EP2230377A1 - Underwater cementing method - Google Patents

Underwater cementing method Download PDF

Info

Publication number
EP2230377A1
EP2230377A1 EP09250755A EP09250755A EP2230377A1 EP 2230377 A1 EP2230377 A1 EP 2230377A1 EP 09250755 A EP09250755 A EP 09250755A EP 09250755 A EP09250755 A EP 09250755A EP 2230377 A1 EP2230377 A1 EP 2230377A1
Authority
EP
European Patent Office
Prior art keywords
annulus
wellbore
casing string
liquid
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP09250755A
Other languages
German (de)
French (fr)
Inventor
Christopher Greaves
Daryl Sheridan Kellingray
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BP Exploration Operating Co Ltd
Original Assignee
BP Exploration Operating Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BP Exploration Operating Co Ltd filed Critical BP Exploration Operating Co Ltd
Priority to EP09250755A priority Critical patent/EP2230377A1/en
Publication of EP2230377A1 publication Critical patent/EP2230377A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
    • E21B33/143Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/001Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor specially adapted for underwater drilling

Definitions

  • This invention relates to a method of cementing a casing string in an offshore wellbore, typically, from the bottom of the casing string to the seafloor.
  • first casing string in the wellbore In the drilling of a wellbore under a water body, such as in the drilling of an offshore wellbore under a sea, lake or estuary, it is usually desirable to cement the first casing string in the wellbore from the bottom of the casing string to the floor of the sea, lake or estuary (hereinafter "seafloor").
  • the first casing string usually extends from the seafloor into the wellbore for several hundred to several thousand feet. Often the upper portion of the first casing string is cemented to a conductor pipe that is positioned in the uppermost portion of the wellbore.
  • the pressure in the annulus adjacent to an exposed permeable formation that contains a fluid may be insufficient to prevent fluid ingress into the annulus from the exposed permeable formation.
  • the ingress of fluid can interfere with the setting of the cement.
  • an object of the present invention is to maintain the pressure above the unset cement thereby preventing ingress of fluids into the annulus.
  • this invention is directed to a method of cementing a casing string in an wellbore that has been drilled below a body of water wherein the wellbore penetrates at least one permeable fluid-bearing formation, the method comprising:
  • This invention is applicable to any wellbore drilled beneath a body of water, such as a sea, lake, or estuary.
  • the wellbore will be referred to as an "offshore wellbore", the body of water as a “sea”, the bottom of the body of water as a “seafloor”, and the bottom of the casing string as a “casing shoe”.
  • the permeable fluid-bearing formation that is penetrated by the wellbore is referred to as an "exposed formation”.
  • the pressure in the annulus adjacent to the exposed formation initially has two components, the slurry "head" which may be considered the pressure expressed as a height of liquid cement slurry in the annulus above the exposed formation and the pressure applied to the injected slurry. If the applied pressure dissipates, this reduces the pressure in the annulus adjacent to the exposed formation such that the pressure may be insufficient to prevent fluid ingress from the exposed formation. However, the present invention increases the pressure within the annulus adjacent to the exposed formation owing to the additional head pressure provided by the column of liquid.
  • the offshore wellbore is an open hole wellbore that penetrates at least one permeable formation that contains a fluid such as water, brine or gas.
  • a conductor pipe may have been driven into the upper portion of the wellbore.
  • wall of the wellbore is meant the wall of the open hole wellbore and the inner wall of any conductor pipe that may have been driven into the upper portion of the wellbore.
  • the casing string is either cemented to the open hole wellbore or is cemented to the inner wall of the conductor pipe.
  • the casing string that is cemented in the offshore wellbore using the process of the present invention is a surface casing string (first casing string).
  • first casing string typically, the casing string is cemented to the wall of the offshore wellbore from the bottom of the casing string (casing shoe) to the seafloor.
  • the casing string is positioned in the wellbore and a cement slurry is pumped down the casing string, around the casing shoe and into the annulus formed about the casing string and the wellbore wall.
  • the injection of the cement slurry is terminated when the cement slurry has filled the annulus to a position above the exposed formation.
  • injection of the cement slurry terminates when the cement slurry has filled the annulus up to the seafloor.
  • injection of the cement slurry is generally terminated when the cement slurry has filled the annulus up to the wellhead.
  • injection of the cement slurry is terminated when cement slurry begins to be discharged from the annulus into the discharge line.
