EP2999842B1 - Single upset landing string running system - Google Patents
Single upset landing string running system Download PDFInfo
- Publication number
- EP2999842B1 EP2999842B1 EP14801335.2A EP14801335A EP2999842B1 EP 2999842 B1 EP2999842 B1 EP 2999842B1 EP 14801335 A EP14801335 A EP 14801335A EP 2999842 B1 EP2999842 B1 EP 2999842B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- elevator
- tubular
- spider
- upset
- wedges
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/02—Rod or cable suspensions
- E21B19/06—Elevators, i.e. rod- or tube-gripping devices
- E21B19/07—Slip-type elevators
Definitions
- heavy tubulars extend downward from the platform and may be supported by engagement with a landing string.
- the landing string may be provided by drill pipe or other high-tensile tubulars.
- Such landing strings are often required to support a heavy load, such that traditional running systems, which generally employ slips or bushings to hold the tubular by engaging the outer diameter thereof, are inadequate.
- landing strings are typically lowered by engagement with an upset (i.e., a shoulder) on the tubular body of the landing string.
- an upset i.e., a shoulder
- One way to do this is to employ dual-upset tubulars, allowing the tubular to be lowered by engaging one upset with the elevator and the second with the spider.
- Another common method shuttles or circulates a pair of elevators to ensure that only the upset is engaged, thereby obviating the need for special dual-upset tubulars.
- the first elevator begins suspended by the bails, while the second elevator acts as a spider, resting on the rotary table and supporting the landing string by the upset of the uppermost tubular of the landing string (i.e., the most recently run-in segment). The first elevator engages a the exposed box of the landing string.
- the slips or bushings of the second elevator are then disengaged from the upset and the second elevator is removed; thus, the weight of the landing string is transmitted through the new tubular segment to the first elevator.
- the first elevator then lowers until it abuts the rotary table, and, as such, now acts as a spider.
- the bails are then switched to the second elevator, which engages another new tubular segment, and the process is repeated.
- WO2012/151146A2 discloses an elevator and spider in which wedges of the spider may be configured to slide axially at least partially in channels of the elevator.
- US2008/0149326A1 discloses a method and apparatus for handling a supported tubular string with an elevator and spider.
- EP2216496A2 discloses an oilfield tubular elevator and method of use.
- EP2189619A1 discloses an adjustable pipe guide for use with an elevator and/or a spider.
- WO2011/005501A2 discloses large diameter tubular lifting apparatuses and methods.
- first and second features are formed in direct contact
- additional features may be formed interposing the first and second features, such that the first and second features may not be in direct contact.
- exemplary embodiments presented below may be combined in any combination of ways, i.e., any element from one exemplary embodiment may be used in any other exemplary embodiment, without departing from the scope of the disclosure.
- FIG. 1 illustrates a perspective view of an exemplary running system 10, according to an embodiment described.
- the exemplary running system 10 may be particularly useful for running landing strings; however, it will be appreciated that the running system 10 disclosed herein may be equally applicable to running, lowering, raising, making-up, breaking-out, or otherwise moving any type of tubulars for any purpose.
- the running system 10 generally includes first and second tubular engagement devices 12, 14.
- the first tubular engagement device 12 is movable, and may be referred to as an elevator 12.
- the second tubular engagement device 14, on the other hand, may be stationary and may be referred to as a spider 14.
- the elevator 12 includes a body 16, which may have a generally cylindrical shape and opposing flats 18, 20. Ears 22, 24 for engagement with bails (not shown) extend from the flats 18, 20, for example outward, such that the elevator 12 may be suspended from the rig (e.g., via a traveling block and/or top drive, not shown) and movable vertically toward or away from the spider 14.
- the body 16 defines a central bore 26 therethrough, in which gripping assemblies 28, 30, 32, 34 are positioned.
- gripping assembly is intended to be broadly defined to include any configuration of one or more slips, bushings, or any other device(s) used to engage a tubular, whether including teeth or not. Channels 36, 38, 40, 42 are defined by the bore 26, between adjacent gripping assemblies 28, 30, 32, 34.
- each of the gripping assemblies 28, 30, 32, 34 may generally include a tapered housing 44, a bracket 46, a piston 48, and a wedge 50.
- wedge is intended to be broadly defined to include slips, bushings, bushing segments, or any like structures capable of applying a gripping force to a tubular, whether including teeth or not.
- the wedge 50 is free from teeth or other marking structures.
- the tapered housing 44 is generally positioned in the bore 26 and bears on the body 16; further, the tapered housing 44 may be integral with a remainder of the body 16 and/or may be coupled thereto.
- the tapered housing 44 is tapered such that it extends radially inward, proceeding downwards, and provides a channel 45 in which the bracket 46 and piston 48 are at least partially disposed.
- the bracket 46 is moved in the channel 45 by movement of the piston 48.
- the piston 48 may be moved or articulated by a hydraulic assembly, as is well-known in the art.
- the piston 48 may be driven by pneumatics, motors, springs, linkages, combinations thereof, or the like.
- the bracket 46 may be configured to transmit longitudinal, for example, upward, force on the wedge 50, to disengage the wedge 50 from a tubular (not shown), as will be described in greater detail below.
- four gripping assemblies 28, 30, 32, 34 are shown, it will be appreciated that fewer or additional gripping assemblies, for example, two, three, five, six or more gripping assemblies, may be used without departing from the scope of the disclosure.
- the spider 14 includes a body 100, which may be generally cylindrical in shape and may have an increased-radius shoulder 101 defining at least a portion of the top of the body 100.
- the shoulder 101 of the body 100 defines flats (three are visible: 102, 104, 106) on its outer diameter for engagement with various tools or other structures, as will be described in greater detail below. Further, the shoulder 101 may define a landing surface 108 on the upper side thereof.
- the body 100 may also define a bore 103 extending axially therethrough, for receiving a tubular (not shown). Proximal the top of the bore 103, the body 100 may define an annular seat 105, which is recessed from the landing surface 108.
- the body 100 may be split, as shown, defining two or more generally arc-shaped segments 109a, 109b.
- the segments 109a,b may be held together by an interior surface defined in the rotary table (not shown), as is known in the art. In other embodiments, however, other structures such as a retaining collar or the like may be used to secure the position of the body 100. Additionally, in still other embodiments, the segments 109a,b may be coupled together via a hinge (not shown) or any other coupling mechanism.
- Gripping assemblies 110, 112, 114, 116 may extend upward from the landing surface 108 and the seat 105 and inward from the bore 103.
- Channels 118, 120, 122, 124 are defined between adjacent gripping assemblies 110, 112, 114, 116.
- each gripping assembly 110, 112, 114, 116 may include a tapered housing 126, a bracket 128, a wedge 130, and a piston 132. Further, the housing 126 provides a channel 135 therein for guiding longitudinal movement of the bracket 128.
- the bracket 128 is coupled to the wedge 130 and may be configured to transfer longitudinal force from the piston 132 to the wedge 130, for example, to raise or lower the wedge 130 into or out of engagement with a tubular (not shown).
- the piston 132 may be driven to move the bracket 128 by pneumatics, hydraulics, motors, mechanical linkages, springs, combinations thereof, or the like.
- FIGS 2-7 illustrate an exemplary operation of the running system 10, whereby a sequence of the elevator 12 engaging and moving a tubular 200, lowering the tubular 200 through the spider 14, transferring load to the spider 14, and disengaging from the tubular 200 is illustrated. It will be appreciated that this sequence may be reversed, or otherwise rearranged without departing from the scope of this disclosure.
- the gripping assemblies 28, 30, 32, 34, particularly the wedges 50 are configured to releasably engage the tubular 200.
