EP3067523A1 - Turbomachine exhaust frame lifting system and method - Google Patents
Turbomachine exhaust frame lifting system and method Download PDFInfo
- Publication number
- EP3067523A1 EP3067523A1 EP16159455.1A EP16159455A EP3067523A1 EP 3067523 A1 EP3067523 A1 EP 3067523A1 EP 16159455 A EP16159455 A EP 16159455A EP 3067523 A1 EP3067523 A1 EP 3067523A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- shell portion
- flange
- exhaust frame
- flange section
- shell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D25/00—Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
- F01D25/28—Supporting or mounting arrangements, e.g. for turbine casing
- F01D25/285—Temporary support structures, e.g. for testing, assembling, installing, repairing; Assembly methods using such structures
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05D—INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- F05D2230/00—Manufacture
- F05D2230/60—Assembly methods
- F05D2230/68—Assembly methods using auxiliary equipment for lifting or holding
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05D—INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- F05D2230/00—Manufacture
- F05D2230/72—Maintenance
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05D—INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- F05D2260/00—Function
- F05D2260/02—Transport and handling during maintenance and repair
Definitions
- the subject matter disclosed herein relates to the art of turbomachines and, more particularly to a turbomachine exhaust frame lifting system and method of lifting an exhaust frame.
- Turbomachine systems typically include a compressor portion coupled to a turbine portion through a combustor assembly.
- An exhaust frame may be coupled to an outlet of the turbine portion.
- the exhaust frame serves as an interface with an exhaust system.
- the exhaust frame typically includes a lower shell portion and an upper shell portion.
- the upper shell portion is coupled to the lower shell portion through first and second bolted joints. Occasionally it is desirable to separate the upper shell portion from the lower shell portion to access internal components for maintenance, repair and/or replacement. Separation of the upper shell portion from the lower shell portion to access the internal components requires a crane.
- an exhaust frame includes a first shell portion including a flange portion, and a second shell portion including a flange section configured to be joined to the flange portion.
- the second shell portion is spaced from the first shell portion a desired distance.
- a rail system is mounted to the flange section, and a trolley is mounted to the flange portion.
- the first shell portion is axially shiftable along the rail system to expose an internal portion of the exhaust frame.
- a method of lifting and shifting a shell portion of an exhaust frame includes installing one or more lifting members through a flange portion of a first shell portion to a flange section of a second shell portion of the exhaust frame, operating the one or more lifting members separating the first shell portion from the second shell portion a desired distance, installing a trolley on the flange portion of the first shell portion, mounting a rail system to the flange section of the second shell portion, and shifting the first shell portion relative to the second shell portion upon the rail system.
- Exhaust frame 2 includes a first shell portion 4 and a second shell portion 6.
- First shell portion 4 is shown as an upper shell while second shell portion 6 is shown as a lower shell.
- First shell portion 4 includes a first flange portion 8 and a second flange portion 10 ( FIG. 6 ).
- second shell 6 includes a first flange section 14 and a second flange section 16 ( FIG. 3 ).
- first flange portion 8 is joined to first flange section 14 to form a first bolted joint (not separately labeled) and second flange portion 10 is joined to second flange section 16 to form a second bolted joint (also not separately labeled).
- First flange portion 8 includes a plurality of threaded openings, one of which is indicated at 20, and a plurality of unthreaded openings, one of which is indicated at 22.
- first flange section 14 includes a plurality of threaded openings, one of which is indicated at 25, and a plurality of unthreaded openings 26.
- mechanical fasteners (not shown) pass through unthreaded openings 22 of first flange portion 8 and engage with threaded openings 25 of first flange section 14 to join first shell portion 4 to second shell portion 6.
- a first guide member 32 is passed through first flange portion 8 and first flange section 14.
- a second guide member 34 is also passed through first flange portion 8 and first flange section 14 spaced from first guide member 32.
- First and second guide members 32 and 34 include first and second collars 36 and 38 respectively. Collars 36 and 38 prevent first and second guide members 32 and 34 from passing completely through first flange portion 8.