  • the cement slurry is then maintained in the annulus and allowed to set and bond the casing string to the wellbore wall while applying a sufficiently high pressure to the cement slurry that there is no ingress of fluid from exposed formation into the annulus.
  • the pressure in the annulus adjacent to the exposed formation is maintained at above the formation pressure i.e. the pressure within the pore space of the exposed formation.
  • the one-way valve opens so that fluid flows through the one-way valve from the column of fluid and into the annulus such that the head pressure of the column of liquid is applied to the cement in the annulus. Accordingly, in order to avoid ingress of fluid into the annulus from the exposed formation, the combined head pressure of the column of fluid and of the cement slurry adjacent to the exposed formation should be greater than the formation pressure.
  • the column of liquid may be a column of water that is of sufficient height that the hydrostatic head pressure that is transmitted to the unset cement in the annulus prevents ingress of fluid into the annulus from the exposed formation.
  • the one-way valve may be in fluid communication with the body of water.
  • the body of water has a depth of at least 200 metres (corresponding to a hydrostatic head pressure of at least 20 bar absolute).
  • the column of liquid may also be a column of liquid within an umbilical wherein the umbilical extends from at or near the surface of a body of water to the one-way valve.
  • the umbilical is connected either directly or indirectly to the one-way valve.
  • the height of the liquid in the umbilical is selected such that the head pressure of the column of liquid is sufficiently high that when the one-way valve is open, the head pressure transmitted by the column of liquid to the unset cement in the annulus is sufficiently high that the pressure in the annulus adjacent to the exposed formation is sufficient to prevent ingress of fluid into the annulus from the exposed formation.
  • the pressure adjacent to the permeable formation i.e.
  • the liquid that forms the column of liquid within the umbilical may be selected from seawater, lake water, estuarine water and wellbore fluids such as drilling muds or completion fluids.
  • the one-way valve that is in fluid communication with the column of liquid is a simple check-valve or non-return valve of the type well known to the person skilled in the art.
  • suitable valves include a flapper valve and a poppet type valve in the form of a check valve closure element that is biased to a closed position against a valve seat by a coil spring.
  • the pressure below the open one-way valve will be the head pressure of the column of liquid minus any pressure required to maintain the one-way valve in an open position.
  • the isolation valve may be closed such that the annulus is no longer capable of being in fluid communication with the column of liquid.
  • wellbore may be extended after the first casing string has been cementing into the wellbore and that the extended wellbore may be lined using a further casing string.
  • the sealing of the annulus formed between the first casing string and the wall of the wellbore prevents loss of pressure within the annulus formed between the second casing string and the wellbore wall.
  • Figure 1 is a drawing illustrating the one-way valve when used in an offshore wellbore environment.
  • Figure 1 shows an offshore wellbore 1 having a conductor pipe 2 in the upper portion thereof.
  • a casing string 3 is run into the wellbore 1 from the wellhead 4 to the bottom of the wellbore.
  • a drill string (not shown) may be positioned within the casing string and extends to the lower portion thereof to facilitate the circulating of a cement slurry from a cement injection line (not shown) through the wellhead 4, down the drill string around the bottom of the casing, and into the annulus 5 formed between the casing string 3 and the wall of the wellbore 1 and between the casing string 3 and the inner wall of the conductor pipe 2.
  • Wellbore fluids such as drilling mud displaced by the cement slurry may be discharged from the annulus 5 via valve V3 with valve V1 closed. Pumping of the cement is continued until the cement rises to the top of the annulus 5 (reaches the wellhead 4 at the seafloor) as evidenced by discharge of slurry from valve V3. The injection of the cement slurry is then terminated and the drill string is cleared of cement slurry. Valve V3 is then closed and valve V1 which is provided to isolate the one-way valve V2 is opened. The one-way valve V2 permits fluid flow from the body of water 6 (sea, lake or estuary) into the annulus but no flow of fluids from the annulus to the body of water 6.
  • the one-way valve V2 opens if the pressure in the annulus above the cement falls to below the hydrostatic head pressure of the body of water 6.
  • the person skilled in the art would be able to provide a suitable one-way valve that opens at the desired pre-set pressure. Accordingly, the hydrostatic head pressure of the body of water is transmitted to the annulus thereby re-pressurising the annulus. Re-pressurising of the annulus prevents ingress of fluid from an exposed formation into the annulus during setting of the cement.
  • the one-way valve will close when the hydrostatic head pressure in the annulus above the cement equalises with the hydrostatic pressure of the body of water above the one-way valve.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

