EP3263786A1 - Pressure sewer system and method therefor - Google Patents
Pressure sewer system and method therefor Download PDFInfo
- Publication number
- EP3263786A1 EP3263786A1 EP17177818.6A EP17177818A EP3263786A1 EP 3263786 A1 EP3263786 A1 EP 3263786A1 EP 17177818 A EP17177818 A EP 17177818A EP 3263786 A1 EP3263786 A1 EP 3263786A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pressure
- pump
- wastewater
- sewer system
- flow rate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
- E03F1/006—Pneumatic sewage disposal systems; accessories specially adapted therefore
- E03F1/007—Pneumatic sewage disposal systems; accessories specially adapted therefore for public or main systems
Definitions
- the invention concerns a system for automatic flushing of the pressure sewer system preventing its fouling by solidifying waste.
- the pressure sewer system is used where it is not possible to use a gravity sewer system no matter whether due to the terrain layout or transported wastewater type.
- the pressure sewer system consists of pump sumps equipped with pumps, house connecting pressure pipes and the pressure main. Gravity house connecting pressure pipes from individual houses are routed into house pump sumps or pump sumps designed for a group of houses from where wastewater is pumped into the pressure main.
- the pressure main is usually routed into the wastewater treatment plant. Water gathered in the pump sump is then transported by the pump into the house connecting pressure pipe and from here it is pumped over into the pressure main.
- a combination of a pump sump and a pump connected to the pressure sewer system can be referred to as the pump unit for the purposes of this document.
- the control of pumps installed in pump sumps on house connecting pressure pipes of the pressure sewer system can be executed on an as-needed basis by the operator who activates the pump once the pump sump is full.
- the disadvantage of this solution is that the caretaker, or the pump sump owner must monitor the pump sump water level.
- the pump sump water level can also be monitored by an automatic control unit which is connected both to the pump and a group of sensors installed in the pump sump for the water level monitoring. The sensors monitor the minimum wastewater level in the pump sump at which the pump must be switched off, the current wastewater level in the pump sump and the maximum wastewater level in the pump sump at which the pump must be switched on, or other optional wastewater levels where necessary.
- This solution is known for example from the Czech utility design CZ 23662 U1 .
- the known technical solution works automatically without the necessity of any control to be executed by the operator.
- the automatic control unit is electrically connected to the sensors installed in the pump sump and to the pump.
- the technical solution is described as a closed autonomous system.
- the disadvantage of this solution is that in the case of an unexpected event concerning the pressure sewer system, such as an accident, reconstruction, etc., it is necessary to circumvent all the installed control units and control their operation on a temporary basis for example to interrupt the drawing of the pump sumps into the pressure sewer system when parts of the pressure main are being replaced.
- the patent application AU 2012318281 A1 provides a solution that also includes a pump sump, a pump connected to the house connecting pressure pipe for the pump sump emptying, an automatic control unit electrically connected to the pump sump and sensors for measuring the pump sump water level.
- the automatic control unit is connected, either by wire or in a wireless way, to a remote server by a communication interface.
- the remote server is connected with several automatic control units which can be switched over from automatic to remote-controlled operation. Through the automatic control units the remote server can control the operation of the pumps installed in the pressure sewer system, so that, for example at the time of reconstruction of the pressure main, the pumps are not switched on and wastewater discharged at the construction site.
- the pipes of the pressure sewer system are built with the capacity given by the nominal flow rate in its individual parts (house connecting pressure pipes, the pressure main) with a relevant margin which is utilized in exceptional cases.
- the nominal flow rate and nominal pressure refer to the values for which the house connecting pressure pipes and the pressure main are dimensioned according to the design.
- the unused nominal capacity of the pressure sewer system pipes (in particular of the pressure main) is exposed, in particular as a result of the pump units emptying, to the continuous sedimentation and solidification of solid residues from wastewater at the bottom of the pressure main, which may ultimately result in the obstruction of the pressure sewer system pipes.
- the task of the invention is the creation of the method and system for automatic flushing of the pressure sewer system effectively protecting the pressure sewer system pipes against obstruction, removing the solidifying sediments of waste contained in wastewater from the pressure sewer system on a regular basis, while it is desirable, from the point of view of investments, operation and maintenance, not to add any additional mechanical equipment to the system if possible.
- the set task has been resolved by the method and system of automatic flushing of the pressure sewer system according to this invention.
- the method for automatic flushing of the pressure sewer system consisting of the pressure main and at least two house connecting pressure pipes connecting at least two wastewater pump sumps to the pressure main.
- the pump sumps are equipped with sensors for measuring the pump sump water level and each house connecting pressure pipe or pump sump is fitted with a pump for transporting wastewater to the pressure main via the house connecting pressure pipes.
- Each pump is connected to an autonomous electronic control unit with inputs for the analysis of data from the sensors, outputs for the pump control, at least one processor, at least one database for at least one software module deposition and at least one communication interface for wire or wireless communication.
- the core of the invention is based on the fact that the activation of the pumps for the removal wastewater from the pump sumps is executed in a synchronised manner resulting in a temporary controlled change of instantaneous flow rate and instantaneous pressure in at least part of the pressure main.
- the instantaneous flow rate during the controlled change corresponds to the required flushing flow rate of the given part of the pressure main and the instantaneous pressure during the controlled change does not exceed the nominal pressure of the pressure main.
- the removal of wastewater from the pump sumps is executed according to the order of the house connecting pressure pipe outlets into the pressure main and/or based on data concerning wastewater level in individual pump sumps.
- a reserve is created in at least some of the pump sumps before the generation of the controlled change in instantaneous flow rate and instantaneous pressure to accumulate wastewater and ensure the complete flushing of the given part of the pressure main.
- the total volume which is necessary for flushing the respective pipe segment, refers to the sum of volumes in individual co-operating pump sumps. The total volume is determined according to the dimension and length of the pipe segment subject to flushing based using the calculation in the hydraulic simulation model of the low pressure sewerage network.
