EP2817397B1 - Offshore processing method and system - Google Patents
Offshore processing method and system Download PDFInfo
- Publication number
- EP2817397B1 EP2817397B1 EP13706235.2A EP13706235A EP2817397B1 EP 2817397 B1 EP2817397 B1 EP 2817397B1 EP 13706235 A EP13706235 A EP 13706235A EP 2817397 B1 EP2817397 B1 EP 2817397B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- treatment solution
- compound
- subsea
- treatment
- stream
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
- E21B43/36—Underwater separating arrangements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/14—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
- B01D53/1425—Regeneration of liquid absorbents
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/14—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
- B01D53/1456—Removing acid components
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/14—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
- B01D53/1456—Removing acid components
- B01D53/1475—Removing carbon dioxide
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/14—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
- B01D53/1456—Removing acid components
- B01D53/1481—Removing sulfur dioxide or sulfur trioxide
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/14—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
- B01D53/1493—Selection of liquid materials for use as absorbents
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10L—FUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G OR C10K; LIQUIFIED PETROLEUM GAS; USE OF ADDITIVES TO FUELS OR FIRES; FIRE-LIGHTERS
- C10L3/00—Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
- C10L3/06—Natural gas; Synthetic natural gas obtained by processes not covered by C10G, C10K3/02 or C10K3/04
- C10L3/10—Working-up natural gas or synthetic natural gas
- C10L3/101—Removal of contaminants
- C10L3/102—Removal of contaminants of acid contaminants
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2252/00—Absorbents, i.e. solvents and liquid materials for gas absorption
- B01D2252/20—Organic absorbents
- B01D2252/202—Alcohols or their derivatives
- B01D2252/2023—Glycols, diols or their derivatives
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2252/00—Absorbents, i.e. solvents and liquid materials for gas absorption
- B01D2252/20—Organic absorbents
- B01D2252/204—Amines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2256/00—Main component in the product gas stream after treatment
- B01D2256/24—Hydrocarbons
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2257/00—Components to be removed
- B01D2257/30—Sulfur compounds
- B01D2257/304—Hydrogen sulfide
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2257/00—Components to be removed
- B01D2257/50—Carbon oxides
- B01D2257/504—Carbon dioxide
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/14—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
- B01D53/1406—Multiple stage absorption
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/14—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
- B01D53/1456—Removing acid components
- B01D53/1462—Removing mixtures of hydrogen sulfide and carbon dioxide
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/26—Drying gases or vapours
- B01D53/263—Drying gases or vapours by absorption
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0007—Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02C—CAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]
- Y02C20/00—Capture or disposal of greenhouse gases
- Y02C20/40—Capture or disposal of greenhouse gases of CO2
Definitions
- the present invention relates to an offshore processing method and system, especially the present invention relates to an offshore processing method where a treatment solution is employed for separation of a component from a main fluid stream. Further, the present invention relates to a method and a system where a fluid stream is transported from a subsea arranged installation to a topside installation without the use of a pump.
- Crude process fluid extracted from a well is initially separated in a crude natural gas stream and one or more liquid streams.
- the crude natural gas stream will usually contain acid compounds such as carbon dioxide and hydrogen sulphide as well as being saturated with water.
- the acid compounds can together with condensed water form liquid acid during handling and transport which may result in corrosion unless all equipment is made of high quality and high cost steel. Further the presence of water in the natural gas can during temperature and pressure changes result in the formation of solid hydrates that may result in blockage of the passages through the equipment.
- One offshore processing method includes letting a mayor part of the hydrocarbon gas handling take place sub-sea but handling some regeneration processes and side streams top side.
- the well fluid from a subsea well will normally naturally have sufficient pressure to proceed from the subsea well head and up to a topside arranged installation.
- Known processes for removal of acid compounds/CO 2 and water include separate absorption processes where the crude gas is brought in contact with a selective absorbent solution. After contact with the absorbent solution a gas stream depleted from the compound absorbed in the absorbent solution is obtained. To remove more compounds or group of compounds the crude gas stream may be pass through a series of contactors employing similar or different absorbent solutions. Examples of known processes are disclosed in US 3 495 380 A , FR 2 618 876 A1 , US 4 948 394 A and US 2008/190291 A1 .
- the different absorbent solutions including the selective absorbents usually have a significant cost and for environmental reasons require special treatment.
- the absorbent solutions are normally regenerated for reuse in the absorption process.
- the regeneration is normally performed by heating and/or depressurization of the rich absorption solution in a desorber. Resulting in desorption of the absorbed compound from the solution.
- the solution is separated from the desorbed gas and cooled before being reused.
- the desorption and regeneration process is demanding both with respect to energy, mainly for heating and with respect to structural space.
- topside For subsea wells the treatment processes are presently being performed topside, which requires that all the gas is brought up to the surface and that all the process equipment is installed topside including absorbers, desorbers, tanks for the treatment solutions etc. Due to the fact that the topside facility is handling all the produced natural gas significant security requirements must be fulfilled. The hazard risks are initial significant when inflammable gas is handled and the security requirements must be in place to lower the risk. This increases the size and the complexity of the topside facility.
- the topside facility can be a floating platform or ship like construction or it can be a rig construction with one or more legs fixed to the ground subsea.
- Disclosed solutions for subsea pumps comprise different techniques for handling the external pressure and the corrosive environment.
- subsea compressors are provided to facilitate compact transport of the gas stream.
- compressors which work effectively under subsea conditions.
- the objective of the present invention is to provide an alternative method and system for gas treatment which impose fewer requirements on the topside facility, without significantly increasing the complexity of the system.
- the present invention provides a method for removal of a compound from a crude hydrocarbon gas stream to be obtained from a sub-sea well, as defined in appended claims 1-8.
- the present invention provides a crude natural gas treatment system for removal of a compound from a crude natural gas stream as defined in claim 9.
- hydrocarbon gas handling takes place sub-sea, but some regeneration processes and side streams are handled top side.
- a method for transporting a treatment fluid from a subsea treatment unit to a topside regeneration unit comprising adding pressurized natural gas to the treatment fluid subsea as a lift gas and separating the natural gas from the treatment fluid topside before the treatment fluid enters the treatment unit.
- the added pressurize natural gas will normally be hot at the prevailing conditions.