A method of cementing a casing string in a wellbore that has been drilled below a body of water wherein the wellbore penetrates at least one permeable fluid-bearing formation, the method comprising:
(a) injecting a cement slurry through the casing string (3) and into the annulus (5) formed between the casing string and the wellbore wall thereby displacing any wellbore fluid from the wellbore through a discharge line that is in fluid communication with the annulus wherein the cement slurry is injected into the annulus at a sufficiently high pressure to prevent fluid ingress from the permeable fluid-bearing formation into the annulus;
(b) when the cement has reached a desired height in the annulus above the permeable fluid-bearing formation, isolating the discharge line from the annulus by closing a discharge valve (V3);
(c) opening an isolation valve (V1) that isolates a one-way valve (V2) from the annulus wherein the one-way valve is in fluid communication with a column of liquid that is above the valve and the one-way valve opens when the pressure below the one-way valve falls to below the head pressure of the column of liquid such that the head pressure of the column of liquid maintains the pressure in the annulus adjacent to the permeable fluid-bearing formation at above the pressure of the permeable formation thereby allowing the slurry to set and bond the casing string to the wellbore wall without ingress of fluids into the annulus from the permeable fluid-bearing formation.

Description

  • This invention relates to a method of cementing a casing string in an offshore wellbore, typically, from the bottom of the casing string to the seafloor.
  • In the drilling of a wellbore under a water body, such as in the drilling of an offshore wellbore under a sea, lake or estuary, it is usually desirable to cement the first casing string in the wellbore from the bottom of the casing string to the floor of the sea, lake or estuary (hereinafter "seafloor"). The first casing string usually extends from the seafloor into the wellbore for several hundred to several thousand feet. Often the upper portion of the first casing string is cemented to a conductor pipe that is positioned in the uppermost portion of the wellbore.
  • A problem arises in setting of a cement in the annulus between the first casing string and the wellbore wall in that there may be a loss of pressure in the annulus above the unset cement. Where there is a loss of pressure in the annulus above the unset cement, the pressure in the annulus adjacent to an exposed permeable formation that contains a fluid may be insufficient to prevent fluid ingress into the annulus from the exposed permeable formation. The ingress of fluid can interfere with the setting of the cement. Thus, an object of the present invention is to maintain the pressure above the unset cement thereby preventing ingress of fluids into the annulus.
  • Accordingly, this invention is directed to a method of cementing a casing string in an wellbore that has been drilled below a body of water wherein the wellbore penetrates at least one permeable fluid-bearing formation, the method comprising:
    1. (a) injecting a cement slurry through the casing string and into the annulus formed between the casing string and the wellbore wall thereby displacing any wellbore fluid from the wellbore through a discharge line that is in fluid communication with the annulus wherein the cement slurry is injected into the annulus at a sufficiently high pressure to prevent fluid ingress from the permeable fluid-bearing formation into the annulus;
    2. (b) when the cement has reached a desired height in the annulus above the permeable fluid-bearing formation, isolating the discharge line from the annulus by closing a discharge valve;
    3. (c) opening an isolation valve that isolates a one-way valve from the annulus wherein the one-way valve is in fluid communication with a column of liquid that is above the valve and the one-way valve opens when the pressure below the one-way valve falls to below the head pressure of the column of liquid such that the head pressure of the column of liquid maintains the pressure in the annulus adjacent to the permeable fluid-bearing formation at above the pressure of the permeable formation thereby allowing the slurry to set and bond the casing string to the wellbore wall without ingress of fluids into the annulus from the permeable fluid-bearing formation.
  • This invention is applicable to any wellbore drilled beneath a body of water, such as a sea, lake, or estuary. For simplicity of description, the wellbore will be referred to as an "offshore wellbore", the body of water as a "sea", the bottom of the body of water as a "seafloor", and the bottom of the casing string as a "casing shoe". The permeable fluid-bearing formation that is penetrated by the wellbore is referred to as an "exposed formation".
