EP2643629B1 - Facilities for offshore liquefied natural gas floating storage with jetty regasification unit - Google Patents
Facilities for offshore liquefied natural gas floating storage with jetty regasification unit Download PDFInfo
- Publication number
- EP2643629B1 EP2643629B1 EP11852293.7A EP11852293A EP2643629B1 EP 2643629 B1 EP2643629 B1 EP 2643629B1 EP 11852293 A EP11852293 A EP 11852293A EP 2643629 B1 EP2643629 B1 EP 2643629B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- unit
- jetty
- lng
- regasification
- facilities
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C5/00—Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
- F17C5/06—Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with compressed gases
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C9/00—Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
- F17C9/02—Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure with change of state, e.g. vaporisation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/03—Mixtures
- F17C2221/032—Hydrocarbons
- F17C2221/033—Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/01—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
- F17C2223/0146—Two-phase
- F17C2223/0153—Liquefied gas, e.g. LPG, GPL
- F17C2223/0161—Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/03—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
- F17C2223/033—Small pressure, e.g. for liquefied gas
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2225/00—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
- F17C2225/01—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
- F17C2225/0107—Single phase
- F17C2225/0123—Single phase gaseous, e.g. CNG, GNC
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2225/00—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
- F17C2225/03—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
- F17C2225/035—High pressure, i.e. between 10 and 80 bars
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/03—Heat exchange with the fluid
- F17C2227/0302—Heat exchange with the fluid by heating
- F17C2227/0309—Heat exchange with the fluid by heating using another fluid
- F17C2227/0316—Water heating
- F17C2227/0318—Water heating using seawater
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/03—Heat exchange with the fluid
- F17C2227/0367—Localisation of heat exchange
- F17C2227/0388—Localisation of heat exchange separate
- F17C2227/0393—Localisation of heat exchange separate using a vaporiser
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2265/00—Effects achieved by gas storage or gas handling
- F17C2265/05—Regasification
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0102—Applications for fluid transport or storage on or in the water
- F17C2270/0118—Offshore
- F17C2270/0121—Platforms
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0102—Applications for fluid transport or storage on or in the water
- F17C2270/0118—Offshore
- F17C2270/0123—Terminals
Definitions
- the present invention relates to facilities for offshore liquefied natural gas (LNG) floating storage with jetty regasification unit, and more particularly, to offshore facilities that have floating storage and regasification unit installed on jetty unit.
- LNG offshore liquefied natural gas
- this concept have been found to reduce installation, operating costs and construction time, and moreover increases stability of regasification performance of LNG.
- the regasification facilities are used for regasification of LNG, i.e., to turn LNG back into natural gas.
- Such facilities are for instance known from US 2009/0208294 A1 and WO 2008/073152 A2 .
- the facilities can be identified into two different types, onshore and offshore.
- LNG storage and regasification units are installed onshore, whereas offshore facilities include a floating LNG storage unit, usually an LNG carrier or a gravity based structure (GBS), and a regasification unit installed on the floating structure, a shuttle regasification vessel (SRV) or a LNG regasification vessel (RV).
- GGS gravity based structure
- SRV shuttle regasification vessel
- RV LNG regasification vessel
- the SRV or the LNG RV is special purposed vessels that can navigate with regasification facilities.
- the procedure starts by loading LNG from where it is produced and transports to an unloading location where then it is moored by submerged turret loading (STL) in offshore.
- STL submerged turret loading
- FSRU or SRV is moored to a jetty structure to withstand offshore weather and conditions.
- LNG is supplied to FSRU from LNC carrier (LNGC) through a loading arm installed on a jetty where both FSRU and LNGC are moored side by side.
- LNC carrier LNC carrier
- high pressured natural gas (usually between 40 and 90 atm) is supplied to onshore through high pressure gas arm.
- the loading arm and the high pressure gas arm have a large number of components which can absorb impact from the motions.
- the present invention facilities for offshore LNG floating storage with jetty regasification unit, is designed for reduction of a construction time and cost, and enhances the stability for operation when compared to a newly constructed or converted FSRU and LNG RV.
- a facilities for offshore liquefied natural gas (LNG) floating storage with jetty regasification unit comprising: a jetty unit of a steel structure or an iron concrete structure installed in offshore; a storage unit moored at the jetty unit providing a space for storing LNG; a regasification unit as a module which regasifies the LNG supplied from the storage unit, installed on a top portion of the jetty unit and is separable from the jetty unit; a utility unit comprising a power source and a sea water pump to supply power and sea water to the regasification unit; and a piping unit comprising unloading pipe for connecting the regasification unit and the storage unit and supplying pipe for carrying natural gas gasified by the regasification unit.