- First and second guide members 32 and 34 may pass through unthreaded openings 22 in first flange portion 8 that register with threaded openings 25 in first flange section 14 in order to maintain a desired alignment between first shell portion 4 and second shell portion 6. It should be understood that additional guide members (not shown) may be passed through second flange portion 10 and second flange section 16.
- a first lifting member 42 is threaded into one of threaded openings 20 in first flange portion 8 and engages with first flange section 14. In the exemplary embodiment shown, first lifting member 42 engages into an unthreaded opening 26 in first flange section 14.
- a second lifting member 44 is threaded into another one of threaded openings 20 in first flange portion 8 and engages with first flange section 14. In the exemplary embodiment shown, second lifting member 44 engages into another unthreaded opening 26 in first flange section 14.
- first and second lifting members 42 and 44 may simply engage an outer surface (not separately labeled) of first flange section 14.
- First lifting member 42 includes a first end 48, a second end 49 ( FIG. 2 ), and an intermediate portion 50 extending therebetween. Intermediate portion 50 includes a plurality of threads 52 that may engage with one of threaded openings 20.
- a tool engagement member 54 is arranged at first end 48. Tool engagement member 54 includes a rotating count indicator 56 that enables technicians to determine how many revolutions are imparted to first lifting member 42 during lifting. In this manner, the technicians ensure that first shell portion 4 is lifted evenly to reduce stresses.
- second lifting member 44 includes a first end 58 a second end 59 ( FIG. 2 ), and an intermediate portion 60 extending therebetween. A plurality of threads 62 are provided on intermediate portion 60.
- First end 58 includes a tool engagement member 64 having a rotating count indicator 66.
- first and second lifting members 42 and 44 are rotated causing first shell portion 4 to begin to lift.
- a cribbing block 70 may be inserted between first flange portion 8 and first flange section 14.
- Cribbing block 70 may include structure (not shown) that engages with threaded openings 25 and/or unthreaded openings 26. Cribbing block 70 may provide additional support to first flange portion 8 during lifting.
- first and second lifting members 42 and 44 may be manipulated to further lift first shell portion 4 and another cribbing block 72 is installed upon cribbing block 70.
- first and second guide members 32 and 34 maintain a desired alignment between first shell portion 4 and second shell portion 6.
- first shell portion 4 is supported on cribbing blocks 70 and 72 and first and second lifting members 42 and 44 are backed out a distance sufficient to allow insertion of first and second spacers 74 and 76.
- Spacers may be a single height, such as shown in connection with spacer 74, or may include multiple spacer portions, as shown with spacer 76.
- first and second lifting members 42 and 44 are threaded back into first flange portion 8 to further lift first shell portion 4 to a desired height, as shown in FIG. 5 .
- the desired height is about 24 inches (60.96-centimeters).
- cribbing blocks 70 and 72 are replaced by final cribbing blocks 81 and 82.
- Final cribbing blocks 81 and 82 include a length substantially equivalent to the desired height and may be retained through mechanical fasteners 84 and 85 respectively.
- first shell portion 4 is shown supported above second shell portion 6 through final cribbing blocks 81 and 82. Further, second spacer 76 may be replaced with a third spacer 87 that provides additional clearance to enhance access and facilitate shifting first shell portion 4.
- a trolley 90 is installed to first flange portion 8 and a rail system 94 is installed to first flange section 14.
- Trolley 90 includes a support plate 104 that is coupled to first flange portion 8 by a plurality of mechanical fasteners, one of which is indicated at 106.
- a first wheel 108 and a second wheel 109 are connected to support plate 104. At this point, it should be understood that while shown with two wheels 108 and 109, the number of wheels may vary.
- support plate 104 positions first and second wheels 108 and 109 laterally outwardly of first flange portion 8. It should also be understood, that another trolley 112 is coupled to second flange portion 10.
- Rail system 94 includes a rail member 116 having a first end portion 118, a second end portion 119, and an intermediate portion 120.
- Rail member 116 includes a base member 122 and a support member 124 joined by an interconnecting web 126.
