EP3394387A1 - Configuring a velocity string in a production tubing of a wet gas production well - Google Patents
Configuring a velocity string in a production tubing of a wet gas production wellInfo
- Publication number
- EP3394387A1 EP3394387A1 EP16819073.4A EP16819073A EP3394387A1 EP 3394387 A1 EP3394387 A1 EP 3394387A1 EP 16819073 A EP16819073 A EP 16819073A EP 3394387 A1 EP3394387 A1 EP 3394387A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- annular
- production tubing
- components
- liner
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 137
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 claims abstract description 47
- 239000007788 liquid Substances 0.000 claims abstract description 40
- 239000012530 fluid Substances 0.000 claims abstract description 26
- 239000003345 natural gas Substances 0.000 claims abstract description 22
- 239000000463 material Substances 0.000 claims abstract description 14
- 238000005266 casting Methods 0.000 claims description 72
- 238000002347 injection Methods 0.000 claims description 57
- 239000007924 injection Substances 0.000 claims description 57
- 238000000034 method Methods 0.000 claims description 40
- 239000000499 gel Substances 0.000 claims description 19
- 239000004568 cement Substances 0.000 claims description 18
- 239000002002 slurry Substances 0.000 claims description 16
- 239000003795 chemical substances by application Substances 0.000 claims description 13
- 239000000945 filler Substances 0.000 claims description 13
- 241000237858 Gastropoda Species 0.000 claims description 12
- 238000005086 pumping Methods 0.000 claims description 12
- 239000007921 spray Substances 0.000 claims description 9
- 239000007787 solid Substances 0.000 claims description 8
- 239000000126 substance Substances 0.000 claims description 5
- 239000000203 mixture Substances 0.000 claims description 4
- 229920005989 resin Polymers 0.000 claims description 4
- 239000011347 resin Substances 0.000 claims description 4
- 238000010109 expendable mold casting Methods 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 229920003023 plastic Polymers 0.000 claims description 3
- 239000004698 Polyethylene Substances 0.000 claims description 2
- 230000001939 inductive effect Effects 0.000 claims description 2
- 238000002156 mixing Methods 0.000 claims description 2
- 238000007599 discharging Methods 0.000 claims 1
- -1 polyethylene Polymers 0.000 claims 1
- 229920000573 polyethylene Polymers 0.000 claims 1
- 239000011342 resin composition Substances 0.000 claims 1
- 239000010935 stainless steel Substances 0.000 abstract description 5
- 239000007789 gas Substances 0.000 description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 16
- 230000008901 benefit Effects 0.000 description 4
- 238000010992 reflux Methods 0.000 description 4
- 238000011065 in-situ storage Methods 0.000 description 3
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 230000003068 static effect Effects 0.000 description 3
- 239000011248 coating agent Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 239000003822 epoxy resin Substances 0.000 description 2
- 230000004907 flux Effects 0.000 description 2
- 229920000647 polyepoxide Polymers 0.000 description 2
- DGAQECJNVWCQMB-PUAWFVPOSA-M Ilexoside XXIX Chemical compound C[C@@H]1CC[C@@]2(CC[C@@]3(C(=CC[C@H]4[C@]3(CC[C@@H]5[C@@]4(CC[C@@H](C5(C)C)OS(=O)(=O)[O-])C)C)[C@@H]2[C@]1(C)O)C)C(=O)O[C@H]6[C@@H]([C@H]([C@@H]([C@H](O6)CO)O)O)O.[Na+] DGAQECJNVWCQMB-PUAWFVPOSA-M 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000012267 brine Substances 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000000779 depleting effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000012858 resilient material Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 229910052708 sodium Inorganic materials 0.000 description 1
- 239000011734 sodium Substances 0.000 description 1
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/138—Plastering the borehole wall; Injecting into the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
- E21B43/108—Expandable screens or perforated liners
Definitions
- the invention relates to a method for configuring a velocity string downhole in a production tubing of a wet gas production well. In another aspect, the invention relates to a method for producing wet natural gas employing a wet gas
- the cost of installing a conventional corrosion resistant steel velocity string in an onshore well may be between 300,000 and 900,000 US dollars. For offshore it is much higher, due to the higher service cost.
