EP3247516A1 - Cold spray process using treated metal powder - Google Patents

Cold spray process using treated metal powder

Info

Publication number
EP3247516A1
EP3247516A1 EP16740623.0A EP16740623A EP3247516A1 EP 3247516 A1 EP3247516 A1 EP 3247516A1 EP 16740623 A EP16740623 A EP 16740623A EP 3247516 A1 EP3247516 A1 EP 3247516A1
Authority
EP
European Patent Office
Prior art keywords
gas
nitrogen
metal powder
titanium
powder particles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP16740623.0A
Other languages
German (de)
French (fr)
Other versions
EP3247516A4 (en
EP3247516B1 (en
Inventor
Randolph Carlton MCGEE
Zissis A. Dardas
Ying She
Aaron T. Nardi
Michael A. KLECKA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sikorsky Aircraft Corp
Original Assignee
Sikorsky Aircraft Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sikorsky Aircraft Corp filed Critical Sikorsky Aircraft Corp
Publication of EP3247516A1 publication Critical patent/EP3247516A1/en
Publication of EP3247516A4 publication Critical patent/EP3247516A4/en
Application granted granted Critical
Publication of EP3247516B1 publication Critical patent/EP3247516B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C24/00Coating starting from inorganic powder
    • C23C24/02Coating starting from inorganic powder by application of pressure only
    • C23C24/04Impact or kinetic deposition of particles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F1/00Metallic powder; Treatment of metallic powder, e.g. to facilitate working or to improve properties
    • B22F1/14Treatment of metallic powder
    • B22F1/145Chemical treatment, e.g. passivation or decarburisation
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C8/00Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals
    • C23C8/06Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using gases
    • C23C8/08Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using gases only one element being applied
    • C23C8/24Nitriding
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C8/00Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals
    • C23C8/80After-treatment
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C29/00Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides
    • C22C29/16Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides based on nitrides