- data concerning wastewater level in the pump sumps for planning the controlled change in instantaneous flow rate and instantaneous pressure is acquired from the sensors.
- the data concerning wastewater level in the pump sumps is acquired from the database of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system for the previous period of time.
- the data concerning wastewater level in the pump sumps is acquired from the database of records and/or weather forecasts. The correct estimate of wastewater level in the pump sumps is of key importance for the planning of flushing because if the volume of wastewater is insufficient, flushing is ineffective.
- the invention comprises a system for automatic flushing of the pressure sewer system.
- the system for automatic flushing of the pressure sewer system consisting of the pressure main and at least two house connecting pressure pipes connecting at least two wastewater pump sumps to the pressure main.
- the pump sumps are fitted with sensors for measuring the pump sump water level where each house connecting pressure pipe or pump sump includes a pump for wastewater transporting to the pressure main via the house connecting pressure pipes.
- Each pump is connected to the autonomous electronic control unit fitted with inputs for the analysis of data from the sensors, outputs for the pump control, at least one processor, at least one database for at least one software module deposition and at least one communication interface for wire or wireless communication.
- At least two control units are connected to one to the other via a communication interface.
- the core of the invention is based on the fact that at least one control unit is fitted with equipment for real time monitoring and its backup power supply unit, and that at least one control unit is equipped with a software module for pumping synchronization that includes a basic plan of flushing with statistically expected wastewater level in the pump sump and individual real times of the pump activation.
- the interconnection of the control units ensures information sharing between them allowing subsequent organization.
- the backup power supply unit and the equipment for real time monitoring protect the control units against a loss of real time which would result in a mismatch of statistically expected wastewater level in the pump sumps where, for example, a twelve-hour lasting failure of power supply would completely invert the basic flushing plan for day and night.
- the system is equipped with a remote server to which at least some of the control units are connected via a communication interface.
- the remote server is fitted with a database with a software module for pumping synchronization which includes a basic plan of flushing and individual times of activation for the pumps in all pump sumps in the given location of the pressure sewer system.
- the remote server comprises the controlling software module to establish the master/slaves communication with the control units. This arrangement put the controlling software module in charge of the control units which then behave in accordance with the flushing plan transmitted from the remote server.
- the remote server is connected via the communication interface to at least one database of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system for the previous period of time.
- the remote server is connected via the communication interface to at least one database of records and/or weather forecasts. Thanks to the receipt of up-to-date data from the databases by the remote server, the system can update the flushing plan within the limits allowed by wastewater levels in the pump sumps.
- Another advantage of the invention is the possibility of deployment in the existing pressure sewer systems, the relatively low demands for hardware modifications of the currently used control units or the low costs related to the manufacture of the new modified control units.
- Another advantage of the invention is that no additional mechanical equipment is necessary and no additional service water is needed except for wastewater itself.
- Fig. 1 illustrates a diagram of the pressure sewer system consisting of the pressure main 1 with four house connecting pressure pipes 2 routed from four pump sumps 3 .
- the house connecting pressure pipes 2 are equipped with the pumps 4 which transport wastewater from the pump sumps 3 into the pressure main 1 .
- each pump sump 3 is fitted with the control unit 6 .
- the pressure main 1 drains wastewater to the wastewater treatment plant 17 where the pressure main 1 is equipped with the flowmeter 18 .
- the flowmeter 18 provides data concerning the flow rate and the volume of wastewater leaving the pressure sewer system for the wastewater treatment plant 17 to be used in the database 14 of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system.
- Fig. 1 illustrates a diagram of the pressure sewer system consisting of the pressure main 1 with four house connecting pressure pipes 2 routed from four pump sumps 3 .
- the house connecting pressure pipes 2 are equipped with the pumps 4 which transport wastewater from the pump sumps 3 into the pressure main 1 .
- each pump sump 3 is fitted with the
- control unit 6 illustrates the interconnection of the control units 6 and also their connection to the remote server 12. It is obvious to those skilled in the art that the control units 6 are connected to the remote server 12 either by wire or in a wireless manner.
- the remote server 12 in this example consists of a computer.
- the control units 6 are connected to the sensors 5 not included in the illustration for sensing wastewater level in the pump sump 3 and to the pumps 4 to control the removal of wastewater from the pump sumps 3 .
- each segment of the pressure main 1 is at least once a day flushed with wastewater flowing at a speed of 0.7 m/s.
- the nominal flow rate Qn is determined by calculation based on the dimension of the given segment of the pressure main 1 .
- Fig. 2 illustrates the diagram of the pump unit comprised of the pump sump 3 , house connecting pressure pipe 2 equipped with the pump 4 , the control unit 6 connected to the sensors 5 positioned in the pump sump.
- the pump sump 3 refers to a leakproof tank where the wastewater inlet is installed.
- the pump 4 is powered by electric current from the power mains.
- the sensors 5 can be resistance, capacitance, or for example pressure based.
- the control unit 6 can be created by a programmable logic automaton.
- Fig. 2 indicates that the control unit 6 can receive signals using the inputs, or where applicable it can itself be a source of signals by means of the outputs.
- Fig. 3 illustrates a diagram of the control unit 6 showing its connection to the power supply unit 19.
- the control unit 6 comprises the communication interface 7 , which can include, for example, a GSM modem, GPRS modem, GPS modem, modem for connection to a wireless computer network (LAN, Wi-Fi), etc.
- it includes the power supply module 20 from which it is powered by means of the power supply unit 19, and the measuring current module 21.
- the processor 16 coordinating the cooperation of individual components of the control unit 6 and executing steps defined by the software modules deposited in the database 8 .
- the module 22 for the receipt of signals from the sensors 5 , and the power control module 23 of the pump 4 .
- the control unit 6 also includes the equipment for real time monitoring 9 comprising an electrically powered clock which can also be comprised of a software module.
- the backup power supply unit 10 powers either the electrically powered clock, which after the power supply recovery of the power supply module 20 informs the control unit 6 of the current time. Alternatively, the backup power supply unit 10 powers the whole control unit 6 for the entire duration of a power failure of the power supply unit 19 if a software clock is used.