- a method for downhole configuring a velocity string to increase fluid velocity in a production tubing of a wet natural gas production well comprising:
- a method for producing wet natural gas comprising downhole configuring a velocity string to increase fluid velocity in a production tubing of a wet natural gas production well, the method comprising:
- Figures 1A-F show a first sequence of steps illustrating a first embodiment, which uses a (solid) casting string;
- Figures 2A-F show a second sequence of steps illustrating a second embodiment, which uses an expandable casting string
- Figures 3A-E show a third sequence of steps illustrating a third embodiment, which uses a casting string in the form of a casting tubular;
- Figures 4A-E show a fourth sequence of steps illustrating a fourth embodiment, which uses a casting tubular in a different manner as in Figs. 3A-E;
- Figures 5A-E show a fifth sequence of steps illustrating a fifth embodiment, wherein a slug line is used as casting string;
- Figures 6A-E show a sixth sequence of steps illustrating a sixth embodiment wherein a slug line is used as casting string;
- Figures 7A-F show a seventh sequence of steps illustrating a seventh embodiment wherein a vertical slug line is used as casting string;
- Figures 8A-F show an eighth sequence of steps illustrating an eighth embodiment, wherein a spray head is used to build the annular liner layer by layer;
- Figures 9A-F show a ninth sequence of steps illustrating a ninth embodiment, wherein flexible hoses are used to build the annular liner layer by layer; and Figures 10A-F show a tenth sequence of steps illustrating a tenth embodiment, wherein ring-shaped liner sections are stacked.
- the annular liner may thus comprise, preferably consist of, a full solid layer which clads the inside surface of the production tubing over its entire circumference.
- a majority of the inside surface of the production tubing is in physical contact with the annular liner.
- the production tubing provides the mechanical support to the annular liner so that the annular liner itself does not have to be self- supporting .
- the components are injected in a
- the liquid components may be inserted by pumping the liquid components into the annular space, whereby the annular liner is formed by inducing the liquid components to harden in the annular space within the production tubing.
- insertion of the liquid components may be facilitated by inserting a casting string provided near a lower end thereof with a solid or annular bottom plug that slideably engages an inner surface of the
- the stuffing box may comprise a
- the casting string may be a solid rod or tubular which is removed from the well before the step of producing wet natural gas through the interior of the annular liner.
- the liquid components may comprise a cement slurry or a fluid resin which hardens downhole to an annular synthetic liner and the components and any associated casting and/or other annular liner assembling equipment are inserted via a pressure resistant lock, lubricator and/or stuffing box in the wellhead and the well is not killed by a high density liquid when the annular liner is configured, thereby significantly reducing downtime of wet gas production operations .
- a liquid filler material is pumped through an injection port in the wellhead, below the stuffing box and above the bottom plug, thereby pushing the bottom plug down into the well until it has reached a target depth.
- the liquid filler material is inserted in the annular space via a fluid injection string, which is lowered into the production tubing.
- Figures 1A-F show a first embodiment of the method of in-situ casting a velocity string in accordance with the invention.
- Figure 1A shows the production tubing 1 of a wet natural gas production well through which wet gas comprising methane (CH4), water (H2O) , and possibly condensates (C2 _ Cg) and/other condensable components flow to surface as illustrated by arrow 2, but in which due to a gradual temperature and pressure decrease water and/or other condensable components flow back to the bottom of the well as illustrated by arrow 3.
- wet gas comprising methane (CH4), water (H2O) , and possibly condensates (C2 _ Cg) and/other condensable components flow to surface as illustrated by arrow 2, but in which due to a gradual temperature and pressure decrease water and/or other condensable components flow back to the bottom of the well as illustrated by arrow 3.