- the wedges 50 may be drawn downward by engagement with the tubular 200 or by driving the piston 48 downward, as described above.
- the tapered housing 44 is generally prevented from moving radially outward by the body 16, and thus the wedges 50 sliding downward causes the wedges 50 to move inward, toward the tubular 200, until the wedges 50 securely engage the tubular 200.
- the bails (not shown) coupled to the ears 22, 24 may thus enable the rig (not shown) to carry the weight of the tubular 200.
- the tubular 200 is generally free from engagement with the elevator 12 in the channels 36, 38, 40, 42.
- Figure 3 illustrates a perspective view of the running system 10, with the elevator 12 and the spider 14 being moved vertically into close proximity with one another, according to an embodiment described.
- the gripping assemblies 28, 30, 32, 34 of the elevator 12 may be angularly aligned with the channels 118, 120, 122, 124 (channels 120 and 122 are viewable in Figure 4 ) of the spider 14, while the gripping assemblies 28, 30, 32, 34 engage the tubular 200 and transmit its weight via the body 16 of the elevator 12 to the rig (not shown).
- the spider 14 generally does not engage the tubular 200 to bear its weight, although in some instances, it is contemplated that the spider 14 may provide guidance for the lowering of the tubular 200.
- the elevator 12 is lowered toward the spider 14 while engaging an upset (not shown) of the tubular 200, as will be described in greater detail below.
- the body 100 of the spider 14 is surrounded by the rotary table 134.
- the rotary table 134 defines a generally rectangular inner surface 136, with the generally cylindrical body 100 being inscribed therein.
- the flats 102, 104, 106 flats 104 and 102 are viewable in Figure 3 ) of the shoulder 1 01 of the body 100 may bear on the inner surface 136.
- the segments 109a,b of the body 100 may be restrained from separating by the rotary table 134, thereby preventing the gripping assemblies 110, 112, 114, 116 of the spider 14 from moving radially-outward.
- the body 100 of the spider 14 may, in some embodiments, not be segmented, may be hinged, and/or may include more than two segments.
- FIGS 3-5 illustrate perspective and top views, respectively, of the running system 10, showing the elevator 12 transferring the load of the tubular 200 to the spider 14, according to an embodiment described.
- the gripping assemblies 110, 112, 114, 116 extend upward, toward the elevator 12 and are sized to slide axially and fit at least partially in the channels 36, 38, 40, 42 of the elevator 12.
- the gripping assemblies 28, 30, 32, 34 of the elevator 12 are positioned and sized so as to align with and slide at least partially in the channels 118, 120, 122, 124 of the spider 14 (best shown in Figure 1 ).
- the elevator 12 is thus received into the spider 14, such that, in an exemplary embodiment, the elevator 12 rests on the landing surface 108 ( Figure 3 ) of the spider 14.
- the enmeshed gripping assemblies 28, 30, 32, 34 and 110, 112, 114, 116 of the elevator 12 and the spider 14, respectively, are thus both positioned about the tubular 200 at approximately equal axial locations.
- the gripping assemblies 110, 112, 114, 116 of the spider 14 may be engaged when the elevator 12 comes into proximity with, for example lands on, the landing surface 108 ( Figure 3 ).
- the gripping assemblies 110, 112, 114, 116 of the spider 14 are at approximately the same axial location on the tubular 200 as are the gripping assemblies 28, 30, 32, 34 of the elevator 12.
- the gripping assemblies 110, 112, 114, 116 may then engage the tubular 200, for example, the upset (not shown) to which the gripping assemblies 28, 30, 32, 34 of the elevator 12 are also engaged, though at different circumferential locations about the tubular 200.
- the gripping assemblies 28, 30, 32, 34 of the elevator 12 may be disengaged.
- the elevator 12 releases the tubular 200, and the weight of the tubular 200 is transferred seamlessly to the spider 14.
- the elevator 12 may be raised upwards, may have a hinge (not shown) that can open to allow the elevator 12 to be laterally removed, or may be otherwise configured for removal.
- this enmeshing of the gripping assemblies 28, 30, 32, 34, 110, 112, 114, 116 allows the spider 14 and the elevator 12 to engage a single upset, transfer the load between the two (e.g., from the elevator 12 to the spider 14), and release the elevator 12 so that it may be used to engage another tubular (not shown), to repeat the engaging and lowering process.
- FIGs 6 and 7 illustrate perspective and top views, respectively, of the spider 14 engaging the tubular 200, according to an embodiment described.
- the elevator 12 e.g., Figure 5
- the gripping assemblies 110, 112, 114, 116 of the spider 14 engage and maintain the position of the tubular 200, while the rotary table 134 maintains the radial position of the body 100, and thus of the gripping assemblies 110, 112, 114, 116.
- the gripping assemblies 110, 112, 114, 116 of the spider 14 are illustrated as extending upward for being received into the channels 36, 38, 40, 42 of the elevator 12, while the gripping assemblies 28, 30, 32, 34 are generally disposed within the bore 26 of the elevator 12, it will be appreciated that variations of this arrangement are within the scope of this disclosure.
- the gripping assemblies 28, 30, 32, 34 may extend downward, such that they are received in the channels 118, 120, 122, 124 of the spider 14.
- the gripping assemblies 110, 112, 114, 116 may still extend generally upward from the landing surface 108, may reside partially within the bore 103 and partially extending upward from the landing surface 108, or may extend at least partially, or even entirely, down from the landing surface 108, or from a point in the bore 103 below the landing surface 108.
- tubular engagement devices 12, 14 may be movable, without departing from the scope of the disclosure.
- first tubular engagement device 12 may be stationary, while the second tubular engagement device 14 is movable.
- illustrated views of running system 10 may be flipped, such that the first tubular engagement device 12 is moved upward to the second tubular engagement device 14, or the second tubular engagement device 14 is lowered to the first tubular engagement device 12.
- the tubular engagement device 300 may be generally representative of the structure and operation of the elevator 12 and/or the spider 14 described above. Accordingly, the tubular engagement device 300 generally includes gripping assemblies 301, 302. Although two gripping assemblies 301, 302 are shown, it will be appreciated that additional gripping assemblies may be employed, for example two additional gripping assemblies, without departing from the scope of this disclosure.
- the gripping assemblies 301, 302 each generally include a tapered housing 304, 306 and a wedge 308, 310, respectively.
- the wedges 308, 310 are slidable with respect to the housings 304, 306, respectively, and are reverse tapered with respect thereto. Accordingly, as the wedges 308, 310 are drawn downward, for example, by friction from engagement with the tubular 200 and/or by pneumatics, hydraulics, motors, linkages, or the like, the wedges 308, 310 are pushed inwards into engagement with the tubular 200.
- the tapered housing 304, 306 supplies the reactionary axial and horizontal force against the wedges 308, 310.
- the base 312 transfers the weight of the tubular 200, either by resting on a platform (e.g., for a spider), by hanging from the rig via bails (e.g., for an elevator), or in any other suitable manner.
- the wedges 308, 310 each define upper and lower interior surfaces 314, 316 and 318, 320, respectively.
- the upper interior surfaces 314, 318 may be tapered, converging toward a central axis 322, proceeding downwardly.
- the lower interior surfaces 316, 320 may be generally parallel to the axis 322. In other embodiments, however, the lower interior surfaces 316, 320 may also be tapered, converging toward the central axis 322, proceeding downward.
- one, some, or all of the upper and/or lower interior surfaces 314, 316, 318, 320 may be free from teeth or other marking structures; however, in various other embodiments, any of the surfaces 314, 316, 318, 320 may include such teeth or other marking structures (none shown) to facilitate engagement with the tubular 200.
- the upper interior surfaces 314, 318 may be shaped to abut and engage an upset 324 of the tubular 200.