- LNG offshore liquefied natural gas
- the utility unit may be implemented as a module to be separable from the jetty unit.
- the regasification unit may be used an open rack vaporizer (ORV) using sea water for heat exchanger.
- ORV open rack vaporizer
- the sea water pump of the utility unit and a ballast water pump disposed in the storage unit may be simultaneously used to supply sea water to the regasification unit.
- a power facility, a steam generator, and a ballast water pump disposed in the storage unit may be used to supply power, steam, and sea water, respectively, which are necessary for the regasification unit.
- the storage unit may be fixed to the jetty unit, loads LNG from a movable LNG carrier or a floating storage unit (FSU), and carries the LNG to the regasification unit.
- FSU floating storage unit
- the storage unit may be separable from the jetty unit and movable to load LNG.
- the storage unit may be the LNG carrier or an FSU.
- the present invention of offshore LNG floating storage with jetty regasification unit can provide a solution that can dramatically reduce the possibilities of high pressured natural gas leak into the atmosphere when compared to regasification on a floating structure.
- FIG. 1 is a schematic diagram of a liquefied natural gas (LNG) regasification unit according to an embodiment of the present invention.
- LNG liquefied natural gas
- FIG. 1 is a schematic diagram of a liquefied natural gas (LNG) regasification unit according to an embodiment of the present invention.
- LNG liquefied natural gas
- the LNG regasification unit is used to regasify LNG in offshore and supply the regasified LNG, to gas users onshore.
- this invention includes the jetty unit 10, a storage unit 20, a regasification unit 30, a piping unit 40, and a utility unit 50.
- the jetty unit 10 is a fixed structure installed in sea bed with its legs, made of steel or iron concrete.
- the term 'jetty' has various meanings, for example, a structure like a breakwater which distinguishes an inland and the sea, or a facility which is for anchoring vessels.
- a site with certain depth of water, higher than a predetermined depth is required.
- the jetty can be used for berthing in the way of stretching steeled structure from onshore to offshore or constructing a container terminal after dredging.
- the jetty unit 10 is a semi-permanent structure that is installed to maintain a constant altitude above the sea level to withstand the changes of the wave by tidal current.
- the shape of jetty unit 10 is not limited, it can be changed according to the locations and conditions thereof as long as the storage unit 20 can be anchored at.
- a structure for anchoring the storage unit 20, such as a mooring dolphin or a fender, may be installed around the jetty unit 10, and is not shown in FIG. 1 for illustrative convenience (all the constituents are quite simply illustrated in FIG. 1 ).
- the storage unit 20 provides a space for storing LNG once moored at the jetty unit 10.
- the storage unit 20 can be converted from a second-handed LNG carrier or an existing LNG floating storage unit (FSU). Meanwhile, the storage unit 20 may be fixedly moored at the jetty unit 10 and separated from the jetty unit 10 on occasional demands.
- Conventional operation involves supplying the LNG to the regasification unit 30 after receiving LNG from another LNG carrier.
- the storage unit 20 may move to a location where LNG is produced or another FSU by itself, then receives LNG therefrom and supply the LNG to the regasification unit 30 again after being moored at the jetty unit 10.
- another LNG carrier may supply LNG to the regasification unit 30, at the opposite side of the jetty unit 10.
- Fixed or movable type of the storage unit 20 is determined according to circumstances or economical efficiency. For example, when a converted LNG carrier is used for the storage unit 20, storage type can be decided depending on the situation, as its mobility is already obtained.
- the conversion process may require the vessel to operation both LNG loading pipe 21 and LNG unloading pipe 42 simultaneously, as general LNG carrier is designed not to proceed loading and unloading at the same time. Furthermore, if the storage unit 20 is expected to move, an appropriate facility for separating the unloading pipe 42 from the storage unit 20 is required as well.
- the storage unit 20 includes a utility facility 22, such as a power facility, a steam generator, a ballast water pump P2, etc. which general LNG carriers and FSU are already equipped, thus no additional facility is needed when the second-handed LNG carrier or the FSU is converted.
- a utility facility 22 such as a power facility, a steam generator, a ballast water pump P2, etc. which general LNG carriers and FSU are already equipped, thus no additional facility is needed when the second-handed LNG carrier or the FSU is converted.