- CH4 methane
- H2O water
- C2 _ Cg condensates
- a velocity string consisting of a steel pipe may be suspended within the production tubing 1, to enhance the upward velocity of the wet natural gas and inhibit backflow of water and/or other condensable components.
- a velocity string consisting of a steel pipe (not shown) may be suspended within the production tubing 1, to enhance the upward velocity of the wet natural gas and inhibit backflow of water and/or other condensable components.
- illustrated below are preferred alternatives .
- Figures 1B-1F show a cost efficient alternative wherein as illustrated in Figure IF a velocity string formed by an annular liner 4 is cast in situ, which enhances the wet gas velocity 2 such that backflow of water and/or other condensable components is inhibited.
- Figure IB shows that the annular liner 4 is formed by pumping a cement slurry 4A or another hardenable initially liquid substance into via an injection port 5 in the wellhead 6 into the production tubing 1, along with a solid casting string 7, which may be made of poly-ethylene or another stretchable plastic material.
- a bottom plug 8 is connected to the lower end of the casting string 6 and the wellhead 6 comprises a stuffing box 10 that sealingly surrounds the casting string 7, thereby forming a annular space 9 between the casting string 7 and production tubing 1, which is sealed at the bottom by the bottom plug 8 and at the top by the stuffing box 10.
- Stuffing box 10
- FIG. 10 schematically comprises seals 10a and 10b.
- cement slurry 4A is injected via the injection port 5 into the annular space 9 as
- Figure 1C shows that injection of the cement slurry 4A is continued until the bottom plug 8 has reached the target depth near the bottom of the production tubing 1 and just above the production interval (not shown) where during production wet natural gas flows into the wellbore via a permeable tubular sand screen.
- Figure ID shows that after the cement slurry 4A has hardened into an annular liner 4 the casting string 7 may be pulled out of the production tubing 1 as illustrated by arrow 14. Due to the tension the casting string 7 elongates and its diameter may decrease, leading to it being freed up from the solidified annular liner 4.
- Figure IE shows that the lower end of casting string 7 is also released from the bottom plug 8 and the entire casting string 7 is pulled out of the solidified liner 4 via the stuffing box 10.
- Figure IF shows that after removal of the casting string 7 the stuffing box 10 may be removed from the wellhead 6 and the well is brought back in production whereby the upward velocity of the wet natural gas is increased (relative to the situation as shown in Fig. 1A) due to the presence of the annular liner 4, so that downward reflux of condensed water and/or other condensable components is inhibited.
- FIGS 2A-2F illustrate an alternative method of inserting an annular liner.
- the alternative method :
- the casting string is an expandable casting tubular ;
- Figure 2A shows again the starting situation of the unlined tubing 1 in which the gas velocity becomes too low to lift water and other condensable components to surface .
- Figure 2B shows that the annular liner 4 may be formed by pumping a cement slurry 4A or another hardenable initially liquid substance into via the injection port 5 in the wellhead 26 into the production tubing 1, along with a hollow casting string 27, which is in a collapsed state during insertion through the stuffing box 10 in the wellhead 6.
- a bottom plug 8 is connected to the lower end of the casting string 27 and the wellhead 6 comprises a stuffing box 10 that sealingly surrounds the collapsed casting string 7, thereby forming an annular space 29 between the casting string 27 and the production tubing 1, which is sealed at the bottom by the bottom plug 8 and at the top by the stuffing box 10.
- cement slurry 4A may be injected via the injection port 5 into the annular space 29 as illustrated by arrows 11 thereby pushing the bottom plug down as illustrated by arrow 12, which may then pull the casting string 6 down into the production tubing 1 as illustrated by arrow 13.
- Figure 2C shows that injection of the cement slurry 4A may be continued until the bottom plug 8 has reached the target depth near the bottom of the production tubing 1 and just above the production interval (not shown) where during production wet natural gas flows into the wellbore via a permeable tubular sandscreen.