- Fig. 4 illustrates an example of the embodiment of the controlling part of the system which includes the plastic electrical installations box 25 .
- the plastic electrical installations box 25 Inside the box 25 some components of the system are fixed.
- the modules 22 for the reception of signals from the sensors 5 , control unit 6 , power supply module 20 , communication interface 7 , measuring current module 21 and pump power control module 4 .
- the electrical installations box 25 is also fitted with the aerial output 24 , input 28 for the receipt of signals from the measurement of wastewater level in the pump sump 3 , the inputs 26 for power supply connection and output 27 for the penetration of cabling of the power control unit output of the pump 3 .
- Fig. 5 provides an illustration of the remote server 12 connected to one control unit 6 .
- the remote server 12 is fitted with the communication interface 7 , comprised of, as in the case of the control unit 6 , by a GSM modem, GPRS modem, or a GPS modem, modem for the connection to a wireless computer network (LAN, Wi-Fi), etc.
- the remote server 12 is also connected via the communication interface 7 to the database of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system for the previous period of time 14 and to the database of records and/or weather forecasts 15 .
- a person skilled in the art will be able to determine without significant problems that the connection to both databases 14, 15 is resolved by communication with the server where the databases are saved.
- the remote server 12 is also fitted with the processor 16 and database 8 .
- the database 8 includes the software module for pumping synchronization 11 and the controlling software module 13 .
- the system comprises only interconnected control units 6 .
- the control units 6 are equipped with the software module for pumping synchronization 11.
- This module 11 can be installed in the control units 6 subsequently, which means that this example of embodiment is suitable also for the existing pressure sewer systems.
- the software module for pumping synchronization 11 is programmed based on the statistical processing of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system. Thanks to the statistical analysis of data, a basic plan of flushing is created.
- the plan estimates the wastewater level in the pump sumps 3 based on an empirical model of flow rate and determines the order of the activation of the pumps 4 in real time according to the hydraulic simulation model of the low pressure sewerage network.
- the empirical model of flow rate utilizes statistical information on the outflow of wastewater from the pressure sewer system during a day with individual days of week distinguished, and the effect of the average and maximum daily temperatures and the total precipitation amount are taken into account. Based on statistical probability the wastewater level in the pumps sumps can be determined and their inclusion into the flushing plan can be designed.
- the hydraulic model of the low pressure sewerage network is the calculation analysis of the pressure sewer system based on which the order of activation of the pumps 4 in the pump sumps 3 and the time of their operation can be determined with a view to creating a flow rate sufficient for the removal of sediments without exceeding the nominal flow rate Q n and the nominal pressure P n in the pipes of the pressure sewer system.
- Each control unit 6 is identified in the basic flushing plan while taking into account the position of the outlet of the respective house connecting pressure pipe 2 into the pressure main 1 , and the real time of its activation is determined so that the synchronized activation of the pumps 4 in the pressure sewer system created a controlled change in the instantaneous pressure Pi and instantaneous flow rate Q i .
- control units 6 skip the planned flushing of the pressure sewer system and start creating a reserve in the minimum amount of 50% of the capacity of the pump sumps 3 .
- the remote server 12 assumes the role of the master in communication and the control units 6 fulfil the role of the slaves.
- the remote server 12 controls, using the software module for pumping synchronization 11 and the controlling software module 13 , the change in the instantaneous pressure Pi and instantaneous flow rate Qi during the pressure sewer system flushing.
- the system is able to create, based on the knowledge of records from the databases 14 and 15 , a modified plan of flushing for one planned or unplanned flushing.
- the system can plan the flushing of the pressure sewer system in excess of the framework of the basic flushing plan based on records on precipitation in the respective location provided in the database 15 .
- the basic flushing plan remains unchanged so that in the case of the remote server 12 failure the system of interconnected control units 6 follows the basic flushing plan.
- the method and system for automatic flushing of the pressure sewer system according to the invention can be employed in the field of operation of the pressure sewer system, in particular in the area of its operation and maintenance.
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
Description
- The invention concerns a system for automatic flushing of the pressure sewer system preventing its fouling by solidifying waste.
- The pressure sewer system is used where it is not possible to use a gravity sewer system no matter whether due to the terrain layout or transported wastewater type. The pressure sewer system consists of pump sumps equipped with pumps, house connecting pressure pipes and the pressure main. Gravity house connecting pressure pipes from individual houses are routed into house pump sumps or pump sumps designed for a group of houses from where wastewater is pumped into the pressure main. The pressure main is usually routed into the wastewater treatment plant. Water gathered in the pump sump is then transported by the pump into the house connecting pressure pipe and from here it is pumped over into the pressure main. A combination of a pump sump and a pump connected to the pressure sewer system can be referred to as the pump unit for the purposes of this document.
