EP2393709A2 - Integrated control system and galvanic protection of the electric power suppliers for the marine applications - Google Patents

Integrated control system and galvanic protection of the electric power suppliers for the marine applications

Info

Publication number
EP2393709A2
EP2393709A2 EP10706778A EP10706778A EP2393709A2 EP 2393709 A2 EP2393709 A2 EP 2393709A2 EP 10706778 A EP10706778 A EP 10706778A EP 10706778 A EP10706778 A EP 10706778A EP 2393709 A2 EP2393709 A2 EP 2393709A2
Authority
EP
European Patent Office
Prior art keywords
previewed
fact
power
allows
same scope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP10706778A
Other languages
German (de)
French (fr)
Other versions
EP2393709B1 (en
Inventor
Marco Monsurro'
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COELMO SpA
Original Assignee
CO EL MO Srl
Coelmo Srl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CO EL MO Srl, Coelmo Srl filed Critical CO EL MO Srl
Publication of EP2393709A2 publication Critical patent/EP2393709A2/en
Application granted granted Critical
Publication of EP2393709B1 publication Critical patent/EP2393709B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J99/00Subject matter not provided for in other groups of this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J3/00Driving of auxiliaries
    • B63J3/04Driving of auxiliaries from power plant other than propulsion power plant
    • B63J2003/043Driving of auxiliaries from power plant other than propulsion power plant using shore connectors for electric power supply from shore-borne mains, or other electric energy sources external to the vessel, e.g. for docked, or moored vessels

Definitions

  • the system permits to have an intelligent power management, and guarantees the feeding of loads without any voltage interruption (no-break) as well as the galvanic protection of the boat structure.
  • the galvanic isolation is done by using electronic power converters (PFC) without the need to use a low frequency isolation transformer, as is the case in traditional systems.
  • This converter is made and shielded in a way to guarantee obtaining the same features as those of the low frequency transformer isolation.
  • the advantage of using a high frequency transformer is the remarkable reduction of weight and dimensions compared to those of systems using low frequency isolation transformers.
  • connection points of the system are: Cl) Connection to the generating set or to another energy source (photovoltaic, eolic, etc) .
  • C2 Connection to the shore power grid.
  • This system makes it possible to manage the power flow among electric sources, loads and batteries.
  • the management is done by means, of five suitably-controlled power converters: PFC, DC/DC (1), DC/DC (2), DC/DC (3) and DC/AC (4) .
  • the Sl) , S2) and S5) contactors it is possible to choose the power supply mode, and thus connect the system to a generating set and/or to the shore power source.
  • the electric power can be directly supplied to the boat AC ordinary utilities, or to the ordinary and privileged utilities, in accordance with the condition of the S3), S4) and S5) contactors.
  • this energy or part of it can charge the batteries and feed the DC loads when it passes through the PFC, or it can be supplied to the AC loads through the inverters.
  • This functioning mode is used when the batteries are being recharged.
  • S2), S3) and S5) contactors are open.
  • the active lines are Ll) L3) L4) L5) L6) L7) L8)
  • Part of the power supplied by the power grid is used to feed the ordinary loads, while the other part of it passes through the PFC.
  • the PFC output power is then divided as follows: on the LlO) line to charge the batteries and feed the auxiliary battery DC loads. on the L5), L6) and L8) lines to feed the privileged AC loads.
  • the active lines are Ll) L3) L4) L5) L6) L7 ) L8)
  • the PFC output power is used to feed the AC privileged loads through the L5) L6) LB) lines. Part of the power necessary to feed the AC privileged loads is supplied by the batteries, and it passes through the DC/DC3 converter.
  • the non-privileged loads shall be disconnected.
  • the Sl contactor is closed while the S2) , S3) , S4) and S5) contactors are open.
  • the active lines are: Ll) L4) L5) L6) L8) L9) LlO) LIl) L12) L13) .
  • This functioning mode is active when: 1. the battery voltage in the shore power supply mode, gets lower than the fixed limit and the
  • “sleep” mode is not active (Unit enabled to start) .
  • the active lines are: L3) L4) L5) L6) L7) L8) L9)
  • Part of the power supplied by the generating set is used to feed the ordinary loads and the other part passes through the PFC.
  • the PFC output power then goes on line LlO) to charge the batteries, if necessary, and to feed the auxiliary battery DC loads; and on the L5) , L6 and L8 lines to feed the privileged AC loads.
  • This functioning mode is active when the power required for the loads exceeds the maximum power that can be supplied by the Unit.
  • the active lines are: L2) L3) L4) L5) L6) L7) L8) L9) LlO) LIl) L12) L13) .
  • Part of the power taken from the Unit is used to feed the ordinary loads and the other part passes through the PFC.
  • the PFC output power feeds the privileged AC loads through the L5, L6 and L8 lines. Part of the power necessary to feed the AC privileged loads is supplied by the batteries, and it passes through the DC/DC3 converter.
  • F) Functioning mode generating set limited power supply This method is active if, during the previous phase, the voltage of the auxiliary battery gets lower than the fixed limit.
  • the non-privileged loads shall be opened.
  • the S2 contactor is closed, while the S2, S3, S4 and S5 contactors are open.
  • the active lines are: L2) L4) L5) L6) L8) L9) LlO)
  • This mode is enabled in case of power supply shortage from the shore and from generating set.
  • Both the power grid and the generating set are disconnected.
  • the S3 contactor is closed, while the S2, S2, S4 and
  • S5 contactors are open.
  • the active lines are: L6) L7) L8) L9) L13.
  • H Functioning mode: using an inverter with limitation (Fig. 9) This mode is enabled if, during the inverter functioning mode, the battery voltage gets lower that the fixed limit.
  • the Sl), S2), S3), S4) and S5) contactors are open.
  • the active lines are: L6) L8) L9) L13) .
  • This functioning mode refers to the condition in which the system is connected to a shore power grid but the required power is higher than the suppliable power (the maximum shore power threshold can be set by the user) .
  • the generating set starts automatically, and it shall directly supply the L7) line, thanks to the closing of the S5 contactor.
  • S2, S3 and S4 contactors are open.
  • the active lines are: Ll) L2) L3) L4) L5) L6) L7)
  • the power supplied by the power grid passes through the PFC.
  • the PFC output power is then divided as follows: - on the LlO) line to charge the batteries and feed the auxiliary battery DC loads. on the L5) , L ⁇ ) and L8) lines in order to feed the privileged AC loads.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Control Of Electric Motors In General (AREA)
  • Emergency Protection Circuit Devices (AREA)
  • Prevention Of Electric Corrosion (AREA)