- FIG 2D shows that, after the bottom plug 8 has reached the target depth, a working fluid 26, such as water, brine and/or compressed air, may be injected into the interior of the casting string 27 thereby radially expanding the casting string 27 until the entire casting tubular 27 is expanded to an enlarged and preferably uniform outer diameter D as illustrated in Figure 2E .
- the expanding casting tubular 27 reduces the volume of the surrounding annular space 29 and pushes any excess cement slurry out of the annular space 29 vie the cement injection port 5.
- the expanding casting tubular 27 is held at pressure during cement hardening to generate a cement liner 4 with a uniform inner diameter and without any voids or other
- Figures 2D and 2E shows how the production tubing 1 with annular liner 4 and expanded casting tubular 27 may be prepared for re-initiating wet gas production at elevated velocity after removal of the stuffing box 10 and closed bottom end 27A of the expanded casting tubular 27.
- liquid components are inserted by injecting them as an annular gel body around a substantially
- cylindrical core formed by a degradable gel which is injected into the wellhead simultaneously with and at substantially the same downward velocity as the annular gel body, and
- annular gel body is allowed to harden and the cylindrical core is allowed to degrade.
- Figures 3A-3E show such an embodiment of the method according to the invention, wherein a gelled cement slurry 34A is pumped through the injection port 5 into the annulus 39 surrounding a substantially unexpandable casting tubular 37.
- a degradable bottom plug 32 is provided in a lower end of the casting tubular 37.
- a degradable gelling core fluid 38 may be pumped into the casting tubular 37 at substantially the same downward velocity as the gelled cement slurry 34A to assist in pushing the degradable bottom plug 32 down into the production tubing 1.
- the degradable gelled core fluid 38 and the degradable bottom plug 32 may be designed to
- the degradable bottom plug 32 and/or the degradable gelled core fluid 38 may dissolve over time.
- Figure 3D shows that one way of getting the remaining degraded core fluid 38 out of the well is to use sodium balls 35 to create bubbles and let the degraded core fluid be lifted to the surface.
- Figure 3E shows that alternatively, the degraded core fluid 38 could be lifted from the well by means of a coiled tubing 33 or other type of pipe.
- a wireline with a bailing device could be used to remove the degraded core fluid from the well and prepare the well for resumption of wet gas
- Figures 4A-4E show another embodiment wherein the annular liner 4 is cast in-situ within the production tubing 1 to generate the pumped velocity string.
- the liquid filler material comprises a chemical composition that hardens upon mixing with a hardening agent .
- the casting tubular is pulled out of the well whilst the interior of the bottom section thereof is closed and the hardening agent is injected via the upper part of the casting tubular and a hardening agent injection opening in the wall of the casting tubular above the closed bottom section. Thereby a hardened synthetic liner is generated.
- the casting string for this embodiment is preferably a casting tubular with a bottom section which may have a larger outer diameter than an upper part of the casting tubular to facilitate compacting the filler material in the annular space.
- Figure 4A shows again the original condition of the production tubing 1 in which water and/or other condensable components may trickle down (3) through the production tubing 1.
- Figure 4B shows that a hardenable fluid 44A, such as an epoxy resin or other chemical composition is pumped via the injection port 5 into the annular space 41 between the production tubing 1 and a casting tubular 47.
- the casting tubular 47 may be a coiled tubing.
- a bottom section 47A is provided with the bottom plug 8 which may be similar as in other
- the casting tubular 47 may have an enlarged bottom section 47A, to which bottom plug 8 is connected.
- a ball catcher 50 may be provided in the casting tubular 47.
- the ball catcher 50 may seal off (or be operatively connected to seals that seal off) agent injection ports 52 provided in the casting tubular 47.