- The control of pumps installed in pump sumps on house connecting pressure pipes of the pressure sewer system can be executed on an as-needed basis by the operator who activates the pump once the pump sump is full. The disadvantage of this solution is that the caretaker, or the pump sump owner must monitor the pump sump water level. The pump sump water level can also be monitored by an automatic control unit which is connected both to the pump and a group of sensors installed in the pump sump for the water level monitoring. The sensors monitor the minimum wastewater level in the pump sump at which the pump must be switched off, the current wastewater level in the pump sump and the maximum wastewater level in the pump sump at which the pump must be switched on, or other optional wastewater levels where necessary. This solution is known for example from the Czech utility design
. The known technical solution works automatically without the necessity of any control to be executed by the operator. The automatic control unit is electrically connected to the sensors installed in the pump sump and to the pump. The technical solution is described as a closed autonomous system. The disadvantage of this solution is that in the case of an unexpected event concerning the pressure sewer system, such as an accident, reconstruction, etc., it is necessary to circumvent all the installed control units and control their operation on a temporary basis for example to interrupt the drawing of the pump sumps into the pressure sewer system when parts of the pressure main are being replaced.CZ 23662 U1 - The patent application
provides a solution that also includes a pump sump, a pump connected to the house connecting pressure pipe for the pump sump emptying, an automatic control unit electrically connected to the pump sump and sensors for measuring the pump sump water level. The automatic control unit is connected, either by wire or in a wireless way, to a remote server by a communication interface. The remote server is connected with several automatic control units which can be switched over from automatic to remote-controlled operation. Through the automatic control units the remote server can control the operation of the pumps installed in the pressure sewer system, so that, for example at the time of reconstruction of the pressure main, the pumps are not switched on and wastewater discharged at the construction site.AU 2012318281 A1 - Among the disadvantages of the aforementioned known solutions is the fact that they to not eliminate one of the key problems of the pressure sewer system, which is the pressure sewer system pipes fouling. The pipes of the pressure sewer system are built with the capacity given by the nominal flow rate in its individual parts (house connecting pressure pipes, the pressure main) with a relevant margin which is utilized in exceptional cases. For the purposes of this background information, the nominal flow rate and nominal pressure refer to the values for which the house connecting pressure pipes and the pressure main are dimensioned according to the design. During common operation wastewater from individual house connecting pressure pipes flows towards the pressure main gradually, so that the flow in the pressure main is very low compared to its nominal capacity. The unused nominal capacity of the pressure sewer system pipes (in particular of the pressure main) is exposed, in particular as a result of the pump units emptying, to the continuous sedimentation and solidification of solid residues from wastewater at the bottom of the pressure main, which may ultimately result in the obstruction of the pressure sewer system pipes.
- The task of the invention is the creation of the method and system for automatic flushing of the pressure sewer system effectively protecting the pressure sewer system pipes against obstruction, removing the solidifying sediments of waste contained in wastewater from the pressure sewer system on a regular basis, while it is desirable, from the point of view of investments, operation and maintenance, not to add any additional mechanical equipment to the system if possible.
- The set task has been resolved by the method and system of automatic flushing of the pressure sewer system according to this invention.
- The method for automatic flushing of the pressure sewer system consisting of the pressure main and at least two house connecting pressure pipes connecting at least two wastewater pump sumps to the pressure main. The pump sumps are equipped with sensors for measuring the pump sump water level and each house connecting pressure pipe or pump sump is fitted with a pump for transporting wastewater to the pressure main via the house connecting pressure pipes. Each pump is connected to an autonomous electronic control unit with inputs for the analysis of data from the sensors, outputs for the pump control, at least one processor, at least one database for at least one software module deposition and at least one communication interface for wire or wireless communication.
- The core of the invention is based on the fact that the activation of the pumps for the removal wastewater from the pump sumps is executed in a synchronised manner resulting in a temporary controlled change of instantaneous flow rate and instantaneous pressure in at least part of the pressure main. The instantaneous flow rate during the controlled change corresponds to the required flushing flow rate of the given part of the pressure main and the instantaneous pressure during the controlled change does not exceed the nominal pressure of the pressure main. The removal of wastewater from the pump sumps is executed according to the order of the house connecting pressure pipe outlets into the pressure main and/or based on data concerning wastewater level in individual pump sumps. The instantaneous flow rate reaching the value required for flushing flushes a majority of waste sediments in the pressure pipes. With repeated automatic flushing, the pressure sewer system is maintained in good operating condition. Flushing takes into account the position of the house connecting pressure pipes with respect to the pressure main so that new wastewater is continuously added to the mass of wastewater without any damage to the pressure pipes that would be sustained if the nominal pressure were exceeded in any single point. In addition, the total volume of wastewater intended for the generation of a change in the instantaneous flow rate and instantaneous pressure is taken into account.
- In the preferred embodiment of the method of automatic flushing of the pressure sewer system according to the invention a reserve is created in at least some of the pump sumps before the generation of the controlled change in instantaneous flow rate and instantaneous pressure to accumulate wastewater and ensure the complete flushing of the given part of the pressure main. By creating the reserve, a sufficient amount of wastewater for flushing is secured. The total volume, which is necessary for flushing the respective pipe segment, refers to the sum of volumes in individual co-operating pump sumps. The total volume is determined according to the dimension and length of the pipe segment subject to flushing based using the calculation in the hydraulic simulation model of the low pressure sewerage network.
- In the preferred embodiment of the method of automatic flushing of the pressure sewer system according to the invention, data concerning wastewater level in the pump sumps for planning the controlled change in instantaneous flow rate and instantaneous pressure is acquired from the sensors. Alternatively, the data concerning wastewater level in the pump sumps is acquired from the database of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system for the previous period of time. Alternatively, the data concerning wastewater level in the pump sumps is acquired from the database of records and/or weather forecasts. The correct estimate of wastewater level in the pump sumps is of key importance for the planning of flushing because if the volume of wastewater is insufficient, flushing is ineffective.
- In addition, the invention comprises a system for automatic flushing of the pressure sewer system.
- The system for automatic flushing of the pressure sewer system consisting of the pressure main and at least two house connecting pressure pipes connecting at least two wastewater pump sumps to the pressure main. The pump sumps are fitted with sensors for measuring the pump sump water level where each house connecting pressure pipe or pump sump includes a pump for wastewater transporting to the pressure main via the house connecting pressure pipes. Each pump is connected to the autonomous electronic control unit fitted with inputs for the analysis of data from the sensors, outputs for the pump control, at least one processor, at least one database for at least one software module deposition and at least one communication interface for wire or wireless communication. At least two control units are connected to one to the other via a communication interface.
- The core of the invention is based on the fact that at least one control unit is fitted with equipment for real time monitoring and its backup power supply unit, and that at least one control unit is equipped with a software module for pumping synchronization that includes a basic plan of flushing with statistically expected wastewater level in the pump sump and individual real times of the pump activation. The interconnection of the control units ensures information sharing between them allowing subsequent organization. The backup power supply unit and the equipment for real time monitoring protect the control units against a loss of real time which would result in a mismatch of statistically expected wastewater level in the pump sumps where, for example, a twelve-hour lasting failure of power supply would completely invert the basic flushing plan for day and night.