- the regasification unit 30 is a module for regasifying LNG which is supplied from the storage unit 20.
- the regasification unit 30 is also separable from the jetty unit 10. Installment of the regasification unit 30 on the jetty unit 10, which is fixed on the sea bed, allows LNG to be regasified in offshore without the problems which commonly occurs in operation of conventional FSRU of LNG RV, a danger of leakage of natural gas due to an automatic piping separation in the operation or abrupt disconnection of a high pressure gas arm on the jetty unit 10 under the various offshore conditions. Since regasification work is performed on the hull 11 of the jetty unit 10, LNG can be transferred through the pipe between the storage unit 20 and the regasification unit 30. The stability of the hull 11 allows more safe transfer of LNG, regardless of the storage unit 20 movement due to the waves and tidal current.
- a heat exchanger of the regasification unit 30 in the present invention is an open rack vaporizer (ORV) that utilizes sea water as a heat source. By contacting the heat exchanger, sea water absorbs the heat and vaporizes LNG into gas. ORV is strongly recommended due to its low investment and operating cost. However, if sea water is not uniformly coated on the vaporizer, the heat exchanger freezes and deteriorates its structure. That is why the ORV cannot be installed on FSRU of LNG RV. For the present invention, fixed structure of the jetty unit 10 guarantees safe operation of the ORV, which is a relatively inexpensive heat exchange system.
- a sea water pump PI in the utility unit 50 and the ballast water pump P2 of the utility facility 22 in the storage unit 20 are used to supply sea water to the ORV.
- the sea water pump PI and the ballast water pump P2 are designed to operate simultaneous as depicted in FIG1 , it is not necessary to use both of them.
- the sea water pump PI acts as a main pump and the ballast water pump P2 as an auxiliary pump. Or, only the sea water pump PI may be operated if the storage unit 20 is disconnected. How to supply the sea water to the ORV are subject to circumstances.
- the piping unit 40 connecting the regasification unit 30 and the storage unit 20, includes unloading pipe 41 for supplying LNG from the storage unit 20 to the regasification unit 30 and supply pipe 42 for supplying gasified LNG from the regasification unit 30 to the end users in onshore. If required part of the piping unit 40 may be installed below a sea level.
- the utility unit 50 (module) includes a power source, the sea water pump PI, and the steam generator for supplying power, sea water, and steam, respectively, to the regasification unit 30. Similar with the regasification unit 30, it is installed on the jetty unit 10, but also separable.
- the utility unit 50 and the regasification unit 30 are connected by a power cable 51, sea water pipe 52, and steam pipe 53. They are respectively connected to the utility facilities in the storage unit 20 to be used simultaneously or complementarily in the present invention. Unlike shown in FIG.1 , only the utility unit 50 may operate independently.
- the piping unit 40, the power cable 51, the sea water pipe 52, and the steam pipe 53 are quite simply illustrated in FIG.1 for illustrative convenience, but the actual design is considerably complicated. Nevertheless, for the purpose of illustration, such simple diagram will be understood by those who have knowledge of this technology.
- LNG stored in the storage unit 20 is supplied to the regasification unit 30 through the unloading pipe 41. Once regasified through the unit 30, regasified LNG is carried to the end users' pipe line onshore through the supplying pipe 42.
- the storage unit 20 can be fixed to the jetty unit 10 to load LNG from an LNG carrier (supplied through the loading pipe 21) or can be moved by itself to receive LNG from a neighboring FSU or a location where LNG is produced. If the storage unit 20 moves to different site, designated replacement should substitute for the previous storage unit 20, in order to supply LNG continuously.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Description
- The present invention relates to facilities for offshore liquefied natural gas (LNG) floating storage with jetty regasification unit, and more particularly, to offshore facilities that have floating storage and regasification unit installed on jetty unit. Compared to conventional regasification facility which is installed on LNG carriers or onshore LNG terminal, this concept have been found to reduce installation, operating costs and construction time, and moreover increases stability of regasification performance of LNG.
