 verifies via block section information, that block section 10, 11' is in state "unblocked"(Check_2) and checks the compliance of determination of route at 12 to state "unlocked" - Comp_2.
      In case of a positive compliance the block adaption device 7:
      1. a. sets the state of the route section 12, 12' to "unlocked" (Set_2) and
      2. b. reports the unlocked state for the route section 12, 12' to route capable interlocking 2 (Report_3).
    10. 10. Now the procedure for a new train run can be started.
  • In case of an intended train movement from the block-based protection system 5 to the route-based protection system 3 (Fig. 4), the block adaption device 7 is interacting in the following way to transit the train from the block-based protection system 5 to the route-based protection system 3:
    1. 1. The block-based protection system 5 sets the state of block section 10, 11' to state "blocked". The block adaption device 7 receives block section information concerning information (in particular state information) concerning line block section 10, 11' from block-based protection system 5 (Check_1).
    2. 2. Block adaption device 7 is checks by means of driver 13 the compliance of the block section information received from the block groups 6 with the state of the route section 12, 12' for a route from transition section TS1, TS3' to interface-point 5 (Comp_1).
    3. 3. In case of an positive compliance, block adaption device 7:
      1. a. sets the state of the route section 12, 12' with direction from transition section TS1, TS3' to interface-point 5 to state "locked" (Set_1)
      2. b. sends a route request for entrance route (from interface-point 5 into route capable interlocking 2) to the route capable interlocking 2 (Request 1).
    4. 4. As soon as the route section of an entrance route (from interface-point 5 into route capable interlocking 2) is in state "locked", an according report is transmitted to block adaption device 7 - Report_2.
    5. 5. As soon as the train:
      1. a. occupies track sections behind interface-point 5 (Report_6) and
      2. b. completely leaves transition section TS1, TS3' in direction to the route capable interlocking 2,
      the driver 13 of the block adaption device 7 sets the state of the route section 12 to state "unlocked" (Set_2), then sends an according report to the route capable interlocking 2 (Report_4) and sets the state of line block section 10, 11' at the block based protection system 5 to "unblocked" (Block_1). Now a new train run into transition section TS1, TS3' is possible.
    6. 6. As soon as the state of the entrance route is set to "unlocked", this is reported to block adaption device 7 (Report_5). Now a new train run from transition section TS1, TS3' to the route based protection system 2 is possible.
    List of Reference Signs
  • 1
    track
    2
    route-capable interlocking
    3
    route-based protection system
    4
    different route-based protection system
    5
    block-based protection system
    6
    block groups/adaption groups line interface
    7
    block adaption device
    8
    standardized interface
    9
    in/out-interface
    10
    line block section for transition section
    11
    line block section for block protected track section
    11'
    line block section for transition section
    12, 12'
    route section for transition section
    13
    driver device of block adaption device
    14
    route section for transition section
    TS1
    block-protected track section (transition section)
    TS1'
    route protected track section
    TS2
    block-protected track section
    TS2'
    route protected track section
    TS3'
    transition section of length 0
    5
    interface-point of block-based protection
    References
    1. [1] Becker, B. (2010, 08 04). Detailed Design Document (DDD) Line Interface (LI) of .
    2. [2] Günther, P. (1963). Reilais- und Selbstblockanlagen Teil II Selbstblockanlagen. (H. d. Bundesbahn, Ed.) Starnberg: Josef Keller Verlag.
    3. [3] Günther, P. (1965). Relaisblockanlagen Teil I. (H. d. Bundesbahn, Hrsg.) Starnberg: Josef Keller Verlag.
    4. [4] Haug, T. (2016, 02 01). Firmenneutrale Zentralblock-Schnittstelle.
    5. [5] Mascheic, U. (2013). Sicherung des Schienenverkehrs (ISBN 978-3-8348-2653-4) (2. ed.). Wiesbaden: Springer Fachmedien Wiesbaden.
    6. [6] Natterer, R. (1997, 03 11). ESTW L90 Blockanpassungsgruppe.
    7. [7] Schmal, A. (2009, 12 09). Schnittstelle L90 (EAM) / EB L2000.