- In the preferred embodiment of the system for automatic flushing of the pressure sewer system according to the invention, the system is equipped with a remote server to which at least some of the control units are connected via a communication interface. The remote server is fitted with a database with a software module for pumping synchronization which includes a basic plan of flushing and individual times of activation for the pumps in all pump sumps in the given location of the pressure sewer system. In addition, the remote server comprises the controlling software module to establish the master/slaves communication with the control units. This arrangement put the controlling software module in charge of the control units which then behave in accordance with the flushing plan transmitted from the remote server.
- In the preferred embodiment of the system for automatic flushing of the pressure sewer system according to the invention the remote server is connected via the communication interface to at least one database of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system for the previous period of time. Alternatively, the remote server is connected via the communication interface to at least one database of records and/or weather forecasts. Thanks to the receipt of up-to-date data from the databases by the remote server, the system can update the flushing plan within the limits allowed by wastewater levels in the pump sumps.
- Among the advantages of the invention is the possibility of deployment in the existing pressure sewer systems, the relatively low demands for hardware modifications of the currently used control units or the low costs related to the manufacture of the new modified control units. The system interconnectedness and the utilization of the until now negative impact of a change in instantaneous flow rate and instantaneous pressure up to the values of the nominal flow rate and nominal pressure for the pressure sewer system flushing. Another advantage of the invention is that no additional mechanical equipment is necessary and no additional service water is needed except for wastewater itself.
- The present invention will be explained in detail by means of the following figures where:
- Fig. 1
- illustrates the flow diagram of the pressure sewer system and the system with the indicated direction of wastewater flow,
- Fig. 2
- illustrates the diagram of the pump unit,
- Fig 3
- illustrates the flow diagram of the control unit,
- Fig 4
- illustrates an example of a realistic control unit,
- Fig 5
- illustrates the flow diagram of the remote server.
- It shall be understood that the specific cases of the invention embodiments described and depicted below are provided for illustration only and do not limit the invention to the examples provided here. Those skilled in the art will find or, based on routine experiment, will be able to provide a greater or lesser number of equivalents to the specific embodiments of the invention which are described here. Also such equivalents will be included in the scope of the following claims.
-
Fig. 1 illustrates a diagram of the pressure sewer system consisting of the pressure main 1 with four house connectingpressure pipes 2 routed from fourpump sumps 3 . In this example of the invention embodiment, the house connectingpressure pipes 2 are equipped with thepumps 4 which transport wastewater from thepump sumps 3 into the pressure main 1 . FromFig. 1 it is obvious that eachpump sump 3 is fitted with thecontrol unit 6 . The pressure main 1 drains wastewater to thewastewater treatment plant 17 where the pressure main 1 is equipped with theflowmeter 18. Theflowmeter 18 provides data concerning the flow rate and the volume of wastewater leaving the pressure sewer system for thewastewater treatment plant 17 to be used in thedatabase 14 of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system. In addition,Fig. 1 illustrates the interconnection of thecontrol units 6 and also their connection to theremote server 12. It is obvious to those skilled in the art that thecontrol units 6 are connected to theremote server 12 either by wire or in a wireless manner. Theremote server 12 in this example consists of a computer. Thecontrol units 6 are connected to thesensors 5 not included in the illustration for sensing wastewater level in thepump sump 3 and to thepumps 4 to control the removal of wastewater from thepump sumps 3 . - According to the applicable ČSN standard for regular flushing of the pressure sewer system it is necessary that each segment of the pressure main 1 is at least once a day flushed with wastewater flowing at a speed of 0.7 m/s. The nominal flow rate Qn is determined by calculation based on the dimension of the given segment of the pressure main 1 .
-
Fig. 2 illustrates the diagram of the pump unit comprised of thepump sump 3 , house connectingpressure pipe 2 equipped with thepump 4 , thecontrol unit 6 connected to thesensors 5 positioned in the pump sump. Thepump sump 3 refers to a leakproof tank where the wastewater inlet is installed. Thepump 4 is powered by electric current from the power mains. Thesensors 5 can be resistance, capacitance, or for example pressure based. Thecontrol unit 6 can be created by a programmable logic automaton. In addition,Fig. 2 indicates that thecontrol unit 6 can receive signals using the inputs, or where applicable it can itself be a source of signals by means of the outputs. -
Fig. 3 illustrates a diagram of thecontrol unit 6 showing its connection to thepower supply unit 19. Thecontrol unit 6 comprises thecommunication interface 7 , which can include, for example, a GSM modem, GPRS modem, GPS modem, modem for connection to a wireless computer network (LAN, Wi-Fi), etc. In addition, it includes thepower supply module 20 from which it is powered by means of thepower supply unit 19, and the measuringcurrent module 21. In addition, theprocessor 16 coordinating the cooperation of individual components of thecontrol unit 6 and executing steps defined by the software modules deposited in thedatabase 8 . In addition, themodule 22 for the receipt of signals from thesensors 5 , and thepower control module 23 of thepump 4 . Thecontrol unit 6 also includes the equipment for real time monitoring 9 comprising an electrically powered clock which can also be comprised of a software module. The backuppower supply unit 10 powers either the electrically powered clock, which after the power supply recovery of thepower supply module 20 informs thecontrol unit 6 of the current time. Alternatively, the backuppower supply unit 10 powers thewhole control unit 6 for the entire duration of a power failure of thepower supply unit 19 if a software clock is used. -
Fig. 4 illustrates an example of the embodiment of the controlling part of the system which includes the plasticelectrical installations box 25. Inside thebox 25 some components of the system are fixed. For example themodules 22 for the reception of signals from thesensors 5 ,control unit 6 ,power supply module 20,communication interface 7 , measuringcurrent module 21 and pumppower control module 4 . Theelectrical installations box 25 is also fitted with theaerial output 24,input 28 for the receipt of signals from the measurement of wastewater level in thepump sump 3 , theinputs 26 for power supply connection andoutput 27 for the penetration of cabling of the power control unit output of thepump 3 . -