Abstract

The patent proposes an integrated system for the control and galvanic protection of electric energy sources for marine applications. Said system makes it possible to have a galvanic isolation through an electric power converter (PFC) The management of the power flow among the electric sources, the load and batteries, is done by means of five suitably-controlled power converters (1-5).

Description

INTEGRATED CONTROL SYSTEM AND GALVANIC PROTECTION OF THE ELECTRIC POWER SUPPLIERS FOR TKE MARINE APPLICATIONS .
Boats have three different means to supply the utilities aboard them with electric power: a) through an on-shore power distribution switchboard (hereinafter called "shore") : b) through an electric energy accumulation system (batteries) : c) through a generating endothermic engine (hereinafter called "generating set") . Each of the above listed sources has a maximum power supply capacity and needs a specific command, control and distribution system.
It is the user who chooses the source to use. This choice is based on a subjective evaluation of the power necessary to be supplied to the utilities, which could probably involve a waste of energy resources compared to those which are actually needed .
Moreover, the very common use of the shore as the source to supply the utilities aboard the boat with power, ' exposes the metal structures of the boats to damages caused by galvanic currents, typically present in ports. These currents take the shape of a single galvanic cell. On the one hand, the installation of a transformer on the boat could isolate the circuit aboard it from the circuit on-shore and reduces thus the corrosive effect of the above mentioned currents. Yet, on the other hand, such a transformer is not widely used because of its bulky dimensions and also because of the damage inflicted on the metal parts by the wet-saline environment on boats. This industrial invention patent proposes a system that unites both the management of electric energy sources for marine application and galvanic protection .
The system permits to have an intelligent power management, and guarantees the feeding of loads without any voltage interruption (no-break) as well as the galvanic protection of the boat structure.' The galvanic isolation is done by using electronic power converters (PFC) without the need to use a low frequency isolation transformer, as is the case in traditional systems.
This converter is made and shielded in a way to guarantee obtaining the same features as those of the low frequency transformer isolation. The advantage of using a high frequency transformer is the remarkable reduction of weight and dimensions compared to those of systems using low frequency isolation transformers.
Suitable measures have been taken to reduce capacitive couplings. The system principle is illustrated in fig. 1 of the system block diagram.
The main connection points of the system are: Cl) Connection to the generating set or to another energy source (photovoltaic, eolic, etc) . C2) Connection to the shore power grid.
C3) Connection to the ordinary utilities AC power supply . C4) Connection to the privileged utilities AC power supply (no break) .
C5) Connection to the starter batteries.
C6) Connection to the auxiliary batteries and the utilities DC line.
This system makes it possible to manage the power flow among electric sources, loads and batteries.
The management is done by means, of five suitably- controlled power converters: PFC, DC/DC (1), DC/DC (2), DC/DC (3) and DC/AC (4) .
Thanks to the Sl) , S2) and S5) contactors it is possible to choose the power supply mode, and thus connect the system to a generating set and/or to the shore power source. The electric power can be directly supplied to the boat AC ordinary utilities, or to the ordinary and privileged utilities, in accordance with the condition of the S3), S4) and S5) contactors.
Alternatively, this energy or part of it, can charge the batteries and feed the DC loads when it passes through the PFC, or it can be supplied to the AC loads through the inverters.
The possible functioning modes are described hereunder : A) Functioning mode: shore power supply (Fig 2)
This functioning mode is used when the batteries are being recharged.
The Sl) and S4) contactors are closed, while the
S2), S3) and S5) contactors are open. The active lines are Ll) L3) L4) L5) L6) L7) L8)
L9) LlO) LIl) L12) .
Part of the power supplied by the power grid is used to feed the ordinary loads, while the other part of it passes through the PFC. '
The PFC output power is then divided as follows: on the LlO) line to charge the batteries and feed the auxiliary battery DC loads. on the L5), L6) and L8) lines to feed the privileged AC loads.
