EP3110186A4 - User equipment and base station - Google Patents
User equipment and base station Download PDFInfo
- Publication number
- EP3110186A4 EP3110186A4 EP15751341.7A EP15751341A EP3110186A4 EP 3110186 A4 EP3110186 A4 EP 3110186A4 EP 15751341 A EP15751341 A EP 15751341A EP 3110186 A4 EP3110186 A4 EP 3110186A4
- Authority
- EP
- European Patent Office
- Prior art keywords
- base station
- user equipment
- user
- equipment
- station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0001—Arrangements for dividing the transmission path
- H04L5/0003—Two-dimensional division
- H04L5/0005—Time-frequency
- H04L5/0007—Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
- H04L5/001—Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT the frequencies being arranged in component carriers
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W8/00—Network data management
- H04W8/22—Processing or transfer of terminal data, e.g. status or physical capabilities
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signaling for the administration of the divided path
- H04L5/0092—Indication of how the channel is divided
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signaling for the administration of the divided path
- H04L5/0096—Indication of changes in allocation
- H04L5/0098—Signalling of the activation or deactivation of component carriers, subcarriers or frequency bands
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/14—Two-way operation using the same type of signal, i.e. duplex
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/14—Two-way operation using the same type of signal, i.e. duplex
- H04L5/1469—Two-way operation using the same type of signal, i.e. duplex using time-sharing
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0453—Resources in frequency domain, e.g. a carrier in FDMA
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/21—Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0058—Allocation criteria
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0078—Timing of allocation
- H04L5/008—Timing of allocation once only, on installation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/14—Two-way operation using the same type of signal, i.e. duplex
- H04L5/16—Half-duplex systems; Simplex/duplex switching; Transmission of break signals non-automatically inverting the direction of transmission
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Databases & Information Systems (AREA)
- Mobile Radio Communication Systems (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014029957 | 2014-02-19 | ||
JP2014161843A JP5781674B1 (en) | 2014-02-19 | 2014-08-07 | User equipment and base station |
PCT/JP2015/054601 WO2015125860A1 (en) | 2014-02-19 | 2015-02-19 | User equipment and base station |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3110186A1 EP3110186A1 (en) | 2016-12-28 |
EP3110186A4 true EP3110186A4 (en) | 2017-01-11 |
EP3110186B1 EP3110186B1 (en) | 2018-06-20 |
Family
ID=53878359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15751341.7A Not-in-force EP3110186B1 (en) | 2014-02-19 | 2015-02-19 | User equipment and base station |
Country Status (6)
Country | Link |
---|---|
US (1) | US11082834B2 (en) |
EP (1) | EP3110186B1 (en) |
JP (1) | JP5781674B1 (en) |
KR (1) | KR20160122699A (en) |
CN (1) | CN106031205B (en) |
WO (1) | WO2015125860A1 (en) |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105874856B (en) * | 2014-12-05 | 2019-10-22 | 华为技术有限公司 | A kind of different configuration of localization method and device of TDD uplink and downlink |
US9820298B2 (en) | 2015-03-09 | 2017-11-14 | Ofinno Technologies, Llc | Scheduling request in a wireless device and wireless network |
US10182406B2 (en) | 2015-03-09 | 2019-01-15 | Comcast Cable Communications, Llc | Power headroom report for a wireless device and a base station |
US10327236B2 (en) | 2015-03-09 | 2019-06-18 | Comcast Cable Communications, Llc | Secondary cell in a wireless device and wireless network |
US9820264B2 (en) | 2015-03-09 | 2017-11-14 | Ofinno Technologies, Llc | Data and multicast signals in a wireless device and wireless network |
US10700845B2 (en) | 2015-03-09 | 2020-06-30 | Comcast Cable Communications, Llc | Secondary cell deactivation in a wireless device and a base station |
US11641255B2 (en) | 2015-04-05 | 2023-05-02 | Comcast Cable Communications, Llc | Uplink control information transmission in a wireless network |
US9877334B2 (en) * | 2015-04-05 | 2018-01-23 | Ofinno Technologies, Llc | Cell configuration in a wireless device and wireless network |
US10200177B2 (en) | 2015-06-12 | 2019-02-05 | Comcast Cable Communications, Llc | Scheduling request on a secondary cell of a wireless device |
US9894681B2 (en) | 2015-06-12 | 2018-02-13 | Ofinno Technologies, Llc | Uplink scheduling in a wireless device and wireless network |
US9948487B2 (en) | 2015-06-15 | 2018-04-17 | Ofinno Technologies, Llc | Uplink resource allocation in a wireless network |
US10575287B2 (en) * | 2015-08-23 | 2020-02-25 | Lg Electronics Inc. | Method for transmitting PUCCH using FDD frame in wireless communication system and device therefor |
JP2017092827A (en) * | 2015-11-13 | 2017-05-25 | 株式会社Nttドコモ | User device, base station, notification method, and setting method |