  • The pressure in the annulus adjacent to the exposed formation initially has two components, the slurry "head" which may be considered the pressure expressed as a height of liquid cement slurry in the annulus above the exposed formation and the pressure applied to the injected slurry. If the applied pressure dissipates, this reduces the pressure in the annulus adjacent to the exposed formation such that the pressure may be insufficient to prevent fluid ingress from the exposed formation. However, the present invention increases the pressure within the annulus adjacent to the exposed formation owing to the additional head pressure provided by the column of liquid.
  • The offshore wellbore is an open hole wellbore that penetrates at least one permeable formation that contains a fluid such as water, brine or gas. Optionally, a conductor pipe may have been driven into the upper portion of the wellbore. Accordingly, by "wall of the wellbore" is meant the wall of the open hole wellbore and the inner wall of any conductor pipe that may have been driven into the upper portion of the wellbore. Accordingly, the casing string is either cemented to the open hole wellbore or is cemented to the inner wall of the conductor pipe.
  • The casing string that is cemented in the offshore wellbore using the process of the present invention is a surface casing string (first casing string). Typically, the casing string is cemented to the wall of the offshore wellbore from the bottom of the casing string (casing shoe) to the seafloor. Generally, the casing string is positioned in the wellbore and a cement slurry is pumped down the casing string, around the casing shoe and into the annulus formed about the casing string and the wellbore wall. The injection of the cement slurry is terminated when the cement slurry has filled the annulus to a position above the exposed formation. Generally, injection of the cement slurry terminates when the cement slurry has filled the annulus up to the seafloor. Where the wellhead is located at the seafloor, injection of the cement slurry is generally terminated when the cement slurry has filled the annulus up to the wellhead. Typically, injection of the cement slurry is terminated when cement slurry begins to be discharged from the annulus into the discharge line. The cement slurry is then maintained in the annulus and allowed to set and bond the casing string to the wellbore wall while applying a sufficiently high pressure to the cement slurry that there is no ingress of fluid from exposed formation into the annulus. Thus, the pressure in the annulus adjacent to the exposed formation is maintained at above the formation pressure i.e. the pressure within the pore space of the exposed formation. If the pressure starts to fall in the annulus, the one-way valve opens so that fluid flows through the one-way valve from the column of fluid and into the annulus such that the head pressure of the column of liquid is applied to the cement in the annulus. Accordingly, in order to avoid ingress of fluid into the annulus from the exposed formation, the combined head pressure of the column of fluid and of the cement slurry adjacent to the exposed formation should be greater than the formation pressure.
  • The column of liquid may be a column of water that is of sufficient height that the hydrostatic head pressure that is transmitted to the unset cement in the annulus prevents ingress of fluid into the annulus from the exposed formation. Typically, the one-way valve may be in fluid communication with the body of water. Typically, the body of water has a depth of at least 200 metres (corresponding to a hydrostatic head pressure of at least 20 bar absolute).
  • The column of liquid may also be a column of liquid within an umbilical wherein the umbilical extends from at or near the surface of a body of water to the one-way valve. Thus, the umbilical is connected either directly or indirectly to the one-way valve. Typically, the height of the liquid in the umbilical is selected such that the head pressure of the column of liquid is sufficiently high that when the one-way valve is open, the head pressure transmitted by the column of liquid to the unset cement in the annulus is sufficiently high that the pressure in the annulus adjacent to the exposed formation is sufficient to prevent ingress of fluid into the annulus from the exposed formation. Thus, the pressure adjacent to the permeable formation (i.e. the head pressure applied by the column of liquid and the column of unset cement above the exposed formation) is greater than the pressure of the exposed formation. The liquid that forms the column of liquid within the umbilical may be selected from seawater, lake water, estuarine water and wellbore fluids such as drilling muds or completion fluids.