Claims (10)

  1. Method for vital coupling of a route-based protection system (3) and
    a block-based protection system (5) for railway traffic on a railway track (1) wherein the route-based protection system (3) comprises a first interlocking which is a route capable interlocking (2) and wherein the block-based protection system (5) comprises a second interlocking (4) which is a block-based interlocking,
    wherein the railway track (1) comprises at least one block protected track section (TS1, TS2, TS3'), which is secured by means of the block based protection system (5), wherein each track section (TS1, TS2, TS1', TS2') can assume several states, the states of the block protected track sections (TS1, TS2) being represented by line block sections (10, 11, 11') comprising line block section information and wherein the railway track (1) comprises route protected track sections (TS1', TS2'), which are secured by means of the route based protection system, the states of the route protected track sections being represented by route sections, the states of the route protected track sections (TS1', TS2') being represented by route sections (12') comprising route section information,
    wherein the block protected track section (TS1, TS3') at which the protection system changes from block based protection to route based protection or vice versa, is a transition section (TS1, TS3'),
    that for the transition section (TS1, TS3') at least one line block section (11, 11') and at least one route section (12, 12') are provided in parallel, wherein a block adaption device (7) provides the at least one route section (12, 12') for the transition section (TS1, TS3'), and
    that the block adaption device (7) connects the block-based protection system (5) with the route-based protection system (3) and communicates with the route-capable interlocking (2) and with the block-based protection system at an interface-point (S, S'), wherein the block adaption device (7) is adapted to receive information from and transmit information to the block-based protection system (5) and the route-based protection system (3) and wherein the block adaption device (7) is adapted to set the state of the route section (12, 12') of the transition section in dependence of line block section information received from the block-based protection system (5) and to set the state of the line block section (10, 11') of the transition section (TS1, TS3') in dependence of a route request received from the route-capable interlocking (2) in case the line block section information does not comply with the route request.
  2. Method according to claim 1, characterized in that the block adaption device (7) receives line block section information concerning the transition section (TS1, TS3') from the block-based protection system (5).
  3. Method according to claim 2, characterized in that for securing a railbound vehicle from the block-based protection system (5) to the route-based route-based protection system (3) the block adaption device (7) sends a route request to the route-capable interlocking (2) if, preferably only if, the line block section information received by the block adaption device (7) has changed.
  4. Method according to claim 2 or 3, characterized in that for securing a railbound vehicle from the route-based protection system (3) to the block-based protection system (5) the block adaption device (7) receives a route request from the route-capable interlocking (2).
  5. Method according to claim 4, characterized in that that for train movement from route-based protection system (5) to block-based protection system (3) the block adaption device (7) sets the state of the line block section of the transition section (TS1, TS3') in dependence of the route request received from the route-capable interlocking (2) in case the line block section information does not comply with the route request.
  6. Method according to any one of the claims 2 through 5, characterized in that for train movement from route based protection system (3) to block-based protection system (5) the block adaption device (7) sets the state of the route section (12, 12') provided by the block adaption device (7) in dependence of the received line block section information.
  7. Train movement protection system for securing railbound vehicles on a railway track (1) comprising at least one block protected track section (TS1, TS2), the states of the block protected track sections (TS1, TS2) being represented by line block sections (10, 11, 11'), the train movement protection system comprising a route-based protection system (3) with a route-capable interlocking (2), in particular an electronic interlocking and a block-based protection system (5) for providing a line block section (10, 11') for a transition section (TS1, TS2'), the block-based protection system (5) comprising a block-based interlocking,
    wherein the train movement protection system further comprises a block adaption device (7) with a standardized interface (8) via which the block-based protection system (5) is connected to the route-based protection system (3); wherein the block adaption device (7) is adapted
    ∘ to provide at least one route section (12, 12') for the transition section (TS1, TS3') comprising information concerning the state of the transition section; wherein the line block section (11, 11') and the route section (12, 12') are provided in parallel,
    ∘ to receive information from and to transmit information to the block-based protection system (5) and the route-based protection system (3);
    ∘ to set the state of the route section (12, 12') or of a line block section (10, 11') for the transition section (TS1, TS3'), the line block section (10, 11') for the transition section (TS1, TS3') comprising information concerning the state of the transition section; and
    that the block adaption device (7) comprises a driver device (13) which is adapted to set the state of the at least one route section (12, 12') in dependence of the line block section information received from the block-based protection system (5) and is adapted to set the state of the line block section (10, 11') of the transition section (TS1, TS3') in dependence of the route request received from the route-capable interlocking (2) in case the line block section information does not comply with the route request.
  8. Train movement protection system according to claim 7, characterized in that that the block-based protection system (5) comprises a second interlocking (4) with an adaption groups line interface (6) the adaption groups line interface (6) being adapted for transmission of line block section information.
  9. Train movement protection system according to any one of the claims 7 through 8, characterized in that the standardized interface (8) is an SCI-IL interface.
  10. Train movement protection system according to any one of the claims 7 through 9, characterized in that the train protection system is adapted to carry out the method according to one of the claims 1 through 6.
EP17188959.5A 2017-09-01 2017-09-01 Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system Active EP3450281B8 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
PL17188959.5T PL3450281T3 (en) 2017-09-01 2017-09-01 Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system
EP17188959.5A EP3450281B8 (en) 2017-09-01 2017-09-01 Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system
ES17188959T ES3002310T3 (en) 2017-09-01 2017-09-01 Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system
FIEP17188959.5T FI3450281T5 (en) 2017-09-01 2017-09-01 Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system
DK17188959.5T DK3450281T3 (en) 2017-09-01 2017-09-01 METHOD FOR VITAL COUPLING OF A ROUTE-BASED PROTECTION SYSTEM AND A BLOCK-BASED PROTECTION SYSTEM, TRAIN MOVEMENT PROTECTION SYSTEM
PT171889595T PT3450281T (en) 2017-09-01 2017-09-01 Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP17188959.5A EP3450281B8 (en) 2017-09-01 2017-09-01 Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system