- The regasification facilities are used for regasification of LNG, i.e., to turn LNG back into natural gas. Such facilities are for instance known from
US 2009/0208294 A1 andWO 2008/073152 A2 . The facilities can be identified into two different types, onshore and offshore. In onshore facilities, LNG storage and regasification units are installed onshore, whereas offshore facilities include a floating LNG storage unit, usually an LNG carrier or a gravity based structure (GBS), and a regasification unit installed on the floating structure, a shuttle regasification vessel (SRV) or a LNG regasification vessel (RV). - The SRV or the LNG RV is special purposed vessels that can navigate with regasification facilities. The procedure starts by loading LNG from where it is produced and transports to an unloading location where then it is moored by submerged turret loading (STL) in offshore. These vessels have been widely used in the US, etc. for supplying natural gas and have been constructed by several Korean shipbuilding companies.
- In light of growing of LNG demand, many attempts have been considered to construct new FSRU, but only several second-handed LNG carriers had been converted to FRSU due to economical reason and time constrains to deliver in Latin America and Asia, etc.
- Construction of onshore facilities, however, faces more severe constrains. A large site has to be secured near facilities where LNG carriers are moored, and large scale construction incurs high cost, complex civil appeals of neighboring residents, and immobility of the facility once the construction is over. Thus, in many cases, offshore facilities are considered as a better solution for the fast tract of supplying natural gas.
- Nevertheless, when newbuilding or conversion of FSRU is considered, the construction period expands to several years along with high capital costs. Also, when a second-handed LNG carrier conversion is considered, one has to account for the age of the vessel and cargo containment type, since it determines the conversion cost and period. With respect to the cargo containment type, LNG carriers with membrane cargo containment system have to go through a partial reinforcement on its membrane structure to support the regasification facilities on the upper deck; storage of LNG and operation of regasification facilities are restricted due to the risk of sloshing damage from frequent partial loading of LNG.
- Meanwhile, FSRU or SRV is moored to a jetty structure to withstand offshore weather and conditions. LNG is supplied to FSRU from LNC carrier (LNGC) through a loading arm installed on a jetty where both FSRU and LNGC are moored side by side. Once regasified by FSRU or SRV, high pressured natural gas (usually between 40 and 90 atm) is supplied to onshore through high pressure gas arm. During this process, because floating facilities like FSRU or LNG RV are influenced by tidal currents and wind, directional and rotational motions are accompanied. Thus, the loading arm and the high pressure gas arm have a large number of components which can absorb impact from the motions. If the FSRU or the LNG carrier is disconnected from the jetty beyond an operational range, the pipe line will automatically disconnect from the jetty for the safety. Although general LNG carriers are designed to operate under several pressures while loading and unloading of LNG, FSRU and LNG RV are constantly exposed to high pressure natural gas leak which can cause a fire or an explosion.
- The present invention, facilities for offshore LNG floating storage with jetty regasification unit, is designed for reduction of a construction time and cost, and enhances the stability for operation when compared to a newly constructed or converted FSRU and LNG RV.
- According to an aspect of the present invention, there is provided a facilities for offshore liquefied natural gas (LNG) floating storage with jetty regasification unit, the facilities comprising: a jetty unit of a steel structure or an iron concrete structure installed in offshore; a storage unit moored at the jetty unit providing a space for storing LNG; a regasification unit as a module which regasifies the LNG supplied from the storage unit, installed on a top portion of the jetty unit and is separable from the jetty unit; a utility unit comprising a power source and a sea water pump to supply power and sea water to the regasification unit; and a piping unit comprising unloading pipe for connecting the regasification unit and the storage unit and supplying pipe for carrying natural gas gasified by the regasification unit.
- The utility unit may be implemented as a module to be separable from the jetty unit.
- The regasification unit may be used an open rack vaporizer (ORV) using sea water for heat exchanger.
- The sea water pump of the utility unit and a ballast water pump disposed in the storage unit may be simultaneously used to supply sea water to the regasification unit.
- A power facility, a steam generator, and a ballast water pump disposed in the storage unit may be used to supply power, steam, and sea water, respectively, which are necessary for the regasification unit.
- The storage unit may be fixed to the jetty unit, loads LNG from a movable LNG carrier or a floating storage unit (FSU), and carries the LNG to the regasification unit.
- The storage unit may be separable from the jetty unit and movable to load LNG.
- The storage unit may be the LNG carrier or an FSU.
- The present invention of offshore LNG floating storage with jetty regasification unit can provide a solution that can dramatically reduce the possibilities of high pressured natural gas leak into the atmosphere when compared to regasification on a floating structure.
-
FIG. 1 is a schematic diagram of a liquefied natural gas (LNG) regasification unit according to an embodiment of the present invention. - Hereinafter, the detailed mode for carrying out the present invention will be described with reference to exemplary embodiments of the invention.