- the upset 324 may be a radial protrusion extending radially outward from a remaining tubular body 326, as shown, but in other embodiments may extend radially inward.
- the upset 324 may be disposed on (e.g., fastened, welded, brazed, or otherwise connected to, integral with, or otherwise part of) the tubular 200.
- the upset 324 may be capable of withstanding greater tensile forces than the tubular body 326 and transmitting such axial forces to the gripping assemblies 301, 302. Accordingly, the upset 324 may represent an area desirable for the gripping assemblies 301, 302 to engage, to avoid slip crushing the tubular 200.
- the lower interior surfaces 316, 320 may engage the tubular body 326, as shown. Accordingly, some of the axial load of the tubular 200 weight is transmitted via the radial gripping force applied by the gripping assemblies 301, 302 onto the tubular body 326.
- the tubular engagement device 300, and ultimately the rig may be able to support and run the tubular 200, while supporting strings having a greater weight than that which a simple engagement with the upset 324, let alone engagement only with the tubular body 326 by itself, is capable of safely handling.
- Figure 9 illustrates a method 400 for lowering a tubular, according to an embodiment described.
- the method 400 may proceed by operation of the running system 10 and/or the tubular engagement device 300 described above with reference to Figures 1-9 and may be best understood with reference thereto.
- the method 400 includes engaging an upset of the tubular with gripping assemblies of a first tubular engagement device, as at 402. More particularly, in at least one embodiment, such engagement may include simultaneously engaging the upset and a body of the tubular to support a weight of the tubular via engagement with both the upset and the body.
- the tubular supported by the first tubular engagement device, as at 402 may then be lowered into and made-up to a tubular string, such that the method 400 includes supporting the weight of the string of tubulars with the first engagement device.
- the method 400 further includes vertically moving, for example, lowering the tubular through a second tubular engagement device by lowering the first tubular engagement device, as at 404.
- the method 400 may also include receiving gripping assemblies of the second tubular engagement device into channels defined between gripping assemblies of the first tubular engagement device, as at 406.
- the method 400 may also include engaging the upset of the tubular with the gripping assemblies of the second tubular engagement device, as at 408.
- the method 400 may further include disengaging the upset of the tubular from the gripping assemblies of the first tubular engagement device, such that the upset is supported by the second tubular engagement device, as at 410.
- elevator 512 in accordance with one or more embodiments of the present disclosure is shown in top ( Figure 10 ) and perspective ( Figure 11 ) views. Similar to elevators 12 depicted in Figures 1-5 , elevator 512 of Figures 10 and 11 includes a main body 516, a pair of flats 518, 520, a pair of lifting ears 522, 524, a plurality (six shown) of gripping assemblies 528, and a plurality of channels (not visible) configured to receive plurality of gripping assemblies (e.g., 550 of Figures 12 and 13 ) of a corresponding spider ( e . g ., 514 of Figures 12 and 13 ).
- plurality of gripping assemblies e.g., 550 of Figures 12 and 13
- a corresponding spider e.g ., 514 of Figures 12 and 13 .
- spider 514 in accordance with one or more embodiments of the present disclosure is shown in top ( Figure 12 ) and perspective ( Figure 13 ) views. Similar to spider 14 of Figures 1 , 3 , 4 , 6 and 7 , spider 514 includes a main body 540, a plurality of gripping assemblies 550 and a plurality of channels 552 configured to receive plurality of gripping assemblies 528 of corresponding elevator 512 ( Figures 10 and 11 ).
- elevator 512 and spider 514 further comprise one or more alignment features to ensure that gripping assemblies 528 of elevator 512 properly engage channels 552 of spider 514, and gripping assemblies 550 of spider 514 properly engage channels (not visible) within elevator 512.
- the phrase "proper engagement” refers to an axial engagement of elevator 512 with spider 514 such that gripping assemblies (528 and 550, respectively) are allowed to engage with their corresponding channels without engaging, interfering, or otherwise impacting each other as elevator 512 is lowered proximate to and on top of spider 514.
- elevator 512 is shown comprising two alignment features in the form of bore holes 560 and 562, while spider 514 is shown comprising two alignment features in the form of bore holes 564 and 566.
- Alignment feature bore holes 560, 562, 564, and 566 may be used in combination with alignment rods (not shown) to ensure that as elevator 512 is lowered to spider 514 by a rig's draw works, proper radial alignment of gripping assemblies 528 and 550 is maintained.
- alignment rods may be rigidly affixed within holes 564 and 566 of spider 514 to allow slidable engagement with holes 560 and 562 of elevator 512, and in other embodiments, alignment rods may be rigidly affixed within holes 560 and 562 of elevator 512 to allow slidable engagement with holes 564 and 566 of spider 514.
- alignment rods may be tapered at a free end to facilitate engagement within alignment features (i.e., holes) 560 and 562, or 564 and 566, and in other embodiments alignment feature bore holes may be tapered to facilitate engagement with free ends of alignment rods.
- alignment rods used in conjunction with alignment features 560, 562, 564, and 566 may extend the entire length of the draw works to maintain radial alignment of elevator 512 with spider 514 along the entire lifting stroke of elevator 512 or, in alternative embodiments, alignment rods may only be of sufficient length to maintain radial alignment of elevator 512 with spider 514 for a portion of the lifting stroke of elevator 512.
- a spider assembly 614 in accordance with embodiments disclosed herein includes a main body 640 split into two sections 640A and 640B, a pair of retaining bolts 670 and 672 to retain halves 640A and 640B together, and a pair of alignment feature holes 664 and 666.
- spider assembly 614 is shown having a plurality (six shown) of gripping assemblies 650A-F and a plurality of channels 652 configured to receive a plurality of gripping assemblies from a corresponding elevator ( e . g ., 512 of Figures 10 and 11 ).
- gripping assemblies 650A-F each include a wedge 655A-C driven by a corresponding piston 680A-C.
- spider assembly 614 further comprises a timing ring split into two sections 682A, 682B corresponding to main body halves 640A and 640B.
- timing ring 682A connected to pistons 680A, 680B, and 680C, ensures that wedges 655A, 655B, and 655C move to engage and/or disengage a tubular (or other device) simultaneously at the same rate and relative position as timing ring section 682A is moved by an actuator 684A.
- timing ring section 682B ensures that wedges of gripping assemblies 650D-F within main body half 640B move to engage and/or disengage a tubular simultaneously as timing ring section 682B is thrust by actuator 684B.
- timing ring sections 682A and 682B and actuators 684A and 684B allow gripping assemblies 650A-F to simultaneously engage a tubular located within the bore of spider assembly 614 such that the tool is centrally positioned within the bore of spider 614 and so that radial and axial loads may be more evenly applied to the tubular.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Mechanical Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Description
- The present application claims priority to
, which is a Continuation-In-Part application from United States Patent Application Serial No.U.S. Patent Application Serial No. 13/898,260, filed May 20, 2013 . The '314 Application claimed priority to13/459,314, filed April 30, 2012 .U.S. Provisional Patent Application Serial No. 61/481,216, filed May 1, 2011 - In oilfield applications, for example, in deep-sea locations, heavy tubulars extend downward from the platform and may be supported by engagement with a landing string. Depending on the particular application (i.e., drilling, completion, etc.), the landing string may be provided by drill pipe or other high-tensile tubulars. Such landing strings are often required to support a heavy load, such that traditional running systems, which generally employ slips or bushings to hold the tubular by engaging the outer diameter thereof, are inadequate. Further, as offshore drilling operations continually push into deeper water, the tensile load transmission from the landing string to the rig continues to increase in order to support the increased string weight, which is increasingly causing "slip crushing," whereby the slips and/or bushings engage the tubular body with such force that the tubular body is crushed or otherwise damaged.
