EP2110307A2 - Vertäuungssystem - Google Patents

Vertäuungssystem Download PDF

Info

Publication number
EP2110307A2
EP2110307A2 EP09163320A EP09163320A EP2110307A2 EP 2110307 A2 EP2110307 A2 EP 2110307A2 EP 09163320 A EP09163320 A EP 09163320A EP 09163320 A EP09163320 A EP 09163320A EP 2110307 A2 EP2110307 A2 EP 2110307A2
Authority
EP
European Patent Office
Prior art keywords
harness
line
anchor
yoke
tether
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP09163320A
Other languages
English (en)
French (fr)
Other versions
EP2110307A3 (de
EP2110307B1 (de
Inventor
Michael Collee
Edward Maycock
Martin Shaw
Richard Yemm
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pelamis Wave Power Ltd
Original Assignee
Pelamis Wave Power Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pelamis Wave Power Ltd filed Critical Pelamis Wave Power Ltd
Publication of EP2110307A2 publication Critical patent/EP2110307A2/de
Publication of EP2110307A3 publication Critical patent/EP2110307A3/de
Application granted granted Critical
Publication of EP2110307B1 publication Critical patent/EP2110307B1/de
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers

Definitions

  • the present invention relates to a system for the mooring and retrieval of floating aquatic installations and structures.
  • Known mooring systems for floating structures comprise a number of anchors, weights and associated tether lines which are attached to the installation or structure.
  • the anchors can take different forms, but each is intended to hold its associated tether line on the bed of the body of water upon which the structure is floating. Additional weights can be added to the anchor lines in order to counter the forces on the structure (e.g. wind, waves or tidal currents) and maintain the position of the structure on the water. Additional mooring and restraint lines can also be incorporated depending on the conditions which the structure is expected to encounter.
  • a further disadvantage of the known systems is that they are normally intended to moor only one structure per system. If a number of structures are to be installed at the same location, separate anchor points, weights and tether lines are needed for each structure. As a result, the structures need to be a certain distance from one another to avoid fouling the various lines. Having to space the structures from one another in this manner is not an effective use of space. It is often desired to place a number of structures in as small a space on the water as possible, normally for economic, aesthetic or environmental reasons.
  • mooring systems are limited in that they are only intended to encounter loading from a single direction (e.g. a marine structure which is only intended to encounter waves from one direction). Such systems can lack stability if they encounter forces from an unexpected direction. Such forces can lead to rotational or yaw movements of the structure which can cause damage to both the structure and the components of the mooring system.
  • a mooring system for a floating aquatic structure comprising:
  • the mooring system further comprises at least one second anchor removably attached to the connecting line by at least one second anchor line, wherein the second anchor is adapted to resist movement of the structure in a second direction substantially opposite to the first direction.
  • the mooring system further comprises a support line having one end adapted to be removably attached to the structure and its other end removably attached to the second anchor line, the support line adapted to restrict yaw motion of the structure.
  • the mooring system further comprises one or more secondary weights attached to one or more of the first and second anchor lines.
  • the system comprises at least two first anchors removably attached to said primary weight by respective first anchor lines, wherein each first anchor is adapted to resist movement of the structure in the first direction.
  • the at least one primary weight comprises a frame member and one or more chain links suspended from said frame member.
  • the frame member includes at least two first mechanical attachment means adapted to removably attach the connecting line and at least one first anchor line thereto.
  • the first mechanical attachment means are universal joints having detachable pin members.
  • the mooring system comprises:
  • the system further comprises a third primary weight attached to a third connecting line and suspended on the third connecting line from the second end of the harness; and at least one second anchor removably attached to the third connecting line by at least one respective second anchor line, wherein the second anchor is adapted to resist movement of the structure in a second direction substantially opposite to the first direction.
  • the system further comprises a support line having one end adapted to be removably attached to the structure and its other end removably attached to the second anchor line, the support line adapted to restrict yaw motion of the structure.
  • the system further comprises a pair of second anchors each having respective second anchor lines, one of the second anchors being removably attached to the first primary weight by one second anchor line and the other second anchor being removably attached to the second primary weight by the other second anchor line, wherein the second anchors are adapted to resist movement of the structure in a second direction substantially opposite to the first direction.