  • The one-way valve that is in fluid communication with the column of liquid is a simple check-valve or non-return valve of the type well known to the person skilled in the art. Examples of suitable valves include a flapper valve and a poppet type valve in the form of a check valve closure element that is biased to a closed position against a valve seat by a coil spring. The person skilled in the art will also understand that the pressure below the open one-way valve will be the head pressure of the column of liquid minus any pressure required to maintain the one-way valve in an open position.
  • Once the cement in the annulus has gained compressive strength, the isolation valve may be closed such that the annulus is no longer capable of being in fluid communication with the column of liquid.
  • The person skilled in the art will understand that wellbore may be extended after the first casing string has been cementing into the wellbore and that the extended wellbore may be lined using a further casing string. However, the sealing of the annulus formed between the first casing string and the wall of the wellbore prevents loss of pressure within the annulus formed between the second casing string and the wellbore wall.
  • According to another aspect of the invention there is provided a system for maintaining the pressure in an annulus of an offshore wellbore during setting of a cement that has been injected into the annulus wherein the annulus is formed between a first casing string and the wall of the offshore wellbore, the system comprising:
    • a T-piece having a first pipe section that is in fluid communication with the annulus of the offshore wellbore, a second pipe section that is connected to a discharge line and a third pipe section that is either open to a body of water or is connected to an umbilical that contains a column of liquid wherein a discharge valve is provided in the second pipe section, and a one-way valve and an isolation valve that isolates the one-way valve from the annulus are provided in the third pipe section, and when the discharge valve is closed and the isolation valve is opened, the one-way valve opens, in use, when the pressure in the annulus is below the head pressure of the body of water or the column of liquid in the umbilical to allow fluid flow from the body of water or the column of liquid through the
    • third and first pipe sections of the T-piece and into the annulus.
  • The method and system of the present invention are better understood by reference to Figure 1 which is a drawing illustrating the one-way valve when used in an offshore wellbore environment. Figure 1 shows an offshore wellbore 1 having a conductor pipe 2 in the upper portion thereof. A casing string 3 is run into the wellbore 1 from the wellhead 4 to the bottom of the wellbore. A drill string (not shown) may be positioned within the casing string and extends to the lower portion thereof to facilitate the circulating of a cement slurry from a cement injection line (not shown) through the wellhead 4, down the drill string around the bottom of the casing, and into the annulus 5 formed between the casing string 3 and the wall of the wellbore 1 and between the casing string 3 and the inner wall of the conductor pipe 2. Wellbore fluids such as drilling mud displaced by the cement slurry may be discharged from the annulus 5 via valve V3 with valve V1 closed. Pumping of the cement is continued until the cement rises to the top of the annulus 5 (reaches the wellhead 4 at the seafloor) as evidenced by discharge of slurry from valve V3. The injection of the cement slurry is then terminated and the drill string is cleared of cement slurry. Valve V3 is then closed and valve V1 which is provided to isolate the one-way valve V2 is opened. The one-way valve V2 permits fluid flow from the body of water 6 (sea, lake or estuary) into the annulus but no flow of fluids from the annulus to the body of water 6. The one-way valve V2 opens if the pressure in the annulus above the cement falls to below the hydrostatic head pressure of the body of water 6. The person skilled in the art would be able to provide a suitable one-way valve that opens at the desired pre-set pressure. Accordingly, the hydrostatic head pressure of the body of water is transmitted to the annulus thereby re-pressurising the annulus. Re-pressurising of the annulus prevents ingress of fluid from an exposed formation into the annulus during setting of the cement. The one-way valve will close when the hydrostatic head pressure in the annulus above the cement equalises with the hydrostatic pressure of the body of water above the one-way valve. The cement slurry is therefore maintained in the annulus and allowed to set and bond the casing string 3 to the open hole wall of the wellbore or the conductor tubing from the bottom of the casing string (casing shoe) to the seafloor. In addition, any potential flow of fluids that ingress from the permeable formation to outside of the wellbore is blocked by valves V2 and V3.