- the term "hot” as used here refers to at a temperature above the temperature of the treatment fluid, as the pressurized gas is heated during the compression.
- topside refers to a position in proximity of the sea level.
- part of the equipment may be installed above or below the sea level but with in or on the floating vessel or platform.
- topside should be interpreted to refer to any position on the platform above sea level.
- Figure 1 illustrates how, according to the present invention, a crude gas stream 11 comprising a compound to be removed is fed to a contactor system 14, 16 arranged subsea.
- the contactor system is a 2 stage process with an initial direct contactor (mixer device) 14 and a traditional contactor column 16.
- the present invention is not limited to this embodiment but any contactor system applicable for subsea arrangement may be employed.
- the gas stream is brought in contact with a treatment solution stream fed trough pipe 23.
- the obtained gas treatment solution mixture proceeds as stream 17 into the contactor column 16.
- Lean treatment solution is provided to the column from pipe 21.
- the treatment solution for the direct contactor is obtained from the column 16 at a level above the gas inlet, however the present invention is not limited to this solution as lean treatment solution could also be fed to the direct contactor as well as the column.
- the treatment solution comprises one or more species that at least with some selectivity absorb the compound to be removed from the crude gas stream.
- a species and solvent/diluent applicable for forming an effective treatment solution can be selected by the user depending on the compound to be removed and the prevailing conditions within the system.
- the compound to be removed is absorbed in the solution.
- the crude gas accordingly at least partly depleted from the compound to be removed leaves the system over the top of the column trough pipeline 31.
- the main crude gas stream accordingly stays subsea during the treatment process.
- the rich treatment solution leaves the contactor 16 trough the bottom outlet pipeline 25.
- a pump 18 is provided to force the rich treatment solution to proceed up through the riser or pipeline 27.
- a regeneration system 20 is installed on a topside facility 90 . The system receives the rich solution from pipeline 27, desorbes and separates the absorbed compound there from and obtains a depleted treatment solution which is send back to the subsea contactor system trough pipeline/riser 21. The desorbed compound leaves the regeneration unit 20 as stream 29.
- the compound to be removed is an acid gas, such as CO 2 and/or H 2 S and the treatment solution comprises an amine based CO 2 absorbent.
- the compound to be removed from the gas is water, and the treatment solution is water absorbent such as tri ethylene glycol or another glycol based water absorbing compound.
- Figure 2 illustrates a further embodiment of the present invention. Illustrated here is also the initial treatment of a well fluid 1.
- the well fluid 1 enters a phase separator 2, where the gas stream 3 is separated from the liquid.
- a water stream 19 is passed to a produced water treatment system 4, and the oil stream 13 is past to an oil treatment system 6.
- the gas 3 is initially cooled by cooler 8 to obtain cooled gas 5.
- the cooling results in condensation of higher hydrocarbons which are separated in separator 10.
- the liquid stream 7 is via pump 12 and pipe 9 mixed with the main oil stream from the separator 2.
- the gas 11 leaving over the top of the separator 10 is subject to a system and treatment as discussed in connection with figure 1 .
- the obtained treated gas 31 enters a second system according to the present invention comprising a direct contactor 34, where it is brought in contact with a treatment solution stream 43.
- the obtained mixture is fed to a contactor column 36.
- the rich treatment solution leaves via the bottom as stream 45, via pump 38 and is transported via pipeline 47 to a top side installation 90 and a regeneration unit 40.
- the compound absorbed in the rich treatment solution is released resulting in a compound stream 49 and a lean treatment solution 41 being returned to the subsea contactor 36.
- the treated gas stream 51 leaving over the top of 36 can be compressed in compressor 52 and the temperature of the compressed gas 53 controlled by heat exchanger 54.
- heat exchanger 54 the temperature of the compressed gas 53 controlled by heat exchanger 54.
- CO 2 is removed in the first contactor 16 and water is removed from the gas in the second contactor 36, whereby the obtained gas is sweetened and dewpointed to allow for pipe line transport.
- the CO 2 29 released from the treatment solution 27 within the unit 20 is then in this embodiment transferred to a CO 2 injection system 60 where it is compressed or otherwise prepared for injection via line 61.
- the gas stream 31 is a sweet gas stream. Water present in the gas is absorbed in the treatment solution 47.
- the removed compound in stream 49 is water and this stream can be released to the atmosphere.
- the gas stream 51 is sweet and dry and as such is conditioned for transport.
- Figure 3 illustrates the heat exchanger pipeline configuration of the present invention.
- the pipelines 121 and 127 correspond to the pipe lines 21 and 27 in figure 1 , but arranged as a pipe-in-pipe riser.
- the inner pipe 127 of the two concentric pipes transports the lean treatment solution
- the outer pipe 121 of the two concentric pipes transport the rich treatment solution.
- the topside regeneration of the treatment solution normally involves supplying heat to the solution to release the absorbed compound
- the pipe-in-pipe arrangement allows for heat transfer form the warm lean treatment solution to the rich treatment solution and thereby to a more energy efficient process as well as reducing the number connections between the subsea installation and the topside facility.
- FIG. 4 illustrates an embodiment of the present invention with an alternative way of providing pressure to a treatment fluid or other liquid streams employed subsea where said stream need to be transported to topside.
- a subsea stream 11 is fed to a treatment column 36 where the stream 31 is brought in contact with a treatment fluid 41.
- the stream 31 may be a natural gas stream and the treatment fluid is an absorbent for absorbing a compound to be removed from the natural gas stream.
- the bottom stream 45 leaving the column will be a rich treatment solution.
- the natural gas with a reduced content of the compound to be removed leaves over the top as stream 51.
- the gas is fed to a sub sea compressor 52 to obtain compressed, depleted, natural gas 53.
- a part 55 of the compressed, depleted, natural gas proceeds to shore, storage or further processing.
- Another part 59 of the compressed gas is injected into the rich treatment solution 45, thereby providing sufficient pressure for the rich treatment solution to be transported through riser 47 to a topside installation 90.
- the top side installation 90 comprises a treatment solution regeneration system 40, wherein the treatment solution is regeneration through separation of the absorbed compound and removal of the natural gas introduced into the solution.
- the natural gas 93 is preferably supplied as fuel gas to an onboard power supply system 86 which might require recompression of the gas phase.
- the depleted treatment fluid is returned through pipeline 41 to the subsea system.