  • the system further comprises first and second support lines, each support line having one end adapted to be removably attached to the structure and its other end removably attached to one of the second anchor lines, the support lines adapted to restrict yaw motion of the structure.
  • the harness comprises first and second arm members and a shaft member, wherein the arm members have first and second ends and the shaft member is connected between the respective first ends of the arm members to form the first end of the harness, and wherein the shaft member has an axis of rotation about which the harness pivots.
  • the harness is adapted to apply roll restraint to the structure.
  • said shaft member and at least one of said arm members are hollow, the harness further comprising at least one conduit that is at least partially located in the hollow arm member and the shaft member.
  • the harness further comprises connecting means for connecting one or more utility supplies to the harness.
  • said connecting means comprises a junction box having one or more connectors therein, the junction box being in communication with the at least one conduit, and the conduit carrying utility supply through the harness to the structure.
  • the harness further comprises retrieval means to facilitate retrieval of the harness from a body of water.
  • the retrieval means comprises one or more slots provided on the harness.
  • the retrieval means further comprises one or more roller members provided on the harness.
  • the harness further comprises a second mechanical attachment means for removably attaching the connecting line thereto.
  • the second mechanical fixing means is a universal joint having a detachable pin therethrough.
  • the at least one connecting line includes a linking plate member, and wherein the at least one second anchor line is removably connected to the connecting line by the linking plate member.
  • the linking plate member includes:
  • the floating aquatic structure is a wave energy converter.
  • weight for a mooring system comprising a frame member and at least two chain links suspended from said frame member.
  • the weight comprises a plurality of chain links suspended from the frame member.
  • the frame member includes at least two mechanical attachment means adapted to removably attaching components of a mooring system thereto.
  • the mechanical attachment means are universal joints having detachable pin members.
  • a recovery apparatus for a marine vessel comprising:
  • said guide means is a ramp having an inclined surface lying in a ramp surface plane, and wherein the retention means is housed on the ramp.
  • the base member is adapted to permit longitudinal movement of the retention means relative to the ramp.
  • the ramp further comprises a guide track in which the base member is located.
  • the guide track has first and second portions, wherein the first portion lies at a greater angle relative to the horizontal than the second portion.
  • the first guide track portion lies at an angle relative to the ramp surface plane and the second guide track portion is substantially parallel to the ramp surface plane.
  • the guide track includes locking means adapted to lock the retention means in one or more positions on the guide track.
  • the recovery apparatus further comprises a tensioning roller member adjacent a first end of the guide means for tensioning the recovery line.
  • a second end of the guide means terminates adjacent the stern of the marine vessel, and the apparatus further comprises a recovery roller member adjacent the stern of the vessel, the recovery roller member adapted to assist in the recovery of an object onto the guide means.
  • FIG. 1(a) and 1(b) A first embodiment of a mooring system for a floating aquatic structure in accordance with the present invention is shown in Figures 1(a) and 1(b) .
  • the mooring system is intended for use with any structure, marine vessel or installation which requires securing in water at a particular location.
  • the mooring system is securing a wave energy converter (WEC), which is itself the subject of International Patent Application No PCT/GB99/03204 to the same Applicant. The WEC will therefore not be described further here.
  • WEC wave energy converter
  • the WEC 1 floats on the surface of the water and is provided with a pivoting harness or yoke 2 at its front end 3 - that is, the end facing in the direction of the anticipated wave action or current. Attached to the yoke 2 below is a connecting or tether weight line 11 to which is secured a primary or tether weight 10.
  • First or front anchor lines 16 are attached to the tether weight arrangement 10 and have first or front anchors 15 of a known type at the ends of the front anchor lines 16 remote from the tether weight arrangement 10.
  • the embodiment shown in Figures 1(a) and 1(b) is provided with three front anchors 15 and front anchor lines 16, the system need only utilise one front anchor and front anchor line. Additional front anchors and front anchor lines can be added depending on the operational requirements of the system.
  • Optional secondary or clump weights may also be provided on the front anchor lines 16 to provide additional friction if desired.
  • FIG. 1(b) shows a schematic plan view of the WEC 1 and front and rear anchor lines 16,13 when under the action of waves coming from the direction shown by arrow 4.
  • FIG. 1(a) and 1(b) One of the advantages of the mooring system shown in Figures 1(a) and 1(b) is that it is particularly suitable for securing aquatic structures in an array.