Publications (3)

Publication Number Publication Date
EP3450281A1 EP3450281A1 (en) 2019-03-06
EP3450281B1 true EP3450281B1 (en) 2024-10-23
EP3450281B8 EP3450281B8 (en) 2024-11-27

Family

ID=59761814

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17188959.5A Active EP3450281B8 (en) 2017-09-01 2017-09-01 Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system

Country Status (6)

Country Link
EP (1) EP3450281B8 (en)
DK (1) DK3450281T3 (en)
ES (1) ES3002310T3 (en)
FI (1) FI3450281T5 (en)
PL (1) PL3450281T3 (en)
PT (1) PT3450281T (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112660206B (en) * 2020-11-25 2022-08-26 卡斯柯信号有限公司 Protection route design method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1630059A2 (en) 2004-08-31 2006-03-01 Siemens Aktiengesellschaft System for safe operation of railbound trains
EP1750988B1 (en) 2004-05-20 2008-12-17 Balfour Beatty plc Railway signalling system, method and interlocking

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008009746A1 (en) * 2008-02-18 2009-08-27 Deutsche Bahn Ag Method for implementing a universal route safety technology using industrially available PLC components
WO2016017740A1 (en) * 2014-07-31 2016-02-04 東日本旅客鉄道株式会社 Interlocking device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1750988B1 (en) 2004-05-20 2008-12-17 Balfour Beatty plc Railway signalling system, method and interlocking
EP1630059A2 (en) 2004-08-31 2006-03-01 Siemens Aktiengesellschaft System for safe operation of railbound trains