- Support member 124 includes a support surface 129 extending between first end portion 118 and second end portion 119.
- Support member 124 also includes a first blocking tab 132 extending between first and second end portions 118 and 119 on a first lateral side of support surface 129, and a second blocking tab 133 extending between first and second end portions 118 and 119 on a second, opposing side of support surface 129.
- First and second blocking tabs 132 and 133 create a guide track for first and second wheels 108 and 109.
- Base member 122 is coupled to a plurality of brackets 136-139 that are spaced between first end portion 118 and second end portion 119. Brackets 136-139 are secured to base member 122 through a plurality of mechanical fasteners, one of which is indicated at 142. Additional mechanical fasteners, one of which is indicated at 145, secure brackets 136-139 to first flange section 14. In accordance with an aspect of an exemplary embodiment, brackets 136-139 position rail member 116 laterally outwardly of first flange section 14 such that support surface 129 aligns with first and second wheels 108 and 109. It should also be understood that another rail system 150 is coupled to second flange section 16.
- First and second lifting members 42 and 44 may now be backed out to lower first shell portion 4 onto rail systems 94 and 150. At this point, all lifting members and guide members may be removed and first shell portion 4 shifted along rail systems 94 and 150 to provide access to internal portions of exhaust frame 2. At this point, it should be understood, that the exemplary embodiments provide a system and method for lifting and shifting an exhaust frame shell portion installed in an area that may be inaccessible to cranes or other large lifting devices.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
- Automatic Assembly (AREA)
Abstract
Description
- The subject matter disclosed herein relates to the art of turbomachines and, more particularly to a turbomachine exhaust frame lifting system and method of lifting an exhaust frame.
- Turbomachine systems typically include a compressor portion coupled to a turbine portion through a combustor assembly. An exhaust frame may be coupled to an outlet of the turbine portion. The exhaust frame serves as an interface with an exhaust system. The exhaust frame typically includes a lower shell portion and an upper shell portion. The upper shell portion is coupled to the lower shell portion through first and second bolted joints. Occasionally it is desirable to separate the upper shell portion from the lower shell portion to access internal components for maintenance, repair and/or replacement. Separation of the upper shell portion from the lower shell portion to access the internal components requires a crane.
- According to one aspect of an exemplary embodiment, an exhaust frame includes a first shell portion including a flange portion, and a second shell portion including a flange section configured to be joined to the flange portion. The second shell portion is spaced from the first shell portion a desired distance. A rail system is mounted to the flange section, and a trolley is mounted to the flange portion. The first shell portion is axially shiftable along the rail system to expose an internal portion of the exhaust frame.
- According to another aspect of an exemplary embodiment, a method of lifting and shifting a shell portion of an exhaust frame includes installing one or more lifting members through a flange portion of a first shell portion to a flange section of a second shell portion of the exhaust frame, operating the one or more lifting members separating the first shell portion from the second shell portion a desired distance, installing a trolley on the flange portion of the first shell portion, mounting a rail system to the flange section of the second shell portion, and shifting the first shell portion relative to the second shell portion upon the rail system.
- These and other advantages and features will become more apparent from the following description taken in conjunction with the drawings.
- The subject matter, which is regarded as the invention, is particularly pointed out and distinctly claimed in the claims at the conclusion of the specification. The foregoing and other features, and advantages of the invention are apparent from the following detailed description taken in conjunction with the accompanying drawings in which:
-
FIG. 1 depicts an exhaust frame prior to being separated, in accordance with an exemplary embodiment; -
FIG. 2 depicts a first shell portion of the exhaust frame being lifted relative to a second shell portion of the exhaust frame through one or more lifting members; -
FIG. 3 depicts the first shell portion being further lifted relative to the second shell portion; -
FIG. 4 depicts the first shell portion being still further lifted through the use of spacers; -
FIG. 5 depicts the first shell portion being lifted to a desired height; -
FIG. 6 depicts a trolley mounted to a flange portion of the first shell portion and a rail system mounted to a flange section of the second shell portion; -
FIG. 7 depicts the rail system ofFIG. 6 ; and -
FIG. 8 depicts an end view of the rail system ofFIG. 7 . - The detailed description explains embodiments of the invention, together with advantages and features, by way of example with reference to the drawings.