- Stream 49 is the removed compound or a part thereof.
- the treatment fluid could be a glycol such as triethylene glycol.
- the rich glycol 45 including water together with the pressurized natural gas 59 through the riser 47 it is expected that part of the water is transferred back to the gas phase.
- This water will be separated of together with the natural gas forming fuel gas 93.
- it is well known to combust fuel gas containing water and this might even be beneficial for the control of the combustion temperature.
- the size of the further system to regenerate the treatment solution can be reduced in size.
- Other examples of treatment fluids and similar systems include absorbents of acidic compounds such as amine solutions for removing CO 2 and /or H 2 S.
- FIG. 5 illustrates a further embodiment of the present invention with an alternative way of providing pressure to a treatment fluid or other liquid streams employed subsea where said stream need to be transported to topside.
- a well fluid 1 enters a phase separator 2, where a gas stream 3 is separated from the liquid.
- a water stream 19 is passed to a produced water treatment system 4, and the oil stream 13 is past to an oil treatment system 6.
- the gas 3 is initially cooled by cooler 8 to obtain cooled gas 5.
- the cooling results in condensation of higher hydrocarbons which are separated in separator 10.
- the liquid stream 7 is via pump 12 and pipe 9 mixed with the main oil stream from the separator 2.
- the gas 11 leaving over the top of the separator 10 is subject to a gas treatment system.
- the crude gas stream 11 comprising a compound to be removed such as CO 2 and/or other acid gasses is fed to a contactor system 14, 16 arranged subsea.
- the contactor system is a 2 stage process with an initial direct contactor 14 and a traditional contactor column 16.
- the present invention is not limited to this embodiment but any contactor system applicable for subsea arrangement may be employed.
- the gas stream is brought in contact with a treatment solution stream fed trough pipe 23.
- the obtained gas treatment solution mixture proceeds as stream 17 into the contactor column 16.
- Lean treatment solution is provided to the column from pipe 21.
- the treatment solution for the direct contactor is obtained from the column 16 at a level above the gas inlet, however the present invention is not limited to this solution as lean treatment solution could also be fed to the direct contactor as well as the column.
- the treatment solution comprises one or more species that at least with some selectivity absorb the compound to be removed from the crude gas stream.
- a species and solvent/diluent applicable for forming an effective treatment solution can be selected by the user depending on the compound to be removed and the prevailing conditions within the system.
- the crude gas accordingly at least partly depleted from the compound to be removed leaves over the top of the column trough pipeline 31.
- the main crude gas stream accordingly stays subsea during the treatment process.
- the rich treatment solution leaves the contactor 16 trough the bottom outlet pipeline 25.
- a pressurized natural gas stream 65 is added to the rich treatment solution to provide the necessary pressure to transport the rich treatment solution to the top side installation through riser 27.
- a regeneration system 20 is installed on a topside facility 90 .
- the system receives the rich solution from pipeline 27, separates of the added natural gas 91 and desorbes and separates the absorbed compound there from and obtains a depleted treatment solution which is send back to the subsea contactor system trough pipeline/riser 21.
- a part of the absorbed compound may be released to the gas phase during transport trough the riser 27. This released gas will follow the added natural gas via pipeline 91 and be added as fuel gas to the fuel gas system 86.
- the desorbed compound leaves the regeneration unit 20 as stream 29. If the compound is CO 2 the stream 29 may be treated and compressed in unit 60 and from there transported via pipeline 61 to a subsea injection well (not shown).
- the obtained treated gas 31 enters a second system for removal of a second compound, such as water.
- the system comprises a direct contactor 34, where the gas is brought in contact with a treatment solution stream 43.
- the obtained mixture is fed to a contactor column 36.
- the rich treatment solution leaves via the bottom as stream 45 and is transported via pipeline 47 to a top side installation 90 and a regeneration unit 40.
- Pressurized hot natural gas 59 is added to the rich treatment solution subsea to facilitate the transport up trough the riser 47.
- the top side system is as discussed in connection with figure 4 .
- Topside the added gas 93 and possibly some of the absorbed compound is obtained as fuel gas 93.
- the rest of the compound absorbed in the rich treatment solution is released resulting in a compound stream 49 and a lean treatment solution 41 being returned to the subsea contactor 36. If the compound is water the stream 49 is steam that can be released to the atmosphere.
- the treated gas stream 51 leaving over the top of 36 can be compressed in compressor 52 and the temperature of the compressed gas 53 controlled by heat exchanger 54.
- heat exchanger 54 the temperature of the compressed gas 53 controlled by heat exchanger 54.
- a topside stabilization system 84 comprises one or more stabilization steps where gas is flashed of from the crude oil.
- the first step is preferably performed at a pressure equal to the pressure required by the fuel gas system 86 so that it is not required to compressed the fuel gas 89 before feeding it to the fuel gas system 86.
- the fuel gas is a combination of the added gas 57 and the gas present in the crude oil prior to stabilization. Additional stabilization steps may be included within unit 84 to allow for removal of additional gas to secure quality applicable for tanker transport.
- the amount of added gas 57 can be regulated based on the amount of fuel need by the power generators and the fuel 91 and 93 being provided to the fuel gas system after having work as a lift gas for the treatment solutions.
- the amount of pumps required for transferring the treatment solutions from the subsea treatment units to the topside regeneration facilities has been limited and the pressurized natural gas added as lift gas serves as fuel for topside power generation.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Organic Chemistry (AREA)
- Gas Separation By Absorption (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
Description
- The present invention relates to an offshore processing method and system, especially the present invention relates to an offshore processing method where a treatment solution is employed for separation of a component from a main fluid stream. Further, the present invention relates to a method and a system where a fluid stream is transported from a subsea arranged installation to a topside installation without the use of a pump.
- Crude process fluid extracted from a well is initially separated in a crude natural gas stream and one or more liquid streams. The crude natural gas stream will usually contain acid compounds such as carbon dioxide and hydrogen sulphide as well as being saturated with water. The acid compounds can together with condensed water form liquid acid during handling and transport which may result in corrosion unless all equipment is made of high quality and high cost steel. Further the presence of water in the natural gas can during temperature and pressure changes result in the formation of solid hydrates that may result in blockage of the passages through the equipment.