- To avoid this, landing strings are typically lowered by engagement with an upset (i.e., a shoulder) on the tubular body of the landing string. One way to do this is to employ dual-upset tubulars, allowing the tubular to be lowered by engaging one upset with the elevator and the second with the spider. Another common method shuttles or circulates a pair of elevators to ensure that only the upset is engaged, thereby obviating the need for special dual-upset tubulars. The first elevator begins suspended by the bails, while the second elevator acts as a spider, resting on the rotary table and supporting the landing string by the upset of the uppermost tubular of the landing string (i.e., the most recently run-in segment). The first elevator engages a the exposed box of the landing string. The slips or bushings of the second elevator are then disengaged from the upset and the second elevator is removed; thus, the weight of the landing string is transmitted through the new tubular segment to the first elevator. The first elevator then lowers until it abuts the rotary table, and, as such, now acts as a spider. The bails are then switched to the second elevator, which engages another new tubular segment, and the process is repeated.
- Such known processes have significant drawbacks, requiring special dual-upset tubulars or time-consuming switching of bails between elevators. What is needed are faster, more cost-effective methods and apparatus for lowering such heavy tubulars, while avoiding slip crushing.
-
WO2012/151146A2 discloses an elevator and spider in which wedges of the spider may be configured to slide axially at least partially in channels of the elevator.US2008/0149326A1 discloses a method and apparatus for handling a supported tubular string with an elevator and spider.EP2216496A2 discloses an oilfield tubular elevator and method of use.EP2189619A1 discloses an adjustable pipe guide for use with an elevator and/or a spider.WO2011/005501A2 discloses large diameter tubular lifting apparatuses and methods. - The invention is defined in the independent claims, to which reference should now be made. Advantageous embodiments are set out in the sub claims.
- The present disclosure is best understood from the following detailed description when read with the accompanying Figures. It is emphasized that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.
-
Figure 1 illustrates a perspective view of an exemplary running system, according to an aspect of the disclosure. -
Figure 2 illustrates a top view of the elevator, according to an aspect of the disclosure. -
Figure 3 illustrates a perspective view of the running system ofFigure 1 engaging a tubular, according to an aspect of the disclosure. -
Figure 4 illustrates a perspective view of the tubular being transferred from the elevator to the spider, according to an aspect of the disclosure. -
Figure 5 illustrates a top view of the running system as shown inFigure 4 . -
Figure 6 illustrates a perspective view of the spider engaging the tubular, according to an aspect of the disclosure. -
Figure 7 illustrates a top view of the spider ofFigure 6 , according to an aspect of the disclosure. -
Figure 8 illustrates a simplified, side, cross-sectional view of a tubular engagement device engaging a tubular, according to an aspect of the disclosure. -
Figure 9 illustrates a flowchart of an exemplary method for moving a tubular, according to an aspect of the disclosure. -
Figure 10 is a top view drawing of an elevator in accordance with embodiments disclosed herein. -
Figure 11 is a perspective view drawing of the elevator ofFigure 10 . -
Figure 12 is a top view drawing of a spider in accordance with embodiments disclosed herein. -
Figure 13 is a perspective view drawing of the spider ofFigure 12 . -
Figure 14 is a sectioned profile view of a spider in accordance with embodiments disclosed herein. -
Figure 15 is a bottom-view drawing of the spider ofFigure 14 . - It is to be understood that the following disclosure describes several exemplary embodiments for implementing different features, structures, or functions of the invention. Exemplary embodiments of components, arrangements, and configurations are described below to simplify the present disclosure; however, these exemplary embodiments are provided merely as examples and are not intended to limit the scope of the invention. Additionally, the present disclosure may repeat reference numerals and/or letters in the various exemplary embodiments and across the Figures provided herein. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various exemplary embodiments and/or configurations discussed in the various Figures. Moreover, the formation of a first feature over or on a second feature in the description that follows may include embodiments in which the first and second features are formed in direct contact, and may also include embodiments in which additional features may be formed interposing the first and second features, such that the first and second features may not be in direct contact. Finally, the exemplary embodiments presented below may be combined in any combination of ways, i.e., any element from one exemplary embodiment may be used in any other exemplary embodiment, without departing from the scope of the disclosure.
- Additionally, certain terms are used throughout the following description and claims to refer to particular components. As one skilled in the art will appreciate, various entities may refer to the same component by different names, and as such, the naming convention for the elements described herein is not intended to limit the scope of the invention, unless otherwise specifically defined herein. Further, the naming convention used herein is not intended to distinguish between components that differ in name but not function. Additionally, in the following discussion and in the claims, the terms "including" and "comprising" are used in an open-ended fashion, and thus should be interpreted to mean "including, but not limited to." All numerical values in this disclosure may be exact or approximate values unless otherwise specifically stated. Accordingly, various embodiments of the disclosure may deviate from the numbers, values, and ranges disclosed herein without departing from the intended scope. Furthermore, as it is used in the claims or specification, the term "or" is intended to encompass both exclusive and inclusive cases, i.e., "A or S" is intended to be synonymous with "at least one of A and S," unless otherwise expressly specified herein.
-
Figure 1 illustrates a perspective view of anexemplary running system 10, according to an embodiment described. Theexemplary running system 10 may be particularly useful for running landing strings; however, it will be appreciated that the runningsystem 10 disclosed herein may be equally applicable to running, lowering, raising, making-up, breaking-out, or otherwise moving any type of tubulars for any purpose. The runningsystem 10 generally includes first and second 12, 14. In at least one embodiment, the firsttubular engagement devices tubular engagement device 12 is movable, and may be referred to as anelevator 12. The secondtubular engagement device 14, on the other hand, may be stationary and may be referred to as aspider 14. - As shown, the
elevator 12 includes abody 16, which may have a generally cylindrical shape and opposing 18, 20.flats 22, 24 for engagement with bails (not shown) extend from theEars 18, 20, for example outward, such that theflats elevator 12 may be suspended from the rig (e.g., via a traveling block and/or top drive, not shown) and movable vertically toward or away from thespider 14. Thebody 16 defines acentral bore 26 therethrough, in which gripping 28, 30, 32, 34 are positioned. As the term is used herein, "gripping assembly" is intended to be broadly defined to include any configuration of one or more slips, bushings, or any other device(s) used to engage a tubular, whether including teeth or not.assemblies 36, 38, 40, 42 are defined by theChannels bore 26, between adjacent 28, 30, 32, 34.gripping assemblies - As indicated for the gripping