- An exhaust frame for a turbomachine, in accordance with an exemplary embodiment, is indicated generally at 2, in
FIG. 1 .Exhaust frame 2 includes afirst shell portion 4 and asecond shell portion 6.First shell portion 4 is shown as an upper shell whilesecond shell portion 6 is shown as a lower shell. Of course, it should be understood that the terms "first" and "second" should not be understood to be limited to upper and lower.First shell portion 4 includes afirst flange portion 8 and a second flange portion 10 (FIG. 6 ). Similarly,second shell 6 includes afirst flange section 14 and a second flange section 16 (FIG. 3 ). During operation,first flange portion 8 is joined tofirst flange section 14 to form a first bolted joint (not separately labeled) andsecond flange portion 10 is joined tosecond flange section 16 to form a second bolted joint (also not separately labeled). - Reference will now follow to
first flange portion 8 andfirst flange section 14 with an understanding thatsecond flange portion 10 andsecond flange section 16 may include similar structure.First flange portion 8 includes a plurality of threaded openings, one of which is indicated at 20, and a plurality of unthreaded openings, one of which is indicated at 22. Similarly,first flange section 14 includes a plurality of threaded openings, one of which is indicated at 25, and a plurality ofunthreaded openings 26. Generally, mechanical fasteners (not shown) pass throughunthreaded openings 22 offirst flange portion 8 and engage with threadedopenings 25 offirst flange section 14 to joinfirst shell portion 4 tosecond shell portion 6. However, occasionally, it is desirable to liftfirst shell portion 4 away fromsecond shell portion 6 to expose an internal chamber (not separately labeled) ofexhaust frame 2 for maintenance and/or repair. - In accordance with an aspect of an exemplary embodiment, a
first guide member 32 is passed throughfirst flange portion 8 andfirst flange section 14. Asecond guide member 34 is also passed throughfirst flange portion 8 andfirst flange section 14 spaced fromfirst guide member 32. First and 32 and 34 include first andsecond guide members 36 and 38 respectively. Collars 36 and 38 prevent first andsecond collars 32 and 34 from passing completely throughsecond guide members first flange portion 8. First and 32 and 34 may pass throughsecond guide members unthreaded openings 22 infirst flange portion 8 that register with threadedopenings 25 infirst flange section 14 in order to maintain a desired alignment betweenfirst shell portion 4 andsecond shell portion 6. It should be understood that additional guide members (not shown) may be passed throughsecond flange portion 10 andsecond flange section 16. - In further accordance with an exemplary embodiment, a
first lifting member 42 is threaded into one of threadedopenings 20 infirst flange portion 8 and engages withfirst flange section 14. In the exemplary embodiment shown, firstlifting member 42 engages into anunthreaded opening 26 infirst flange section 14. Asecond lifting member 44 is threaded into another one of threadedopenings 20 infirst flange portion 8 and engages withfirst flange section 14. In the exemplary embodiment shown,second lifting member 44 engages into anotherunthreaded opening 26 infirst flange section 14. At this point, it should be understood, that first and 42 and 44 may simply engage an outer surface (not separately labeled) ofsecond lifting members first flange section 14. -
First lifting member 42 includes afirst end 48, a second end 49 (FIG. 2 ), and anintermediate portion 50 extending therebetween.Intermediate portion 50 includes a plurality ofthreads 52 that may engage with one of threadedopenings 20. Atool engagement member 54 is arranged atfirst end 48.Tool engagement member 54 includes arotating count indicator 56 that enables technicians to determine how many revolutions are imparted to first liftingmember 42 during lifting. In this manner, the technicians ensure thatfirst shell portion 4 is lifted evenly to reduce stresses. In a similar manner,second lifting member 44 includes a first end 58 a second end 59 (FIG. 2 ), and anintermediate portion 60 extending therebetween. A plurality ofthreads 62 are provided onintermediate portion 60.First end 58 includes atool engagement member 64 having a rotatingcount indicator 66. - Reference will now follow to
FIGs. 2-6 , wherein like reference numbers represent corresponding parts in the respective views in describing a method of lifting and shiftingfirst shell portion 4 fromsecond shell portion 6. It should also be understood that the discussion will follow describing actions that occur atfirst flange portion 8 andsecond flange section 14 with an understanding that similar actions take place atsecond flange portion 10 andsecond flange section 16. As shown inFIG. 2 , first and 42 and 44 are rotated causingsecond lifting members first shell portion 4 to begin to lift. Once separated, acribbing block 70 may be inserted betweenfirst flange portion 8 andfirst flange section 14.Cribbing block 70 may include structure (not shown) that engages with threadedopenings 25 and/orunthreaded openings 26. Cribbingblock 70 may provide additional support tofirst flange portion 8 during lifting. - In