- The exploitation of subsea wells has gone through considerable developments since the start of the offshore era. The location of the wells has changed both with respect to sea dept as well as distance to shore. This has resulted in new systems for handling the well streams. One such system includes a subsea installation near the well head combined with a topside platform, which can be a floating processing platform. Transportation of the well products can take place either through subsea pipelines or via tanker transport. Due to the limited space on a floating platform generally the amount of process equipment need to be adjust to the available space. One offshore processing method includes letting a mayor part of the hydrocarbon gas handling take place sub-sea but handling some regeneration processes and side streams top side.
- The well fluid from a subsea well will normally naturally have sufficient pressure to proceed from the subsea well head and up to a topside arranged installation.
- However the subsea processing steps will often result in loss of pressure, as the different separation and treatment processes can not be performed at such high pressures. After treatment the produced stream as well as the treatment solutions employed subsea will no longer have sufficient pressure for transportation to the topside installation. To facilitate transport of the fluids pumps are installed subsea. Power to the pumps is provided from the top side installation. At high sea depths the power demand would be considerable, which requires a considerable power plant on the top side installation and increased dimensions for the power cable and the length thereof.
- Accordingly it is well known to pass the crude natural gas through different separation processes to remove acid compound, water and or other compounds to obtain a natural gas stream ready for export.
- Conventionally when natural gas is recovered from a subsea well the well stream is either transported to a topside facility as is or an initial phase separation take place subsea before the gas and/or oil is transported to a topside facility for further treatment prior to export.
- Known processes for removal of acid compounds/CO2 and water include separate absorption processes where the crude gas is brought in contact with a selective absorbent solution. After contact with the absorbent solution a gas stream depleted from the compound absorbed in the absorbent solution is obtained. To remove more compounds or group of compounds the crude gas stream may be pass through a series of contactors employing similar or different absorbent solutions. Examples of known processes are disclosed in
US 3 495 380 A , ,FR 2 618 876 A1US 4 948 394 A andUS 2008/190291 A1 . - The different absorbent solutions including the selective absorbents usually have a significant cost and for environmental reasons require special treatment. For these and other reasons the absorbent solutions are normally regenerated for reuse in the absorption process. The regeneration is normally performed by heating and/or depressurization of the rich absorption solution in a desorber. Resulting in desorption of the absorbed compound from the solution. The solution is separated from the desorbed gas and cooled before being reused. The desorption and regeneration process is demanding both with respect to energy, mainly for heating and with respect to structural space.
- For subsea wells the treatment processes are presently being performed topside, which requires that all the gas is brought up to the surface and that all the process equipment is installed topside including absorbers, desorbers, tanks for the treatment solutions etc. Due to the fact that the topside facility is handling all the produced natural gas significant security requirements must be fulfilled. The hazard risks are initial significant when inflammable gas is handled and the security requirements must be in place to lower the risk. This increases the size and the complexity of the topside facility.
- The topside facility can be a floating platform or ship like construction or it can be a rig construction with one or more legs fixed to the ground subsea.
- Disclosed solutions for subsea pumps comprise different techniques for handling the external pressure and the corrosive environment. For gas streams subsea compressors are provided to facilitate compact transport of the gas stream. Presently there exist compressors which work effectively under subsea conditions.
- The objective of the present invention is to provide an alternative method and system for gas treatment which impose fewer requirements on the topside facility, without significantly increasing the complexity of the system.
- The present invention provides a method for removal of a compound from a crude hydrocarbon gas stream to be obtained from a sub-sea well, as defined in appended claims 1-8.
- Further the present invention provides a crude natural gas treatment system for removal of a compound from a crude natural gas stream as defined in claim 9.
- According to the present invention a major part of the hydrocarbon gas handling takes place sub-sea, but some regeneration processes and side streams are handled top side.
- As there in this solution are fluids that are transported between topside and subsea facilities, dependent on the water depth and the process pressure subsea, one may make use of the differences in operating pressures subsea and topside to reduce or possibly eliminate the need for additional pressure increasing/decreasing devices as pumps/chokes/lift gas systems etc. in the system. The hydraulic head and transportation in itself will assist in the pressure increase and decrease of the fluids that is transported between subsea and topside.
- Further disclosed is an alternative way of providing pressure to a treatment fluid or other liquid stream employed subsea, where the streams need to be transported to topside for regeneration or further processing.
- Further disclosed is a process which at the same time as it provides pressure for transport it assists during transport the separation of a rich treatment fluid.
- Further disclosed is a system which supplies fuel to a topside fuel gas system.
- Further disclosed is a method for transporting a treatment fluid from a subsea treatment unit to a topside regeneration unit wherein the method comprises adding pressurized natural gas to the treatment fluid subsea as a lift gas and separating the natural gas from the treatment fluid topside before the treatment fluid enters the treatment unit. The added pressurize natural gas will normally be hot at the prevailing conditions. The term "hot" as used here refers to at a temperature above the temperature of the treatment fluid, as the pressurized gas is heated during the compression.
- The term "topside" as used here refers to a position in proximity of the sea level. For floating topside installations part of the equipment may be installed above or below the sea level but with in or on the floating vessel or platform. For platforms with one or more legs connected to the seabed the term "topside" should be interpreted to refer to any position on the platform above sea level.
- The present invention will be discussed in further detail with reference to the enclosed figures where:
-
Figure 1 schematically illustrates a first embodiment of the present invention. -
Figure 2 illustrates the process scheme of a second embodiment of the present invention. -
Figure 3 illustrates a cross sectional view in the longitudinal direction of an embodiment of the riser/pipeline. -
Figure 4 schematically illustrates an embodiment of the present invention with an alternative way of providing pressure to a treatment fluid or other liquid streams employed subsea where said stream need to be transported to topside. -
Figure 5 schematically illustrates a further embodiment of the present invention with an alternative way of providing pressure to a treatment fluid or other liquid streams employed subsea where said stream need to be transported to topside. - The figures illustrate different embodiments of the present invention. The same reference numbers are used to refer to equally elements within the different embodiments. It should be understood that features of the different embodiments may be combined to provide additional embodiments of the present invention.