assembly 28, each of the 28, 30, 32, 34 may generally include a taperedgripping assemblies housing 44, abracket 46, apiston 48, and awedge 50. As the term is used herein, "wedge" is intended to be broadly defined to include slips, bushings, bushing segments, or any like structures capable of applying a gripping force to a tubular, whether including teeth or not. In the illustrated embodiment, thewedge 50 is free from teeth or other marking structures. The taperedhousing 44 is generally positioned in thebore 26 and bears on thebody 16; further, the taperedhousing 44 may be integral with a remainder of thebody 16 and/or may be coupled thereto. The taperedhousing 44 is tapered such that it extends radially inward, proceeding downwards, and provides achannel 45 in which thebracket 46 andpiston 48 are at least partially disposed. Thebracket 46 is moved in thechannel 45 by movement of thepiston 48. In various embodiments, thepiston 48 may be moved or articulated by a hydraulic assembly, as is well-known in the art. In other embodiments, thepiston 48 may be driven by pneumatics, motors, springs, linkages, combinations thereof, or the like. Further, thebracket 46 may be configured to transmit longitudinal, for example, upward, force on thewedge 50, to disengage thewedge 50 from a tubular (not shown), as will be described in greater detail below. Although four 28, 30, 32, 34 are shown, it will be appreciated that fewer or additional gripping assemblies, for example, two, three, five, six or more gripping assemblies, may be used without departing from the scope of the disclosure.gripping assemblies - Turning to the
spider 14, thespider 14 includes abody 100, which may be generally cylindrical in shape and may have an increased-radius shoulder 101 defining at least a portion of the top of thebody 100. Theshoulder 101 of thebody 100 defines flats (three are visible: 102, 104, 106) on its outer diameter for engagement with various tools or other structures, as will be described in greater detail below. Further, theshoulder 101 may define alanding surface 108 on the upper side thereof. Thebody 100 may also define abore 103 extending axially therethrough, for receiving a tubular (not shown). Proximal the top of thebore 103, thebody 100 may define anannular seat 105, which is recessed from thelanding surface 108. - In at least one embodiment, the
body 100 may be split, as shown, defining two or more generally arc-shaped 109a, 109b. As will be described in greater detail below, thesegments segments 109a,b may be held together by an interior surface defined in the rotary table (not shown), as is known in the art. In other embodiments, however, other structures such as a retaining collar or the like may be used to secure the position of thebody 100. Additionally, in still other embodiments, thesegments 109a,b may be coupled together via a hinge (not shown) or any other coupling mechanism. - Gripping assemblies (e.g., bushing or slip assemblies) 110, 112, 114, 116 may extend upward from the
landing surface 108 and theseat 105 and inward from thebore 103. 118, 120, 122, 124 are defined between adjacentChannels 110, 112, 114, 116. As indicated for thegripping assemblies gripping assembly 110, each gripping 110, 112, 114, 116 may include aassembly tapered housing 126, abracket 128, awedge 130, and apiston 132. Further, thehousing 126 provides achannel 135 therein for guiding longitudinal movement of thebracket 128. Thebracket 128 is coupled to thewedge 130 and may be configured to transfer longitudinal force from thepiston 132 to thewedge 130, for example, to raise or lower thewedge 130 into or out of engagement with a tubular (not shown). Thepiston 132 may be driven to move thebracket 128 by pneumatics, hydraulics, motors, mechanical linkages, springs, combinations thereof, or the like. -
Figures 2-7 illustrate an exemplary operation of the runningsystem 10, whereby a sequence of theelevator 12 engaging and moving a tubular 200, lowering the tubular 200 through thespider 14, transferring load to thespider 14, and disengaging from the tubular 200 is illustrated. It will be appreciated that this sequence may be reversed, or otherwise rearranged without departing from the scope of this disclosure. - Referring now specifically to
Figure 2 , there is illustrated a perspective view and a top view, respectively, of theelevator 12, according to an embodiment described. As shown, the gripping 28, 30, 32, 34, particularly the wedges 50 (assemblies Figure 2 ) thereof, are configured to releasably engage the tubular 200. Thewedges 50 may be drawn downward by engagement with the tubular 200 or by driving thepiston 48 downward, as described above. The taperedhousing 44 is generally prevented from moving radially outward by thebody 16, and thus thewedges 50 sliding downward causes thewedges 50 to move inward, toward the tubular 200, until thewedges 50 securely engage the tubular 200. The bails (not shown) coupled to the 22, 24 may thus enable the rig (not shown) to carry the weight of the tubular 200. As will be appreciated, the tubular 200 is generally free from engagement with theears elevator 12 in the 36, 38, 40, 42.channels -
Figure 3 illustrates a perspective view of the runningsystem 10, with theelevator 12 and thespider 14 being moved vertically into close proximity with one another, according to an embodiment described. As theelevator 12 is lowered, the gripping 28, 30, 32, 34 of theassemblies elevator 12 may be angularly aligned with the 118, 120, 122, 124 (channels 120 and 122 are viewable inchannels Figure 4 ) of thespider 14, while the 28, 30, 32, 34 engage the tubular 200 and transmit its weight via thegripping assemblies body 16 of theelevator 12 to the rig (not shown). During this time, thespider 14 generally does not engage the tubular 200 to bear its weight, although in some instances, it is contemplated that thespider 14 may provide guidance for the lowering of the tubular 200. In at least one specific embodiment, theelevator 12 is lowered toward thespider 14 while engaging an upset (not shown) of the tubular 200, as will be described in greater detail below. - As also illustrated in
Figure 3 , thebody 100 of thespider 14 is surrounded by the rotary table 134. In one embodiment, the rotary table 134 defines a generally rectangularinner surface 136, with the generallycylindrical body 100 being inscribed therein. The 102, 104, 106 (flats 104 and 102 are viewable inflats Figure 3 ) of the shoulder 1 01 of thebody 100 may bear on theinner surface 136. Accordingly, thesegments 109a,b of thebody 100 may be restrained from separating by the rotary table 134, thereby preventing the 110, 112, 114, 116 of thegripping assemblies spider 14 from moving radially-outward. As discussed above, however, it will be appreciated that thebody 100 of thespider 14 may, in some embodiments, not be segmented, may be hinged, and/or may include more than two segments. - With continuing reference to
Figures 3-5 illustrate perspective and top views, respectively, of the runningsystem 10, showing theelevator 12 transferring the load of the tubular 200 to thespider 14, according to an embodiment described. The 110, 112, 114, 116 extend upward, toward thegripping assemblies elevator 12 and are sized to slide axially and fit at least partially in the 36, 38, 40, 42 of thechannels elevator 12. Correspondingly, the gripping 28, 30, 32, 34 of theassemblies elevator 12 are positioned and sized so as to align with and slide at least partially in the 118, 120, 122, 124 of the spider 14 (best shown inchannels Figure 1 ). As shown inFigures 4 and5 , theelevator 12 is thus received into thespider 14, such that, in an exemplary embodiment, theelevator 12 rests on the landing surface 108 (Figure 3 ) of thespider 14. The enmeshed 28, 30, 32, 34 and 110, 112, 114, 116 of thegripping assemblies elevator 12 and thespider 14, respectively, are thus both positioned about the tubular 200 at approximately equal axial locations. - Accordingly, the gripping
110, 112, 114, 116 of theassemblies spider 14 may be engaged when theelevator 12 comes into proximity with, for example lands on, the landing surface 108 (Figure 3 ). As such, the gripping 110, 112, 114, 116 of theassemblies spider 14 are at approximately the same axial location on the tubular 200 as are the 28, 30, 32, 34 of thegripping assemblies elevator 12. The 110, 112, 114, 116 may then engage the tubular 200, for example, the upset (not shown) to which thegripping assemblies 28, 30, 32, 34 of thegripping assemblies elevator 12 are also engaged, though at different circumferential locations about the tubular 200. Once the engagement between thespider 14 and the tubular 200 is secured, the gripping 28, 30, 32, 34 of theassemblies elevator 12 may be disengaged. As such, theelevator 12 releases the tubular 200, and the weight of the tubular 200 is transferred seamlessly to thespider 14. To remove theelevator 12 from the tubular 200, theelevator 12 may be raised upwards, may have a hinge (not shown) that can open to allow theelevator 12 to be laterally removed, or may be otherwise configured for removal. As will be appreciated, this enmeshing of the 28, 30, 32, 34, 110, 112, 114, 116 allows thegripping assemblies spider 14 and theelevator 12 to engage a single upset, transfer the load between the two (e.g., from theelevator 12 to the spider 14), and release theelevator 12 so that it may be used to engage another tubular (not shown), to repeat the engaging and lowering process. -