FIG. 3 , first and 42 and 44 may be manipulated to further liftsecond lifting members first shell portion 4 and another cribbingblock 72 is installed upon cribbingblock 70. During lifting, first and 32 and 34 maintain a desired alignment betweensecond guide members first shell portion 4 andsecond shell portion 6. InFIG. 4 ,first shell portion 4 is supported on cribbing 70 and 72 and first andblocks 42 and 44 are backed out a distance sufficient to allow insertion of first andsecond lifting members 74 and 76. Spacers may be a single height, such as shown in connection withsecond spacers spacer 74, or may include multiple spacer portions, as shown withspacer 76. At this point, first and 42 and 44 are threaded back intosecond lifting members first flange portion 8 to further liftfirst shell portion 4 to a desired height, as shown inFIG. 5 . In accordance with an aspect of an exemplary embodiment, the desired height is about 24 inches (60.96-centimeters). At the desired height, cribbing 70 and 72 are replaced by final cribbing blocks 81 and 82. Final cribbing blocks 81 and 82 include a length substantially equivalent to the desired height and may be retained throughblocks 84 and 85 respectively.mechanical fasteners - In
FIG. 6 ,first shell portion 4 is shown supported abovesecond shell portion 6 through final cribbing blocks 81 and 82. Further,second spacer 76 may be replaced with athird spacer 87 that provides additional clearance to enhance access and facilitate shiftingfirst shell portion 4. Atrolley 90 is installed tofirst flange portion 8 and arail system 94 is installed tofirst flange section 14.Trolley 90 includes asupport plate 104 that is coupled tofirst flange portion 8 by a plurality of mechanical fasteners, one of which is indicated at 106. Afirst wheel 108 and asecond wheel 109 are connected to supportplate 104. At this point, it should be understood that while shown with two 108 and 109, the number of wheels may vary. In further accordance with an aspect of an exemplary embodiment,wheels support plate 104 positions first and 108 and 109 laterally outwardly ofsecond wheels first flange portion 8. It should also be understood, that anothertrolley 112 is coupled tosecond flange portion 10. - Reference will now follow to
FIGs. 7 and 8 in describingrail system 94 in accordance with an aspect of an exemplary embodiment.Rail system 94 includes arail member 116 having afirst end portion 118, asecond end portion 119, and anintermediate portion 120.Rail member 116 includes abase member 122 and asupport member 124 joined by an interconnectingweb 126.Support member 124 includes asupport surface 129 extending betweenfirst end portion 118 andsecond end portion 119.Support member 124 also includes afirst blocking tab 132 extending between first and 118 and 119 on a first lateral side ofsecond end portions support surface 129, and asecond blocking tab 133 extending between first and 118 and 119 on a second, opposing side ofsecond end portions support surface 129. First and second blocking 132 and 133 create a guide track for first andtabs 108 and 109.second wheels -
Base member 122 is coupled to a plurality of brackets 136-139 that are spaced betweenfirst end portion 118 andsecond end portion 119. Brackets 136-139 are secured tobase member 122 through a plurality of mechanical fasteners, one of which is indicated at 142. Additional mechanical fasteners, one of which is indicated at 145, secure brackets 136-139 tofirst flange section 14. In accordance with an aspect of an exemplary embodiment, brackets 136-139position rail member 116 laterally outwardly offirst flange section 14 such thatsupport surface 129 aligns with first and 108 and 109. It should also be understood that anothersecond wheels rail system 150 is coupled tosecond flange section 16. - First and
42 and 44 may now be backed out to lowersecond lifting members first shell portion 4 onto 94 and 150. At this point, all lifting members and guide members may be removed andrail systems first shell portion 4 shifted along 94 and 150 to provide access to internal portions ofrail systems exhaust frame 2. At this point, it should be understood, that the exemplary embodiments provide a system and method for lifting and shifting an exhaust frame shell portion installed in an area that may be inaccessible to cranes or other large lifting devices. - The term "about" is intended to include the degree of error associated with measurement of the particular quantity based upon the equipment available at the time of filing the application. For example, "about" can include a range of ± 8% or 5%, or 2% of a given value.