-
Figure 1 illustrates how, according to the present invention, acrude gas stream 11 comprising a compound to be removed is fed to a 14, 16 arranged subsea. In the illustrated embodiment the contactor system is a 2 stage process with an initial direct contactor (mixer device) 14 and acontactor system traditional contactor column 16. However the present invention is not limited to this embodiment but any contactor system applicable for subsea arrangement may be employed. In the direct contactor the gas stream is brought in contact with a treatment solution stream fedtrough pipe 23. The obtained gas treatment solution mixture proceeds asstream 17 into thecontactor column 16. Lean treatment solution is provided to the column frompipe 21. In the illustrated embodiment the treatment solution for the direct contactor is obtained from thecolumn 16 at a level above the gas inlet, however the present invention is not limited to this solution as lean treatment solution could also be fed to the direct contactor as well as the column. The treatment solution comprises one or more species that at least with some selectivity absorb the compound to be removed from the crude gas stream. A species and solvent/diluent applicable for forming an effective treatment solution can be selected by the user depending on the compound to be removed and the prevailing conditions within the system. During contact with the treatment solution the compound to be removed is absorbed in the solution. The crude gas accordingly at least partly depleted from the compound to be removed leaves the system over the top of thecolumn trough pipeline 31. The main crude gas stream accordingly stays subsea during the treatment process. The rich treatment solution leaves thecontactor 16 trough thebottom outlet pipeline 25. In the illustrated embodiment apump 18 is provided to force the rich treatment solution to proceed up through the riser orpipeline 27. The is only an illustration of one possible way of securing transport of the rich treatment solution up trough thepipeline 27 other methods of providing the needed pressure and flow can equally be employed. On a topside facility 90 aregeneration system 20 is installed. The system receives the rich solution frompipeline 27, desorbes and separates the absorbed compound there from and obtains a depleted treatment solution which is send back to the subsea contactor system trough pipeline/riser 21. The desorbed compound leaves theregeneration unit 20 asstream 29. - In one aspect of the present invention the compound to be removed is an acid gas, such as CO2 and/or H2S and the treatment solution comprises an amine based CO2 absorbent. In another embodiment the compound to be removed from the gas is water, and the treatment solution is water absorbent such as tri ethylene glycol or another glycol based water absorbing compound.
-
Figure 2 illustrates a further embodiment of the present invention. Illustrated here is also the initial treatment of a well fluid 1. Firstly the well fluid 1 enters aphase separator 2, where thegas stream 3 is separated from the liquid. In the illustrated embodiment awater stream 19 is passed to a producedwater treatment system 4, and theoil stream 13 is past to anoil treatment system 6. Thegas 3 is initially cooled by cooler 8 to obtain cooledgas 5. The cooling results in condensation of higher hydrocarbons which are separated inseparator 10. Theliquid stream 7 is viapump 12 and pipe 9 mixed with the main oil stream from theseparator 2. Thegas 11 leaving over the top of theseparator 10 is subject to a system and treatment as discussed in connection withfigure 1 . The obtained treatedgas 31 enters a second system according to the present invention comprising adirect contactor 34, where it is brought in contact with atreatment solution stream 43. The obtained mixture is fed to acontactor column 36. The rich treatment solution leaves via the bottom asstream 45, viapump 38 and is transported viapipeline 47 to atop side installation 90 and aregeneration unit 40. Here the compound absorbed in the rich treatment solution is released resulting in acompound stream 49 and alean treatment solution 41 being returned to thesubsea contactor 36. - The treated
gas stream 51 leaving over the top of 36 can be compressed incompressor 52 and the temperature of the compressedgas 53 controlled byheat exchanger 54. Hereby providing a treatedgas stream 55 adjusted for subsea pipeline transport. - In one embodiment of the present invention CO2 is removed in the
first contactor 16 and water is removed from the gas in thesecond contactor 36, whereby the obtained gas is sweetened and dewpointed to allow for pipe line transport. TheCO 2 29 released from thetreatment solution 27 within theunit 20 is then in this embodiment transferred to a CO2 injection system 60 where it is compressed or otherwise prepared for injection vialine 61. Thegas stream 31 is a sweet gas stream. Water present in the gas is absorbed in thetreatment solution 47. The removed compound instream 49 is water and this stream can be released to the atmosphere. Thegas stream 51 is sweet and dry and as such is conditioned for transport. -
Figure 3 illustrates the heat exchanger pipeline configuration of the present invention. Here the 121 and 127 correspond to thepipelines 21 and 27 inpipe lines figure 1 , but arranged as a pipe-in-pipe riser. In the illustrated embodiment theinner pipe 127 of the two concentric pipes transports the lean treatment solution, whereas theouter pipe 121 of the two concentric pipes transport the rich treatment solution. The topside regeneration of the treatment solution normally involves supplying heat to the solution to release the absorbed compound, the pipe-in-pipe arrangement allows for heat transfer form the warm lean treatment solution to the rich treatment solution and thereby to a more energy efficient process as well as reducing the number connections between the subsea installation and the topside facility.Figure 4 illustrates an embodiment of the present invention with an alternative way of providing pressure to a treatment fluid or other liquid streams employed subsea where said stream need to be transported to topside.. Asubsea stream 11 is fed to atreatment column 36 where thestream 31 is brought in contact with atreatment fluid 41. In one embodiment thestream 31 may be a natural gas stream and the treatment fluid is an absorbent for absorbing a compound to be removed from the natural gas stream. Thebottom stream 45 leaving the column will be a rich treatment solution. The natural gas with a reduced content of the compound to be removed leaves over the top asstream 51. The gas is fed to asub sea compressor 52 to obtain compressed, depleted,natural gas 53. Apart 55 of the compressed, depleted, natural gas proceeds to shore, storage or further processing. Anotherpart 59 of the compressed gas is injected into therich treatment solution 45, thereby providing sufficient pressure for the rich treatment solution to be transported throughriser 47 to atopside installation 90. - The
top side installation 90 comprises a treatmentsolution regeneration system 40, wherein the treatment solution is regeneration through separation of the absorbed compound and removal of the natural gas introduced into the solution. Thenatural gas 93 is preferably supplied as fuel gas to an onboardpower supply system 86 which might require recompression of the gas phase. The depleted treatment fluid is returned throughpipeline 41 to the subsea system.Stream 49 is the removed compound or a part thereof. - To further explain the present invention the following example is provided. If the compound to be removed from the