-
FIG. 1 is a schematic diagram of a liquefied natural gas (LNG) regasification unit according to an embodiment of the present invention. - The LNG regasification unit, according to the present invention, is used to regasify LNG in offshore and supply the regasified LNG, to gas users onshore. And this invention includes the
jetty unit 10, astorage unit 20, aregasification unit 30, apiping unit 40, and autility unit 50. - The
jetty unit 10 is a fixed structure installed in sea bed with its legs, made of steel or iron concrete. The term 'jetty' has various meanings, for example, a structure like a breakwater which distinguishes an inland and the sea, or a facility which is for anchoring vessels. To anchor large ships, such as container vessel, oil tankers, or LNG carriers, a site with certain depth of water, higher than a predetermined depth, is required. - And the jetty can be used for berthing in the way of stretching steeled structure from onshore to offshore or constructing a container terminal after dredging. In the present invention, the
jetty unit 10 is a semi-permanent structure that is installed to maintain a constant altitude above the sea level to withstand the changes of the wave by tidal current. As the shape ofjetty unit 10 is not limited, it can be changed according to the locations and conditions thereof as long as thestorage unit 20 can be anchored at. A structure for anchoring thestorage unit 20, such as a mooring dolphin or a fender, may be installed around thejetty unit 10, and is not shown inFIG. 1 for illustrative convenience (all the constituents are quite simply illustrated inFIG. 1 ). - The
storage unit 20 provides a space for storing LNG once moored at thejetty unit 10. Thestorage unit 20 can be converted from a second-handed LNG carrier or an existing LNG floating storage unit (FSU). Meanwhile, thestorage unit 20 may be fixedly moored at thejetty unit 10 and separated from thejetty unit 10 on occasional demands. Conventional operation involves supplying the LNG to theregasification unit 30 after receiving LNG from another LNG carrier. On an occasional demand, thestorage unit 20 may move to a location where LNG is produced or another FSU by itself, then receives LNG therefrom and supply the LNG to theregasification unit 30 again after being moored at thejetty unit 10. In the latter case, for continuously regasification of LNG, another LNG carrier may supply LNG to theregasification unit 30, at the opposite side of thejetty unit 10. - Fixed or movable type of the
storage unit 20 is determined according to circumstances or economical efficiency. For example, when a converted LNG carrier is used for thestorage unit 20, storage type can be decided depending on the situation, as its mobility is already obtained. - Meanwhile, when a second-handed LNG vessel is used for the
storage unit 20, the conversion process may require the vessel to operation bothLNG loading pipe 21 andLNG unloading pipe 42 simultaneously, as general LNG carrier is designed not to proceed loading and unloading at the same time. Furthermore, if thestorage unit 20 is expected to move, an appropriate facility for separating the unloadingpipe 42 from thestorage unit 20 is required as well. - The
storage unit 20 includes autility facility 22, such as a power facility, a steam generator, a ballast water pump P2, etc. which general LNG carriers and FSU are already equipped, thus no additional facility is needed when the second-handed LNG carrier or the FSU is converted. - The
regasification unit 30 is a module for regasifying LNG which is supplied from thestorage unit 20. Theregasification unit 30 is also separable from thejetty unit 10. Installment of theregasification unit 30 on thejetty unit 10, which is fixed on the sea bed, allows LNG to be regasified in offshore without the problems which commonly occurs in operation of conventional FSRU of LNG RV, a danger of leakage of natural gas due to an automatic piping separation in the operation or abrupt disconnection of a high pressure gas arm on thejetty unit 10 under the various offshore conditions. Since regasification work is performed on the hull 11 of thejetty unit 10, LNG can be transferred through the pipe between thestorage unit 20 and theregasification unit 30. The stability of the hull 11 allows more safe transfer of LNG, regardless of thestorage unit 20 movement due to the waves and tidal current. - A heat exchanger of the
regasification unit 30 in the present invention is an open rack vaporizer (ORV) that utilizes sea water as a heat source. By contacting the heat exchanger, sea water absorbs the heat and vaporizes LNG into gas. ORV is strongly recommended due to its low investment and operating cost. However, if sea water is not uniformly coated on the vaporizer, the heat exchanger freezes and deteriorates its structure. That is why the ORV cannot be installed on FSRU of LNG RV. For the present invention, fixed structure of thejetty unit 10 guarantees safe operation of the ORV, which is a relatively inexpensive heat exchange system. - A sea water pump PI in the