- Figure 4C shows that once the bottom plug 8 has reached a target depth a ball 49 is pumped into the ball catcher 50, whereupon the agent injection ports 52 are opened. A hardening agent 54 may then be pumped into the annular space 41 via casting tubular 47 (as illustrated by arrows 51) and the injection ports 52. The injection ports may be circumferentially spaced around the casting tubular 47.
- Figure 4D shows how hardening agent 54 may be continuously pumped via the injection ports 52 into the surrounding annulus as illustrated by arrows 53 while pulling the casting tubular 47 out of the production tubing 1 as illustrated by arrow 55.
- the hardening agent 54 can thereby be thoroughly mixed with the hardenable fluid 44A to form a hardened annular liner 44 that performs as velocity string as illustrated in Figure 4E.
- the bottom section of the casting string may be provided with a coating to prevent sticking to the annular liner being produced.
- a fluid injection string which is lowered into the production tubing, is employed to insert the liquid filler material into the annular space within the production tubing.
- the casting string may suitably take the form of a slug line which is lowered through the production tubing.
- the slug line may subsequently be retrieved from the production tubing, while pumping slugs of said components down the slug line to a frusto-conical injection head at a lower end of the slug line.
- the components may be mixed at an entrance of the frusto-conical injection head, and mixed components may be discharged from the frusto- conical injection head against the inner surface of the production tubing, whereby allowing the mixed
- Figures 5A-F, 6A-F, and 7A-F show embodiments wherein a slug line comprising a frusto-conical injection head is employed.
- the slug line is provided with a mixer tool in or above the frustro-conical injection head. Three examples are illustrated.
- the slug line may be made of coiled tubing.
- Figure 5A shows the original situation of a production tubing 1 of a wet gas production well in which the upward velocity 2 is too low to inhibit downward reflux 3 of condensed water and/or other condensates.
- Figure 5B shows how a frusto-conical injection head 80 attached to a filled slug line 81 may be lowered into the production tubing 1. Slugs of two different gels 82 and 83 are pumped down the slug line 81 to the injection head 80.
- Figure 5C shows how the slugs of two gels 82 and 83 may be mixed at the entrance of the injection head 80 by pumping them through a piece of pipe split in two parallel channels 84 and 85 with different flow resistances, slowing the flow more down in the
- FIGS. 5C and 5D show how the injection head 80 may be pulled upwards as illustrated by arrows 88 by pulling the slug line 81 through a stuffing box assembly 10 at the wellhead 6 while the gel slugs 82 and 83 are pumped down, creating the solidified annular liner 87 against the inner surface of the production tubing 1.
- Figure 5E shows how the injection head 80 and stuffing box assembly 10 may be removed from the wellhead 6 after the solidified annular liner 87 has been placed.
- Figure 5F shows how wet gas production with an elevated production velocity 2 is resumed in the production tubing 1 of which the inner wall is covered by the cured annular liner 87.
- Figure 6A again shows the original situation of a production tubing 1 of a wet gas production well in which the upward velocity 2 is too low to inhibit downward reflux 3 of condensed water and/or other condensates .
- Figure 6B shows how a frusto-conical injection head 90 attached to a filled slug line 91 may be lowered into the production tubing 1. Slugs of two different gels 92 and 93 are pumped down the slug line 91 to the injection head 90.
- Figure 6C shows how the slugs of two gels 92 and 93 may be mixed at the entrance of the injection head 90 by pumping them through a piece of pipe split in two parallel channels 94 and 95 with different flow resistances, slowing the flow more down in the
- FIGS. 6C and 6D show how the injection head 90 may be pulled upwards as illustrated by arrows 98 by pulling the slug line 91 through a stuffing box assembly 10 at the wellhead 6, while the gel slugs 92 and 93 are pumped down, creating the solidified annular liner 97 against the inner surface of the production tubing 1.
- Figure 6E shows how the injection head 90 and stuffing box assembly 10 may be removed from the wellhead 6 after the solidified annular liner 97 has been placed.