- The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and/or "comprising," when used in this specification, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one more other features, integers, steps, operations, element components, and/or groups thereof.
- While the invention has been described in detail in connection with only a limited number of embodiments, it should be readily understood that the invention is not limited to such disclosed embodiments. Rather, the invention can be modified to incorporate any number of variations, alterations, substitutions or equivalent arrangements not heretofore described, but which are commensurate with the spirit and scope of the invention. Additionally, while various embodiments of the invention have been described, it is to be understood that aspects of the invention may include only some of the described embodiments. Accordingly, the invention is not to be seen as limited by the foregoing description, but is only limited by the scope of the appended claims.
Claims (15)
- An exhaust frame (2) comprising:a first shell portion (4) including a flange portion (8,10);a second shell portion (6) including a flange section (14,16) configured to be joined with the flange portion (8,10), the second shell portion (4) being spaced from the first shell portion a desired distance;a rail system (94) mounted to the flange section (14,16); anda trolley (90) mounted to the flange portion (8,10), the first shell portion (4) being axially shiftable along the rail system (94) to expose an internal portion of the exhaust frame (2).
- The exhaust frame according to claim 1, wherein the desired distance is about 61 centimeters (24-inches).
- The exhaust frame according to claim 1 or 2, wherein the trolley (90) includes a support plate (104) and at least one wheel (108,109), the support plate (104) being coupled to the flange portion (8,10).
- The exhaust frame according to claim 3, wherein the at least one wheel includes a first wheel (108) and a second wheel (109).
- The exhaust frame according to claim 3 or 4, wherein the at least one wheel (108,109) is positioned laterally outwardly of the flange portion (8,10).
- The exhaust frame according to any of claims 3 to 5, wherein the rail system (96) includes a rail member (124) having a support surface (129), and at least one support bracket (136-139) coupled to the flange section (14,16).
- The exhaust frame according to claim 6, wherein the support surface (129) is positioned laterally outwardly of the flange section (14,16).
- The exhaust frame according to claim 6 or 7, wherein the rail member (124) includes a first blocking tab (132) projecting outwardly of the support surface (129) and second blocking tab (133) projecting outwardly of the support surface (129) spaced from the first blocking tab, the at least one wheel (108,109) being supported by the support surface (129) between the first and second blocking tabs (132,133).
- The exhaust frame according to any preceding claim, further comprising: a plurality of lifting members (42,44) extending through the flange portion (8,10) to the flange section (14,16), each of the plurality of lifting members (42,44) acting on the flange section (14,16) to raise the first shell portion (4), at least one of the plurality of lifting members (42,44) including a rotating count indicator (66).
- The exhaust frame according to any preceding claim, further comprising: a plurality of guide members (32,34) extending through the flange portion (8,10) and the flange section (14,16), the plurality of guide members (32,34) maintaining a desired alignment between the first and second shell portions (4,6).