Claims (9)

  1. A method of cementing a casing string in an wellbore that has been drilled below a body of water wherein the wellbore penetrates at least one permeable fluid-bearing formation, the method comprising:
    (a) injecting a cement slurry through the casing string and into the annulus formed between the casing string and the wellbore wall thereby displacing any wellbore fluid from the wellbore through a discharge line that is in fluid communication with the annulus wherein the cement slurry is injected into the annulus at a sufficiently high pressure to prevent fluid ingress from the permeable fluid-bearing formation into the annulus;
    (b) when the cement has reached a desired height in the annulus above the permeable fluid-bearing formation, isolating the discharge line from the annulus by closing a discharge valve;
    (c) opening an isolation valve that isolates a one-way valve from the annulus wherein the one-way valve is in fluid communication with a column of liquid that is above the valve and the one-way valve opens when the pressure below the one-way valve falls to below the head pressure of the column of liquid such that the head pressure of the column of liquid maintains the pressure in the annulus adjacent to the permeable fluid-bearing formation at above the pressure of the permeable formation thereby allowing the slurry to set and bond the casing string to the wellbore wall without ingress of fluids into the annulus from the permeable fluid-bearing formation.
  2. A method as claimed in Claim 1 wherein the casing string that is cemented in the offshore wellbore is a surface casing string and the cement slurry is pumped down the surface casing string, around the bottom of the casing string and into the annulus formed about the casing string and the wellbore wall and injection of the cement slurry is terminated when the cement slurry has filled the annulus to a position above the permeable formation.
  3. A method as claimed in Claim 2 wherein injection of the cement slurry terminates when the cement slurry has filled the annulus up to the floor of the body of water.
  4. A method as claimed in any one of the preceding claims wherein the column of liquid is a body of water having a depth of at least 200 metres.
  5. A method as claimed in any one of claims 1 to 3 wherein the column of liquid is within an umbilical that is connected either directly or indirectly to the one-way valve and wherein the umbilical extends from the one-way valve to a position at or near the surface of a body of water
  6. A method as claimed in Claim 5 wherein the liquid that forms the column of liquid within the umbilical is selected from seawater, lake water, estuarine water and wellbore fluids.
  7. A method as claimed in any one of the preceding claims wherein the one-way valve that is in fluid communication with the column of liquid is selected from a flapper valve and a poppet type valve.
  8. A method as claimed in any one of the preceding claims wherein the isolation valve is closed when the cement in the annulus has gained compressive strength.
  9. A system for maintaining the pressure in an annulus of an offshore wellbore during setting of a cement that has been injected into the annulus wherein the annulus is formed between a first casing string and the wall of the offshore wellbore, the system comprising:
    a T-piece having a first pipe section that is in fluid communication with the annulus of the offshore wellbore, a second pipe section that is connected to a discharge line and a third pipe section that is either open to a body of water or is connected to an umbilical that contains a column of liquid wherein a discharge valve is provided in the second pipe section, and a one-way valve and an isolation valve that isolates the one-way valve from the annulus are provided in the third pipe section, and when the discharge valve is closed and the isolation valve is opened, the one-way valve opens, in use, when the pressure in the annulus is below the head pressure of the body of water or the column of liquid in the umbilical to allow fluid flow from the body of water or the column of liquid through the third and first pipe sections of the T-piece and into the annulus.
EP09250755A 2009-03-18 2009-03-18 Underwater cementing method Withdrawn EP2230377A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP09250755A EP2230377A1 (en) 2009-03-18 2009-03-18 Underwater cementing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP09250755A EP2230377A1 (en) 2009-03-18 2009-03-18 Underwater cementing method

Publications (1)

Publication Number Publication Date
EP2230377A1 true EP2230377A1 (en) 2010-09-22

Family

ID=40908608

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09250755A Withdrawn EP2230377A1 (en) 2009-03-18 2009-03-18 Underwater cementing method

Country Status (1)