  • a number of WECs or other structures can be held by shared anchor points on the sea bed and can also share electrical connections and such like.
  • an array of WECs 1 is to be moored at the same location, they can be arranged in rows, as shown in Figure 2 .
  • Each WEC 1 has substantially the same mooring system as that described with reference to Figures 1(a) and 1(b) .
  • the front anchors 15 are shared by adjacent WECs 1.
  • the front anchor lines 16 of adjacent WECs 1 share the same front anchor 15.
  • the front anchors 15 of each row also act as the rear anchors of the adjacent row.
  • the rear anchor line 13 of the WEC 1 is connected between the tether line 11 of the WEC 1 and the front anchor 15 of the WEC in the next row.
  • the adjacent WECs also can also share a variety of utilities via one or more umbilical utility supply lines 27, which in the illustrated embodiment are electrical cables.
  • the umbilical lines 27 are adapted so that they may continue to supply utilities around the array, even if one WEC is temporarily removed for some reason.
  • the umbilical lines are connected "mid-water" (i.e.
  • electrical switchgear is provided in each WEC 1 in order to act as circuit breakers.
  • the circuit breakers in the associated WECs trip in order to isolate the faulty cable.
  • the array can continue to operate whilst the faulty cable is replaced.
  • FIGS 3(a) and 3(b) show the yoke 2 of the mooring system in more detail.
  • the yoke 2 is designed to pivot relative to the WEC 1 in a substantially vertical plane (when viewed in Figures 3(a) and 3(b) ) through a large angle range 5, both above and below the surface 9 of the water. This allows the yoke 2 to pivot about the front end 3 of the WEC 1 so that the lower end of the yoke 2 can be recovered to the surface 9 without removing any attachments, as will be explained below.
  • the yoke 2 is also adapted to pivot in order to allow the WEC 1 to move on its moorings without the yoke 2 and the WEC 1 coming into contact.
  • the yoke 2 comprises a pair of arm members 7 which are connected together at their lower ends.
  • the first or upper ends of the arm members 7 are also connected to respective ends of a hollow shaft member 8, such that the yoke 2 is substantially triangular in shape.
  • the yoke 2 may also be provided with one or more crossbrace members 6 which allow the yoke 2 to spread the mooring loads.
  • the crossbrace member(s) 6 strengthen the yoke 2 whilst still allowing it to pivot about the front 3 of the WEC 1.
  • FIGS 4(a) and 4(b) show how the mooring system provides restorative forces to the WEC 1 when it is subjected to wave action.
  • the lower end of the yoke 2 is connected to the tether weight 10 by the tether line 11.
  • the rear anchor line 13 and rear anchor 18 are connected to the tether line, preferably by a link plate 12, although they may be attached by any other suitable means.
  • the tether weight 10 is linked to the front anchors 15 using the front anchor lines 16. At rest, the system is arranged such that the tether weight 10 is suspended just off the sea bed 17.
  • the rear anchor line 13 is connected to the rear anchor 18 at the rear of the WEC 1 and mooring system to provide restraint should the WEC 1 and system move forwards.
  • Figure 4(a) shows how the system generates a restoring force R H for rearward displacement of the WEC 1 under wave action from the direction illustrated by arrow 4.
  • the yoke 2 and tether line 11 adopt an angle ⁇ to the vertical which generates a restoring force R H back to the rest position due to the effect of the tether weight 10.
  • the system remains linear in behaviour for angles ⁇ up to approximately 30 degrees (approximately half water depth).
  • the restoring force R H becomes more non-linear with displacement but 'snatching' is avoided for angles less than approximately 60 degrees (approximately 85% of water depth).
  • snatching occurs when a slack mooring line is suddenly subjected to a high load.
  • An example of snatching occurs when the tether weight is lying on the seabed and the slack tether line is subjected to a high load by movement of the structure. As the line goes taught, the tether weight will be lifted from the seabed, the inertial and possible suction forces on the weight as it lifts from the sediment on the bed can also increase the load on the tether line. These sudden loads on the line are known as snatch loads.
  • Figure 4(b) shows how the system generates a restoring force R H for forward displacements towards the direction 4 of the waves.
  • the rear anchor 18 and rear anchor line 13 act on the bottom of the yoke 2 to generate an angle on the yoke. This leads to a restoring force R H as shown.