natural gas 11 for instance is water, the treatment fluid could be a glycol such as triethylene glycol. During transport of therich glycol 45 including water together with the pressurizednatural gas 59 through theriser 47 it is expected that part of the water is transferred back to the gas phase. This water will be separated of together with the natural gas formingfuel gas 93. However it is well known to combust fuel gas containing water, and this might even be beneficial for the control of the combustion temperature. When a significant amount of the compound to the removed, in this example water is separated during transport and separated of through initial phase separation, the size of the further system to regenerate the treatment solution can be reduced in size. Other examples of treatment fluids and similar systems include absorbents of acidic compounds such as amine solutions for removing CO2 and /or H2S. -
Figure 5 illustrates a further embodiment of the present invention with an alternative way of providing pressure to a treatment fluid or other liquid streams employed subsea where said stream need to be transported to topside.. A well fluid 1 enters aphase separator 2, where agas stream 3 is separated from the liquid. In the illustrated embodiment awater stream 19 is passed to a producedwater treatment system 4, and theoil stream 13 is past to anoil treatment system 6. Thegas 3 is initially cooled by cooler 8 to obtain cooledgas 5. The cooling results in condensation of higher hydrocarbons which are separated inseparator 10. Theliquid stream 7 is viapump 12 and pipe 9 mixed with the main oil stream from theseparator 2. Thegas 11 leaving over the top of theseparator 10 is subject to a gas treatment system. Thecrude gas stream 11 comprising a compound to be removed such as CO2 and/or other acid gasses is fed to a 14, 16 arranged subsea. In the illustrated embodiment the contactor system is a 2 stage process with an initialcontactor system direct contactor 14 and atraditional contactor column 16. However the present invention is not limited to this embodiment but any contactor system applicable for subsea arrangement may be employed. In the direct contactor the gas stream is brought in contact with a treatment solution stream fedtrough pipe 23. The obtained gas treatment solution mixture proceeds asstream 17 into thecontactor column 16. Lean treatment solution is provided to the column frompipe 21. In the illustrated embodiment the treatment solution for the direct contactor is obtained from thecolumn 16 at a level above the gas inlet, however the present invention is not limited to this solution as lean treatment solution could also be fed to the direct contactor as well as the column. The treatment solution comprises one or more species that at least with some selectivity absorb the compound to be removed from the crude gas stream. A species and solvent/diluent applicable for forming an effective treatment solution can be selected by the user depending on the compound to be removed and the prevailing conditions within the system. During contact with the treatment solution the compound to be removed is absorbed in the solution. The crude gas accordingly at least partly depleted from the compound to be removed leaves over the top of thecolumn trough pipeline 31. The main crude gas stream accordingly stays subsea during the treatment process. The rich treatment solution leaves thecontactor 16 trough thebottom outlet pipeline 25. A pressurizednatural gas stream 65 is added to the rich treatment solution to provide the necessary pressure to transport the rich treatment solution to the top side installation throughriser 27. - On a topside facility 90 a
regeneration system 20 is installed. The system receives the rich solution frompipeline 27, separates of the addednatural gas 91 and desorbes and separates the absorbed compound there from and obtains a depleted treatment solution which is send back to the subsea contactor system trough pipeline/riser 21. As discussed in connection withfigure 4 , a part of the absorbed compound may be released to the gas phase during transport trough theriser 27. This released gas will follow the added natural gas viapipeline 91 and be added as fuel gas to thefuel gas system 86. The desorbed compound leaves theregeneration unit 20 asstream 29. If the compound is CO2 thestream 29 may be treated and compressed inunit 60 and from there transported viapipeline 61 to a subsea injection well (not shown). - The obtained treated
gas 31 enters a second system for removal of a second compound, such as water. The system comprises adirect contactor 34, where the gas is brought in contact with atreatment solution stream 43. The obtained mixture is fed to acontactor column 36. The rich treatment solution leaves via the bottom asstream 45 and is transported viapipeline 47 to atop side installation 90 and aregeneration unit 40. Pressurized hotnatural gas 59 is added to the rich treatment solution subsea to facilitate the transport up trough theriser 47. The top side system is as discussed in connection withfigure 4 . Topside the addedgas 93 and possibly some of the absorbed compound is obtained asfuel gas 93. The rest of the compound absorbed in the rich treatment solution is released resulting in acompound stream 49 and alean treatment solution 41 being returned to thesubsea contactor 36. If the compound is water thestream 49 is steam that can be released to the atmosphere. - The treated
gas stream 51 leaving over the top of 36 can be compressed incompressor 52 and the temperature of the compressedgas 53 controlled byheat exchanger 54. Hereby providing a treatedgas stream 55 adjusted for subsea pipeline transport. - Further illustrated on
figure 5 is the handling of theoil stream 13, which is fed to to an initialoil treatment system 6 arranged subsea. Here the crude oil is dehydration for instance by use of electrostatic coalescers or other dehydration techniques. Separated water is past asstream 15 to the producedwater treatment system 4. Thedehydrated oil 81 is viapump 80 transferred to thetopside installation 90 asstream 85 together with apart 57 of the treated and compressedgas 53. Atopside stabilization system 84 comprises one or more stabilization steps where gas is flashed of from the crude oil. The first step is preferably performed at a pressure equal to the pressure required by thefuel gas system 86 so that it is not required to compressed the fuel gas 89 before feeding it to thefuel gas system 86. The fuel gas is a combination of the addedgas 57 and the gas present in the crude oil prior to stabilization. Additional stabilization steps may be included withinunit 84 to allow for removal of additional gas to secure quality applicable for tanker transport. The amount of addedgas 57 can be regulated based on the amount of fuel need by the power generators and the 91 and 93 being provided to the fuel gas system after having work as a lift gas for the treatment solutions.fuel - According to the present invention, as by way of example is illustrated in
figures 4 and5 , the amount of pumps required for transferring the treatment solutions from the subsea treatment units to the topside regeneration facilities has been limited and the pressurized natural gas added as lift gas serves as fuel for topside power generation.
Claims (9)
- Method for removal of a compound from a crude hydrocarbon gas stream to be obtained from a sub-sea well, wherein the method comprises bringing the crude hydrocarbon gas stream in contact with a treatment solution comprising an absorbent at least partly selective to the compound to be removed, thereby obtaining a rich treatment solution and a compound depleted gas stream, regenerating the treatment solution comprising the absorbent by desorbing the compound from the rich treatment solution, thereby obtaining a compound stream wherein the crude hydrocarbon gas stream is brought in contact with the treatment solution comprising the absorbent subsea, the compound depleted gas stream is obtained subsea, and the regenerating of the rich treatment solution and obtaining the compound stream is performed topside, wherein the rich treatment solution is heat exchanged in a pipe-in-pipe riser with the treatment solution comprising the absorbent during transport of the compound rich treatment solution from subsea to topside and transport of the treatment solution comprising the absorbent from topside to subsea.