Fig. 5 provides an illustration of theremote server 12 connected to onecontrol unit 6 . Theremote server 12 is fitted with thecommunication interface 7 , comprised of, as in the case of thecontrol unit 6 , by a GSM modem, GPRS modem, or a GPS modem, modem for the connection to a wireless computer network (LAN, Wi-Fi), etc. Theremote server 12 is also connected via thecommunication interface 7 to the database of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system for the previous period oftime 14 and to the database of records and/orweather forecasts 15. A person skilled in the art will be able to determine without significant problems that the connection to both 14, 15 is resolved by communication with the server where the databases are saved. Thedatabases remote server 12 is also fitted with theprocessor 16 anddatabase 8 . Thedatabase 8 includes the software module for pumpingsynchronization 11 and thecontrolling software module 13. - In the example of the embodiment with no illustrations provided, the system comprises only
interconnected control units 6 . Thecontrol units 6 are equipped with the software module for pumpingsynchronization 11. Thismodule 11 can be installed in thecontrol units 6 subsequently, which means that this example of embodiment is suitable also for the existing pressure sewer systems. - The software module for pumping
synchronization 11 is programmed based on the statistical processing of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system. Thanks to the statistical analysis of data, a basic plan of flushing is created. The plan estimates the wastewater level in thepump sumps 3 based on an empirical model of flow rate and determines the order of the activation of thepumps 4 in real time according to the hydraulic simulation model of the low pressure sewerage network. The empirical model of flow rate utilizes statistical information on the outflow of wastewater from the pressure sewer system during a day with individual days of week distinguished, and the effect of the average and maximum daily temperatures and the total precipitation amount are taken into account. Based on statistical probability the wastewater level in the pumps sumps can be determined and their inclusion into the flushing plan can be designed. The hydraulic model of the low pressure sewerage network is the calculation analysis of the pressure sewer system based on which the order of activation of thepumps 4 in thepump sumps 3 and the time of their operation can be determined with a view to creating a flow rate sufficient for the removal of sediments without exceeding the nominal flow rate Q n and the nominal pressure P n in the pipes of the pressure sewer system. Eachcontrol unit 6 is identified in the basic flushing plan while taking into account the position of the outlet of the respective house connectingpressure pipe 2 into the pressure main 1 , and the real time of its activation is determined so that the synchronized activation of thepumps 4 in the pressure sewer system created a controlled change in the instantaneous pressure Pi and instantaneous flow rate Q i . The change can be expressed by the following formula Qi = Q1 + ... + Qn, where Qn is the last contribution to the instantaneous flow rate Q i from the n-th pump unit. - In the case that the actual wastewater level in the
pump sumps 3 fails to correspond to the statistically expected wastewater level, thecontrol units 6 skip the planned flushing of the pressure sewer system and start creating a reserve in the minimum amount of 50% of the capacity of thepump sumps 3 . - In the illustrated example of the invention embodiment, the
remote server 12 assumes the role of the master in communication and thecontrol units 6 fulfil the role of the slaves. Theremote server 12 controls, using the software module for pumpingsynchronization 11 and thecontrolling software module 13 , the change in the instantaneous pressure Pi and instantaneous flow rate Qi during the pressure sewer system flushing. In addition, the system is able to create, based on the knowledge of records from the 14 and 15, a modified plan of flushing for one planned or unplanned flushing. For example if it is discovered based on thedatabases database 14 that the wastewater inflow from thepump sumps 3 was not sufficient, the flushing cycle is skipped, or, on the other hand, the system can plan the flushing of the pressure sewer system in excess of the framework of the basic flushing plan based on records on precipitation in the respective location provided in thedatabase 15. The basic flushing plan remains unchanged so that in the case of theremote server 12 failure the system ofinterconnected control units 6 follows the basic flushing plan. - The method and system for automatic flushing of the pressure sewer system according to the invention can be employed in the field of operation of the pressure sewer system, in particular in the area of its operation and maintenance.
-
- 1
- pressure main
- 2
- house connecting pressure pipe
- 3
- pump sump
- 4
- pump
- 5
- sensor for measuring the pump sump water level
- 6
- control unit
- 7
- communication interface
- 8
- database
- 9
- equipment for real time monitoring
- 10
- backup power supply unit
- 11
- software module for pumping synchronization
- 12
- remote server
- 13
- controlling software module
- 14
- database of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system for the previous period of time
- 15
- database of records and/or weather forecasts
- 16
- processor
- 17
- wastewater treatment plant
- 18
- flowmeter
- 19
- power supply unit
- 20
- power supply module
- 21
- measuring current module
- 22
- module for the reception of signals from sensors
- 23
- pump power control module
- 24
- aerial output
- 25
- electrical installations box
- 26
- power supply unit input
- 27
- pump power control module output
- 28
- input of the pump sump water level measuring
- Qi
- instantaneous flow rate
- Pi
- instantaneous pressure
- Qn
- nominal flow rate
- Pn
- nominal pressure
Claims (9)
- The method for automatic flushing of the pressure sewer system consisting of the pressure main (1) and at least two house connecting pressure pipes (2) connecting to the pressure main (1) at least two pump sumps (3) for wastewater fitted with the sensors (5) for measuring the wastewater level where each house connecting pressure pipe (2) or pump sump (3) is equipped with the pump (4) for transferring wastewater via the house connecting pressure pipes (2) into the pressure main (1); each pump (4) is interconnected with the electronic control unit (6) fitted with inputs for analysing data from the sensors (5), outputs for the control of the pump (4), at least one processor (16), at least one database (8) allowing at least one software module to be deposited, and at least one communication interface (7) for wire or wireless communication, characterized in that the activation of the pumps (4) for the withdrawal of wastewater from the pump sumps (3) is executed in a synchronized manner where a temporary controlled change in the instantaneous flow rate (Qi) and instantaneous pressure (Pi) is generated at least in a segment of the pressure main (1), where the instantaneous flow rate (Qo) during the controlled change corresponds to the required flushing flow rate (Qn) of the pressure main (1) and the instantaneous pressure (Pi) during the controlled change does not exceed the nominal pressure (Pn) of the pressure main (1), and the withdrawal of wastewater from the pump sumps (3) is executed according to the order of the house connecting pressure pipes (2) inlets into the pressure main (1) and/or according to data concerning the wastewater level in the pump sumps (3).