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
D4 - 2013 10 25 BTP-SCI-ILS Hauptdokument Baseline 1.0 – DB Netz AG: „Lastenheft für BTP-SCI-ILS Hauptdokument", R. Berglehner, 10/2013
D5 - 2013 10 25 FAS BTP-SCI-ILS ModellVersion 0.8 – DB Netz AG: „Lastenheft für Standard Communication Interface", Modellversion: 8, R. Berglehner, 10/2013
D7 - ESTW-R_F1 – DB Infrastruktur Netz: „Lastenheft für das Elektronische Stellwerk Regional", 06/2007
JÖRG PFERDMENGES, TORSTEN STEINHÖFEL: "Relaisblockanpassung ZSB 2000", SIGNAL UND DRAHT: SIGNALLING & DATACOMMUNICATION, EURAILPRESS, DE, vol. 105, no. 7/8, 1 July 2013 (2013-07-01), DE , pages 21 - 23, XP001583203, ISSN: 0037-4997
SÖLCH R., ALKER P., HOEFT M., OBERLÄNDER W.: "Signalisierter Zugleitbetrieb - Teil 2: Technisch / funktionale und Bedien-Anforderungen", SIGNAL UND DRAHT: SIGNALLING & DATACOMMUNICATION, EURAILPRESS, DE, vol. 96, no. 5, 1 May 2004 (2004-05-01), DE , pages 16 - 22, XP001556143, ISSN: 0037-4997
STEFFEN HENNING UND HEINZ LAUMEN: "Die Realisierung von ESTW-R und ESZB mit dem Elektronischen Stellwerk ZSB 2000", SIGNAL UND DRAHT: SIGNALLING & DATACOMMUNICATION, EURAILPRESS, DE, vol. 105, no. 9, 1 September 2013 (2013-09-01), DE , pages 16 - 20 + 22-23., XP001583676, ISSN: 0037-4997
THOMAS KOCH: "Adapterlösungen für Bahnübergänge und Altstellwerke im Stellwerk ZSB 2000 - Adapter solutions for level crossings and older interlocking systems within the ZSB 2000 system", SIGNAL UND DRAHT: SIGNALLING & DATACOMMUNICATION, EURAILPRESS, DE, vol. 108, no. 10, 7 October 2016 (2016-10-07), DE , pages 34 - 41, XP055308944, ISSN: 0037-4997

Also Published As

Publication number Publication date
DK3450281T3 (en) 2025-01-13
EP3450281A1 (en) 2019-03-06
PL3450281T3 (en) 2025-07-28
FI3450281T3 (en) 2025-01-10
EP3450281B8 (en) 2024-11-27
ES3002310T3 (en) 2025-03-06
PT3450281T (en) 2025-01-13
FI3450281T5 (en) 2025-01-24

Similar Documents

Publication Publication Date Title
KR102206128B1 (en) Exclusive Track Resource Sharing System
US20150225003A1 (en) Control of a rail vehicle
EP3612430B1 (en) Method for operating a track-bound traffic system and apparatus
JP5515122B2 (en) Train operation management device, temporary speed limit management method, and train operation management program
KR102338241B1 (en) Temporary train speed-limiting device
EP2607199B1 (en) Decentralized interlocking
ATE343166T1 (en) CONTROL AND DATA TRANSMISSION SYSTEM AND METHOD FOR TRANSMITTING SECURITY-RELATED DATA
WO2004005104A3 (en) Train control system and method
EP2860082B1 (en) Signaling system
CN104097645A (en) Train control system
EP2307256B1 (en) Method and device for operating a railroad security system
EP2443015B1 (en) Method for transferring data from a programming device to a transponder of a train control system, programming device, and transponder
EP3450281A1 (en) Method for vital coupling of a route-based protection system and a block-based protection system, train movement protection system
CN107089250A (en) A kind of yard switching method of radio scheduling locomotive signal and monitoring system
CN106132803B (en) Method for handling the driving on the railway network and the railway network with train maintenance device
Booth Intermittent and continuous automatic train protection
US11958519B2 (en) Method for operating a railway system, and vehicle of a railway system
JP4739732B2 (en) Vehicle traffic control system
EP2121410B1 (en) Method and system for the data exchange between a central unit and a train influencing component
KR20120115120A (en) Signalling system
EP0976633A3 (en) A control and communication system for railway trains
JP5014033B2 (en) Train operation management system
EP1118185B1 (en) Communication system for radio-contolled driving
CN116176660A (en) Method for checking driving permit in ATO mode, vehicle-mounted equipment and system
KR100879216B1 (en) Train path control facility and path configuration method for high density train operation