B) Functioning mode: integrated shore power supply (Fig. 3) This functioning mode is active when the power required for the loads exceeds the limit set for the shore-supplied currents.
In this functioning mode, a part of the power required for the AC loads is sustained by the auxiliary batteries.
The Sl and S4 contactors are closed, while the S2) ,
S3 and S5 contactors are open.
The active lines are Ll) L3) L4) L5) L6) L7 ) L8)
L9) LlO) LIl) L12) L13) . Part of the shore power is used to feed the ordinary loads, while the other part of it passes through the
PFC.
The PFC output power is used to feed the AC privileged loads through the L5) L6) LB) lines. Part of the power necessary to feed the AC privileged loads is supplied by the batteries, and it passes through the DC/DC3 converter.
C) Functioning mode: limited shore power supply (Fig. 4)' This mode is active if, during the previous phase, the voltage of the auxiliary battery gets lower than the fixed limit and the system is in the "sleep" mode, (the Unit cannot start) .
The non-privileged loads shall be disconnected. The Sl contactor is closed while the S2) , S3) , S4) and S5) contactors are open. The active lines are: Ll) L4) L5) L6) L8) L9) LlO) LIl) L12) L13) .
D) Functioning mode: power supplied by a generating set (Fig. 5) .
This functioning mode is active when: 1. the battery voltage in the shore power supply mode, gets lower than the fixed limit and the
"sleep" mode is not active (Unit enabled to start) .
2. the shore power does not exist and the generating set is started manually. The S2 and S4 contactors are closed, while the Sl,
S3 and S5 contactors are open.
The active lines are: L3) L4) L5) L6) L7) L8) L9)
LlO) LIl) L12) .
Part of the power supplied by the generating set is used to feed the ordinary loads and the other part passes through the PFC.
The PFC output power then goes on line LlO) to charge the batteries, if necessary, and to feed the auxiliary battery DC loads; and on the L5) , L6 and L8 lines to feed the privileged AC loads.
E) Functioning mode: integrated power supply by a generating set (Fig. 6)
This functioning mode is active when the power required for the loads exceeds the maximum power that can be supplied by the Unit.
In this mode, part of the power required for the AC loads is sustained by the auxiliary batteries. _
/ The S2 and S4 contactors are closed, while the S2,
S3 and-S5 contactors are open.
The active lines are: L2) L3) L4) L5) L6) L7) L8) L9) LlO) LIl) L12) L13) . Part of the power taken from the Unit is used to feed the ordinary loads and the other part passes through the PFC.
The PFC output power feeds the privileged AC loads through the L5, L6 and L8 lines. Part of the power necessary to feed the AC privileged loads is supplied by the batteries, and it passes through the DC/DC3 converter.
F) Functioning mode: generating set limited power supply This method is active if, during the previous phase, the voltage of the auxiliary battery gets lower than the fixed limit.
The non-privileged loads shall be opened.
The S2 contactor is closed, while the S2, S3, S4 and S5 contactors are open.
The active lines are: L2) L4) L5) L6) L8) L9) LlO)
LIl) L12) L13.
G) Functioning mode: with inverter (Fig. 8)
This mode is enabled in case of power supply shortage from the shore and from generating set.
Both the power grid and the generating set are disconnected.
The S3 contactor is closed, while the S2, S2, S4 and
S5 contactors are open. The active lines are: L6) L7) L8) L9) L13.
H) Functioning mode: using an inverter with limitation (Fig. 9) This mode is enabled if, during the inverter functioning mode, the battery voltage gets lower that the fixed limit.
The Sl), S2), S3), S4) and S5) contactors are open. The active lines are: L6) L8) L9) L13) .
Only the privileged loads and DC loads are supplied with power.
LlO) LIl) L12) L13.
I ) Functioning mode: combined power supply from the power grid and the generating set (Fig. 10)
This functioning mode refers to the condition in which the system is connected to a shore power grid but the required power is higher than the suppliable power (the maximum shore power threshold can be set by the user) .The generating set starts automatically, and it shall directly supply the L7) line, thanks to the closing of the S5 contactor.
Thus the Sl) and S5) contactors are closed, and the
S2, S3 and S4 contactors are open. The active lines are: Ll) L2) L3) L4) L5) L6) L7)
L8) L9) LlO) LIl) L12) .
The power supplied by the power grid passes through the PFC.
The PFC output power is then divided as follows: - on the LlO) line to charge the batteries and feed the auxiliary battery DC loads. on the L5) , Lβ) and L8) lines in order to feed the privileged AC loads.
Procedural and structural modifications can be applied to this prospect, within the limits of the same inventive concept which is defined by the following claims.