Figures 6 and7 illustrate perspective and top views, respectively, of thespider 14 engaging the tubular 200, according to an embodiment described. After the upset of the tubular 200 has been lowered onto thespider 14, and the weight of the tubular 200 has been transferred to thespider 14, the elevator 12 (e.g.,Figure 5 ) may be removed. As such, the gripping 110, 112, 114, 116 of theassemblies spider 14 engage and maintain the position of the tubular 200, while the rotary table 134 maintains the radial position of thebody 100, and thus of the 110, 112, 114, 116.gripping assemblies - Referring to
Figures 1-7 , although the 110, 112, 114, 116 of thegripping assemblies spider 14 are illustrated as extending upward for being received into the 36, 38, 40, 42 of thechannels elevator 12, while the 28, 30, 32, 34 are generally disposed within thegripping assemblies bore 26 of theelevator 12, it will be appreciated that variations of this arrangement are within the scope of this disclosure. For example, the gripping 28, 30, 32, 34 may extend downward, such that they are received in theassemblies 118, 120, 122, 124 of thechannels spider 14. In such embodiments, the gripping 110, 112, 114, 116 may still extend generally upward from theassemblies landing surface 108, may reside partially within thebore 103 and partially extending upward from thelanding surface 108, or may extend at least partially, or even entirely, down from thelanding surface 108, or from a point in thebore 103 below thelanding surface 108. - Moreover, it will be appreciated that either or both of the
12, 14 may be movable, without departing from the scope of the disclosure. Furthermore, in various embodiments, the firsttubular engagement devices tubular engagement device 12 may be stationary, while the secondtubular engagement device 14 is movable. Additionally, the illustrated views of runningsystem 10 may be flipped, such that the firsttubular engagement device 12 is moved upward to the secondtubular engagement device 14, or the secondtubular engagement device 14 is lowered to the firsttubular engagement device 12. - Turning now to
Figure 8 , there is illustrated a simplified, side, cross-sectional view of a portion of the tubular 200 being engaged by atubular engagement device 300, according to an embodiment described. Thetubular engagement device 300 may be generally representative of the structure and operation of theelevator 12 and/or thespider 14 described above. Accordingly, thetubular engagement device 300 generally includes 301, 302. Although twogripping assemblies 301, 302 are shown, it will be appreciated that additional gripping assemblies may be employed, for example two additional gripping assemblies, without departing from the scope of this disclosure. Thegripping assemblies 301, 302 each generally include agripping assemblies 304, 306 and atapered housing wedge 308, 310, respectively. Thewedges 308, 310 are slidable with respect to the 304, 306, respectively, and are reverse tapered with respect thereto. Accordingly, as thehousings wedges 308, 310 are drawn downward, for example, by friction from engagement with the tubular 200 and/or by pneumatics, hydraulics, motors, linkages, or the like, thewedges 308, 310 are pushed inwards into engagement with the tubular 200. The tapered 304, 306 supplies the reactionary axial and horizontal force against thehousing wedges 308, 310. As such, the base 312 transfers the weight of the tubular 200, either by resting on a platform (e.g., for a spider), by hanging from the rig via bails (e.g., for an elevator), or in any other suitable manner. - The
wedges 308, 310 each define upper and lower 314, 316 and 318, 320, respectively. The upperinterior surfaces 314, 318 may be tapered, converging toward ainterior surfaces central axis 322, proceeding downwardly. The lower 316, 320 may be generally parallel to theinterior surfaces axis 322. In other embodiments, however, the lower 316, 320 may also be tapered, converging toward theinterior surfaces central axis 322, proceeding downward. In some embodiments, one, some, or all of the upper and/or lower 314, 316, 318, 320 may be free from teeth or other marking structures; however, in various other embodiments, any of theinterior surfaces 314, 316, 318, 320 may include such teeth or other marking structures (none shown) to facilitate engagement with the tubular 200.surfaces - The upper
314, 318 may be shaped to abut and engage an upset 324 of the tubular 200. The upset 324 may be a radial protrusion extending radially outward from a remaininginterior surfaces tubular body 326, as shown, but in other embodiments may extend radially inward. In various embodiments, the upset 324 may be disposed on (e.g., fastened, welded, brazed, or otherwise connected to, integral with, or otherwise part of) the tubular 200. The upset 324 may be capable of withstanding greater tensile forces than thetubular body 326 and transmitting such axial forces to the 301, 302. Accordingly, the upset 324 may represent an area desirable for thegripping assemblies 301, 302 to engage, to avoid slip crushing the tubular 200.gripping assemblies - To provide further load distribution, the lower
316, 320 may engage theinterior surfaces tubular body 326, as shown. Accordingly, some of the axial load of the tubular 200 weight is transmitted via the radial gripping force applied by the gripping 301, 302 onto theassemblies tubular body 326. By simultaneously engaging the upset 324 with the upper 314, 318, and theinterior surfaces tubular body 326 with the lower 316, 320, the grippinginterior surfaces 301 , 302, theassemblies tubular engagement device 300, and ultimately the rig may be able to support and run the tubular 200, while supporting strings having a greater weight than that which a simple engagement with the upset 324, let alone engagement only with thetubular body 326 by itself, is capable of safely handling. -
Figure 9 illustrates amethod 400 for lowering a tubular, according to an embodiment described. Themethod 400 may proceed by operation of the runningsystem 10 and/or thetubular engagement device 300 described above with reference toFigures 1-9 and may be best understood with reference thereto. Themethod 400 includes engaging an upset of the tubular with gripping assemblies of a first tubular engagement device, as at 402. More particularly, in at least one embodiment, such engagement may include simultaneously engaging the upset and a body of the tubular to support a weight of the tubular via engagement with both the upset and the body. The tubular supported by the first tubular engagement device, as at 402, may then be lowered into and made-up to a tubular string, such that themethod 400 includes supporting the weight of the string of tubulars with the first engagement device. - The
method 400 further includes vertically moving, for example, lowering the tubular through a second tubular engagement device by lowering the first tubular engagement device, as at 404. Themethod 400 may also include receiving gripping assemblies of the second tubular engagement device into channels defined between gripping assemblies of the first tubular engagement device, as at 406. Themethod 400 may also include engaging the upset of the tubular with the gripping assemblies of the second tubular engagement device, as at 408. Themethod 400 may further include disengaging the upset of the tubular from the gripping assemblies of the first tubular engagement device, such that the upset is supported by the second tubular engagement device, as at 410. - Referring now to
Figures 10 and 11 , a first engagement device, orelevator 512, in accordance with one or more embodiments of the present disclosure is shown in top (Figure 10 ) and perspective (Figure 11 ) views. Similar toelevators 12 depicted inFigures 1-5 ,elevator 512 ofFigures 10 and 11 includes amain body 516, a pair of 518, 520, a pair of liftingflats 522, 524, a plurality (six shown) ofears gripping assemblies 528, and a plurality of channels (not visible) configured to receive plurality of gripping assemblies (e.g., 550 ofFigures 12 and 13 ) of a corresponding spider (e.g., 514 ofFigures 12 and 13 ). - Referring now to
Figures 12 and 13 together, a second engagement device, orspider 514, in accordance with one or more embodiments of the present disclosure is shown in top (Figure 12 ) and perspective (Figure 13 ) views. Similar tospider 14 ofFigures 1 ,3 ,4 ,6 and7 ,spider 514 includes amain body 540, a plurality ofgripping assemblies 550 and a plurality ofchannels 552 configured to receive plurality ofgripping assemblies 528 of corresponding elevator 512 (Figures 10 and 11 ). Thus, aselevator 512 supporting a tubular member withgripping assemblies 528 is lowered tospider 514, the protruding grippingassemblies 528 may be received intochannels 552 ofspider 514 so that collision and/or interference between 528 and 550 may be avoided asgripping assemblies elevator 512 axially approachesspider 514, as described above in reference toFigures 1-9 . - Referring now to