- Figure 6F shows how wet gas production with an elevated production velocity 2 is resumed in the production tubing 1 of which the inner wall is covered by the cured annular liner 97.
- Figure 7A again shows the original situation of a production tubing 1 of a wet gas production well in which the upward velocity 2 is too low to inhibit downward reflux 3 of condensed water and/or other condensates .
- Figure 7B shows how a frusto-conical injection head
- slug line 101 may be lowered into the production tubing 1.
- vertical slugs of two different components 102 and 103 are pumped down the slug line 101 to the injection head 100.
- the slug line may be compartmentalized to prohibit contact between the vertical slugs of different components.
- the slug line 101 may comprise concentrically arranged conduits.
- the slug line 101 may have multiple tubes bundled within one slug line 101. All conduits and tubes may consist of coiled tubing. Compartmentalization may not be necessary in case the components are pumped down in gelled form.
- Figure 7C shows how the slugs of two components 102 and 103 may be mixed at the entrance of the injection head 100 by pumping them through a suitable mixer tool.
- a static mixer 105 may be employed, such as for instance a helical static mixer available from StamixCo or an X-grid static mixer. The two components 102 and 103 are thereby mixed in the annular space 106
- FIGS 7C and 7D show how the injection head 100 may be pulled upwards as illustrated by arrows 108 by pulling the slug line 101 through a stuffing box assembly 10 at the wellhead 6, while the component slugs 102 and 103 are pumped down, creating the solidified annular liner 107 against the inner surface of the production tubing 1.
- Figure 7E shows how the injection head 100 and stuffing box assembly 10 may be removed from the wellhead 6 after the solidified annular liner 107 has been placed.
- Figure 7F shows how wet gas production with an elevated production velocity 2 is resumed in the production tubing 1 of which the inner wall is covered by the cured annular liner 107.
- the frusto-conical injection head may be provided with a bypass line (not shown) to establish fluid communication between the annular space above the injection head (between the slug line and the production tubing) and the interior space surrounded by the annular liner below the injection head.
- a bypass line (not shown) to establish fluid communication between the annular space above the injection head (between the slug line and the production tubing) and the interior space surrounded by the annular liner below the injection head.
- pressure differential below and above the injection head can be equalized when the slug line is inserted into or retracted from the production tubing.
- a coating may be provided on the injection head to prevent sticking with the annular liner.
- cured annular liner may necessarily extend all the way up to the wellhead (similar to the other
- the cured annular liner does not necessarily extend all the way up to the wellhead.
- the cured annular liner is only formed below installed well equipment, such as a subsurface safety valve .
- the liquid components may also be inserted by a longitudinally movable, and optionally rotatable, spray head that sprays and clads the liquid components against the inner surface of the production tubing to configure the annular liner.
- Figures 8A-E show an example wherein from the wellhead 6 a spray head 60 is lowered to the target depth D.
- Figure 8B shows that once at the target depth D, a hardenable liquid 63, for example a liquid or gelled cement slurry or a hardenable epoxy resin composition, may be sprayed onto the inner surface of the production tubing 1 wall whilst the spray head 60 is pulled upwards as illustrated by arrow 61 and optionally also rotated as illustrated by arrow 62 to provide an annular cladding 64 with uniform thickness against the inner surface of the production tubing 1.
- a hardenable liquid 63 for example a liquid or gelled cement slurry or a hardenable epoxy resin composition
- FIGs 8C and 8D show that after the hardenable liquid has cured, the spray head 60 can be lowered again to the target depth D as illustrated by arrow 65 whereupon the spray head 60 may be pulled up again as illustrated by arrow 61 and an additional annular layer 66 is applied within the existing annular layer 64.
- This spraying process may be repeated as many times as necessary to obtain the desired internal flow diameter of the velocity string.
- Figure 8E shows that when the appropriate thickness of the annular layer 64,66 has been reached, the well is opened up again for production of wet gas at an elevated velocity.