Definitions

  • Thermal spray technologies such as the cold spray process can be used for various applications such as applying metal layers to non-metallic substrates to make metal layer-containing composite articles, applying metal outer layers to substrates of a different material, for example to obtain corrosion benefits of the outer layer metal with the processability of the substrate metal, field repair of metal components, and various other additive manufacturing technology applications.
  • Titanium and titanium alloys are widely used for various applications such as aircraft, motor vehicles, and countless other applications, where they provide beneficial properties including but not limited to strength, strength:weight ratio, corrosion resistance, high specific heat, and tolerance of extreme temperatures.
  • the use of titanium alloys as metal powder used in the cold spray process has been limited by factors such as degradation of the nozzles used in the cold gas spray process and a tendency of the titanium alloys to clog nozzles used in the cold spray process.
  • Conventional approaches for dealing with such nozzle problems typically involve the use of exotic (and expensive) materials such as quartz for the cold spray nozzles, or modification of cold spray process parameters to lower temperatures or other process modifications that can cause adverse impacts to the properties of cold spray-applied material.
  • the invention there is a method of applying a metal comprising titanium to a substrate.
  • the method comprises nitriding the surface of metal powder particles comprising titanium by contacting the particles with a first gas comprising nitrogen in a fluidized bed reactor, and depositing the nitrided metal powder particles onto the substrate with cold spray deposition using a second gas.
  • the metal powder particles comprise titanium or titanium alloys Ti-6A1-4V, Ti-3A1-2.5V, Ti-5Al-2.5Sn, Ti-8Al-lMo-lV,
  • the metal powder particles comprises titanium or titanium alloy grades 5 (Ti-6A1-4V) or 23(Ti-6Al-4V) according to ASTM B861-
  • the metal powder particles after nitriding comprise elemental nitrogen at the particle surface and also comprise an internal particle portion that is free of elemental nitrogen.
  • the metal powder particles after nitriding have a surface nitrogen content ranging from 5.96 wt.% to 12.22 wt.% as determined by x- ray photoelectron spectroscopy.
  • the metal powder particles after nitriding have a nitrogen:oxygen surface wt.% ratio of from 5.96:26.20 to 12.22: 16.75 as determined by x-ray photoelectron spectroscopy.
  • the first gas comprises at least 1 vol.% nitrogen.
  • the first gas consists essentially of nitrogen.
  • the fluidized bed reactor is operated at a temperature of 500°C to 850°C.
  • the first gas is at a pressure of 0.11 to 0.12
  • the space velocity of the first gas in the fluidized bed reactor is from 1 min 1 to 30 min 1 .
  • the metal powder particles are contacted with the first gas in the fluidized bed reactor for at least 1 minute.
  • the second gas comprises helium or argon.
  • the second gas comprises helium or argon and nitrogen.
  • the second gas consists essentially of helium or argon.
  • the second gas is at a temperature of 20°C to
  • FIG. 1 is a schematic depiction of a fluidized bed reactor assembly
  • FIG. 2 is a schematic depiction of a cold spray system
  • FIG. 3 is a bar chart showing the results of surface elemental analysis of titanium alloy powders processed as described herein.
  • FIG. 1 An exemplary fluidized bed reactor assembly for nitriding titanium alloys is depicted in FIG. 1.
  • the assembly includes a fluidized bed reactor 12 having inlet openings 14 disposed at one end of the reactor 12 and an outlet opening 16 disposed at the opposite end of the reactor 12.
  • the fluidized bed reactor 12 is disposed inside of an outer tubing 18, with outlet 16 extending to the outside of outer tubing 18.
  • the fluidized bed assembly is disposed in a furnace (not shown) to provide heat.
  • Thermocouples 17 and 19 are disposed to monitor temperature in the reactor 12 and outer tubing 18, respectively.
  • An inlet 20 is connected to a gas feed line 22.
  • a gas source 24 such as a storage tank or a gas-generating reactor is connected to gas feed line 22 to supply a gas feed to the fluidized bed reactor 12.
  • Other components such as mass flow controller 26, pressure regulating valve 28, pressure sensor 30, and shut-off valves 32 and 34 are also disposed in the gas feed line 22 for monitoring and controlling the flow rate and pressure of the gas delivered to the reactor 12.
  • Reactor outlet 16 is connected to outlet line 36, which is connected to a water or other liquid bubbler 38.
  • a bleed line 40 with shut-off valve 42 also connects feed line 22 to the bubbler 38, which is vented to atmosphere through exhaust port 44.
  • a gas comprising nitrogen from gas source 24 is fed through feed line 22, with the flow rate and gas pressure controlled by mass flow controller 26 and pressure regulating valve 28.
  • the nitrogen-containing gas enters the outer tubing 18 through inlet 20.
  • the gas is heated as it passes through the space between fluidized bed 12 and outer tubing 18 to enter the fluidized bed reactor 12 through inlet 14.
  • the fluidized bed reactor 12 has metal particles 46 comprising titanium disposed therein, and the upward gas flow rate through the reactor applies sufficient upward force to the particles 46 to counteract the force of gravity acting on the particles so that they are suspended in a fluid configuration in the reactor space.
  • the gas flow is generally maintained below levels that would carry entrained particles out of the reactor 16 through outlet 16, and outlet 16 can also be fitted with a filter or screen to further assist in keeping metal powder particles 46 from exiting the reactor 12.
  • Nitrogen-containing gas exits the reactor 12 through outlet 16 and flows via outlet line 36 to the bubbler 38, from which it is exhausted to the atmosphere through exhaust port 44.
  • the invention can utilize any titanium metal or titanium metal alloy, including any of the grades of titanium alloys specified in ASTM B861-10. Alpha titanium alloys, near-alpha titanium alloys, alpha-beta titanium alloys, and beta titanium alloys.
  • the titanium alloy comprises from 0 to 10 wt.% aluminum and from 0 to 10 wt.% vanadium.
  • the titanium alloy is an alpha-beta titanium alloy such as Ti-6A1-4V (e.g., grades 5 or 23 according to ASTM B861-10), Ti-Al-Sn, Ti-Al-V-Sn, Ti-Al-Mo, Ti-Al-Nb, Ti-V-Fe-Al, Ti-8Al-lMo-lV, Ti-6Al-2Sn-4Zr-2Mo, ⁇ + ⁇ Ti-6A1-4V or near ⁇ Ti-10V-2Fe-3Al.
  • the titanium alloy is a Ti-6A1-4V alloy such as grade 5 or grade 23 according to ASTM B861-10.
  • the nitrogen-containing gas can contain from 1 vol.% to 100 vol.% nitrogen, more specifically from 5 vol.% to 100 vol.% nitrogen, and more specifically from 25 vol.% to 75 vol.% nitrogen. In some embodiments, the nitrogen-containing gas consists essentially of nitrogen, and in some embodiments the nitrogen-containing gas is pure.