- The method according to the claim 1, characterized in that prior to the generation of the controlled change in the instantaneous flow rate (Qi) and instantaneous pressure (Pi) at least in some of the pump sumps (3) a reserve for the accumulation of wastewater is generated to ensure the thorough flushing of the given segment of the pressure main (1).
- The method according to the claims 1 or 2, characterized in that the data concerning the wastewater level in the pump sumps (3) for planning the controlled change in the instantaneous flow rate (Qi) and instantaneous pressure (Pi) is acquired using the sensors (5).
- The method according to any of the claims 1 through 3, characterized in that the data concerning the wastewater level in the pump sumps (3) is acquired from the database of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system for the previous period of time (14).
- The method according to any of the claims 1 through 4, characterized in that the data concerning the wastewater level in the pump sumps (3) is acquired from the database of records and/or weather forecasts (15).
- The system for automatic flushing of the pressure sewer system according to any of the claims 1 through 5, where the pressure sewer system comprises the pressure main (1) and at least two house connecting pressure pipes (2) connecting to the pressure main (1) at least two wastewater pump sumps (3) fitted with the sensors (5) for measuring the wastewater level, where each house connecting pressure pipe (2) or pump sump (3) is equipped with the pump (4) for transferring wastewater via the house connecting pressure pipes (2) into the pressure main (1); each pump (4) is interconnected with the autonomous control unit (6), equipped with inputs for the analysis of data from the sensors (5), outputs for the control of the pump (4), at least one processor (16), at least one database (8) allowing at least one software module to be deposited, and at least one communication interface (7) for wire or wireless communication, where at least two control units (6) are interconnected using the communication interface (7), characterized in that at least one control unit (6) is equipped with equipment for real time monitoring (9) and its backup power supply unit (10), and at least one control unit (6) is equipped with the software module for pumping synchronization (11) which includes the basic flushing plan with the statistically expected wastewater level in the pump sump (3) based on the empirical model of wastewater flow rate and individual real times of the activation of the pumps (4) according to the hydraulic simulation model of the pipe network of the pressure sewer system.
- The system according to the claim 6, characterized in that it is fitted with the remote server (12), to which, via the communication interface (7), at least some of the control units (6) are connected; the remote server (12) is equipped with the database (8) with the software module for pumping synchronization (11) which includes the basic flushing plan and individual times of the activation of the pumps in all pump sumps (3) in the given location of the pressure sewer system, and which also includes the controlling software module (13) to establish the master/slaves type of communication with the control units (6).
- The system according to the claim 7, characterized in that the remote server (12) is, via the communication interface (7), connected to at least one database of records on water inflow into the pressure sewer system and wastewater outflow from the pressure sewer system for the previous period of time (14).
- The system according to the claims 7 or 8, characterized in that the remote server (12) is, via the communication interface (7), connected to at least one database of records and/or weather forecasts (15).
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RS20210784A RS62026B1 (en) | 2016-06-28 | 2017-06-26 | Pressure sewer system and method therefor |
| PL17177818T PL3263786T3 (en) | 2016-06-28 | 2017-06-26 | Pressure sewer system and method therefor |
| HRP20211003TT HRP20211003T1 (en) | 2016-06-28 | 2021-06-24 | Pressure sewer system and method therefor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CZ2016-383A CZ306856B6 (en) | 2016-06-28 | 2016-06-28 | A method of automatic flushing of a pressure sewage system and system for implementing this method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP3263786A1 true EP3263786A1 (en) | 2018-01-03 |
| EP3263786B1 EP3263786B1 (en) | 2021-04-14 |
Family
ID=59215642
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP17177818.6A Active EP3263786B1 (en) | 2016-06-28 | 2017-06-26 | Pressure sewer system and method therefor |
Country Status (7)
| Country | Link |
|---|---|
| EP (1) | EP3263786B1 (en) |
| CZ (1) | CZ306856B6 (en) |
| DK (1) | DK3263786T3 (en) |
| HR (1) | HRP20211003T1 (en) |
| HU (1) | HUE055026T2 (en) |
| PL (1) | PL3263786T3 (en) |
| RS (1) | RS62026B1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2019170724A1 (en) | 2018-03-09 | 2019-09-12 | Buck-Chemie Gmbh | Container for a toilet rim block cage |
| US12398518B2 (en) | 2019-04-23 | 2025-08-26 | Robel Bahnbaumaschinen Gmbh | Processing system and method for performing track work |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3590836A (en) * | 1965-12-10 | 1971-07-06 | W Zander Ges Fur Rein Und Abwa | Sewerage transmission system |
| US20120222994A1 (en) * | 2006-12-20 | 2012-09-06 | Data Flow Systems, Inc. | Fluid flow management system and associated methods |
| EP2746477A1 (en) * | 2012-12-20 | 2014-06-25 | Grundfos Holding A/S | Method for operating a wastewater pumping station |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5503533A (en) * | 1994-05-26 | 1996-04-02 | Metropolitan Pump Company | Fluid level control panel structure for multi-pump system |
| US6378554B1 (en) * | 2000-01-14 | 2002-04-30 | Little Giant Pump Company | Controlled sewage sump network system |
-
2016
- 2016-06-28 CZ CZ2016-383A patent/CZ306856B6/en unknown
-
2017
- 2017-06-26 EP EP17177818.6A patent/EP3263786B1/en active Active
- 2017-06-26 DK DK17177818.6T patent/DK3263786T3/en active
- 2017-06-26 HU HUE17177818A patent/HUE055026T2/en unknown
- 2017-06-26 RS RS20210784A patent/RS62026B1/en unknown
- 2017-06-26 PL PL17177818T patent/PL3263786T3/en unknown
-
2021
- 2021-06-24 HR HRP20211003TT patent/HRP20211003T1/en unknown
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3590836A (en) * | 1965-12-10 | 1971-07-06 | W Zander Ges Fur Rein Und Abwa | Sewerage transmission system |
| US20120222994A1 (en) * | 2006-12-20 | 2012-09-06 | Data Flow Systems, Inc. | Fluid flow management system and associated methods |
| EP2746477A1 (en) * | 2012-12-20 | 2014-06-25 | Grundfos Holding A/S | Method for operating a wastewater pumping station |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2019170724A1 (en) | 2018-03-09 | 2019-09-12 | Buck-Chemie Gmbh | Container for a toilet rim block cage |