- FIGS 9A-E illustrate various steps of a ninth embodiment, in which an initially collapsed flexible hose 56A, suitably impregnated with resin, is at a surface end 56D thereof connected to the wellhead 6,
- the flexible hose 56A is gradually inverted, as illustrated by reference sign 56B, and thereby cladded to the inner surface of the production tubing 1 as illustrated by reference sign 56C.
- Figure 9A illustrates that this may be done by pressurizing the inside of the hose 56A-D by pumping working fluid into the hose 56A-D via fluid inlet ports 6A in the wellhead as illustrated by arrows 57.
- Figure 9B shows how a major part of the hose 56B has been cladded to the inner surface of the production tubing 1 after lowering the hose to a target depth D within the production tubing 1. This may be accompanied by paying out a hose hoisting cable 58, connected to a lower end of the hose.
- Figure 9C shows that the resin in the hose 56B may be cured, for example by heat and/or a UV light source and/or a slowly releasing hardening agent that may be released by the inversion process.
- Figure 9D shows that the inverted lower end 56B of the hose 56 may be cut off at the target depth D, for instance using a cutting tool 55, to open up the interior.
- the cut off lower end may be removed from the interior of the production tubing 1, for instance by pulling up the hose hoisting cable 58.
- the result is illustrated in Figure 9E .
- the surface end 56D may be cut off at S.
- Figure 9E illustrates that the hose inversion process may be repeated with other impregnated hoses 59A-D as many times as needed for to reduce the width of the flow path within the cladded production tubing 1 to the desired size. This is another example of how the annular liner may be built up layer by layer.
- the components comprise ring shaped liner sections with substantially cylindrical inner surfaces that are clustered together by stacking the sections on top of each other within the annular space to configure the annular liner.
- the components comprise ring shaped liner sections with substantially cylindrical inner surfaces that are clustered together by stacking the sections on top of each other within the annular space to configure the annular liner.
- ring-shaped liner sections 70A-I are lowered through the wellhead 6 into the production tubing 1 and stacked on top of each other to configure the annular liner.
- the liner sections may be introduced into the production tubing via a pressure resistant lock (not shown) .
- Figure 10A shows that initially a landing sleeve 71 with a conic inner surface or any other desired type of landing device may be inserted at the target depth D.
- Figure 10B shows that subsequently an annular bottom section 72, which may for example be made of plastic or another resilient material, with a conic outer surface 73 is lowered through the wellhead 6 into the production tubing 1.
- annular bottom section 72 which may for example be made of plastic or another resilient material
- Figure IOC shows that the ring shaped bottom section 72 has landed within the landing sleeve 71.
- Figure 10D shows how a first ring-shaped liner section 70A may be lowered through the wellhead 6 into the production tubing.
- Figure 10E shows how the first ring-shaped liner section 70A may be stacked on top of the ring shaped bottom section 72 and a second ring-shaped liner section 70B may be lowered through the wellhead 6 into the production tubing 1.
- Figure 10F shows that the procedure of stacking subsequent ring shaped liner sections 70A-I on top of each other until the thus created annular liner has reached the wellhead 6 or a certain specified depth below the wellhead 6 within the production tubing.
- ring shaped liner sections 70A-I may be inserted in a folded and collapsed configuration through the wellhead 6 and expanded to an annular shape downhole within the production tubing 1.
- the downhole annular liner configuration method and/or any annular liners configured in accordance with the present invention are well adapted to create velocity strings that can be inserted into the production tubing in an efficient and cost effective manner without requiring complex and expensive hoisting and other workover equipment and without requiring expensive elongate stainless steel or other corrosion resistant velocity string tubulars .
- most of the embodiments described herein can be implemented in a pressurized well, without the need to kill the well. This is a big advantage.