Figures 10-13 together,elevator 512 andspider 514 further comprise one or more alignment features to ensure thatgripping assemblies 528 ofelevator 512 properly engagechannels 552 ofspider 514, andgripping assemblies 550 ofspider 514 properly engage channels (not visible) withinelevator 512. As used herein, the phrase "proper engagement" refers to an axial engagement ofelevator 512 withspider 514 such that gripping assemblies (528 and 550, respectively) are allowed to engage with their corresponding channels without engaging, interfering, or otherwise impacting each other aselevator 512 is lowered proximate to and on top ofspider 514. - As can be best viewed in top view
Figures 10 and12 ,elevator 512 is shown comprising two alignment features in the form of bore holes 560 and 562, whilespider 514 is shown comprising two alignment features in the form of bore holes 564 and 566. Alignment feature bore holes 560, 562, 564, and 566 may be used in combination with alignment rods (not shown) to ensure that aselevator 512 is lowered tospider 514 by a rig's draw works, proper radial alignment of 528 and 550 is maintained. In selected embodiments, alignment rods may be rigidly affixed withingripping assemblies 564 and 566 ofholes spider 514 to allow slidable engagement with 560 and 562 ofholes elevator 512, and in other embodiments, alignment rods may be rigidly affixed within 560 and 562 ofholes elevator 512 to allow slidable engagement with 564 and 566 ofholes spider 514. - Additionally, in selected embodiments, alignment rods may be tapered at a free end to facilitate engagement within alignment features (i.e., holes) 560 and 562, or 564 and 566, and in other embodiments alignment feature bore holes may be tapered to facilitate engagement with free ends of alignment rods. Additionally, alignment rods used in conjunction with alignment features 560, 562, 564, and 566 may extend the entire length of the draw works to maintain radial alignment of
elevator 512 withspider 514 along the entire lifting stroke ofelevator 512 or, in alternative embodiments, alignment rods may only be of sufficient length to maintain radial alignment ofelevator 512 withspider 514 for a portion of the lifting stroke ofelevator 512. - Referring now to
Figures 14 and 15 , aspider assembly 614 in accordance with embodiments disclosed herein includes amain body 640 split into two 640A and 640B, a pair of retainingsections 670 and 672 to retainbolts 640A and 640B together, and a pair of alignment feature holes 664 and 666. As withhalves 14 and 514 ofspiders Figures 1-13 ,spider assembly 614 is shown having a plurality (six shown) ofgripping assemblies 650A-F and a plurality ofchannels 652 configured to receive a plurality of gripping assemblies from a corresponding elevator (e.g., 512 ofFigures 10 and 11 ). As shown inFigure 14 , grippingassemblies 650A-F each include awedge 655A-C driven by acorresponding piston 680A-C. - Additionally, in accordance with selected embodiments,
spider assembly 614 further comprises a timing ring split into two 682A, 682B corresponding to main body halves 640A and 640B. As such,sections timing ring 682A, connected to 680A, 680B, and 680C, ensures thatpistons 655A, 655B, and 655C move to engage and/or disengage a tubular (or other device) simultaneously at the same rate and relative position aswedges timing ring section 682A is moved by anactuator 684A. Similarly,timing ring section 682B ensures that wedges ofgripping assemblies 650D-F withinmain body half 640B move to engage and/or disengage a tubular simultaneously astiming ring section 682B is thrust byactuator 684B. As would be appreciated by those having ordinary skill, 682A and 682B andtiming ring sections 684A and 684B allowactuators gripping assemblies 650A-F to simultaneously engage a tubular located within the bore ofspider assembly 614 such that the tool is centrally positioned within the bore ofspider 614 and so that radial and axial loads may be more evenly applied to the tubular. - The foregoing has outlined features of several embodiments so that those skilled in the art may better understand the present disclosure. Those skilled in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. Those skilled in the art should also realize that such equivalent constructions do not depart from the scope of the present disclosure, and that they may make various changes, substitutions and alterations herein without departing from the scope of the present disclosure.
Claims (10)
- A tubular running system (10), comprising:an elevator (12) suspended from a rig and including a body (16) defining a bore (26) to receive a tubular (200) and wedges (50) defining channels (36, 38, 40, 42) therebetween, the wedges being configured to engage the tubular; anda spider (14) including a body (100) defining a bore (103) to receive the tubular (200) and wedges (130) defining channels (118, 120, 122, 124) therebetween, the wedges of the spider being configured to engage the tubular, wherein the wedges (50) of the elevator (12) are configured to slide axially at least partially in the channels (118, 120, 122, 124) of the spider (14) and the wedges (130) of the spider (14) are configured to slide axially at least partially in the channels (36, 38, 40, 42) of the elevator (12);wherein at least one of the elevator (12) and the spider (14) further comprise alignment features to align the elevator with the spider as the wedges (50, 130) of one of the spider and the elevator slide axially at least partially into the channels of the other of the spider and the elevator; andcharacterized in that the alignment features comprise a plurality of bore holes (560, 562, 564, 566) in the body of the elevator (12) and the spider (14), wherein alignment rods are rigidly affixed within the bore holes in the body (100, 16) of the spider or the elevator to allow slidable engagement with the bore holes in the body of the respective elevator or spider.
- The system of claim 1, further comprising a timing ring (682A, 682B) to move the wedges (130) of the spider (14) into engagement with the tubular (200) simultaneously or a timing ring to move the wedges (50) of the elevator (12) into engagement with the tubular simultaneously.
- The system of claim 1, wherein the wedges (130) of the spider (14) and the wedges (50) of the elevator (12) are configured to engage an upset (324) of the tubular (200).
- The system of claim 1, wherein the wedges (130) of the spider (14) extend upward from the body (100) of the spider (14) and the wedges (50) of the elevator (12) are located at least partially within the bore (26) of the elevator (12).
- The system of claim 1, where the wedges (130) of the spider (14), the wedges (50) of the elevator (12), or both are configured to engage the upset (324) and a remaining tubular body of the tubular (200) to support a weight of the tubular.
- The system of claim 1, wherein the wedges (130) of the spider (14), the wedges (50) of the elevator (12), or both each include an upper interior surface (314, 318) tapered to engage the upset (324) and a lower interior surface (316, 320) extending generally parallel to a central axis of the tubular (200) to engage a remaining tubular body of the tubular.
- The system of claim 1, wherein the body (100) of the spider (14) is segmented and received into an interior surface of a rotary table (134).
- A method for running a tubular (200), comprising:engaging an upset (324) of the tubular with an elevator (12);moving the tubular (200) by vertically moving the elevator (12);engaging the upset (324) of the tubular (200) with a spider (14) while still engaging the upset with the elevator (12);disengaging the upset (324) of the tubular (200) from the elevator (12), such that the upset is supported by the spider (14);engaging the upset (324) with the elevator (12) includes engaging the upset with gripping assemblies (28, 30, 32, 34) of the elevator (12), the gripping assemblies being spaced apart circumferentially and defining first channels (36, 38, 40, 42) therebetween;engaging the upset (324) with the spider (14) includes engaging the upset with second gripping assemblies (110, 112, 114, 116) of the spider, the second gripping assemblies being spaced circumferentially apart and defining second channels (118, 120, 122, 124) therebetween, wherein moving the tubular (200) comprises receiving the first gripping assemblies (28, 30, 32, 34) into the second channels (118, 120, 122, 124) and the second gripping assemblies (110, 112, 114, 116) into the first channels (36, 38, 40, 42) prior to disengaging the elevator (12) from the upset; andcharacterized by maintaining alignment of the elevator (12) with the spider (14) with an alignment feature comprising a plurality of alignment rods rigidly affixed within a plurality bore holes (560, 562, 564, 566) in a body (16) of the elevator (12) or a body (100) of the spider (14) to allow slidable engagement with the bore holes in the body of the respective elevator or spider.