- A method of lifting and shifting a shell portion (4,6) of an exhaust frame (2) comprising:installing one or more lifting members (42,44) through a flange portion (8,10) of a first shell portion (4) to a flange section (14,16) of a second shell portion (6) of the exhaust frame (2);operating the one or more lifting members (42,44) separating the first shell portion (4) from the second shell portion (6) a desired distance;installing a trolley (90) on the flange portion (8,10) of the first shell portion (4);mounting a rail system (94) to the flange section (14,16) of the second shell portion (6); andshifting the first shell portion (4) relative to the second shell portion (6) upon the rail system (94).
- The method of claim 11, wherein operating the one or more lifting members (42,44) includes engaging threads (52) on each of the one or more lifting members (42,44) with corresponding threads (20) in the flange portion (8,10).
- The method of claim 12, further comprising:installing one or more cribbing blocks (70,72) between the flange portion (8,10) and the flange section (14,16); andsupporting the first shell portion (4) on the second shell portion (6) through the one or more cribbing blocks (70,72).
- The method of claim 13, further comprising:installing one or more spacers (74,76) to the flange section (14,16); andengaging the one or more lifting members (42,44) with corresponding ones of the one or more spacers (74,76) to further lift the first shell portion (4) from the second shell portion (6).
- The method of any of claims 11 to 14, further comprising: lowering the first shell portion (4) relative to the second shell portion (6) engaging at least one wheel (108,109), on the trolley (90) with a support surface (129) of the rail system (94) and wherein engaging the at least one wheel (108,109) with the support surface (129) includes positioning the at least one wheel (108,109) between first and second blocking tabs (132,133) projecting outwardly of the support surface (129).
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL411550A PL411550A1 (en) | 2015-03-13 | 2015-03-13 | The layout and method of lifting the exhaust frame of a turbine machine |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP3067523A1 true EP3067523A1 (en) | 2016-09-14 |
| EP3067523B1 EP3067523B1 (en) | 2025-10-15 |
Family
ID=55650081
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP16159455.1A Active EP3067523B1 (en) | 2015-03-13 | 2016-03-09 | Turbomachine exhaust frame lifting system and method |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP3067523B1 (en) |
| JP (1) | JP6769716B2 (en) |
| PL (1) | PL411550A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3354985B1 (en) * | 2017-01-27 | 2020-11-25 | General Electric Company | Combustion can maintenance apparatus and method |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20120145976A1 (en) * | 2010-12-09 | 2012-06-14 | General Electric Company | Casing section lift and transport system |
| US20120272496A1 (en) * | 2011-04-29 | 2012-11-01 | General Electric Company | System and method for lifting a casing section |
| US20120275873A1 (en) * | 2011-04-27 | 2012-11-01 | General Electric Company | Inner casing vacuum system for a gas turbine engine casing |
| EP2546475A2 (en) * | 2011-07-15 | 2013-01-16 | General Electric Company | Turbomachine enclosure canopy system |
| KR101251461B1 (en) * | 2012-09-28 | 2013-04-05 | 한국플랜트서비스주식회사 | Lifting system for safety of turbine case |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6033970B2 (en) * | 1979-12-18 | 1985-08-06 | 富士電機株式会社 | How to assemble upper and lower split type double casing |
| JP3078399B2 (en) * | 1992-05-21 | 2000-08-21 | 株式会社青木建設 | Moving device and moving method for tunnel excavator |
| JP3148823B2 (en) * | 1995-08-21 | 2001-03-26 | 鹿島建設株式会社 | Slab formwork method |
| DE10234078A1 (en) * | 2002-07-26 | 2004-02-05 | Adam Opel Ag | Electric hand tool for turning threaded components, e.g. nuts and bolts, has a drive and endless belt which partially wrap the head or body of the item by pivoting arms |
| JP2010180022A (en) * | 2009-02-05 | 2010-08-19 | Nippon Steel Corp | Method of setting sole plate, and load monitor |
-
2015
- 2015-03-13 PL PL411550A patent/PL411550A1/en unknown
-
2016
- 2016-03-03 JP JP2016040560A patent/JP6769716B2/en active Active
- 2016-03-09 EP EP16159455.1A patent/EP3067523B1/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20120145976A1 (en) * | 2010-12-09 | 2012-06-14 | General Electric Company | Casing section lift and transport system |