- Method according to any one of the previous claims, wherein the method comprises inline mixing of the crude hydrocarbon gas stream and the treatment solution comprising the absorbent, preferably by bringing the crude hydrocarbon gas and the treatment solution comprising the absorbent in contact in a counter current contactor column.
- Method according to any one of the previous claims, wherein the compound is CO2 and optionally H2S.
- Method according to claim 3, wherein the obtained compound stream comprising mainly CO2 is further pressurized and reinjected subsea.
- Method according to claim 3 or 4, wherein the treatment solution comprising the absorbent is an aqueous amine solution.
- Method according to any one of the claims 1-2, wherein the compound is H2O.
- Method according to claim 6, wherein the treatment solution comprising the absorbent is a glycol solution.
- Method according to claim 1 for transporting a treatment solution from a subsea treatment unit to a topside regeneration unit, wherein the method comprises adding pressurized hydrocarbon gas to the treatment solution subsea as a lift gas and separating the hydrocarbon gas from the treatment solution topside before the treatment fluid enters the treatment unit, wherein the hydrocarbon gas used as lift gas is obtained by pressurization of crude hydrocarbon gas treated by at least one treatment unit.
- Crude natural gas treatment system for removal of a compound from a crude hydrocarbon gas stream comprising an absorption unit with a hydrocarbon gas inlet, a treatment solution inlet, a compound depleted gas outlet and a rich treatment solution outlet and comprising a desorption unit with a rich treatment solution inlet, a compound outlet and a depleted treatment solution outlet, where the rich treatment solution outlet is in fluid communication with the rich treatment solution inlet and the depleted treatment solution outlet is in fluid communication with the treatment solution inlet, wherein the absorption unit is arrangeable subsea and the desorption unit is arrangeable topside, and wherein the system comprises a heat exchanger for heat exchanging the rich treatment solution with the depleted treatment solution, wherein
the heat exchanger is a pipe-in-pipe riser comprising an inner pipe in fluid communication with the depleted treatment solution outlet topside and the treatment solution inlet subsea, and an outer pipe in fluid communication with the rich treatment solution outlet subsea and the rich treatment solution inlet topside.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NO20120190 | 2012-02-23 | ||
| NO20120195A NO20120195A1 (en) | 2012-02-23 | 2012-02-23 | Offshore processing progress feed |
| PCT/EP2013/053411 WO2013124336A2 (en) | 2012-02-23 | 2013-02-21 | Offshore processing method and system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP2817397A2 EP2817397A2 (en) | 2014-12-31 |
| EP2817397B1 true EP2817397B1 (en) | 2019-07-31 |
Family
ID=51947640
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP13706235.2A Active EP2817397B1 (en) | 2012-02-23 | 2013-02-21 | Offshore processing method and system |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US9638019B2 (en) |
| EP (1) | EP2817397B1 (en) |
| WO (1) | WO2013124336A2 (en) |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2891850C (en) | 2012-11-26 | 2021-03-30 | Statoil Petroleum As | Combined dehydration of gas and inhibition of liquid from a well stream |
| AU2013375230B2 (en) | 2013-01-25 | 2016-02-18 | Exxonmobil Upstream Research Company | Contacting a gas stream with a liquid stream |
| AR096078A1 (en) | 2013-05-09 | 2015-12-02 | Exxonmobil Upstream Res Co | SEPARATION OF IMPURITIES OF A GAS CURRENT USING A CONTACT SYSTEM IN VERTICALLY ORIENTED EQUICORRIENT |
| AR096132A1 (en) | 2013-05-09 | 2015-12-09 | Exxonmobil Upstream Res Co | SEPARATE CARBON DIOXIDE AND HYDROGEN SULFIDE FROM A NATURAL GAS FLOW WITH CO-CURRENT SYSTEMS IN CONTACT |
| AU2014318458B2 (en) | 2013-09-16 | 2018-02-01 | Savannah River Nuclear Solutions, Llc | Mass transfer apparatus and method for separation of gases |
| GB2526604B (en) | 2014-05-29 | 2020-10-07 | Equinor Energy As | Compact hydrocarbon wellstream processing |
| WO2016056918A1 (en) * | 2014-10-10 | 2016-04-14 | Maritime Promeco As | A marine riser |
| SG11201704529RA (en) | 2015-01-09 | 2017-07-28 | Exxonmobil Upstream Res Co | Separating impurities from a fluid steam using multiple co-current contactors |
| AU2016220515B2 (en) | 2015-02-17 | 2019-02-28 | Exxonmobil Upstream Research Company | Inner surface features for co-current contactors |
| EP3268119A1 (en) | 2015-03-13 | 2018-01-17 | ExxonMobil Upstream Research Company | Coalescer for co-current contactors |
| AU2015397171B2 (en) | 2015-06-05 | 2020-08-20 | Equinor Energy As | Method and apparatus for dehydration of a hydrocarbon gas |
| US10233738B2 (en) | 2015-08-06 | 2019-03-19 | Subcool Technologies Pty Ltd. | System and method for processing natural gas produced from a subsea well |
| JP6818760B2 (en) * | 2015-11-19 | 2021-01-20 | エクソンモービル アップストリーム リサーチ カンパニー | Compact underwater dehydration |
| AU2018283902B9 (en) | 2017-06-15 | 2021-08-05 | Exxonmobil Upstream Research Company | Fractionation system using bundler compact co-current contacting systems |
| EP3638391B1 (en) | 2017-06-15 | 2024-09-11 | ExxonMobil Technology and Engineering Company | Fractionation system using compact co-current contacting systems |
| CA3067524C (en) | 2017-06-20 | 2023-05-09 | Exxonmobil Upstream Research Company | Compact contacting systems and methods for scavenging sulfur-containing compounds |
| CA3073038C (en) | 2017-08-21 | 2023-02-14 | Exxonmobil Upstream Research Company | Integration of cold solvent and acid gas removal |
| CN108970334B (en) * | 2018-08-02 | 2020-10-27 | 中国科学技术大学 | Regeneration system for carbon-rich amine liquid and its use |
| NO349358B1 (en) * | 2024-03-01 | 2025-12-22 | Hans Gude Gudesen | Method and system for temperature-controlled CO2 capture and utilization |
Family Cites Families (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1131003A (en) * | 1967-02-24 | 1968-10-16 | Shell Int Research | Process and apparatus for the dehydration of a gas |
| US4239510A (en) * | 1979-01-19 | 1980-12-16 | Phillips Petroleum Company | Natural gas purification |
| FR2570162B1 (en) * | 1984-09-07 | 1988-04-08 | Inst Francais Du Petrole | METHOD AND DEVICE FOR COMPRESSING AND TRANSPORTING A GAS CONTAINING A LIQUID FRACTION |