  • the nitriding reaction conducted in the fluidized bed reactor is typically conducted at elevated temperature, compared to ambient conditions. The reaction temperature in the reactor can range from 500°C to 800°C, more specifically from 600°C to 750°C, and even more specifically from 600°C to 700°C.
  • Pressures in the reactor can range from 0.11 MPa to 0.13 MPa, more specifically from 0.11 MPa to 0.12 MPa, and even more specifically from 0.11 MPa to 0.115 MPa.
  • the flow rate of nitrogen to the reactor can vary based on factors such as reactor dimension, with exemplary flow rates of 0.0069 m/min to 0.013 m/min, more specifically from 0.0097 m/min to 0.011 m/min, and even more specifically from 0.010 ml min to 0.0105 m/min.
  • the metal powder particles can be nitrided for periods (i.e., contact time with the nitrogen-containing gas) of at least 1 minute, for example, time periods ranging from 1 minute to 30 minutes, more specifically from 1 minute to 10 minutes, and even more specifically from 1 minute to 5 minutes.
  • contact time with the nitrogen-containing gas i.e., contact time with the nitrogen-containing gas
  • the reactor is operated for the specified amount of time to achieve the desired contact time.
  • throughput of the particles through the reactor can be adjusted to achieve an average residence time equal to the desired contact time.
  • the particles After processing the titanium-containing metal particles in the nitrogen- containing fluidized bed reactor, the particles can have a surface nitrogen content ranging from 5.96 wt.% to 12.22 wt.%, more specifically from 5.96 wt.% to 7.90 wt.%, or from 7.90 wt.% to 9.77 wt.%, or from 9.77 wt.% to 12.22 wt.%, as determined by x-ray photoelectron spectroscopy.
  • x-ray photoelectron spectroscopy and the values specified herein are according to the protocols of according to ASTM E2735-14, Standard Guide for Selection of Calibrations Needed for X-ray Photoelectron Spectroscopy (XPS) Experiments, ASTM International, West Conshohocken, PA, 2014.
  • XPS X-ray Photoelectron Spectroscopy
  • the metal powder particles after nitriding the metal powder particles can have a nitrogen: oxygen surface wt.% ratio of from 5.96:26.20 to 7.90:21.83 as determined by x-ray photoelectron spectroscopy, and more specifically can have a nitrogen: oxygen surface wt.% ratio of from 9.77: 19.99 to 12.22: 16.75.
  • the use of pure titanium nitride as a cold spray applied metal can result in undesirable porosity levels in the applied material.
  • the nitriding reaction is conducted under conditions (e.g., contact time, temperature, space velocity) so that nitriding occurs on the surface of the metal particles but not throughout the interior of the particles, resulting in particles with a surface layer comprising nitrogen and at least a portion of the particles' interior being free of nitrogen.
  • conditions e.g., contact time, temperature, space velocity
  • the nitride titanium or titanium alloy metal powder is applied to a substrate with a cold spray deposition process.
  • a cold spray process unmelted metal particles are introduced into a high velocity gas stream being projected out of a high velocity (e.g., supersonic) nozzle toward the coating substrate target.
  • the particles' kinetic energy provides sufficient heat on impact with the coating substrate such that the particles plastically deform and fuse with the substrate and surrounding deposited metal material.
  • the particles impact the substrate they rapidly cool even as the particles are deforming. The particles change shape dramatically from relatively round to very thin flat splats on the surface.
  • FIG. 2 An exemplary system is depicted in FIG. 2.
  • metal powder is fed from powder feeder 48 through conduit 49 to spray gun 50, which includes nozzle 52 and gun heater 54.
  • Powder particle diameter sizes can range from 1 to 120 microns, more specifically from 5 to 75 microns.
  • Pressurized gas is fed from gas pre-heater 56 to gun heater 54 through conduit 55.
  • Exemplary gases for use in the system include helium, nitrogen, or a mixture of helium and nitrogen. Helium can provide greater gas velocities than nitrogen and has the additional technical effect of being benefited by the nitriding process because unlike a nitrogen-based gas stream, helium does not provide any opportunity for nitriding to occur in the spray gun 50.
  • the powder and the gas streams are mixed in the gun and accelerated to supersonic speeds as the gas/powder mixture exits the nozzle 52.
  • the system also includes a controller or control console 58, which receives input from gun pressure sensor 60 and gun temperature sensor 62 and provides control signals to the gas pre-heater and powder feeder.
  • the term "cold” in “cold spray deposition” refers to the fact that the gas is maintained at a temperature below the melting point of the metal powder; however, as described above the gas is heated in both the gas pre-heater 56 and the gun heater 54.
  • the temperature of the gas used in the process can range from 0°C to 1200°C, more specifically from 200°C to 1000°C, and even more specifically from 200°C to 800°C.
  • Gas pressure can range from 5 bar to 60 bar, more specifically from 15 bar to 45 bar, and even more specifically from 20 bar to 40 bar.
  • Ti-6A1-4V alloy powder materials were nitrided in a fluidized bed reactor as shown in FIG. 1. Approximately, 25 - 40g of Ti-6Al-4-V powder, particle size of 10 to 88 microns was loaded into the fluidized bed reactor. The reactor was then placed in a Model K- 3-18 reactor furnace (CM Furnaces, Inc.). Prior to nitridation, argon gas (Praxair) was introduced into the reactor at flow rates equivalent to the N 2 rates to be used for nitridation. This was done by using an MKS type 247 mass flow controller. In each case, the furnace temperature was increased at a rate of about 4.5°C/min to the target nitridation temperature as shown in Table 1. A control sample was also prepared in which argon gas was used for the entire process without any nitrogen gas.
  • CM Furnaces, Inc. Model K- 3-18 reactor furnace
  • the gas flow was switched to nitrogen (Matheson) and the temperature was held for the times indicated in Table 1.
  • the gas flow was switched to argon and the reactor was allowed to cool down. This was done primarily to isolate the soak time and to prevent any further nitridation that might occur at the higher temperatures during the slow cooling process.
  • the powder temperature reached a low enough temperature (about 300°C)
  • the gas flow was switched again, back to nitrogen and the furnace continued to cool down to ambient temperature.
  • the resulting metal powders, along with samples of the untreated powder were characterized using scanning electron microscopy (SEM) and energy dispersive X-ray microanalysis (EDX).
  • the nitrided titanium alloy powders exhibited significantly reduced nozzle clogging (and resulting higher quality metal deposits) than either the untreated powder or the control powder.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Solid-Phase Diffusion Into Metallic Material Surfaces (AREA)