  • the mooring system allows the WEC 1 to yaw about the vertical axis in response to changes in the incident wave direction, as shown in Figures 5(a) and 5(b) .
  • the available range of motion is limited by the yaw line 14 acting in conjunction with the rear anchor line 13.
  • the lengths of these lines 13,14 can be chosen to limit the yaw motion if necessary.
  • the yaw limit would typically be +/- 90 degrees relative to the expected direction 4 of incoming waves for a coastal location.
  • Figure 5(a) shows a typical limiting angle for waves coming from the starboard direction shown by arrow 19.
  • Figure 5(b) shows a typical limiting angle for waves coming from the port direction shown by arrow 20. If more yaw angle is required the mooring system can be provided with a swivel to allow it to rotate fully, and electrical/other interconnection would be through slip rings or similar means.
  • a further function of the mooring system is to provide greater rotational stability about a particular axis.
  • the mooring system is used to provide additional roll stability.
  • the yoke 2, tether line 11 and tether weight 10 combine to give the WEC additional roll stability about its longitudinal axis, as shown in Figure 6 .
  • the yoke 2 behaves in the same manner as the keel of a yacht, producing a counteracting force to counter the roll action of the WEC.
  • Figure 7 shows a detail view of the upper part of the yoke 2.
  • the two arm members 7 of the yoke 2 are connected to respective ends of a hollow shaft 8.
  • the shaft 8 provides a structural link between the arm members 7, which ensures that the yoke 2 is a rigid, structurally efficient frame able to withstand large mooring loads while remaining relatively lightweight.
  • the shaft 8 is located in a housing at the front end 3 of the WEC 1 and bearings 21 are provided between the shaft 8 and the housing. These bearings 21 allow low friction rotation 22 of the yoke about the rotational axis 23 of the shaft 8.
  • Conduits 24 are also provided which are located within either one or both of the arm members 7 and the shaft 8.
  • the conduits 24 allow electrical and communications wiring, and/or hydraulic or other lines to run between the upper and lower ends of the yoke 2.
  • the conduits 24 exit the shaft 8 at one or more exit apertures 25 with the flexible end portions 26 of the conduits 24 connecting to the WEC 1.
  • the flexible end portions 26 are designed to allow the yoke 2 to pivot freely about the rotational axis 23 of the shaft 8 while minimising strain on the internal wires or other lines. This allows all internal/external connections to the yoke 2 and machine 1 to be made at the lower end of the yoke 2.
  • the connection/disconnection of the WEC 1 from the mooring system can be done without needing human intervention on the WEC 1 whilst in the water.
  • the arrangement also protects the wiring and other connections from the water.
  • FIGS 8(a) and 8(b) show details views of the lower end of the yoke 2.
  • the lower ends of the arm members 7 meet to form the corner or apex of the substantially triangular yoke 2.
  • All of the mechanical, electrical and/or other connections to the machine are housed at this lower end of the yoke 2.
  • These connections typically comprise flexible umbilical utility supply lines 27 which usually contain electrical, communication, hydraulic or other lines interconnecting adjacent WECs in an array such as that shown in Figure 2 , or connecting the WEC to main supply lines on the sea bed.
  • the umbilical lines 27 between adjacent WECs 1 are made "mid-water". In other words, the umbilical lines 27 lie below the surface of the water, but are not in contact with the sea bed.
  • umbilical lines 27 are connected via sealed connectors 28 to a connecting means in the form of a junction box 29 mounted on the yoke 2.
  • the junction box 29 is linked to the conduits 24 to provide a path for the various lines to the upper part of the yoke 2 and then subsequently into the WEC 1, as shown in Figure 7 .
  • the connectors 28 are designed to be a male/female mating pair so that they can be connected together in order to maintain continuity for an array of WECs if this particular WEC 1 and yoke 2 are off-site for any reason.
  • the lower part of the yoke 2 also includes the main mechanical attachment to the tether line 11. In the illustrated embodiment, this is provided by a universal joint 30 to allow free motion about two perpendicular rotational axes and to minimise wear of the connection in service. This connection is made using a single pin 31 to allow straightforward and rapid attachment and removal of the tether line. In addition, back-up lines (not shown) may be provided to maintain integrity of the mooring system in the event of failure of any of the components.
  • the lower part of the yoke 2 is also provided with a retrieval means to allow easier retrieval of the yoke 2 onto the rear of an installation/removal vessel, as will be described further below.
  • This retrieval means comprises profiled slots 32 or may alternatively comprise a ball and socket joint (not shown) or any similar connection.
  • skids or rollers 33 are also provided. These allow the system to be easily and safely pulled up over stern of the vessel and guide the end of the yoke 2 into a latching means. Further guides, rollers, or latches may also be added to aid the safe and rapid recovery of the yoke 2.
  • a tether weight 10 which is used in the mooring system is shown in Figure 9 .
  • the tether weight 10 comprises a frame member 34 for attachment to the tether line 11 and the front anchor lines 16 and any other ancillary or back-up lines (not shown).
  • the attachment of the various lines is again made using universal joints 30 to allow full and free motion and minimise wear of the connection.
  • Loops or lengths of chain links 35 are suspended from the frame 34 to provide the weight required to generate the mooring reaction forces, as will be described below.
  • the operation of the tether weight 10 is shown in Figures 10 and 11(a)-(c) .
  • the mooring system is arranged such that when it is not experiencing any displacement forces from the water, the tether weight 10 is positioned as close as possible to, or partially resting on, the sea bed 17.
  • the vertical motion or pitch of the WEC 1 may be great, as shown in Figures 10(a) and 10(b) .
  • the tether weight 10 will be lifted away from the sea bed 17.
  • the front of the machine is in a wave trough, as shown in Figure 10(b)
  • the tether weight 10 will fall onto the sea bed 17 unless sufficient clearance is provided.
  • the tether weight 10 shown in Figure 9 allows a progressive pick-up from the sea bed, as shown in Figures 11 (a)-(c) .
  • the chain links 35 are progressively picked up by the frame 34, ensuring a smooth increase in the mass of the tether weight 10 as it rises from the sea bed 17.
  • FIG 11(f) shows how the load in the tether line would vary with time for both types of tether weight during the passage of a large wave.
  • the time represented by point 38 the tether weights are resting fully on the sea bed.
  • the tether line tightens as the weights start to be lifted back off the sea bed.
  • the large snatching load 40 with the solid tether weight is caused by the rapid vertical acceleration of the moored structure during the wave action and the suction effect of the sea bed sediment on the tether weight.
  • This snatching load is many times larger than the normal loads intended for the tether line to encounter in service, and can lead to damage and, in extreme cases, failure of the tether line.
  • the weight rises from the sea bed more progressively, and a much smaller snatch load 41 is placed on the tether line, as shown in the graph of Figure 11(f) .
  • One of the advantages of the mooring system as described above is that the moored machine or structure can be disconnected whilst out of the water. In this way, there is no need for an operator to either be in the water or on the structure during the connection or disconnection.
  • the yoke houses the connections to the utility umbilical lines and the tether weight and anchors.
  • the yoke remains attached to the machine/structure when the umbilical line(s) and connecting line to the tether weight are disconnected, thus allowing the remainder of the mooring system to remain in the water when the structure and yoke are retrieved.
  • a recovery or retrieval apparatus is required for retrieving the yoke from the water.
  • An example of such an apparatus is shown in Figures 12(a) and 14(b) .
  • the retrieval apparatus 45 is installed on the deck 46 of a support vessel and is arranged to hold the end of the yoke 2, as shown in Figure 12(b) , during connection or disconnection of the remainder of the mooring system.
  • the structure and yoke can then be towed to a suitable location for the maintenance work, or else they can be lifted onto a barge or the like for maintenance or transportation.
  • the retrieval apparatus is provided with a ramp 47 onto which the lower end of the yoke 2 is recovered, as has been previously described with reference to Figures 12 and 13 .
  • the ramp 47 has an inclined surface which lies in a ramp surface plane.
  • the rear end of the ramp is inclined at an angle to the ramp surface plane in order to help with the recovery of the yoke.
  • either the rear of the vessel itself or the ramp 47 is provided with a recovery roller or drum 44 to ensure the smooth recovery or deployment of the various lines and umbilicals attached to the yoke 2.
  • a tensioning roller 48 is also provided at the top end of the ramp 47 to ensure that the recovery line 42 is pulled onto its drum (not shown) at the proper angle and tension.
  • Guide plates 49 are located on either side of the ramp 47 to guide the yoke 2 onto a retention means 50 of the apparatus 45.
  • the retention means 50 comprises a retaining member or block 51 which has a pair of coaxial bars 52 on either side thereof.
  • the block 51 is mounted on a spherical bearing 53 which ensures that the block 51 can move in all three axes (i.e. move in any roll, pitch or yaw motion).
  • the bearing 53 and block 51 are mounted on a base member comprising a pedestal 54 mounted on a carriage 55, as shown in Figures 14(a) and 16(b) .
  • the carriage 55 has a number of rollers 57 which are housed within a set of guide tracks 56 so that the whole retention means may move longitudinally relative to the ramp 47.
  • the guide tracks 56 have first and second, or lower and upper, portions 58,59 which are at different angles relative to the horizontal.
  • the lower portion 58 is at a steeper angle to the ramp surface plane in order that the attachment block 51 lies generally in the ramp surface plane when the yoke 2 is pulled onto the ramp 47.
  • the upper portion 58 of the guide track 56 is substantially parallel to the ramp surface plane.
  • Figures 15(a)-(d) show the steps of the yoke 2 being retrieved.
  • the yoke 2 has been pulled up onto the ramp 47 as the recovery line 42 is wound onto its drum (not shown).
  • the carriage 55 With the carriage 55 in position in the lower portion 58 of the guide track 56, the lower end of the yoke 2 and the attachment block 51 come into contact.
  • the coaxial bars 52 of the block 51 locate in the previously described slots 32 of the yoke 2.
  • the carriage 55 moves up the guide track 56 as the winding recovery line 42 continues to pull the yoke 2 up the ramp 47.
  • This stage is shown in Figure 15(b) , as the carriage 55 moves from the lower portion 58 to the upper portion 59 of the guide track 56.
  • FIG. 15(a)-(d) it can also be seen that the connecting line 11 of the primary weight 10 is still connected to the yoke 2 and running up over the stern roller 44.
  • the retrieval apparatus 45 may also be provided with a catch 60 on the ramp 47 in order to secure the connecting line 11 once it is disconnected from the yoke 2, as shown in Figures 15(c) and 17(d).
  • the connecting line 11 is provided with a sleeve 61 located at a point on the line 11 such that when the carriage 55 and yoke 2 reach the uppermost point of the guide track 56, the sleeve has been pulled up past the catch 60.
  • the recovery line 42 can then be slackened a little so that the sleeve 61 hangs on the catch 60, as shown in Figure 15(d) .
  • the load of the connecting line 11 and primary weight 10 are then removed from the mechanical attachment joint 30 of the yoke 2.
  • the attachment pin 31 and connecting line 11 may then be easilt and safely removed from the yoke 2.
  • the recovery line 42 can also be disconnected from the yoke 2, and the WEC or other structure will then be held or towed directly through the block 51 and bearing 53. Any umbilical utility lines may also be disconnected from the yoke 2 at this point.
  • the yaw line 14 can be disconnected from the WEC or structure using either a surface buoy or boat hook, as described below with reference to Figure 16 , or by some other remotely operated means.
  • the yoke 2 and WEC 1 are now fully separated from the remainder of the mooring system.
  • the yoke 2 and WEC are now ready for towing, as shown in Figure 12(b) . In order to reconnect the yoke 2 and the remainder of the mooring system, the steps described above are simply undertaken in reverse.
  • FIGs 16(a)-(h) illustrate one method of recovering the yoke 2 and WEC 1 to a support vessel 100.
  • the WEC 1 is held by the mooring system as previously described.
  • a recovery line 42 is permanently attached to the lower end of the yoke 2 when the yoke 2 and WEC 1 are moored.
  • the end of the recovery line 42 remote from the yoke 2 is held by a buoy 102.
  • the recovery line may be provided with one or more clump weights 104 and/or buoyancy aids 106, as required.
  • the support vessel 100 arrives at the buoy 102.
  • the remote end of the recovery line 42 is retrieved from the buoy 102 and is attached to its winding drum (not shown) on the vessel 100.
  • FIG 16(b) shows the next stage of the recovery procedure.
  • the buoy 102 is retrieved and placed on the deck of the vessel 100.
  • the clump weight 104 is lifted from the sea bed and rises towards the vessel 100. If fitted, the buoyancy aids 106 will also rise to the surface as the recovery line 42 is wound in.
  • the recovery line 42 has been wound in enough to take up any slack in the line 42, it will then begin to raise the lower end of the yoke 2 towards the vessel 100.
  • the yoke 2 will pivot about the axis of rotation 23 of the shaft 8, as shown in Figure 16(c) .
  • the tether line 11 can be disconnected from the yoke 2 along with any other lines or umbilicals once the yoke is attached to the attachment mechanism 50.
  • the tether line 11 sinking to the sea bed once it has been disconnected, it is attached to the buoy 102 and the buoy is replaced in the water, which is the state shown in Figure 16(e) .
  • a second vessel 110 is used to detach the rear anchor and yaw lines 13,14 from the WEC 1. This is shown in Figures 16(f) and 16(g) , which illustrate schematic end views of the mooring system and WEC 1.
  • a second recovery or chaser line 112 is attached by a first end to the WEC 1 and by a second end to the yaw line 14. The second vessel 110 recovers the first end from the WEC 1 and winds in the chaser line 112, as shown in Figure 16(f) .
  • the rear anchor and yaw lines 13,14 are also recovered onto the second vessel 110, as illustrated in Figure 16(g) .
  • the rear anchor and yaw lines 13,14 can be disconnected and replaced in the water attached to a further buoy 114, as shown in Figure 16(h) .
  • Figures 17(a) and 17(b) show an alternative arrangement, in which the recovery line 42 is clipped to the yoke 2.
  • the recovery line 42 By clipping the recovery line 42 to the yoke 2, there is no need for the recovery line 42 to be provided with clump weights or buoyancy aids. It can simply be unclipped from yoke 2 and recovered in the same way as described with reference to Figure 16 .
  • FIG. 18 shows a second embodiment of a mooring system in accordance with the present invention.
  • the mooring system in Figure 18 shares a number of components with the mooring system previously described, and these features will be assigned the same reference numerals, but with a 2-- prefix. Further description of certain components is not considered necessary given their description above.
  • this second embodiment of a mooring system is shown in Figure 18 mooring a WEC 201.
  • the mooring system has a pivoting harness or yoke 202 at the front end 203 - that is, the end facing in the direction of the anticipated wave action or current - of the WEC 201.
  • first and second connecting or tether weight lines 211A,211B are attached to the yoke 202 below. Connecting together the first and second connecting lines 211A,211B is a link plate 212, which will be described in more detail below.
  • the primary or tether weight 210 is hung from the second connecting line 211B.
  • first or front anchor lines 216 are attached to the tether weight arrangement 210 and have first or front anchors (not shown) of a known type at the ends of the front anchor lines 216 remote from the tether weight arrangement 210.
  • a recovery line 242 incorporating a suitable float is also connected to the link plate 212 to facilitate recovery of the WEC 201.
  • a second or rear anchor line 213 and its associated second or rear anchor (not shown), again of a known type.
  • a support or yaw line 214 is also connected between the WEC 201 and the rear anchor line 213 to help stabilise the WEC 201.
  • the link plate arrangement of the second embodiment is shown in detail in Figure 19 .
  • the link plate 212 has a generally triangular shape and has four connection points for connecting together the first and second connecting lines 211A,211B, rear anchor line 213 and recovery line 242.
  • Rear anchor line 213 is connected to the link plate 212 via a connection fork 150.
  • Stabiliser bars 152 are also provided either side of the link plate 212 to ensure it remains stable when removed from the water.
  • the link plate 212 makes the connections between all the main lines in the mooring system. Thanks to the generally triangular shape of the plate 212 and the stabiliser bars 152, the plate 212 can be easily retrieved over the stern or stern roller of an installation/removal vessel. As well as the stabiliser bars 152, each side of the link plate 212 is also provided with a channel 154. By providing the plate 212 with substantially identical channels 154 on either side, the plate 212 can be locked in KARM forks or similar.
  • the link plate 212 and rear anchor line connection fork 150 give a clean load of wires back over a stern roller.
  • the first connecting line 211A is provided with a hang-off pad-eye 158 to allow tow loads to be taken off the connection pin 156.
  • the connection pin 156 is extracted remotely using a wire or hydraulic ram to avoid having personnel operating near the mooring system as the pin 156 is removed.
  • Figures 20(a) and 20(b) show schematically how the second embodiment of the mooring system is retrieved onto the deck of a support vessel.
  • the recovery line 242 is first retrieved, preferably via a float, and is wound onto a drum or the like on the vessel.