JPWO2017195471A1 (en) * | 2016-05-11 | 2019-03-14 | 株式会社Nttドコモ | User equipment and base station |
US10158477B2 (en) * | 2016-07-28 | 2018-12-18 | At&T Mobility Ii Llc | Method and apparatus for defining carrier aggregation group sets |
JP2021016010A (en) * | 2017-10-06 | 2021-02-12 | 株式会社Nttドコモ | User equipment and base station apparatus |
KR102012360B1 (en) * | 2018-01-16 | 2019-10-21 | 에스케이텔레콤 주식회사 | Load balancing method and apparatus for communication system with carrier aggregation technology |
WO2019146542A1 (en) * | 2018-01-25 | 2019-08-01 | 株式会社Nttドコモ | User equipment and base station device |
KR102615743B1 (en) * | 2018-02-14 | 2023-12-20 | 텔레폰악티에볼라겟엘엠에릭슨(펍) | Configuring narrowband positioning reference signals |
US11212786B2 (en) | 2018-05-09 | 2021-12-28 | Qualcomm Incorporated | Service and format indication techniques for downlink control information |
CN112738893B (en) * | 2018-09-21 | 2022-04-12 | 华为技术有限公司 | Method, related device, storage medium and system for transmitting capability information of user terminal |
CN113014724B (en) * | 2019-12-18 | 2023-04-11 | 深圳市万普拉斯科技有限公司 | Dual-connection mode starting method and device, mobile terminal and readable storage medium |
CN118235468A (en) * | 2021-11-19 | 2024-06-21 | 株式会社Ntt都科摩 | Terminal, base station and communication method |
CN114902713A (en) * | 2022-04-08 | 2022-08-12 | 北京小米移动软件有限公司 | Information transmission method, device, equipment and storage medium |
CN116321324B (en) * | 2023-04-27 | 2023-10-13 | 荣耀终端有限公司 | Communication method and related equipment |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013024796A1 (en) * | 2011-08-12 | 2013-02-21 | 株式会社エヌ・ティ・ティ・ドコモ | Mobile communication method and wireless base station |
US20130051288A1 (en) * | 2011-08-22 | 2013-02-28 | Sharp Laboratories Of America, Inc. | User equipment capability signaling |
WO2013077554A1 (en) * | 2011-11-25 | 2013-05-30 | 주식회사 팬택 | Method and device for transmitting/receiving transmission mode information on user terminal in inter-band tdd transmission scheme |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102378370B (en) | 2010-08-13 | 2014-10-29 | 电信科学技术研究院 | Method and device for processing carrier aggregation capacity |
US20120106404A1 (en) * | 2010-11-01 | 2012-05-03 | Qualcomm Incorporated | Fdd and tdd carrier aggregation |
US20130242881A1 (en) * | 2012-03-16 | 2013-09-19 | Yiping Wang | Explicit indication of uplink control channel resources in carrier aggregation systems |
KR20130126427A (en) * | 2012-05-11 | 2013-11-20 | 주식회사 팬택 | Apparatus and method of transmitting user equipment capability information in multiple component carrier system |
JP2014090396A (en) | 2012-10-04 | 2014-05-15 | Ntt Docomo Inc | Mobile station and wireless base station |
JP5857940B2 (en) | 2012-10-31 | 2016-02-10 | 株式会社デンソー | Wireless communication device |
US9699825B2 (en) * | 2013-01-16 | 2017-07-04 | Lg Electronics Inc. | Method and apparatus for transmitting indication in wireless communication system |
US9497682B2 (en) * | 2013-06-07 | 2016-11-15 | Intel Corporation | Central processing unit and methods for supporting coordinated multipoint transmission in an LTE network |
US9642162B2 (en) * | 2013-10-22 | 2017-05-02 | Acer Incorporated | Signaling method to configure multiple carriers used by wireless device and base station in carrier aggregation operation |
US9900923B2 (en) * | 2013-11-01 | 2018-02-20 | Qualcomm Incorporated | Techniques for using carrier aggregation in dual connectivity wireless communications |
US9544920B2 (en) * | 2014-01-30 | 2017-01-10 | Intel IP Corporation | Random access procedure for dual connectivity |
US9713044B2 (en) * | 2014-01-30 | 2017-07-18 | Sharp Kabushiki Kaisha | Systems and methods for dual-connectivity operation |
US20150223095A1 (en) * | 2014-01-31 | 2015-08-06 | Telefonaktiebolaget L M Ericsson (Publ) | Method for Configuring a Dual Connectivity User Equipment |
-
2014
- 2014-08-07 JP JP2014161843A patent/JP5781674B1/en active Active
-
2015
- 2015-02-19 KR KR1020167018145A patent/KR20160122699A/en unknown
- 2015-02-19 CN CN201580008875.9A patent/CN106031205B/en active Active
- 2015-02-19 WO PCT/JP2015/054601 patent/WO2015125860A1/en active Application Filing
- 2015-02-19 US US15/119,828 patent/US11082834B2/en active Active
- 2015-02-19 EP EP15751341.7A patent/EP3110186B1/en not_active Not-in-force
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013024796A1 (en) * | 2011-08-12 | 2013-02-21 | 株式会社エヌ・ティ・ティ・ドコモ | Mobile communication method and wireless base station |
US20140213268A1 (en) * | 2011-08-12 | 2014-07-31 | Ntt Docomo, Inc. | Mobile communication method and radio base station |
US20130051288A1 (en) * | 2011-08-22 | 2013-02-28 | Sharp Laboratories Of America, Inc. | User equipment capability signaling |
WO2013077554A1 (en) * | 2011-11-25 | 2013-05-30 | 주식회사 팬택 | Method and device for transmitting/receiving transmission mode information on user terminal in inter-band tdd transmission scheme |
US20140328228A1 (en) * | 2011-11-25 | 2014-11-06 | Pantech Co., Ltd | Method and device for transmitting/receiving transmission mode information on user terminal in inter-band tdd transmission scheme |
Non-Patent Citations (3)
Title |
---|