utility unit 50 and the ballast water pump P2 of theutility facility 22 in thestorage unit 20 are used to supply sea water to the ORV. Although the sea water pump PI and the ballast water pump P2 are designed to operate simultaneous as depicted inFIG1 , it is not necessary to use both of them. The sea water pump PI acts as a main pump and the ballast water pump P2 as an auxiliary pump. Or, only the sea water pump PI may be operated if thestorage unit 20 is disconnected. How to supply the sea water to the ORV are subject to circumstances. - The piping
unit 40, connecting theregasification unit 30 and thestorage unit 20, includes unloadingpipe 41 for supplying LNG from thestorage unit 20 to theregasification unit 30 andsupply pipe 42 for supplying gasified LNG from theregasification unit 30 to the end users in onshore. If required part of the pipingunit 40 may be installed below a sea level. - The utility unit 50 (module) includes a power source, the sea water pump PI, and the steam generator for supplying power, sea water, and steam, respectively, to the
regasification unit 30. Similar with theregasification unit 30, it is installed on thejetty unit 10, but also separable. Theutility unit 50 and theregasification unit 30 are connected by apower cable 51,sea water pipe 52, andsteam pipe 53. They are respectively connected to the utility facilities in thestorage unit 20 to be used simultaneously or complementarily in the present invention. Unlike shown inFIG.1 , only theutility unit 50 may operate independently. - The piping
unit 40, thepower cable 51, thesea water pipe 52, and thesteam pipe 53 are quite simply illustrated inFIG.1 for illustrative convenience, but the actual design is considerably complicated. Nevertheless, for the purpose of illustration, such simple diagram will be understood by those who have knowledge of this technology. - Now, functions and effects of regasification element will be described below with explanation of LNG regasification process.
- LNG stored in the
storage unit 20 is supplied to theregasification unit 30 through the unloadingpipe 41. Once regasified through theunit 30, regasified LNG is carried to the end users' pipe line onshore through the supplyingpipe 42. - The
storage unit 20 can be fixed to thejetty unit 10 to load LNG from an LNG carrier (supplied through the loading pipe 21) or can be moved by itself to receive LNG from a neighboring FSU or a location where LNG is produced. If thestorage unit 20 moves to different site, designated replacement should substitute for theprevious storage unit 20, in order to supply LNG continuously. - Power, sea water, and steam are supplied to the
regasification unit 30 through theutility unit 50. - While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood that various changes in form and details may be possible in the technical range of this invention as defined by the following claims.
Claims (4)
- Facilities for offshore liquefied natural gas (LNG) floating storage with jetty regasification unit, the facilities comprising:a jetty unit (10) of a steel structure or an iron concrete structure, installed offshore,a storage unit (20) moored at the jetty unit (10) for providing a space for storing LNG,a regasification unit (30) as a module for regasifying the LNG supplied from the storage unit (20), installed on a top portion of the jetty unit (10) and separable from the jetty unit (10),a utility unit (50) comprising a power source and a sea water pump (P1) to supply power and sea water to the regasification unit (30), anda piping unit (40) comprising unloading pipe (41) for connecting the regasification unit (30) and the storage unit (20) and supplying pipe (42) for carrying natural gas gasified by the regasification unit (30),characterized in that,the storage unit (20) includes a ballast water pump (P2) and is installed in a manner that is separable from the jetty unit (10) and the storage unit (20) is movable relative to the jetty unit (10) to load LNG,wherein the regasification unit (30) comprises a heat exchanger comprising an open rack vaporizer (ORV) in which sea water flow is to be supplied for heat exchange with natural gas,wherein the sea water pump (P1) of the utility unit (50) and the ballast water pump (P2) are configured to be used simultaneously to supply sea water to the open rack vaporizer of the regasification unit (30), andwherein the sea water pump (P1) is configured to be used alone to supply sea water to the open rack vaporizer when the storage unit (20) is moved relative to the jetty unit (10).
- The facilities of claim 1, wherein the utility unit (50) is implemented as a module to be separable from the jetty unit (10).
- The facilities of claim 1, wherein a power facility, a steam generator, and a ballast water pump (P2) disposed in the storage unit (20) are used to supply power, steam, and sea water, respectively, which are necessary for the regasification unit (30).