- the flow area available within the annular liner may be further reduced if deemed necessary by inserting and clustering additional components and configuring an additional annular liner within the annular liner. This may, for instance, be done when, after further depleting the gas reservoir, the flow velocity has again declined.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP15202607 | 2015-12-23 | ||
| PCT/EP2016/081968 WO2017108820A1 (en) | 2015-12-23 | 2016-12-20 | Configuring a velocity string in a production tubing of a wet gas production well |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP3394387A1 true EP3394387A1 (en) | 2018-10-31 |
Family
ID=55024021
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP16819073.4A Withdrawn EP3394387A1 (en) | 2015-12-23 | 2016-12-20 | Configuring a velocity string in a production tubing of a wet gas production well |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20190003281A1 (en) |
| EP (1) | EP3394387A1 (en) |
| AU (1) | AU2016376843A1 (en) |
| CA (1) | CA3007444A1 (en) |
| WO (1) | WO2017108820A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12163385B1 (en) | 2023-06-23 | 2024-12-10 | Saudi Arabian Oil Company | Method and apparatus for downhole in-situ mixing using dual, concentric flow channels |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB8814004D0 (en) * | 1988-06-14 | 1988-07-20 | Shell Int Research | Method & apparatus for placing cement lining in borehole |
| GB8913647D0 (en) * | 1989-06-14 | 1989-08-02 | Shell Int Research | Method of drilling and lining a borehole |
| EP2815060A1 (en) * | 2012-02-14 | 2014-12-24 | Shell Internationale Research Maatschappij B.V. | Method for producing hydrocarbon gas from a wellbore and valve assembly |
-
2016
- 2016-12-20 WO PCT/EP2016/081968 patent/WO2017108820A1/en not_active Ceased
- 2016-12-20 US US16/064,369 patent/US20190003281A1/en not_active Abandoned
- 2016-12-20 CA CA3007444A patent/CA3007444A1/en not_active Abandoned
- 2016-12-20 AU AU2016376843A patent/AU2016376843A1/en not_active Abandoned
- 2016-12-20 EP EP16819073.4A patent/EP3394387A1/en not_active Withdrawn
Also Published As
| Publication number | Publication date |
|---|---|
| AU2016376843A1 (en) | 2018-06-14 |
| US20190003281A1 (en) | 2019-01-03 |
| WO2017108820A1 (en) | 2017-06-29 |
| CA3007444A1 (en) | 2017-06-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7789148B2 (en) | Method and apparatus for consolidating a wellbore | |
| EP3516160B1 (en) | Well apparatus and associated methods | |
| CA2438807C (en) | Mono-diameter wellbore casing | |
| US7516790B2 (en) | Mono-diameter wellbore casing | |
| EP3130746A1 (en) | Method of sealing wells by squeezing sealant | |
| US9695671B2 (en) | Method and system for plugging a well and use of explosive charges in plugging wells | |
| US9909378B2 (en) | Method for downhole cutting of at least one line disposed outside and along a pipe string in a well, and without simultaneously severing the pipe string | |
| CN101395337A (en) | Method and apparatus for selectively treating perforated casing | |
| CN101720378A (en) | Apparatus and method for expanding a tubular element | |
| GB2403972A (en) | Mono - diameter wellbore casing | |
| US20150361759A1 (en) | A method of plugging a well | |
| EP3353373B1 (en) | Methods for placing a barrier material in a wellbore to permanently leave tubing in casing for permanent wellbore abandonment | |
| CN110249108A (en) | Well activation system and method | |
| US20220003068A1 (en) | A-annulus cementing without pumping cement | |
| US20190003281A1 (en) | Configuring a velocity string in a production tubing of a wet gas production well | |
| AU2013228114B2 (en) | Method for zone isolation in a subterranean well | |
| EA008134B1 (en) | Continuous monobore liquid lining system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20180529 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| INTG | Intention to grant announced |
Effective date: 20190712 |
|
| RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: CORNELISSEN, ERIK KERST Inventor name: KRIESELS, PETRUS CORNELIS Inventor name: KERSSENS, PJOTR |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20191123 |