Country Link
EP (1) EP2230377A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505966A (en) * 2017-02-28 2018-09-07 中国石油天然气股份有限公司 Slurry column structure design method and double-condensation double-density slurry column
CN111021982A (en) * 2018-10-09 2020-04-17 中国石油天然气股份有限公司 Well cementing method and well cementing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3189100A (en) * 1962-06-27 1965-06-15 Shell Oil Co Underwater wellhead with cement return line
US4063602A (en) * 1975-08-13 1977-12-20 Exxon Production Research Company Drilling fluid diverter system
US4655286A (en) * 1985-02-19 1987-04-07 Ctc Corporation Method for cementing casing or liners in an oil well
US5327969A (en) * 1993-04-30 1994-07-12 Halliburton Company Method of preventing gas migration during primary well cementing
FR2787827A1 (en) * 1998-12-29 2000-06-30 Elf Exploration Prod METHOD FOR ADJUSTING TO A OBJECTIVE VALUE OF A LEVEL OF DRILLING LIQUID IN AN EXTENSION TUBE OF A WELLBORE INSTALLATION AND DEVICE FOR CARRYING OUT SAID METHOD
US6415877B1 (en) * 1998-07-15 2002-07-09 Deep Vision Llc Subsea wellbore drilling system for reducing bottom hole pressure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3189100A (en) * 1962-06-27 1965-06-15 Shell Oil Co Underwater wellhead with cement return line
US4063602A (en) * 1975-08-13 1977-12-20 Exxon Production Research Company Drilling fluid diverter system
US4655286A (en) * 1985-02-19 1987-04-07 Ctc Corporation Method for cementing casing or liners in an oil well
US5327969A (en) * 1993-04-30 1994-07-12 Halliburton Company Method of preventing gas migration during primary well cementing
US6415877B1 (en) * 1998-07-15 2002-07-09 Deep Vision Llc Subsea wellbore drilling system for reducing bottom hole pressure
FR2787827A1 (en) * 1998-12-29 2000-06-30 Elf Exploration Prod METHOD FOR ADJUSTING TO A OBJECTIVE VALUE OF A LEVEL OF DRILLING LIQUID IN AN EXTENSION TUBE OF A WELLBORE INSTALLATION AND DEVICE FOR CARRYING OUT SAID METHOD

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505966A (en) * 2017-02-28 2018-09-07 中国石油天然气股份有限公司 Slurry column structure design method and double-condensation double-density slurry column
CN111021982A (en) * 2018-10-09 2020-04-17 中国石油天然气股份有限公司 Well cementing method and well cementing device
CN111021982B (en) * 2018-10-09 2022-03-29 中国石油天然气股份有限公司 Well cementing method and well cementing device

Similar Documents

Publication Publication Date Title
AU2018282498B2 (en) System and methods for controlled mud cap drilling
US8844633B2 (en) Method for maintaining wellbore pressure
US9316054B2 (en) Systems and methods for managing pressure in a wellbore
US9206664B2 (en) Method and apparatus to control fluid flow from subsea wells
DK2785965T3 (en) An annular barrier system with a flow pipe
EP1264076A1 (en) Multi-purpose float equipment and method
US9835008B2 (en) Method and apparatus for retaining weighted fluid in a tubular section
CA2932093A1 (en) Reverse cementing valve
CN106368607B (en) Implement the method for kill-job using the system for implementing kill-job in deepwater dual gradient drilling
CN109844257A (en) It is controlled using the well of improved bushing pipe tieback
AU2011321094A1 (en) Method and device for plugging of a subsea well
AU2014377739A1 (en) Method and apparatus for retaining weighted fluid in a tubular section
US7389818B2 (en) Method and device by a displacement tool
US7451822B2 (en) Method for retrieving riser for storm evacuation
EP2230377A1 (en) Underwater cementing method
JPH05500695A (en) Well casing flotation device and method
RU2741882C1 (en) Method for multi-stage cuff cementing of wells
US9657548B2 (en) Apparatus and methods of running casing in a dual gradient system
EP3087246B1 (en) Method for running conduit in extended reach wellbores
US10329873B2 (en) Methods for cementing a subterranean wellbore
RU2234593C2 (en) Method of productive stratum isolation during cementing casing pipe

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

AKX Designation fees paid

Designated state(s): GB

REG Reference to a national code

Ref country code: DE

Ref legal event code: R108

Effective date: 20110426

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20110323