Abstract

A method of applying a metal comprising titanium to a substrate is disclosed. The method comprises nitriding the surface of metal powder particles comprising titanium by contacting the particles with a first gas comprising nitrogen in a fluidized bed reactor, and depositing the metal powder particles onto the substrate with cold spray deposition using a second gas.

Description

COLD SPRAY PROCESS USING TREATED METAL POWDER
BACKGROUND OF THE INVENTION
[0001] Thermal spray technologies such as the cold spray process can be used for various applications such as applying metal layers to non-metallic substrates to make metal layer-containing composite articles, applying metal outer layers to substrates of a different material, for example to obtain corrosion benefits of the outer layer metal with the processability of the substrate metal, field repair of metal components, and various other additive manufacturing technology applications.
[0002] Titanium and titanium alloys are widely used for various applications such as aircraft, motor vehicles, and countless other applications, where they provide beneficial properties including but not limited to strength, strength:weight ratio, corrosion resistance, high specific heat, and tolerance of extreme temperatures. However, the use of titanium alloys as metal powder used in the cold spray process has been limited by factors such as degradation of the nozzles used in the cold gas spray process and a tendency of the titanium alloys to clog nozzles used in the cold spray process. Conventional approaches for dealing with such nozzle problems typically involve the use of exotic (and expensive) materials such as quartz for the cold spray nozzles, or modification of cold spray process parameters to lower temperatures or other process modifications that can cause adverse impacts to the properties of cold spray-applied material.
BRIEF DESCRIPTION OF THE INVENTION
[0003] According the invention, there is a method of applying a metal comprising titanium to a substrate. The method comprises nitriding the surface of metal powder particles comprising titanium by contacting the particles with a first gas comprising nitrogen in a fluidized bed reactor, and depositing the nitrided metal powder particles onto the substrate with cold spray deposition using a second gas.
[0004] In some aspects of the invention, the metal powder particles comprise titanium or titanium alloys Ti-6A1-4V, Ti-3A1-2.5V, Ti-5Al-2.5Sn, Ti-8Al-lMo-lV,
Ti-6Al-2Sn-4Zr-2Mo, α+β Ti-6A1-4V, or near β Ti-10V-2Fe-3Al.
[0005] In some aspects of the invention, the metal powder particles comprises titanium or titanium alloy grades 5 (Ti-6A1-4V) or 23(Ti-6Al-4V) according to ASTM B861-
10. [0006] In some aspects of the invention, the metal powder particles after nitriding comprise elemental nitrogen at the particle surface and also comprise an internal particle portion that is free of elemental nitrogen.
[0007] In some aspects of the invention, the metal powder particles after nitriding have a surface nitrogen content ranging from 5.96 wt.% to 12.22 wt.% as determined by x- ray photoelectron spectroscopy.
[0008] In some aspects of the invention, the metal powder particles after nitriding have a nitrogen:oxygen surface wt.% ratio of from 5.96:26.20 to 12.22: 16.75 as determined by x-ray photoelectron spectroscopy.
[0009] In some aspects of the invention, the first gas comprises at least 1 vol.% nitrogen.
[0010] In some aspects of the invention, the first gas consists essentially of nitrogen.
[0011] In some aspects of the invention, the fluidized bed reactor is operated at a temperature of 500°C to 850°C.
[0012] In some aspects of the invention, the first gas is at a pressure of 0.11 to 0.12
MPa.
[0013] In some aspects of the invention, the space velocity of the first gas in the fluidized bed reactor is from 1 min 1 to 30 min 1.
[0014] In some aspects of the invention, the metal powder particles are contacted with the first gas in the fluidized bed reactor for at least 1 minute.
[0015] In some aspects of the invention, the second gas comprises helium or argon.
[0016] In some aspects of the invention, the second gas comprises helium or argon and nitrogen.
[0017] In some aspects of the invention, the second gas consists essentially of helium or argon.
[0018] In some aspects of the invention, the second gas is at a temperature of 20°C to
850°C.
BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The subject matter which is regarded as the invention is particularly pointed out and distinctly claimed in the claims at the conclusion of the specification. The foregoing and other features, and advantages of the invention are apparent from the following detailed description taken in conjunction with the accompanying figures, in which:
[0020] FIG. 1 is a schematic depiction of a fluidized bed reactor assembly; [0021] FIG. 2 is a schematic depiction of a cold spray system; and
[0022] FIG. 3 is a bar chart showing the results of surface elemental analysis of titanium alloy powders processed as described herein.
DETAILED DESCRIPTION OF THE INVENTION
[0023] An exemplary fluidized bed reactor assembly for nitriding titanium alloys is depicted in FIG. 1. As shown in FIG. 1, the assembly includes a fluidized bed reactor 12 having inlet openings 14 disposed at one end of the reactor 12 and an outlet opening 16 disposed at the opposite end of the reactor 12. The fluidized bed reactor 12 is disposed inside of an outer tubing 18, with outlet 16 extending to the outside of outer tubing 18. During operation, the fluidized bed assembly is disposed in a furnace (not shown) to provide heat. Thermocouples 17 and 19 are disposed to monitor temperature in the reactor 12 and outer tubing 18, respectively. An inlet 20 is connected to a gas feed line 22. A gas source 24 such as a storage tank or a gas-generating reactor is connected to gas feed line 22 to supply a gas feed to the fluidized bed reactor 12. Other components, such as mass flow controller 26, pressure regulating valve 28, pressure sensor 30, and shut-off valves 32 and 34 are also disposed in the gas feed line 22 for monitoring and controlling the flow rate and pressure of the gas delivered to the reactor 12. Reactor outlet 16 is connected to outlet line 36, which is connected to a water or other liquid bubbler 38. A bleed line 40 with shut-off valve 42 also connects feed line 22 to the bubbler 38, which is vented to atmosphere through exhaust port 44.