Claims

1. Integrated control system and galvanic protection of the electric power suppliers for the marine applications, characterized by the fact that it can, according to the connections that will be realized, manage the flows of the power between electrical sources, loads and batteries as this management is realized through five power converters opportunely controlled.
2. System, as for the same scope of the previewed claim, characterized by the fact that the galvanic isolation comes through a high frequency transformer.
3. System, as for the same scope of the previewed claims, characterized by the fact that it allows an operational modality with the batteries during the charge status according to the drawing fig.2.)
4. System, as for the same scope of the previewed claims, characterized by the fact that it allows an operational modality that will be active when the request of the load power exceeds the limits agreed from the current taken from the dock, according to drawing fig.3) .
5. System, as for the same scope of the previewed claims, characterized by the fact that it allows an operational modality that will be active if, during the previewed phase, the battery's tension of the services falls under a prefixed limit and the system is in "sleep" modality (engine interdict to the start) , all this is according to the drawing fig.4) .
6. System, as for the same scope of the previewed claims, characterized by the fact that it allows a modality in which the tension of the batteries falls under a prefixed limit and is not active "sleep" or, also, if the dock is not present and the engine is manually started, according to the drawing fig.5).
7. System, as for the same scope of the previewed claims, characterized by the fact that it allows an operational modality that will be active when the power required from the load exceed the maximum power that the engine can supply, according to the drawing fig.6) .
8. System, as for the same scope of the previewed claims, characterized by the fact that it allows an operational modality that will be active if during the previewed phase, the battery's tension of the services falls under the prefixed limit, according to the drawing fig.7) .
9. System, as for the same scope of the previewed claims, characterized by the fact that it allows an operational modality that will be active in case of a lack of feeding from the dock and also of the generating set, this according to the drawing fig.8)
10. System, as for the same scope of the previewed claims, characterized by the fact that it allows an operational modality that will be active if in inverter modality the battery's tension falls under the prefixed limit, according to the drawing fig.9) ^
11. System, as for the same scope of the previewed claims, characterized by the fact that it allows an operational modality that make reference to a condition in which the system is connected to a dock's board but the power required exceed the power that can be supplied, according to the drawing fig.10) .
All these points are mentioned in the enclosed drawings .
EP10706778.7A 2009-02-05 2010-02-01 Integrated control system for the electric power suppliers and the galvanic protection system on ships Active EP2393709B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ITNA2009A000003A IT1393721B1 (en) 2009-02-05 2009-02-05 INTEGRATED SYSTEM FOR THE MANAGEMENT OF ELECTRICITY SOURCES AND GALVANIC PROTECTION FOR MARINE APPLICATIONS.
PCT/IT2010/000029 WO2010089791A2 (en) 2009-02-05 2010-02-01 Integrated control system and galvanic protection of the electric power suppliers for the marine applications