- The method of claim 8, wherein engaging the upset (324) of the tubular (200) with the elevator (12) comprises simultaneously engaging the upset and a body of the tubular to support a weight of the tubular via engagement with both the upset and the body.
- The method of claim 8, further comprising using a timing ring to simultaneously engage the upset (324) with the gripping assemblies (28, 30, 32, 34) of the elevator (12) or using a timing ring (682A, 682B) to simultaneously engage the upset with the gripping assemblies (110, 112, 114, 116) of the spider (14).
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/898,260 US9353583B2 (en) | 2011-05-01 | 2013-05-20 | Single upset landing string running system |
| PCT/US2014/037500 WO2014189693A1 (en) | 2013-05-20 | 2014-05-09 | Single upset landing string running system |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP2999842A1 EP2999842A1 (en) | 2016-03-30 |
| EP2999842A4 EP2999842A4 (en) | 2016-12-28 |
| EP2999842B1 true EP2999842B1 (en) | 2019-01-16 |
Family
ID=51933972
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP14801335.2A Active EP2999842B1 (en) | 2013-05-20 | 2014-05-09 | Single upset landing string running system |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP2999842B1 (en) |
| BR (1) | BR112015033166B1 (en) |
| CA (1) | CA2912756C (en) |
| MX (1) | MX346935B (en) |
| WO (1) | WO2014189693A1 (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20070261893A1 (en) * | 2006-04-29 | 2007-11-15 | Campisi Frank J | Power slip |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4275488A (en) * | 1979-01-04 | 1981-06-30 | Gray Charles E | Combined well casing spider and elevator |
| GB2414759B (en) * | 2003-04-04 | 2007-11-07 | Weatherford Lamb | Method and apparatus for handling wellbore tubulars |
| US8051909B2 (en) * | 2004-07-16 | 2011-11-08 | Frank's Casing Crew & Rental Tools, Inc. | Method and apparatus for positioning the proximal end of a tubular string above a spider |
| US7571772B2 (en) * | 2005-09-19 | 2009-08-11 | Vetco Gray Inc. | System, method, and apparatus for a radially-movable line termination system for a riser string on a drilling rig |
| US7992634B2 (en) * | 2007-08-28 | 2011-08-09 | Frank's Casing Crew And Rental Tools, Inc. | Adjustable pipe guide for use with an elevator and/or a spider |
| US8146671B2 (en) * | 2009-02-06 | 2012-04-03 | David Sipos | Shoulder-type elevator and method of use |
| US9115547B2 (en) * | 2009-06-22 | 2015-08-25 | Frank's International, Llc | Large diameter tubular lifting apparatuses and methods |
| EP2806099A1 (en) * | 2010-01-08 | 2014-11-26 | Halliburton Energy Services, Inc. | Alignment of bop stack to facilitate use of a rotating control device |
| BR112013033611A8 (en) * | 2011-05-01 | 2018-04-03 | Franks Casing Crew & Rental Tools Inc | SINGLE GRIP LANDING ASSEMBLY CARRYING SYSTEM |
-
2014
- 2014-05-09 CA CA2912756A patent/CA2912756C/en active Active
- 2014-05-09 MX MX2015015928A patent/MX346935B/en active IP Right Grant
- 2014-05-09 EP EP14801335.2A patent/EP2999842B1/en active Active
- 2014-05-09 WO PCT/US2014/037500 patent/WO2014189693A1/en not_active Ceased
- 2014-05-09 BR BR112015033166A patent/BR112015033166B1/en active IP Right Grant
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20070261893A1 (en) * | 2006-04-29 | 2007-11-15 | Campisi Frank J | Power slip |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2999842A1 (en) | 2016-03-30 |
| BR112015033166A2 (en) | 2018-03-13 |
| CA2912756A1 (en) | 2014-11-27 |
| CA2912756C (en) | 2017-06-13 |
| BR112015033166B1 (en) | 2019-01-02 |
| MX346935B (en) | 2017-04-05 |
| EP2999842A4 (en) | 2016-12-28 |
| WO2014189693A1 (en) | 2014-11-27 |
| MX2015015928A (en) | 2016-06-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2834857C (en) | Single upset landing string running system | |
| US10113375B2 (en) | Thread compensation apparatus | |
| RU2503792C2 (en) | Grab retraction control mechanism for creation of gripping tool with enlarged working range, and method of its use | |
| EP2216496B1 (en) | Oilfield tubular elevator and method of use | |
| EP2344716B1 (en) | Tubular handling device | |
| US8720541B2 (en) | Tubular handling device and methods | |
| US9765581B2 (en) | Tubular gripping apparatus with movable bowl | |
| EP2313601B1 (en) | Grip extension linkage to provide gripping tool with improved operational range, and method of use of the same | |
| EP3482030B1 (en) | Integrated tubular handling system | |
| US10801280B2 (en) | Integrated tubular handling system and method | |
| EP3111033B1 (en) | Drill pipe and casing elevator | |
| WO2012162666A2 (en) | Tubular coupling device | |
| US9353583B2 (en) | Single upset landing string running system | |
| EP3569812B1 (en) | Load transfer system for stands of tubulars | |
| CA2912756C (en) | Single upset landing string running system | |
| EP2705215B1 (en) | Single upset landing string running system | |
| US20160060978A1 (en) | Elevator With Dual Lifting Ears | |
| US12540515B2 (en) | Extended range spider | |
| HK1155787B (en) | Grip extension linkage to provide gripping tool with improved operational range, and method of use of the same |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20151120 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: ANGELLE, JEREMY, RICHARD Inventor name: HOLLIER, TYLER, J. Inventor name: THIBODEAUX, ROBERT, JR. |
|
| RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: ANGELLE, JEREMY, RICHARD Inventor name: THIBODEAUX, ROBERT, JR. Inventor name: HOLLIER, TYLER, J. |
|
| DAX | Request for extension of the european patent (deleted) | ||
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602014040073 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: E21B0019160000 Ipc: E21B0019070000 |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20161130 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 19/10 20060101ALI20161124BHEP Ipc: E21B 19/07 20060101AFI20161124BHEP |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20171010 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20180724 |
|
| RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: ANGELLE, JEREMY RICHARD Inventor name: THIBODEAUX, ROBERT, JR. Inventor name: HOLLIER, TYLER J. |
|
| GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| GRAR | Information related to intention to grant a patent recorded |
Free format text: ORIGINAL CODE: EPIDOSNIGR71 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| INTC | Intention to grant announced (deleted) | ||
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| INTG | Intention to grant announced |
Effective date: 20181211 |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1089818 Country of ref document: AT Kind code of ref document: T Effective date: 20190215 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602014040073 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20190116 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1089818 Country of ref document: AT Kind code of ref document: T Effective date: 20190116 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190516 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190516 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190417 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190416 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602014040073 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 |
|
| 26N | No opposition filed |
Effective date: 20191017 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190531 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190509 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190509 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602014040073 Country of ref document: DE Representative=s name: HL KEMPNER PATENTANWAELTE, SOLICITORS (ENGLAND, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602014040073 Country of ref document: DE Representative=s name: HL KEMPNER PATENTANWALT, RECHTSANWALT, SOLICIT, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602014040073 Country of ref document: DE Representative=s name: HL KEMPNER PARTG MBB, DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140509 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190116 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230512 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20260312 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20260317 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20260317 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20260520 Year of fee payment: 13 |