[0024] In operation, a gas comprising nitrogen from gas source 24 is fed through feed line 22, with the flow rate and gas pressure controlled by mass flow controller 26 and pressure regulating valve 28. The nitrogen-containing gas enters the outer tubing 18 through inlet 20. The gas is heated as it passes through the space between fluidized bed 12 and outer tubing 18 to enter the fluidized bed reactor 12 through inlet 14. The fluidized bed reactor 12 has metal particles 46 comprising titanium disposed therein, and the upward gas flow rate through the reactor applies sufficient upward force to the particles 46 to counteract the force of gravity acting on the particles so that they are suspended in a fluid configuration in the reactor space. The gas flow is generally maintained below levels that would carry entrained particles out of the reactor 16 through outlet 16, and outlet 16 can also be fitted with a filter or screen to further assist in keeping metal powder particles 46 from exiting the reactor 12. Nitrogen-containing gas exits the reactor 12 through outlet 16 and flows via outlet line 36 to the bubbler 38, from which it is exhausted to the atmosphere through exhaust port 44. [0025] The invention can utilize any titanium metal or titanium metal alloy, including any of the grades of titanium alloys specified in ASTM B861-10. Alpha titanium alloys, near-alpha titanium alloys, alpha-beta titanium alloys, and beta titanium alloys. In some embodiments, the titanium alloy comprises from 0 to 10 wt.% aluminum and from 0 to 10 wt.% vanadium. In some embodiments, the titanium alloy is an alpha-beta titanium alloy such as Ti-6A1-4V (e.g., grades 5 or 23 according to ASTM B861-10), Ti-Al-Sn, Ti-Al-V-Sn, Ti-Al-Mo, Ti-Al-Nb, Ti-V-Fe-Al, Ti-8Al-lMo-lV, Ti-6Al-2Sn-4Zr-2Mo, α+β Ti-6A1-4V or near β Ti-10V-2Fe-3Al. In some embodiments, the titanium alloy is a Ti-6A1-4V alloy such as grade 5 or grade 23 according to ASTM B861-10.
[0026] The nitrogen-containing gas can contain from 1 vol.% to 100 vol.% nitrogen, more specifically from 5 vol.% to 100 vol.% nitrogen, and more specifically from 25 vol.% to 75 vol.% nitrogen. In some embodiments, the nitrogen-containing gas consists essentially of nitrogen, and in some embodiments the nitrogen-containing gas is pure. The nitriding reaction conducted in the fluidized bed reactor is typically conducted at elevated temperature, compared to ambient conditions. The reaction temperature in the reactor can range from 500°C to 800°C, more specifically from 600°C to 750°C, and even more specifically from 600°C to 700°C. Pressures in the reactor can range from 0.11 MPa to 0.13 MPa, more specifically from 0.11 MPa to 0.12 MPa, and even more specifically from 0.11 MPa to 0.115 MPa. The flow rate of nitrogen to the reactor can vary based on factors such as reactor dimension, with exemplary flow rates of 0.0069 m/min to 0.013 m/min, more specifically from 0.0097 m/min to 0.011 m/min, and even more specifically from 0.010 ml min to 0.0105 m/min. The metal powder particles can be nitrided for periods (i.e., contact time with the nitrogen-containing gas) of at least 1 minute, for example, time periods ranging from 1 minute to 30 minutes, more specifically from 1 minute to 10 minutes, and even more specifically from 1 minute to 5 minutes. In batch mode, such as depicted in the reaction scheme shown in FIG. 1, the reactor is operated for the specified amount of time to achieve the desired contact time. In a continuous mode, throughput of the particles through the reactor can be adjusted to achieve an average residence time equal to the desired contact time.
[0027] After processing the titanium-containing metal particles in the nitrogen- containing fluidized bed reactor, the particles can have a surface nitrogen content ranging from 5.96 wt.% to 12.22 wt.%, more specifically from 5.96 wt.% to 7.90 wt.%, or from 7.90 wt.% to 9.77 wt.%, or from 9.77 wt.% to 12.22 wt.%, as determined by x-ray photoelectron spectroscopy. As used herein, x-ray photoelectron spectroscopy and the values specified herein are according to the protocols of according to ASTM E2735-14, Standard Guide for Selection of Calibrations Needed for X-ray Photoelectron Spectroscopy (XPS) Experiments, ASTM International, West Conshohocken, PA, 2014. Surface nitrogen on titanium or titanium alloy metal particles can bond with titanium or other metals in the alloy such as aluminum, and in doing so can displace oxygen from metal oxide at the particle surface, thus reducing the material's oxygen content at the surface. In some embodiments, after nitriding the metal powder particles can have a nitrogen: oxygen surface wt.% ratio of from 5.96:26.20 to 7.90:21.83 as determined by x-ray photoelectron spectroscopy, and more specifically can have a nitrogen: oxygen surface wt.% ratio of from 9.77: 19.99 to 12.22: 16.75. The use of pure titanium nitride as a cold spray applied metal can result in undesirable porosity levels in the applied material. Accordingly, in some embodiments, the nitriding reaction is conducted under conditions (e.g., contact time, temperature, space velocity) so that nitriding occurs on the surface of the metal particles but not throughout the interior of the particles, resulting in particles with a surface layer comprising nitrogen and at least a portion of the particles' interior being free of nitrogen.
[0028] As mentioned above, the nitride titanium or titanium alloy metal powder is applied to a substrate with a cold spray deposition process. In a cold spray process, unmelted metal particles are introduced into a high velocity gas stream being projected out of a high velocity (e.g., supersonic) nozzle toward the coating substrate target. The particles' kinetic energy provides sufficient heat on impact with the coating substrate such that the particles plastically deform and fuse with the substrate and surrounding deposited metal material. As the particles impact the substrate, they rapidly cool even as the particles are deforming. The particles change shape dramatically from relatively round to very thin flat splats on the surface.