| FR2618876B1 (en) | 1987-07-30 | 1989-10-27 | Inst Francais Du Petrole | PROCESS FOR TREATING AND TRANSPORTING A GAS CONTAINING METHANE AND WATER |
| NO312138B1 (en) * | 2000-05-04 | 2002-03-25 | Kongsberg Offshore As | Process and sea-based installation for handling and processing of multi-fraction hydrocarbons for sea |
| NO20010589A (en) * | 2001-02-05 | 2002-08-05 | Navion Asa | Procedure and sea-based plant for treatment and handling of hydrocarbons |
| GB2404684B (en) * | 2002-04-08 | 2005-10-26 | Offshore Systems Inc | Subsea well production facility |
| US7770651B2 (en) * | 2007-02-13 | 2010-08-10 | Kellogg Brown & Root Llc | Method and apparatus for sub-sea processing |
| CN103635246B (en) * | 2011-01-31 | 2016-01-20 | 马来西亚国家石油公司 | An improved separation device and separation method |
| US8978769B2 (en) * | 2011-05-12 | 2015-03-17 | Richard John Moore | Offshore hydrocarbon cooling system |
| US20130142717A1 (en) * | 2011-12-02 | 2013-06-06 | Michael Siskin | Offshore gas separation process |
| NO20120188A1 (en) * | 2012-02-23 | 2013-08-26 | Fmc Kongsberg Subsea As | Method and system for providing fuel gas to a topside facility |
| NO20120194A1 (en) * | 2012-02-23 | 2013-08-26 | Fmc Kongsberg Subsea As | Gas Treatment System |
| WO2013136310A1 (en) * | 2012-03-16 | 2013-09-19 | Aker Process Systems As | Hydrocarbon gas treatment |
| AU2013203259B2 (en) * | 2012-05-08 | 2016-09-22 | Release Energy Pty Ltd | Inline Non-targeted Component Removal |
| US9724637B2 (en) * | 2012-06-22 | 2017-08-08 | Shell Oil Company | Method and apparatus for circulating a glycol stream, and method of producing a natural gas product stream |
| US20150240605A1 (en) * | 2012-10-05 | 2015-08-27 | Total Sa | Containment system and a method for using said containment system |
| AU2014318458B2 (en) * | 2013-09-16 | 2018-02-01 | Savannah River Nuclear Solutions, Llc | Mass transfer apparatus and method for separation of gases |
-
2013
- 2013-02-21 WO PCT/EP2013/053411 patent/WO2013124336A2/en not_active Ceased
- 2013-02-21 US US14/380,718 patent/US9638019B2/en active Active
- 2013-02-21 EP EP13706235.2A patent/EP2817397B1/en active Active
Non-Patent Citations (1)
| Title |
|---|
| None * |
Also Published As
| Publication number | Publication date |
|---|---|
| US20150013539A1 (en) | 2015-01-15 |
| EP2817397A2 (en) | 2014-12-31 |
| WO2013124336A8 (en) | 2014-10-16 |
| US9638019B2 (en) | 2017-05-02 |
| WO2013124336A3 (en) | 2013-11-21 |
| WO2013124336A2 (en) | 2013-08-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9638019B2 (en) | Offshore processing method and system | |
| US7770651B2 (en) | Method and apparatus for sub-sea processing | |
| US5988283A (en) | Vertical combined production facility | |
| US10576415B2 (en) | Combined dehydration of gas and inhibition of liquid from a well stream | |
| AU2013224145B2 (en) | Gas treatment system using supersonic separators | |
| JP5624612B2 (en) | Method for producing a mixed gas hydrocarbon component stream and a plurality of liquid hydrocarbon component streams, and apparatus therefor | |
| CN101506466A (en) | System, vessel and method for production of oil and heavier gas fractions from a reservoir below the seabed | |
| WO2013136310A1 (en) | Hydrocarbon gas treatment | |
| US20150021235A1 (en) | Method and system for providing fuel gas to a topside facility | |
| BR112017026105B1 (en) | Method and apparatus for dehydrating a hydrocarbon gas | |
| US10233738B2 (en) | System and method for processing natural gas produced from a subsea well | |
| US20250376913A1 (en) | Apparatus and method for storing carbon dioxide | |
| CN113356801B (en) | Arrangement method of glycol recovery device for deep water gas field | |
| KR20140041764A (en) | Method and apparatus for circulating a glycol stream containing a concentration of divalent cations, and method of producing a natural gas product stream | |
| NO20120195A1 (en) | Offshore processing progress feed | |
| MENTES et al. | Floating production storage and offloading units and topside facilities | |
| KR20150096971A (en) | System And Method For Treatment Of Carbon-dioxide |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20140912 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAX | Request for extension of the european patent (deleted) | ||
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20170413 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20190412 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1160885 Country of ref document: AT Kind code of ref document: T Effective date: 20190815 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013058448 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20190731 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20190731 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1160885 Country of ref document: AT Kind code of ref document: T Effective date: 20190731 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191031 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191202 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191101 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191130 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200224 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013058448 Country of ref document: DE |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG2D | Information on lapse in contracting state deleted |
Ref country code: IS |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191030 |
|
| 26N | No opposition filed |
Effective date: 20200603 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602013058448 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200229 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200221 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200229 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200229 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200221 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200901 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200229 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190731 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230523 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20260219 Year of fee payment: 14 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20260127 Year of fee payment: 14 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20260210 Year of fee payment: 14 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20260227 Year of fee payment: 14 |