| DE102018109257A1 (en) | 2018-03-09 | 2019-09-12 | Buck-Chemie Gmbh | Container for a toilet bowl |
| US12398518B2 (en) | 2019-04-23 | 2025-08-26 | Robel Bahnbaumaschinen Gmbh | Processing system and method for performing track work |
Also Published As
| Publication number | Publication date |
|---|---|
| HRP20211003T1 (en) | 2021-11-26 |
| RS62026B1 (en) | 2021-07-30 |
| HUE055026T2 (en) | 2021-10-28 |
| CZ2016383A3 (en) | 2017-08-09 |
| PL3263786T3 (en) | 2021-11-29 |
| EP3263786B1 (en) | 2021-04-14 |
| CZ306856B6 (en) | 2017-08-09 |
| DK3263786T3 (en) | 2021-07-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111815128B (en) | Scheduling operation method and device for deep sewage drainage tunnel and computer equipment | |
| EP3044645B1 (en) | Reservoir control systems and methods | |
| CN105178387B (en) | The intelligence control system and its control method of rainwater comprehensive utilization | |
| CN105868868B (en) | Method for operation process regulation and risk identification of water network water resource system | |
| CN103472792B (en) | Intelligent drainage system | |
| EP3263786B1 (en) | Pressure sewer system and method therefor | |
| Hsu et al. | Multi-phase intelligent decision model for reservoir real-time flood control during typhoons | |
| KR101849681B1 (en) | A water-loop operating system for allocationing and supplying multy-water source using SD | |
| CN104483925A (en) | Multi-unit gate and pump remote testing and control system | |
| US10501925B1 (en) | Notifications for reducing overflows from combined sewer systems and sanitary sewer systems | |
| CN108036824A (en) | A kind of sponge city monitoring terminal | |
| JP2011180899A (en) | Reservoir management plan creation method and device | |
| CN210086461U (en) | A automatic water conservancy washing unit for rainwater regulation pond | |
| Chui et al. | The development of a comprehensive flood prevention strategy for Hong Kong | |
| CN104318370A (en) | Reservoir safe operation real-time monitoring system | |
| GB2516293A (en) | Stormwater management control | |
| KR20170095533A (en) | A preemptive water operating system of multy-water source for preparing imbalance demand and supply | |
| CZ29771U1 (en) | System for head sewerage system automatic flushing | |
| Jensen et al. | Demonstration of Integrated real time control of sanitation systems incl. early warning for WQ in receiving waters in Aarhus | |
| Rijo | SCADA of an upstream controlled irrigation canal system | |
| Ruggaber et al. | Real Time Operations of a Complex Sewer System | |
| Styles et al. | Case Study: Modernization of the Government Highline Canal | |
| RUCKA et al. | DESIGN OF THE PUMP CONTROLLER OF THE LOW PRESSURE SEWER NETWORK. | |
| EP3676790B1 (en) | System and method using probabilistic forecast for control of sewers | |
| Nawaz et al. | GSM Based Canal Gate and Flood Monitoring and Control System |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20170626 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20190603 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20201110 |
|
| RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: KOVAR, JIRI Inventor name: RUCKA, JAN Inventor name: ANDRS, ONDREJ |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602017036550 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1382500 Country of ref document: AT Kind code of ref document: T Effective date: 20210515 |
|
| REG | Reference to a national code |
Ref country code: RO Ref legal event code: EPE |
|
| REG | Reference to a national code |
Ref country code: HR Ref legal event code: TUEP Ref document number: P20211003T Country of ref document: HR |
|
| REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20210702 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
| REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20211003T Country of ref document: HR Payment date: 20210624 Year of fee payment: 5 |
|
| REG | Reference to a national code |
Ref country code: SK Ref legal event code: T3 Ref document number: E 37729 Country of ref document: SK |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20210414 |
|
| REG | Reference to a national code |
Ref country code: HU Ref legal event code: AG4A Ref document number: E055026 Country of ref document: HU |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 |
|
| REG | Reference to a national code |
Ref country code: HR Ref legal event code: T1PR Ref document number: P20211003 Country of ref document: HR |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210814 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210715 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210816 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210714 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602017036550 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20210630 |
|
| 26N | No opposition filed |
Effective date: 20220117 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20210714 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210626 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210626 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210714 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210814 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 |
|
| REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20211003 Country of ref document: HR Payment date: 20220518 Year of fee payment: 6 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 1382500 Country of ref document: AT Kind code of ref document: T Effective date: 20210414 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230515 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 |
|
| REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20211003 Country of ref document: HR Payment date: 20230505 Year of fee payment: 7 |
|
| P02 | Opt-out of the competence of the unified patent court (upc) changed |
Effective date: 20230529 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 |
|
| REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20211003 Country of ref document: HR Payment date: 20240507 Year of fee payment: 8 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210414 |
|
| REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20211003 Country of ref document: HR Payment date: 20250606 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20250604 Year of fee payment: 9 Ref country code: DE Payment date: 20250604 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20250604 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: RS Payment date: 20250604 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: HR Payment date: 20250606 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: HU Payment date: 20250605 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BG Payment date: 20250613 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: RO Payment date: 20250611 Year of fee payment: 9 Ref country code: AT Payment date: 20250616 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SK Payment date: 20250604 Year of fee payment: 9 |