[0029] An exemplary system is depicted in FIG. 2. As shown in FIG. 2, metal powder is fed from powder feeder 48 through conduit 49 to spray gun 50, which includes nozzle 52 and gun heater 54. Powder particle diameter sizes can range from 1 to 120 microns, more specifically from 5 to 75 microns. Pressurized gas is fed from gas pre-heater 56 to gun heater 54 through conduit 55. Exemplary gases for use in the system include helium, nitrogen, or a mixture of helium and nitrogen. Helium can provide greater gas velocities than nitrogen and has the additional technical effect of being benefited by the nitriding process because unlike a nitrogen-based gas stream, helium does not provide any opportunity for nitriding to occur in the spray gun 50. The powder and the gas streams are mixed in the gun and accelerated to supersonic speeds as the gas/powder mixture exits the nozzle 52. The system also includes a controller or control console 58, which receives input from gun pressure sensor 60 and gun temperature sensor 62 and provides control signals to the gas pre-heater and powder feeder. The term "cold" in "cold spray deposition" refers to the fact that the gas is maintained at a temperature below the melting point of the metal powder; however, as described above the gas is heated in both the gas pre-heater 56 and the gun heater 54. The temperature of the gas used in the process can range from 0°C to 1200°C, more specifically from 200°C to 1000°C, and even more specifically from 200°C to 800°C. Gas pressure can range from 5 bar to 60 bar, more specifically from 15 bar to 45 bar, and even more specifically from 20 bar to 40 bar.
[0030] The invention is further described in the following Examples.
Examples
[0031] Ti-6A1-4V alloy powder materials were nitrided in a fluidized bed reactor as shown in FIG. 1. Approximately, 25 - 40g of Ti-6Al-4-V powder, particle size of 10 to 88 microns was loaded into the fluidized bed reactor. The reactor was then placed in a Model K- 3-18 reactor furnace (CM Furnaces, Inc.). Prior to nitridation, argon gas (Praxair) was introduced into the reactor at flow rates equivalent to the N2 rates to be used for nitridation. This was done by using an MKS type 247 mass flow controller. In each case, the furnace temperature was increased at a rate of about 4.5°C/min to the target nitridation temperature as shown in Table 1. A control sample was also prepared in which argon gas was used for the entire process without any nitrogen gas.
Table 1
[0032] After the target temperature was reached using an argon gas flow in the reactor, the gas flow was switched to nitrogen (Matheson) and the temperature was held for the times indicated in Table 1. After treating the powder samples in nitrogen at the designated temperature and time, the gas flow was switched to argon and the reactor was allowed to cool down. This was done primarily to isolate the soak time and to prevent any further nitridation that might occur at the higher temperatures during the slow cooling process. Once the powder temperature reached a low enough temperature (about 300°C), the gas flow was switched again, back to nitrogen and the furnace continued to cool down to ambient temperature. The resulting metal powders, along with samples of the untreated powder, were characterized using scanning electron microscopy (SEM) and energy dispersive X-ray microanalysis (EDX). Identification of bulk phase structures and the extent of nitridation were conducted by X-ray diffraction (XRD) using Rigaku and JADE software from MDI. Surface elemental composition was determined by X-ray photoelectron spectroscopy (XPS) using a PHI VersaProbe. Elemental surface analysis was conducted by x-ray photoelectron spectroscopy, the results of which are shown in FIG. 3. As shown in FIG. 3, nitridation at 700°C and 800°C each resulted in an increase in surface nitrogen on the particles and a decrease in surface oxygen for the particles, with nitridation at 800°C producing a greater effect than nitridation at 700°C. Surface carbon detected by XPS is believed to result from surface contamination during preparation of the metal powders.
[0033] The metal powders were used in a system as shown in FIG. 2 using helium at
700° and 30 bar as the gas or a 50/50 blend of helium and nitrogen at 800°C and 40 bar. The nitrided titanium alloy powders exhibited significantly reduced nozzle clogging (and resulting higher quality metal deposits) than either the untreated powder or the control powder.
[0034] As used herein: The singular forms "a," "an," and "the" include plural referents unless the context clearly dictates otherwise. "Or" means "and/or." The modifier "about" used in connection with a quantity is inclusive of the stated value and has the meaning dictated by the context (e.g., includes the degree of error associated with
measurement of the particular quantity). The terms "front", "back", "bottom", and/or "top" are used herein, unless otherwise noted, merely for convenience of description, and are not limited to any one position or spatial orientation. The terms "first", "second", "third", and so on are used herein, unless otherwise noted, merely for convenience of description, and are not limited to any one ordering or order of preference. The endpoints of all ranges directed to the same component or property are inclusive and independently combinable (e.g., ranges of "less than or equal to 25 wt%, or 5 wt% to 20 wt%," is inclusive of the endpoints and all intermediate values of the ranges of "5 wt% to 25 wt%," etc.). The suffix "(s)" is intended to include both the singular and the plural of the term that it modifies, thereby including at least one of that term (e.g., the colorant(s) includes at least one colorants). "Optional" or
"optionally" means that the subsequently described event or circumstance can or can not occur, and that the description includes instances where the event occurs and instances where it does not. Unless defined otherwise, technical and scientific terms used herein have the same meaning as is commonly understood by one of skill in the art to which this invention belongs. [0035] While the invention has been described in detail in connection with only a limited number of embodiments, it should be readily understood that the invention is not limited to such disclosed embodiments. Rather, the invention can be modified to incorporate any number of variations, alterations, substitutions or equivalent arrangements not heretofore described, but which are commensurate with the spirit and scope of the invention.
Additionally, while various embodiments of the invention have been described, it is to be understood that aspects of the invention may include only some of the described
embodiments. Accordingly, the invention is not to be seen as limited by the foregoing description, but is only limited by the scope of the appended claims.