HUAWEI ET AL: "Standard impact of TDD-FDD CA for UEs not supporting simultaneous transmission and reception", vol. RAN WG1, no. Prague, Czech Republic; 20140210 - 20140214, 9 February 2014 (2014-02-09), XP050735599, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN1/Docs/> [retrieved on 20140209] * |
PANTECH: "Glitch issue on independent activation/deactivation by each eNB for dual connectivity", vol. RAN WG2, no. Prague, Czech Republic; 20140210 - 20140214, 9 February 2014 (2014-02-09), XP050791649, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/> [retrieved on 20140209] * |
See also references of WO2015125860A1 * |
Also Published As
Publication number | Publication date |
---|---|
WO2015125860A1 (en) | 2015-08-27 |
KR20160122699A (en) | 2016-10-24 |
US11082834B2 (en) | 2021-08-03 |
CN106031205B (en) | 2020-03-27 |
US20170064541A1 (en) | 2017-03-02 |
EP3110186B1 (en) | 2018-06-20 |
JP2015173429A (en) | 2015-10-01 |
JP5781674B1 (en) | 2015-09-24 |
EP3110186A1 (en) | 2016-12-28 |
CN106031205A (en) | 2016-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3280209A4 (en) | User equipment and base station | |
EP3110186A4 (en) | User equipment and base station | |
EP3179770A4 (en) | User equipment and base station | |
IL250759A0 (en) | Sudac, user equipment, base station and sudac system | |
EP3179800A4 (en) | User terminal and base station | |
EP3122093A4 (en) | User device and base station | |
EP3190827A4 (en) | Base station and user device | |
EP3200497A4 (en) | Base station and user device | |
EP3174338A4 (en) | User terminal and base station | |
EP3225060A4 (en) | Methods, base station and user equipment | |
EP3190840A4 (en) | Terminal and base station | |
EP3217759A4 (en) | Base station and user terminal | |
EP3413486A4 (en) | User equipment and base station | |
EP3200498A4 (en) | Beam configuration method, base station and user equipment | |
EP3122095A4 (en) | Base station and user device | |
EP3291599A4 (en) | User device and base station | |
EP3200510A4 (en) | Base station and mobile station | |
EP3122104A4 (en) | Terminal device and base station device | |
EP3200516A4 (en) | Base station and user terminal | |
EP3217703A4 (en) | Wireless base station and user terminal | |
EP3122116A4 (en) | Terminal device and base station device | |
EP3280191A4 (en) | Base station and user device | |
EP3122141A4 (en) | Terminal device and base station device | |
EP3166350A4 (en) | Mobile station device and base station device | |
EP3273730A4 (en) | User device and base station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20160901 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20161208 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: H04W 8/22 20090101AFI20161202BHEP Ipc: H04W 72/04 20090101ALI20161202BHEP Ipc: H04L 5/00 20060101ALI20161202BHEP |
|
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20170731 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602015012570 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: H04W0008220000 Ipc: H04L0005000000 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: H04W 8/22 20090101ALI20180115BHEP Ipc: H04L 5/14 20060101ALI20180115BHEP Ipc: H04L 5/16 20060101ALN20180115BHEP Ipc: H04W 72/04 20090101ALI20180115BHEP Ipc: H04L 5/00 20060101AFI20180115BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: H04L 5/00 20060101AFI20180130BHEP Ipc: H04W 72/04 20090101ALI20180130BHEP Ipc: H04W 8/22 20090101ALI20180130BHEP Ipc: H04L 5/16 20060101ALN20180130BHEP Ipc: H04L 5/14 20060101ALI20180130BHEP |
|
INTG | Intention to grant announced |
Effective date: 20180302 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602015012570 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1011323 Country of ref document: AT Kind code of ref document: T Effective date: 20180715 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180620 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180920 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180920 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180921 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1011323 Country of ref document: AT Kind code of ref document: T Effective date: 20180620 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181020 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602015012570 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20190321 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602015012570 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20190219 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190219 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190228 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190228 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190228 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190219 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190219 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190903 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190228 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190228 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190219 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181022 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20150219 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180620 |