- The facilities of claim 1, wherein the storage unit (20) is the LNG carrier or an FSU.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL11852293T PL2643629T3 (en) | 2010-12-30 | 2011-12-19 | Facilities for offshore liquefied natural gas floating storage with jetty regasification unit |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020100139360A KR101018741B1 (en) | 2010-12-30 | 2010-12-30 | The facilities for offshore lng floating storage with jetty regasification unit |
| PCT/KR2011/009773 WO2012091337A2 (en) | 2010-12-30 | 2011-12-19 | Facilities for offshore liquefied natural gas floating storage with jetty regasification unit |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP2643629A2 EP2643629A2 (en) | 2013-10-02 |
| EP2643629A4 EP2643629A4 (en) | 2017-04-19 |
| EP2643629B1 true EP2643629B1 (en) | 2019-12-11 |
Family
ID=43938281
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP11852293.7A Active EP2643629B1 (en) | 2010-12-30 | 2011-12-19 | Facilities for offshore liquefied natural gas floating storage with jetty regasification unit |
Country Status (9)
| Country | Link |
|---|---|
| EP (1) | EP2643629B1 (en) |
| JP (1) | JP5597773B2 (en) |
| KR (1) | KR101018741B1 (en) |
| CN (1) | CN103328879B (en) |
| BR (1) | BR112013016676B1 (en) |
| CL (1) | CL2013001923A1 (en) |
| PL (1) | PL2643629T3 (en) |
| UY (1) | UY33848A (en) |
| WO (1) | WO2012091337A2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20150026674A (en) * | 2013-08-29 | 2015-03-11 | 대우조선해양 주식회사 | Arrangement Structure of Floating and Storage Gas Power Plant |
| KR101715061B1 (en) | 2015-07-02 | 2017-03-13 | 주식회사 가스이즈 | floatable legged platform structure, building and opperation method thereof |
| CN107228275A (en) * | 2017-05-26 | 2017-10-03 | 惠生(南通)重工有限公司 | It is a kind of can flexible combination and unattended floating LNG stocking systems |
| KR20210092198A (en) * | 2018-12-03 | 2021-07-23 | 닛키 글로벌 가부시키가이샤 | floating equipment |
Family Cites Families (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2653462B1 (en) * | 1989-10-24 | 1992-02-14 | Technip Geoproduction | INTEGRATED SUSPENSION AND HANDLING DEVICE FOR THE LEGS OF A SELF-LIFTING OIL PLATFORM. |
| US6546739B2 (en) * | 2001-05-23 | 2003-04-15 | Exmar Offshore Company | Method and apparatus for offshore LNG regasification |
| JP2003014194A (en) * | 2001-07-02 | 2003-01-15 | Kobe Steel Ltd | Vaporizer unit and vaporizer construction method |
| US6829901B2 (en) * | 2001-12-12 | 2004-12-14 | Exxonmobil Upstream Research Company | Single point mooring regasification tower |
| NO330955B1 (en) * | 2003-04-30 | 2011-08-22 | Torp Tech As | Unloading and cargo evaporation device for ships |
| US7360367B2 (en) * | 2004-07-18 | 2008-04-22 | Wood Group Advanced Parts Manufacture | Apparatus for cryogenic fluids having floating liquefaction unit and floating regasification unit connected by shuttle vessel, and cryogenic fluid methods |
| US7080673B2 (en) * | 2004-04-30 | 2006-07-25 | Sbm-Imodco, Inc. | Quick LNG offloading |
| WO2006052896A1 (en) * | 2004-11-08 | 2006-05-18 | Shell Internationale Research Maatschappij B.V. | Liquefied natural gas floating storage regasification unit |
| MX2009002551A (en) | 2006-09-11 | 2009-03-20 | Exxonmobil Upstream Res Co | Open-sea berth lng import terminal. |
| KR100888339B1 (en) * | 2007-07-25 | 2009-03-10 | 대우조선해양 주식회사 | Method and system for treating fluid used in lng regasification on maine structure |
| US7644676B2 (en) * | 2008-02-11 | 2010-01-12 | Daewoo Shipbuilding & Marine Engineering Co., Ltd. | Storage tank containing liquefied natural gas with butane |
| US20090208294A1 (en) * | 2008-02-19 | 2009-08-20 | Yao Aifeng | Apparatus for off-shore processing of a hydrocarbon stream |
| JP2011521818A (en) * | 2008-04-25 | 2011-07-28 | ナショナル ユニバーシティ オブ シンガポール | Offshore fuel storage facility |
| KR20100135354A (en) * | 2009-06-17 | 2010-12-27 | 대우조선해양 주식회사 | Upper support structure of floating offshore structure and its method |
-
2010
- 2010-12-30 KR KR1020100139360A patent/KR101018741B1/en active Active
-
2011
- 2011-12-19 CN CN201180063803.6A patent/CN103328879B/en active Active
- 2011-12-19 JP JP2013547307A patent/JP5597773B2/en not_active Expired - Fee Related
- 2011-12-19 EP EP11852293.7A patent/EP2643629B1/en active Active
- 2011-12-19 BR BR112013016676-2A patent/BR112013016676B1/en active IP Right Grant
- 2011-12-19 PL PL11852293T patent/PL2643629T3/en unknown
- 2011-12-19 WO PCT/KR2011/009773 patent/WO2012091337A2/en not_active Ceased