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20190606

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20210824

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: GTS DEUTSCHLAND GMBH

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: B61L 23/30 20060101ALI20240328BHEP

Ipc: B61L 19/06 20060101ALI20240328BHEP

Ipc: B61L 21/04 20060101AFI20240328BHEP

Ipc: B61L 27/70 20220101ALI20240328BHEP

INTG Intention to grant announced

Effective date: 20240422

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602017085629

Country of ref document: DE

Owner name: HITACHI RAIL GTS DEUTSCHLAND GMBH, DE

Free format text: FORMER OWNER: ANMELDERANGABEN UNKLAR / UNVOLLSTAENDIG, 80297 MUENCHEN, DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PK

Free format text: BERICHTIGUNG B8

Ref country code: CH

Ref legal event code: EP

RAP4 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: HITACHI RAIL GTS DEUTSCHLAND GMBH

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017085629

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602017085629

Country of ref document: DE

Owner name: HITACHI RAIL GTS DEUTSCHLAND GMBH, DE

Free format text: FORMER OWNER: HITACHI RAIL GTS DEUTSCHLAND GMBH, STUTTGART, DE

REG Reference to a national code

Ref country code: FI

Ref legal event code: FGE

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Ref document number: 3450281

Country of ref document: PT

Date of ref document: 20250113

Kind code of ref document: T

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20250107

Ref country code: DK

Ref legal event code: T3

Effective date: 20250108

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

P01 Opt-out of the competence of the unified patent court (upc) registered

Free format text: CASE NUMBER: APP_3096/2025

Effective date: 20250120

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20241023

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 3002310

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20250306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20241023

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20241023

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20241023

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20250223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20241023

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20241023

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20250124

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20250123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20241023

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 602017085629

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20241023

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20241023

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

26 Opposition filed

Opponent name: SIEMENS MOBILITY GMBH

Effective date: 20250723

REG Reference to a national code

Ref country code: CH

Ref legal event code: U11

Free format text: ST27 STATUS EVENT CODE: U-0-0-U10-U11 (AS PROVIDED BY THE NATIONAL OFFICE)

Effective date: 20251001

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20250901

Year of fee payment: 9

Ref country code: FI

Payment date: 20250912

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20250813

Year of fee payment: 9

Ref country code: DK

Payment date: 20250911

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20250909

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20250828

Year of fee payment: 9

Ref country code: IT

Payment date: 20250825

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20250814

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20250821

Year of fee payment: 9

Ref country code: AT

Payment date: 20250827

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20250812

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: RO

Payment date: 20250901

Year of fee payment: 9

PLAF Information modified related to communication of a notice of opposition and request to file observations + time limit

Free format text: ORIGINAL CODE: EPIDOSCOBS2

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20251001

Year of fee payment: 9

PLAB Opposition data, opponent's data or that of the opponent's representative modified

Free format text: ORIGINAL CODE: 0009299OPPO

REG Reference to a national code

Ref country code: CH

Ref legal event code: L10

Free format text: ST27 STATUS EVENT CODE: U-0-0-L10-L00 (AS PROVIDED BY THE NATIONAL OFFICE)

Effective date: 20260128

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20251014

Year of fee payment: 9

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 1734622

Country of ref document: AT

Kind code of ref document: T

Effective date: 20241023

R26 Opposition filed (corrected)

Opponent name: SIEMENS MOBILITY GMBH

Effective date: 20250723