Publications (2)

Publication Number Publication Date
EP2393709A2 true EP2393709A2 (en) 2011-12-14
EP2393709B1 EP2393709B1 (en) 2013-06-05

Family

ID=41499894

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10706778.7A Active EP2393709B1 (en) 2009-02-05 2010-02-01 Integrated control system for the electric power suppliers and the galvanic protection system on ships

Country Status (3)

Country Link
EP (1) EP2393709B1 (en)
IT (1) IT1393721B1 (en)
WO (1) WO2010089791A2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3930977A (en) * 1973-01-18 1976-01-06 Dunwood Development Corporation Protection system for equipment and metallic fittings of non-metallic hulls of power boats
US5510659A (en) * 1994-01-13 1996-04-23 Lewis; David C. Electrolysis inhibiting marine energy management system
US7408273B2 (en) * 2004-10-12 2008-08-05 Slocum Kim M Shore power access system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2010089791A2 *

Also Published As

Publication number Publication date
WO2010089791A3 (en) 2010-12-29
IT1393721B1 (en) 2012-05-08
EP2393709B1 (en) 2013-06-05
WO2010089791A2 (en) 2010-08-12
ITNA20090003A1 (en) 2010-08-06

Similar Documents

Publication Publication Date Title
EP3487035B1 (en) Power supply system and method
EP2737603B1 (en) Single-battery power topologies for online ups systems
US7652393B2 (en) Apparatus and method for employing a DC source with an uninterruptible power supply
KR102609347B1 (en) Power systems for marine applications
JP6131763B2 (en) Power system
CN106471704A (en) UPS
WO2013003189A2 (en) Uninterruptible power supply
MX2012009501A (en) Ferroresonant transformer for use in uninterruptible power supplies.
CN112005460A (en) Power supply equipment
WO2019061694A1 (en) ELECTRICAL BOAT POWER SYSTEM AND ITS CONTROL METHOD
WO2019061803A1 (en) Ship power system
CN115483744A (en) Conversion power supply and automatic power supplementing method of energy storage system
CN114825576A (en) Efficient alternating current-direct current hybrid uninterruptible power supply system
RU2540966C1 (en) Static converter
JP6021312B2 (en) Distributed power supply system and circuit switching device
EP2393709B1 (en) Integrated control system for the electric power suppliers and the galvanic protection system on ships
CN202888860U (en) Off-grid and grid-connected photovoltaic inverter
CN103368253B (en) Intelligent back-up source duty control method and system
CN104065064B (en) 110 kv substation microgrid control methods
RU2594355C2 (en) Method of electric energy conversion installation configuring and device that implements said method
CN114336621A (en) A gas-electric hybrid ship energy management system and method
CN220342050U (en) Ship side shore power supply system of hybrid power ship
RU2813861C1 (en) Automatic transfer switch controller
CN221614679U (en) Light stores up power supply circuit, light stores up power generation system and electric ship
JP2011139556A (en) Power supply system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20110628

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA

RAX Requested extension states of the european patent have changed

Extension state: BA

Payment date: 20110628

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: COELMO S.P.A.

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 615514

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130615

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602010007588

Country of ref document: DE

Effective date: 20130801

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 615514

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130905

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130916

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130906

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130905

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131007

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131005

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

26N No opposition filed

Effective date: 20140306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602010007588

Country of ref document: DE

Effective date: 20140306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140201

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140228

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140228

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140201

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20100201

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20191202

Year of fee payment: 11

Ref country code: DE

Payment date: 20200228

Year of fee payment: 11

Ref country code: NL

Payment date: 20200226

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20200228

Year of fee payment: 11

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602010007588

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210201

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20210301

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210301

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210201

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210228

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210901