- 2011-12-30 UY UY0001033848A patent/UY33848A/en unknown
-
2013
- 2013-06-28 CL CL2013001923A patent/CL2013001923A1/en unknown
Non-Patent Citations (1)
| Title |
|---|
| None * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103328879A (en) | 2013-09-25 |
| EP2643629A2 (en) | 2013-10-02 |
| WO2012091337A3 (en) | 2012-09-27 |
| WO2012091337A2 (en) | 2012-07-05 |
| UY33848A (en) | 2012-06-29 |
| JP2014505842A (en) | 2014-03-06 |
| JP5597773B2 (en) | 2014-10-01 |
| CN103328879B (en) | 2014-12-17 |
| BR112013016676A2 (en) | 2016-10-04 |
| PL2643629T3 (en) | 2020-06-15 |
| BR112013016676B1 (en) | 2020-10-20 |
| EP2643629A4 (en) | 2017-04-19 |
| KR101018741B1 (en) | 2011-03-04 |
| CL2013001923A1 (en) | 2014-04-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9039332B2 (en) | Facilities for offshore liquefied natural gas floating storage with jack-up platform regasification unit | |
| CA2663035C (en) | Open-sea berth lng import terminal | |
| AU2011335362B2 (en) | Floating LNG plant | |
| US20020174662A1 (en) | Method and apparatus for offshore LNG regasification | |
| JP2005512883A (en) | Single point mooring regasification tower | |
| BRPI0716258A2 (en) | Method for Importing Liquefied Natural Gas, Fluid Conveying System, and Methods for Conveying Liquefied Natural Gas and for Conveying Fluid | |
| EP1809940A1 (en) | Liquefied natural gas floating storage regasification unit | |
| CN103328879B (en) | Facilities for offshore liquefied natural gas floating storage with jetty regasification unit | |
| WO2006088371A1 (en) | System and method for offshore offloading and regasification of LNG | |
| Gervois et al. | Offshore LNG Receiving Terminals: An Alternative To Onshore Terminal | |
| Luo et al. | F (S) RU-New Floating Re-Gasification Unit for LNG Import |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| TPAC | Observations filed by third parties |
Free format text: ORIGINAL CODE: EPIDOSNTIPA |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20130627 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| DAX | Request for extension of the european patent (deleted) | ||
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SAMSUNG C&T CORPORATION |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20170322 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: F17C 7/04 20060101AFI20170316BHEP Ipc: F17C 9/02 20060101ALI20170316BHEP Ipc: B63B 25/16 20060101ALI20170316BHEP Ipc: F17C 5/06 20060101ALI20170316BHEP |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20190702 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1212545 Country of ref document: AT Kind code of ref document: T Effective date: 20191215 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602011064011 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20191211 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200311 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200311 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
| REG | Reference to a national code |
Ref country code: GR Ref legal event code: EP Ref document number: 20200400695 Country of ref document: GR Effective date: 20200518 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200506 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20191231 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200411 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602011064011 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1212545 Country of ref document: AT Kind code of ref document: T Effective date: 20191211 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191219 |
|
| 26N | No opposition filed |
Effective date: 20200914 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191231 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191231 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191231 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20111219 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20251224 Year of fee payment: 15 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20251223 Year of fee payment: 15 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AL Payment date: 20251211 Year of fee payment: 15 Ref country code: TR Payment date: 20251209 Year of fee payment: 15 Ref country code: GR Payment date: 20251224 Year of fee payment: 15 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20251229 Year of fee payment: 15 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20251126 Year of fee payment: 15 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20251229 Year of fee payment: 15 |