| US20120275873A1 (en) * | 2011-04-27 | 2012-11-01 | General Electric Company | Inner casing vacuum system for a gas turbine engine casing |
| US20120272496A1 (en) * | 2011-04-29 | 2012-11-01 | General Electric Company | System and method for lifting a casing section |
| EP2546475A2 (en) * | 2011-07-15 | 2013-01-16 | General Electric Company | Turbomachine enclosure canopy system |
| KR101251461B1 (en) * | 2012-09-28 | 2013-04-05 | 한국플랜트서비스주식회사 | Lifting system for safety of turbine case |
Also Published As
| Publication number | Publication date |
|---|---|
| PL411550A1 (en) | 2016-09-26 |
| EP3067523B1 (en) | 2025-10-15 |
| JP6769716B2 (en) | 2020-10-14 |
| JP2016183669A (en) | 2016-10-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102765654B (en) | For promoting the system and method for casing section | |
| US8782865B2 (en) | Combustor liner and flow sleeve tool | |
| US8789866B2 (en) | System and method for supporting a shaft inside a turbine | |
| US9108829B2 (en) | Casing section lift and transport system | |
| US7887291B2 (en) | Support bar with adjustable shim design for turbine diaphragms | |
| US8684683B2 (en) | Gas turbine nozzle attachment scheme and removal/installation method | |
| CN104903550A (en) | Disassembly and assembly method of stator blade ring and auxiliary support device of stator blade sector using this method | |
| DE102014207461A1 (en) | Arrangement of components of a fluid energy machine, joining method | |
| DE112015002973T5 (en) | A method of assembling or disassembling a turbine component, apparatus for carrying out the method, and method of installing the apparatus | |
| EP2949887A1 (en) | Apparatus and method for adjusting an inner casing of a turbomachine | |
| CN105189939B (en) | Assembly tools for exhaust turbochargers | |
| US20150267563A1 (en) | Tool for removing an inner casing from a turbomachine | |
| RU2600217C2 (en) | Method for reducing free space, device for removing the upper exhaust hood of a steam turbine and a steam turbine | |
| EP3067523B1 (en) | Turbomachine exhaust frame lifting system and method | |
| US8910374B2 (en) | Service apparatus for turbomachine | |
| US10844747B2 (en) | Continuous flow machine having multiple guide vane stages and method for partially disassembling a continuous flow machine of this type | |
| EP2730753B1 (en) | A system for assembling and disassembling a turbine section of a gas turbine | |
| EP2811123A1 (en) | Apparatus for pivoting an upper portion of a turbine shell | |
| EP3203040B1 (en) | Lift device for turbine casing and method to lift the casing | |
| US9273569B2 (en) | Gas turbine half-casing lifting and shipping fixture | |
| US9874147B2 (en) | V-band clamp with integral mount plate | |
| US11879352B2 (en) | Tool for removing a fan disc from a module | |
| EP3477066A1 (en) | Installation apparatus for a load-coupling of a turbine system and method of installing a load-coupling in a turbine system | |
| CN209380188U (en) | A kind of large diameter pipeline pipe fitting pairing device | |
| CA3065776A1 (en) | A device for operation on a pressurized bolt connection between a first flanged tubular and a second flanged tubular |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20170314 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20180712 |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: GENERAL ELECTRIC TECHNOLOGY GMBH |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20250728 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| RAP3 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: GE VERNOVA TECHNOLOGY GMBH |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Ref country code: CH Ref legal event code: F10 Free format text: ST27 STATUS EVENT CODE: U-0-0-F10-F00 (AS PROVIDED BY THE NATIONAL OFFICE) Effective date: 20251015 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602016093789 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20251015 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1847135 Country of ref document: AT Kind code of ref document: T Effective date: 20251015 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260115 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20260219 Year of fee payment: 11 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20260219 Year of fee payment: 11 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260115 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260215 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260216 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |