EP2414629A1 - Two coil guidance system for tracking boreholes - Google Patents
Two coil guidance system for tracking boreholesInfo
- Publication number
- EP2414629A1 EP2414629A1 EP10759325A EP10759325A EP2414629A1 EP 2414629 A1 EP2414629 A1 EP 2414629A1 EP 10759325 A EP10759325 A EP 10759325A EP 10759325 A EP10759325 A EP 10759325A EP 2414629 A1 EP2414629 A1 EP 2414629A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- loops
- borehole
- location
- sensor
- determining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
- E21B47/0228—Determining slope or direction of the borehole, e.g. using geomagnetism using electromagnetic energy or detectors therefor
- E21B47/0232—Determining slope or direction of the borehole, e.g. using geomagnetism using electromagnetic energy or detectors therefor at least one of the energy sources or one of the detectors being located on or above the ground surface
Definitions
- the present invention relates to a method and apparatus for tracking and guiding the drilling of a borehole, and more particularly to tracking a borehole being drilled generally horizontally under an obstacle such as a river, a highway, a railroad, an airport runway or the like, where access to the ground above the borehole is difficult or perhaps not possible.
- the driller In order to do this, the driller must have an accurate determination of the lateral position of the borehole as it is being drilled, as well as the precise distance to the exit location so that appropriate adjustments to the inclination and direction of drilling can be made. Even if the radial distance to the exit location from the entry point of the borehole into the Earth is precisely known and the radial distance of the drill bit from its entry point into the Earth is precisely known, safety considerations alone give high priority to directly determining the relative location of the desired borehole exit point with respect to the drill bit location as the exit point is approached. [0003] Conventional directional drilling techniques used to drill such boreholes commonly use a steering tool which measures the borehole inclination, azimuth and tool roll angle at each station along the path where measurements are made.
- the borehole coordinates are computed and tabulated from these steering tool data as a function of the measured distance along the borehole, which may be referred to as the measured depth of the steering tool, or the "away" distance from a reference point such as the borehole entry point.
- these borehole coordinates suffer from serious cumulative effects caused by small errors in the inclination and azimuth determinations made at regularly spaced stations along the borehole, and the lateral errors generated by such conventional borehole surveying are intolerable.
- a number of prior electromagnetic systems present problems to the user since they require access to the land directly above the path to be followed by the borehole in order to permit placement of surface grids or other guidance systems.
- Patents Nos. 6,626,252 and 6,814,163, to Kuckes similarly describe a drill tool which includes a three-axis magnetometer for detecting vector components of target magnetic fields produced by a large solenoid which incorporates a coil surrounding a large ferromagnetic core.
- the solenoid is connected to a reversible source of direct current of sufficient magnitude to provide a target magnetic field in the region of the proposed path of the drilling.
- the drilling equipment is placed at a location where a borehole is to be started, while the target solenoid is positioned at or near the area where the borehole is to exit the ground.
- the borehole entrance may be at or near one side of an obstacle, such as the bank of a river, with the borehole passing beneath the river to an exit beyond the opposite bank.
- Drilling the borehole is begun at the entrance site and conventional survey methods are used to guide the drill for a major part of the distance toward the exit location. As the borehole nears the desired exit site; for example, within about 100 meters, further guidance is by way of the target solenoid field.
- a target magnetic field for borehole drilling guidance is generated by a loop/guide wire antenna system on the Earth's surface above the proposed path of the borehole.
- the loop is energized by a known current to generate a magnetic field that is measured by two single-axis electromagnetic field sensors that lie on an imaginary spherical surface at the known radial distance from a point such as the entry point of the borehole. These sensors are approximately perpendicular to the radius of this spherical segment and to each other. Measurement of the two perpendicular electromagnetic field components generated by the loop is made by the two sensors at a selected borehole site.
- a second embodiment of the system described in the '020 patent includes two electromagnetic field source loops, both near the punch-out location.
- a guide wire leg of each loop is positioned on the Earth's surface along the proposed path of the borehole to produce corresponding electromagnetic fields on that path.
- the loop geometry is designed so that there is a rapid variation in the x and y components of the fields generated near the portion of the borehole beyond the edge of the loops.
- the rapid variations in the x and y field components in this region are used find the radial distance from the drill bit to the proposed punch out location.
- the radial distance to the punch out point is usually a critical parameter.
- the present invention is directed to an improved method and apparatus for providing guidance in drilling boreholes.
- the invention disclosed herein uses two electromagnetic sources consisting of two laterally spaced-apart loops of wire carrying alternating current to provide target magnetic fields that are used to determine the location and direction of the drill head and to guide further drilling. At least one of the loops is significantly off to one side of the borehole being tracked, and preferably both loops are laterally spaced from the proposed path. In one preferred form of the invention, two laterally spaced loops are on opposite sides of the proposed path and of the exit point of the borehole.
- Vector components of the electromagnetic fields are measured near the drill bit in the borehole by an array of magnetic field sensors, and accelerometers are provided to determine the direction of the Earth's gravitational field at the location of the magnetic field sensors.
- These electromagnetic field and accelerometer measurements are analyzed by mathematical techniques using the known loop geometry and electric currents to determine the drill bit location and the azimuthal direction of drilling.
- the drilling inclination direction is determined using standard accelerometer data.
- the location vector to the drilling point can be determined from the measured electromagnetic field vectors without the use of an accelerometer.
- the detailed geometry, power levels and frequency of operation and signal averaging time are subject to design criteria constraints including factors such as the size and location of the spaces available for positioning the loops and the consequent diameters of the loops and the number of turns of wire in each loop.
- the method, and the advantages, of the present system are illustrated by selecting an exemplary set of typical parameters for the wire loops used in the invention.
- two source wire loops are provided, one on each side of the borehole path, with each loop being approximately 50 meters in diameter and the loops being laterally separated by 150 meters.
- Each loop is powered by 5 kilowatts to generate corresponding magnetic fields, which may be referred to as target fields.
- Measurement of the target magnetic fields generated by this current at a selected point, such as a field detector on a drill head 500 meters distant from the loops readily provides a lateral location precision of 5 meters with respect to the proposed path and a few degrees precision in the drilling direction after a short period of signal averaging. Measurements made at a drilling location closer to the source loops will yield more precise results.
- FIG. 1 is a diagrammatic illustration of a drill guidance system utilizing the invention for guiding the drilling of a horizontal borehole following a proposed path to a proposed punch out point, in which two electromagnetic guidance coils are deployed on the far side of an obstacle, illustrated as a river;
- FIG. 2 is a diagrammatic top plan view of a portion of the guidance system of FIG. 1 ;
- FIG. 3 is a diagrammatic illustration of exemplary downhole instrumentation and an up hole computer in accordance with the invention.
- FIG. 4 is a diagrammatic illustration of the electronics powering each of the two loops of the illustrated configuration of FIG. 1 ;
- FIG. 5 is a diagrammatic illustration of the current and clock signal controlling each of the loops of the configuration of FIG. 1 ;
- FIG. 6 is a diagrammatic illustration of the wire loop geometry together with representations of the symbols used for the relative position vectors of a loop and a downhole location P;
- FIG. 7 is a diagrammatic illustration showing the representation of quantities which enter into the theoretical computation of the electromagnetic field generated by a loop segment at the point P;
- FIG. 8 is a diagrammatic representation of the xyz unit vectors and of the bes unit vectors together with the direction of gravity; and [0022]
- FIG. 9 is a top view, looking vertically down showing the relationship of the a, e, and r unit vectors of the aer coordinate system and of the b, e, and s unit vectors of the bes coordinate system.
- a unique and novel feature of the present application is the utilization of two independent, laterally separated source loops to generate electromagnetic fields for use in determining the location and direction of field sensors, and more particularly for guiding borehole drilling.
- Such laterally displaced source loops give a much greater useful range away from the electromagnetic field source for better distant location resolution and for more accurately guiding the drilling of a borehole, than has heretofore been possible.
- FIG. 1 One embodiment of the apparatus utilized in the method of the present invention is generally illustrated at 10 in FIG. 1 , wherein a borehole 12 is drilled under an obstacle such as a river for use in the laying of pipeline, for example.
- the apparatus incorporates a drill head having a down-hole industry standard drilling motor 14 for driving a drilling bit under the control of equipment at a drill rig 16 at the Earth's surface.
- the crossing of the river 18 may entail drilling along a planned path 20 which may pass under the river at a depth of 30 meters, for example, to a planned "punch-out point", or exit location 22, which may be, for example, 1000 to 1500 meters away from a borehole entry point 24.
- the progress of the borehole may be tracked for part of the distance to the exit point by conventional survey equipment, but as the drill bit moves further away from the entry point 24, guidance of the drill bit is best carried out by the use of target magnetic fields generated by two wire loops 26 and 28.
- the loops are illustrated as being located beyond the far bank 32 of the river 18, on the surface 34 of the Earth at the exit side of the river. It will be understood that the loops may be located on the near side of the river or other obstacle, or in some cases pairs of loops may be provided on both sides of the obstacle for precision guidance of the drill.
- the method is particularly important for drilling guidance while drilling under a river or other obstacle where it is impractical to deploy a guide wire system on the surface.
- the loops 26 and 28 are energized, as will be explained below, to produce target magnetic fields that are detected at selected measurement stations along the proposed path by a measurement while drilling (MWD) package 36 located on the drill head at or near the drilling motor 14 to provide the information needed to guide the drilling at each measurement station under the river and subsequently under the earth's surface 34 as drilling progresses toward the proposed exit location 22.
- MWD measurement while drilling
- the drilling motor 14 is mounted on a drill stem 38 to drive a drill bit 40, in conventional manner.
- the MWD package 36 preferably includes a conventional three component accelerometer to measure the direction of gravity and a conventional three component magnetometer to measure alternating magnetic fields, and is mounted on the drill stem adjacent, and just above, the drilling motor.
- the loop sources 26 and 28 are laterally spaced from each other, and are positioned by land surveying techniques at selected, known locations with respect to the proposed path 20 of the borehole being drilled. At least one of the loop sources is laterally displaced a significant distance from the proposed path 20. Preferably, both loops are displaced from the path. And advantageously the loops are on opposite sides of path 20, as illustrated in FIGs. 1 and 2. Each loop may consist of 5 turns of #12 wire, and may be 50 meters in diameter d. As illustrated in FIG.
- the centers 50 and 51 of loops 26 and 28, respectively, are separated by approximately 150 meters, and in the illustrated embodiment are equally spaced by distances 52 and 53 on opposite sides of the path 20, with a line between the center points 50 and 51 being perpendicular to the proposed path 20.
- the loops 26 and 28 are energized by a 5 kw motor/generator set 54 through suitable power control electronics 56 and power lines 58 and 60, respectively, as diagrammatically illustrated in FIG. 1.
- the control electronics simultaneously supply power to the two loops at different frequencies; for example, loop 26 may be energized by an alternating current having a frequency of 1 Hertz, while loop 28 is energized by alternating current at a frequency of 1.14 Hertz, to produce corresponding magnetic fields in the Earth in the region of the path 20.
- the loops may be separately energized by AC currents at the same frequency, in which case two sets of measurements are made sequentially, first with one loop powered and then with the second being powered. The important point is that independent measurements are made of the electromagnetic field components generated by each loop.
- the magnetic field source loops 26 and 28 are positioned near the planned punch-out point 22 of the borehole, in this case on the far side of the obstacle under which the borehole is to be drilled, from the entry point of the borehole. It will be understood, however, that the source loops can be positioned at any location along, or even beyond, the path 20, wherever precise lateral control of the drill bit and thus of the direction of drilling, is needed. It is to be noted that the larger the lateral separation of the loops and the fewer the number of turns for a fixed length of wire and excitation power, the better.
- the choice of parameters, in the example given above, is based on the limitations imposed by land accessibility and other such factors in the region of the path 20 of the borehole, and may vary in accordance with specific applications.
- the direction of drilling a borehole is initially controlled by standard borehole surveying techniques in which a steering tool measures the borehole inclination, azimuth and tool roll angle at successive stations along the path of the borehole.
- the borehole coordinates are computed and tabulated from the steering tool data as a function of the measured distance along the borehole and directional signals are generated and sent to the steering tool to control further drilling.
- these borehole coordinates suffer from serious cumulative effects caused by small errors in the inclination and azimuth determinations made at regularly spaced stations along the borehole, and the lateral errors generated by such conventional borehole surveying can cause serious problems.
- these lateral errors are overcome by utilizing the magnetic fields generated by laterally spaced loops 26 and 28 located where lateral drilling precision is needed.
- the loops 26 and 28 are electrically excited by alternating current after drilling has been stopped at a measurement station along the proposed borehole path.
- the resulting alternating electromagnetic fields are detected by the downhole MWD instrument package 36 on the drill string, and the resulting output data signals are transmitted uphole to the drilling apparatus 16, a few minutes of data are recorded and the data file is generated.
- the MWD package 36 incorporates conventional magnetometers 60 for measuring the x, y and z vector components of the AC magnetic fields generated by the current flow in the loops 26 and 28 and the x, y and z components of the Earth's magnetic field.
- the AC magnetometer output signals are supplied through corresponding AC amplifiers 62, and the Earth's magnetic field vector signals are supplied directly, to respective inputs of multiplexer and telemetry circuitry 64 which is driven by a suitable downhole clock circuit 66.
- the MWD package also incorporates x, y and z accelerometers 68 for measuring the x, y and z components of the Earth's gravity and supplies corresponding output signals to inputs of multiplexer 64.
- the multiplexer output is connected by way of a suitable communications link such as a cable 70 to uphole communication equipment 72 which includes an instrument power supply and telemetry circuits 74.
- Equipment 72 also includes an uphole computer 76 which receives demultiplexed data signals from the telemetry circuitry 74 at Earth's field circuit 77, gravity circuit 78, and AC field circuit 80. These signals are recorded at corresponding data files 82, 84 and 86, respectively, and the computer then determines the direction of further drilling in processor 90 and sends suitable drill control signals downhole by way of controller circuit 92 and telemetry 74 to a downhole controller 94 for the drill motor 14. [0032] As illustrated in FIG.
- the powering electronics 56 for the motor/generator set 54 includes an uphole clock 98 which generates a square wave clock signal 100, illustrated in FIG. 5(A), that drives an FET switching circuit 102 which is connected by way of respective lines 58 and 60 to supply an alternating current 104, illustrated in FIG. 5(B), to the loops 26 and 28.
- Electronics 56 also includes meters 106 for measuring the current in each loop.
- the first step for processing the recorded magnetic field data at processor 90 is the generation of a reference wave form by a reference clock 110 (FIG. 3) which is time synchronized with the clock 98 for the loop switching circuitry 102.
- Magnetic field data signals from the downhole magnetometers 60 that are stored in the AC field data files 86 are time averaged with respect to the reference wave form to produce two single-row data matrices of the three magnetic field components. This is done for magnetic field signals generated by the magnetometers in response to the magnetic fields H1 and H2 produced by the loops 26 and 28, respectively, either simultaneously when the loops are energized by different frequencies, or sequentially when they are energized by a single frequency.
- the location of the magnetic field sensor 60 with respect to the two loops, and thus the location of the drill with respect to the proposed path of the borehole, and the direction of drilling, can be determined by mathematically optimizing the match between measured and computed field components using mathematically well known methods, e.g.
- the first step is to precisely lay out the two electromagnetic source loops, or coils, 26 and 28 on the ground as shown in FIG. 6 for loop 26.
- the loop is defined by n straight line segments 120, which may be referred to generally as segments Ws(I )... Ws(n), with adjacent segments being joined at nodes 122
- the loop, or coil, 26 has N turns, and when energized by the source 56 carries an electric current I. In the illustration, the positive current flows counterclockwise.
- a surveyor's wire file listing the three dimensional coordinates of the vectors Rw(i), Rw(i-1 )...Rw(i-n) with respect to a reference origin point 124 for the wire element nodes 122 of the coils 26 and 28 is generated using standard land surveying techniques with customary away, elevation, right (aer) coordinate axes as illustrated in FIG. 6.
- Each node vector is defined by a vector Rw(i) from the origin 124 by its away, elevation and right (aer) coordinates.
- the elevation unit vector e defining the aer system points vertically upwards, as illustrated by axis 130.
- the away axis 132 is horizontal, usually chosen to be from the entry point toward the proposed borehole exit point., and the right unit vector axis 134 is also horizontal and points to the right of the away axis. [0035]
- the electromagnetic Law of Biot Savart can be used to compute the
- H1 aer and H2aer (away, elevation, right) vector components of the electromagnetic fields H1 and H2 specified in the away, elevation, right coordinate system for any location P at which the target electromagnetic field is to be evaluated.
- the location P is defined by the vector Raer as shown in FIG. 7. This is done by breaking each loop into an ensemble of wire segments such as segment Ws(i) shown in FIG. 7.
- the field generated by the current I carried in each of the N wires of each segment is readily found by summing vectorally the expressions for H(i) generated by each of the n wire segments Ws(i) shown in FIG. 6 for all the wire segments constituting a loop.
- the field H(i) for a wire segment as shown in FIG. 7, using "MATLAB" notation conventions in the following expressions, is:
- H(i) (N*l*Huv(i)/(4*pi*b))*(cosB(i) -cosA(i))
- mag(R) denotes sqrt(dot(R,R)).
- the driller is given the proposed borehole path coordinates expressed in the aer coordinate system and the measured borehole coordinates found in the course of drilling are expressed in the same aer system.
- the coordinates of a borehole being drilled are obtained in the course of drilling using conventional borehole surveying techniques based upon integrating a large number of station measurements of gravity and of the Earth's magnetic field along the borehole.
- the difficulty is that, far away from the borehole entry point, a borehole survey generated in this way does not have sufficient precision due to the cumulative build up of error along the borehole length.
- the driller is provided with the approximate survey file of the borehole, and this is improved upon using the method and apparatus of this invention.
- the borehole instrument 36 To make an electromagnetic determination of the location and drilling azimuth, measurements of three components of the electromagnetic fields generated by the loops 26 and 28, and of gravity, are made by the borehole instrument 36 at a location P at a chosen depth, or away distance along the borehole.
- the instrument 36 sensing axes are defined by an xyz coordinate system 140 fixed to the downhole drilling tool.
- the z axis 142 of system 140 illustrated in FIG. 8, is along the axis of the borehole, with the positive z axis pointing in the direction of drilling.
- the x and y axes 144 and 146 are perpendicular to z and to each other, the xyz system forms a right handed system of coordinate axes.
- H1xyz and H2xyz data i.e., the xyz vector components of the measurements of the down-hole electromagnetic fields produced by loops 26 and 28, respectively
- a bes coordinate system 150 whose axes are shown in FIG. 9, and are shown together with those of the xyz system 140 in FIG. 8.
- the "b" axis of the bes system is the projection of the borehole drilling direction on to the horizontal plane.
- the "e” direction is vertically upwards, i.e., the direction “e” of the "bes" coordinate axes is the same as “e” direction of the surveyors "aer” system.
- the direction "s" is in the horizontal plane and points to the right of the borehole. These directions are defined by the accelerometer measurements.
- H1xyz [H1x; H1y; H1z] (Eq. 6)
- the measurements H2x, H2y, H2z are represented by the 3 by 1 matrix:
- H2 are to be compared to theoretical values of the corresponding quantities H1th and H2th, which are conveniently calculated using the Law of Biot Savart with respect to the "aer" coordinate system used by the land surveyor.
- the matrix representation of H1th and H2th with respect to the aer coordinate axes will be written as:
- H1 aerth [H1 ath; H1 eth; H1 rth] and
- H2aerth [H2ath, H2eth, H2rth] (Eq.9) [0045] To compare the theoretical and measured field values, represent the
- aertobes [cos(Aab) 0 sin(Aab); 0 1 0; -sin(Aab) 0 cos(Aab)] (Eq.10)
- the representation of the theoretical values H 1th and H2th calculated with respect to a surface aer system can be converted to a down-hole bes system by the expressions:
- H1 besth aertobes * H1 aerth
- H2besth aertobes * H2aerth (Eq.11 )
- RA RAO + dRA (Eq, 13) such that the 6 values of H1 besth and H2besth evaluated at the 4 element values of RA match the 6 electromagnetic field measurement values contained in H1 bes and H2bes.
- H1 besth and H2besth evaluated at RAO, Hi besthO and H2besthO and form a 6 by 1 matrix H12besthO, i.e.:
- H12besthO [H1 bthO; Hi ethO; Hi sthO; H2bthO;H2ethO; H2sthO] (Eq.14) [0048] The corresponding theoretically computed field values computed at
- H12besth [H1 bth; H1eth; H1 sth; H2bth;H2eth; H2sth] (Eq.15)
- H12besthO [H1 bth; H1eth; H1 sth; H2bth;H2eth; H2sth]
- H12besth H12besthO + dH12besdRAb * dRA. (Eq.16)
- each of the derivatives in this relation are to be read as calculus partial derivatives evaluated at the element values contained in RAO; e.g., dHi bthdRa in the notation of calculus would be written as dH1 bth/dRa.
- the derivative dH1 bthdRa is the change in H1 bth per unit change in the parameter Ra near the RAO while holding ReO, RrO and AabO constant.
- H1 bth at [RaO; ReO; RrO; AabO] and at [Ra0+0.01 ; ReO; RrO; ;Aab0] (where "0.01 " is any appropriately small number).
- the first value H1 bth is subtracted from the second and this difference is divided by 0.01 , following the basic definition of differentiation.
- the value of the drill bit location Raer and the azimuthal drilling direction with respect to the a axis; i.e., the angle Aab, have been determined from electromagnetic and accelerometer measurements.
- the location vector Raer to the drilling point can be determined from the measured vectors H1xyz and H2xyz without the use of an accelerometer. This can be done by comparing scalar vector invariants of the measured electromagnetic field vectors to corresponding computed values.
- H1 the magnitude of H2
- H1 +H2 the magnitude of the projection of (H1 -H2) upon a plane perpendicular to (H1 +H2).
- the approximate inverse cube decrease in the field magnitudes H1 and H2 with the distance away from each source loop makes these quantities good for determining the away component Ra and the right side component Rr.
- the H1 and H2 vectors are vertical at the Earth's surface; however, the direction of these vectors diverge direction with depth into the Earth.
- the projection of the difference vector H1-H2 onto the plane perpendicular to the direction of H1 +H2; i.e., the near vertical direction, can give a good measure of the elevation component Re.
- H1 mag, H2mag and H12mag defined below.
- H1 mag sqrt(dot(H1 ,H1 ) )
- H12mag sqrt(dot(H12p,H12p)
- H12p (H1 -H2)-dot((H1 -H2),H12plusuv)*H12plusuv
- H12perpmeas [H1 mag; H2mag; H12mag]; (Eq.23)
- RaerO [RaO; ReO; RrO]; (Eq. 24)
- the vector Raer to the best fit sensor location is written asRaerO plus a small correction 3 by 1 correction matrix dRaer; i.e.:
- H12perpth H12perpthO + dH12perpdRaer * dRaer (Eq.26)
- each of the elements of dH12perpdRaer is a partial derivative; e.g., dH1 magdRa is the partial derivative of H1 mag with respect to Ra, etc., and can be computed in the same manner as outlined for the elements of the matrix of (Eq. 17).
- the three linear equations implicit in (Eq. 26) are solved for the three unknowns in dRaer, after equating H12perpth to the corresponding 3 by 1 measurement matrix H12perpmeas
- the improved value for the 3 by 1 matrix Raer is:
- Raer RaerO + dRaer (Eq.29)
- the final Raer matrix has the three components of the drill bit location vector Raer required to locate the drill bit with respect to the proposed path. From this, the driller can determine the appropriate drill control signals needed to progress along the path to the desired exit point.
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Electromagnetism (AREA)
- Geophysics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US16644309P | 2009-04-03 | 2009-04-03 | |
| PCT/US2010/029328 WO2010114872A1 (en) | 2009-04-03 | 2010-03-31 | Two coil guidance system for tracking boreholes |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP2414629A1 true EP2414629A1 (en) | 2012-02-08 |
| EP2414629A4 EP2414629A4 (en) | 2017-06-14 |
| EP2414629B1 EP2414629B1 (en) | 2019-09-11 |
Family
ID=42826914
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP10759325.3A Active EP2414629B1 (en) | 2009-04-03 | 2010-03-31 | Two coil guidance system for tracking boreholes |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20100256913A1 (en) |
| EP (1) | EP2414629B1 (en) |
| CA (1) | CA2765719C (en) |
| WO (1) | WO2010114872A1 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8816689B2 (en) * | 2011-05-17 | 2014-08-26 | Saudi Arabian Oil Company | Apparatus and method for multi-component wellbore electric field Measurements using capacitive sensors |
| US9376869B1 (en) * | 2011-08-12 | 2016-06-28 | Directed Technologies Drilling, Inc. | System and method for installing casing in a blind horizontal well |
| CA2930529C (en) | 2013-12-27 | 2018-06-05 | Halliburton Energy Services, Inc. | Target well ranging method, apparatus, and system |
| US10844705B2 (en) | 2016-01-20 | 2020-11-24 | Halliburton Energy Services, Inc. | Surface excited downhole ranging using relative positioning |
| US12258854B2 (en) | 2021-09-13 | 2025-03-25 | Halliburton Energy Services, Inc. | Bottom hole assembly mounted solenoid for magnetic ranging |
| CN114033353B (en) * | 2021-11-15 | 2022-11-08 | 中国石油天然气集团有限公司 | Electromagnetic positioning method and system for well track |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3529682A (en) * | 1968-10-03 | 1970-09-22 | Bell Telephone Labor Inc | Location detection and guidance systems for burrowing device |
| US4875014A (en) * | 1988-07-20 | 1989-10-17 | Tensor, Inc. | System and method for locating an underground probe having orthogonally oriented magnetometers |
| JP2863957B2 (en) | 1991-03-20 | 1999-03-03 | 株式会社小松製作所 | Underground excavator excavation position measuring device |
| US5320180A (en) * | 1992-10-08 | 1994-06-14 | Sharewell Inc. | Dual antenna radio frequency locating apparatus and method |
| US5513710A (en) * | 1994-11-07 | 1996-05-07 | Vector Magnetics, Inc. | Solenoid guide system for horizontal boreholes |
| US6466020B2 (en) * | 2001-03-19 | 2002-10-15 | Vector Magnetics, Llc | Electromagnetic borehole surveying method |
| AU2002330989A1 (en) * | 2001-08-03 | 2003-04-01 | Baker Hughes Incorporated | A method and apparatus for a multi-component induction instrumentmeasuring system |
| US6626252B1 (en) * | 2002-04-03 | 2003-09-30 | Vector Magnetics Llc | Two solenoid guide system for horizontal boreholes |
| US20060066454A1 (en) * | 2004-09-16 | 2006-03-30 | Vector Magnetics Llc | Earth magnetic field measurements with electronically switched current in a source loop to track a borehole |
| US7219749B2 (en) * | 2004-09-28 | 2007-05-22 | Vector Magnetics Llc | Single solenoid guide system |
| US7775301B2 (en) * | 2007-08-07 | 2010-08-17 | Martin Technology, Inc. | Advanced steering tool system, method and apparatus |
-
2010
- 2010-03-31 EP EP10759325.3A patent/EP2414629B1/en active Active
- 2010-03-31 US US12/751,154 patent/US20100256913A1/en not_active Abandoned
- 2010-03-31 CA CA2765719A patent/CA2765719C/en active Active
- 2010-03-31 WO PCT/US2010/029328 patent/WO2010114872A1/en not_active Ceased
Non-Patent Citations (1)
| Title |
|---|
| See references of WO2010114872A1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2414629A4 (en) | 2017-06-14 |
| WO2010114872A1 (en) | 2010-10-07 |
| EP2414629B1 (en) | 2019-09-11 |
| CA2765719A1 (en) | 2010-10-07 |
| CA2765719C (en) | 2018-06-12 |
| US20100256913A1 (en) | 2010-10-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10746892B2 (en) | System for determining offset and orientation from a planar loop antenna | |
| US5343152A (en) | Electromagnetic homing system using MWD and current having a funamental wave component and an even harmonic wave component being injected at a target well | |
| EP0425569B1 (en) | A system and method for locating an underground probe | |
| US5305212A (en) | Alternating and static magnetic field gradient measurements for distance and direction determination | |
| US6466020B2 (en) | Electromagnetic borehole surveying method | |
| EP0792407B1 (en) | Single-wire guidance system for drilling boreholes | |
| US4529939A (en) | System located in drill string for well logging while drilling | |
| US7209093B2 (en) | Locating technique and apparatus using an approximated dipole signal | |
| US6814163B2 (en) | Two solenoid guide system for horizontal boreholes | |
| US8684107B2 (en) | System and method for densely packing wells using magnetic ranging while drilling | |
| JPH11508004A (en) | Positioning of independent underground boring machines | |
| US9182513B1 (en) | Determining beacon location using magnetic field shape measurements | |
| EP0786043A1 (en) | Solenoid guide system for horizontal boreholes | |
| CA2765719C (en) | Two coil guidance system for tracking boreholes | |
| WO1996014491A9 (en) | Solenoid guide system for horizontal boreholes | |
| US7219749B2 (en) | Single solenoid guide system | |
| US20220136380A1 (en) | Magnetic borehole surveying method and apparatus | |
| CA2041622A1 (en) | Guiding of a tool along a subterranean path |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20111102 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: HALLIBURTON ENERGY SERVICES, INC. |
|
| DAX | Request for extension of the european patent (deleted) | ||
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 47/022 20120101ALI20170419BHEP Ipc: E21B 47/024 20060101AFI20170419BHEP |
|
| RA4 | Supplementary search report drawn up and despatched (corrected) |
Effective date: 20170511 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 47/024 20060101AFI20170505BHEP Ipc: E21B 47/022 20120101ALI20170505BHEP |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20180323 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20190417 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1178693 Country of ref document: AT Kind code of ref document: T Effective date: 20190915 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602010060998 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20190911 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191212 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1178693 Country of ref document: AT Kind code of ref document: T Effective date: 20190911 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200113 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200224 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602010060998 Country of ref document: DE |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG2D | Information on lapse in contracting state deleted |
Ref country code: IS |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200112 |
|
| 26N | No opposition filed |
Effective date: 20200615 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602010060998 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201001 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20260202 Year of fee payment: 17 |