Claims

CLAIMS:
1. A method of applying a metal comprising titanium to a substrate, the method comprising:
nitriding the surface of metal powder particles comprising titanium by contacting the particles with a first gas comprising nitrogen in a fluidized bed reactor; and
depositing the metal powder particles onto the substrate with cold spray deposition using a second gas.
2. The method of claim 1, wherein the metal powder particles comprise at least one titanium or titanium alloy selected from grades 5 (Ti-6A1-4V) and 23(Ti-6Al-4V), according to ASTM B861-10.
3. The method of claim 2, wherein the metal powder particles comprise at least one titanium or titanium alloy selected from Ti-6A1-4V, Ti-3A1-2.5V, Ti-5Al-2.5Sn, Ti-8A1- lMo-lV, Ti-6Al-2Sn-4Zr-2Mo, α+β Ti-6A1-4V, and near β Ti-10V-2Fe-3Al.
4. The method of any of claims 1-3, wherein the metal powder particles after nitriding comprise nitrogen at the particle surface and also comprise an internal particle portion that is free of nitrogen.
5. The method of any of claims 1-4, wherein the metal powder particles after nitriding have a surface nitrogen content ranging from 5.96 wt.% to 12.22 wt.% as determined by x-ray photoelectron spectroscopy.
6. The method of any of claims 1-5, wherein the metal powder particles after nitriding have a nitrogen:oxygen surface wt.% ratio of from 5.96:26.2 to 12.26: 16.75 as determined by x-ray photoelectron spectroscopy.
7. The method of any of claims 1-6, wherein the first gas comprises at least 1 vol.% nitrogen.
8. The method of any of claims 1-6, wherein the first gas consists essentially of nitrogen.
9. The method of any of claims 1-8, wherein the fluidized bed reactor is operated at a temperature of 500°C to 850°C.
10. The method of any of claims 1-9, wherein the first gas is at a pressure of 0.11 to 0.12 MPa.
11. The method of any of claims 1-10, wherein the space velocity of the first gas in the fluidized bed reactor is from 1 min 1 to 30 min 1.
12. The method of any of claims 1-11, wherein the metal powder particles are contacted with the first gas in the fluidized bed reactor for at least 1 minute.
13. The method of any of claims 1-12, wherein the second gas comprises helium.
14. The method of claim 13, wherein the second gas further comprises nitrogen.
15. The method of claim 13, wherein the second gas consists essentially of helium.
16. The method of any of claims 1-15, wherein the second gas is at a temperature of 20°C to 850°C.
EP16740623.0A 2015-01-21 2016-01-20 Cold spray process using treated metal powder Active EP3247516B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201562106140P 2015-01-21 2015-01-21
PCT/US2016/013995 WO2016118551A1 (en) 2015-01-21 2016-01-20 Cold spray process using treated metal powder

Publications (3)

Publication Number Publication Date
EP3247516A1 true EP3247516A1 (en) 2017-11-29
EP3247516A4 EP3247516A4 (en) 2018-08-22
EP3247516B1 EP3247516B1 (en) 2019-08-28

Family

ID=56417666

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16740623.0A Active EP3247516B1 (en) 2015-01-21 2016-01-20 Cold spray process using treated metal powder

Country Status (3)

Country Link
US (1) US20180002815A1 (en)
EP (1) EP3247516B1 (en)
WO (1) WO2016118551A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA3098314C (en) * 2016-09-07 2022-04-12 Tessonics, Inc. Hopper with microreactor and cartridge for low pressure cold spraying
CN107377968A (en) * 2017-09-08 2017-11-24 安徽工业大学 A kind of preparation facilities and preparation method of the Heterogeneous Composite powder based on injection fluidisation
US20190160528A1 (en) * 2017-11-27 2019-05-30 Hamilton Sundstrand Corporation Method and apparatus for improving powder flowability
CN109935533B (en) * 2017-12-18 2021-09-21 无锡华润安盛科技有限公司 Device and method for removing reaction layer of packaging body
US11097340B2 (en) * 2018-11-19 2021-08-24 Hamilton Sundstrand Corporation Powder cleaning systems and methods
CN111992715A (en) * 2020-08-21 2020-11-27 浙江工业大学 Laser-induced interface in-situ reaction enhanced titanium alloy additive manufacturing method
FR3116339B1 (en) * 2020-11-16 2022-11-11 Commissariat Energie Atomique Inorganic Strain Gauge

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5149514A (en) * 1989-04-04 1992-09-22 Sri International Low temperature method of forming materials using one or more metal reactants and a halogen-containing reactant to form one or more reactive intermediates
SE9001009L (en) * 1990-03-21 1991-09-22 Ytbolaget I Uppsala Ab PROCEDURE SHOULD CREATE A HAIR AND Wear-Resistant Layer With Good Adhesion To Titanium Or Titanium Regulations And Products, Manufactured According To The Procedure
EA002903B1 (en) * 1997-05-13 2002-10-31 Ричард Эдмунд Тос Tough-coated hard powders and sintered articles thereof
US7232556B2 (en) * 2003-09-26 2007-06-19 Nanoproducts Corporation Titanium comprising nanoparticles and related nanotechnology
KR101171682B1 (en) * 2010-04-19 2012-08-07 아주대학교산학협력단 A method for Nitriding Surface of Aluminum or Aluminum Alloy by Cold Spray Method

Also Published As

Publication number Publication date
EP3247516A4 (en) 2018-08-22
US20180002815A1 (en) 2018-01-04
EP3247516B1 (en) 2019-08-28
WO2016118551A1 (en) 2016-07-28

Similar Documents

Publication Publication Date Title
EP3247516B1 (en) Cold spray process using treated metal powder
EP3488950B1 (en) Method and apparatus for improving powder flowability
US11919071B2 (en) Systems and methods for synthesis of spheroidized metal powders
Kear et al. Chemical processing and properties of nanostructured WC-Co materials
EP3404127B1 (en) Functionally graded environmental barrier coating
MX2009002908A (en) Metal powder.
Gan et al. Thermal spray forming of titanium and its alloys
CN115637419B (en) A method for preparing a tantalum-tantalum carbide composite coating and its products
CN113463063A (en) Preparation method of refractory metal material
Tsipas et al. Molybdeno-aluminizing of powder metallurgy and wrought Ti and Ti-6Al-4V alloys by pack cementation process
Reddy et al. Microstructure and adhesion strength of Ni3Ti coating prepared by mechanical alloying and HVOF
Shahzad et al. Deposition of the Ti-Al coatings on different metallic substrates by mechanical alloying and subsequent laser treatment
EP3254784A1 (en) Method of coating metallic powder particles with silicon
CN108138335B (en) Method for removing oxides present on the surface of nodules of metal powder before using it in an industrial process
CN115584486B (en) Tantalum carbide coating product and preparation method thereof
US20170247785A1 (en) Reactive deposition systems and associated methods
JP2004210632A (en) Method for manufacturing nano wc-based powder by low pressure gas phase reaction method
KR930007857B1 (en) Production method of zinc-oxide whisker
US11753306B2 (en) Preparation of metal diboride and boron-doped powders
CN107858662B (en) Method for chemical vapor deposition of Co-Al of turbine blade
US20040042953A1 (en) Method of producing nanophase WC-based powder by vapor phase reaction at atmospheric pressure
CN101928909A (en) A method of preparing niobium-titanium-aluminum alloy coating by explosive spraying
US11692273B2 (en) Method for applying a titanium aluminide alloy, titanium aluminide alloy and substrate comprising a titanium aluminide alloy
Wang et al. Different compositions of TC4/TC11 functional gradient materials interface by wire arc additive manufacturing
CN115011888A (en) Amorphous alloy for non-stick cookware, non-stick cookware and manufacturing method thereof

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170809

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20180725

RIC1 Information provided on ipc code assigned before grant

Ipc: C09K 3/18 20060101ALI20180719BHEP

Ipc: C22C 29/00 20060101ALI20180719BHEP

Ipc: B22F 1/02 20060101AFI20180719BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: C09K 3/18 20060101ALI20190215BHEP

Ipc: C22C 29/00 20060101ALI20190215BHEP

Ipc: C22C 29/16 20060101ALI20190215BHEP

Ipc: C23C 8/24 20060101ALI20190215BHEP

Ipc: B22F 1/02 20060101AFI20190215BHEP

Ipc: C23C 8/80 20060101ALI20190215BHEP

Ipc: C23C 24/04 20060101ALI20190215BHEP

Ipc: B22F 1/00 20060101ALI20190215BHEP

INTG Intention to grant announced

Effective date: 20190307

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1171766

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190915

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016019450

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190828

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191128

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191128

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191230

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191228

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191129

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1171766

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190828

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200224

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016019450

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG2D Information on lapse in contracting state deleted

Ref country code: IS

26N No opposition filed

Effective date: 20200603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200120

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200120

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602016019450

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: B22F0001020000

Ipc: B22F0001000000

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190828

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230520

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20260127

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20260128

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20260121

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20260126

Year of fee payment: 11