  • the link plate 212 and other lines 211A,211B,213 are also pulled towards the vessel as well.
  • the link plate 212 reaches the vessel, as seen in Figure 20(a) , it slides onto the deck of the vessel.
  • the vessel may have a recovery roller 244 at the stern.
  • the generally triangular shape of the link plate 212 and stabiliser bars 152 provided thereon allow the link plate 212 to slide across the deck with relatively little friction and no twisting, thus ensuring that the various lines 211A,211B,213 do not become entangled with one another.
  • the deck of the vessel is provided with KARM forks 160 or a similar locking arrangement to hold the link plate 212 on the deck so that the lines 211A,211B,213 can be detached.
  • the link plate 212 has channels 154 either side thereof which receive the KARM forks 160. Additionally, guide rollers 162 can also be provided on the deck to ensure that the link plate 212 passes over the KARM forks 160 when being retrieved.
  • FIG. 21 shows a third embodiment of a mooring system in accordance with the present invention.
  • This third embodiment shares a number of components with the previously described first and second embodiments and as before is shown mooring a WEC 301.
  • the mooring system has a pivoting harness or yoke 302 at the front end 303 - that is, the end facing in the direction of the anticipated wave action or current - of the WEC 301.
  • this third embodiment differs from the previous embodiments is that attached to the second end of the yoke 302 are first, second and third connecting or tether weight lines 311A,311B,311C.
  • each connecting line 311A,311B,311C is attached a respective primary or tether weight 310A,310B,310C.
  • first and second tether weights 310A,310B are first or front anchor lines 316 which have first or front anchors 315 at the remote ends thereof.
  • Attached to the third tether weight 310C is the second or rear anchor line 313 and its associated second or rear anchor 318, again of a known type.
  • a support or yaw line 314 is also connected between the WEC 301 and the rear anchor line 313 to help stabilise the WEC 301.
  • a fourth embodiment of the mooring system of the present invention is shown in Figure 22 .
  • this fourth embodiment shares a number of components with the previously described embodiments and as before is shown mooring a WEC 401.
  • the mooring system has a pivoting harness or yoke 402 at the front end 403 - that is, the end facing in the direction of the anticipated wave action or current - of the WEC 401.
  • the fourth embodiment differs from the previous embodiments in that attached to the second end of the yoke 402 are first and second connecting or tether weight lines 411A,411B. At the end of each connecting line 411A,411B is attached a respective primary or tether weight 410A,410B.
  • first and second tether weights 410A,410B Attached to the first and second tether weights 410A,410B are first or front anchor lines 416 which have first or front anchors 415 at the remote ends thereof. Also attached to each tether weight 410A,410B are respective second or rear anchor lines 413A,413B and their associated second or rear anchors 418. Support or yaw lines 414A,414B are also connected between the WEC 401 and the rear anchor lines 413A,413B for stabilising the WEC 401.
  • the present invention allows a large array of machines to be installed on the same site. This helps reduce costs as the WECs or other structures can share anchor points. In particular, it is desirable for WECs to be spaced closely. Thus, a mooring system such as that of the present invention which has a small spread between anchor points is advantageous. In addition, the mooring system of the present invention provides a large dynamic range of motion which is sufficient to cope with extreme waves while minimising extreme loads on the system and anchors.
  • the mooring system can also provide restraint to other forms of motion such as yaw. This allows the system to respond to the incident waves while avoiding complete rotation about the mooring axis which would require expensive and potentially unreliable assemblies for electrical (or other) interconnection.
  • the mooring system also combines a number of reaction means on the seabed to address different wave- or current-induced loads.
  • Wave loading is characterised most of the time by small, steady and unsteady drift loads due to wave action on the machine/installation. However, in very large and extreme seas very large loads occasionally may be experienced.
  • Small lightweight solid secondary or clump weights provide sufficient reaction for small normal loads accounting for the vast majority of operating conditions and are cheap and easy to deploy in large numbers.
  • the reaction provided by these small weights can be effectively augmented for extreme conditions by the use of conventional embedment anchors, conventional or suction piles, larger clump weights, or by the interlinking of smaller clump weights.
  • a weighted suction pile provides both means of reaction where the sea bed is of a suitable composition - the mass of the pile provides adequate reaction for small waves and under the action of extreme loads the suction of the pile in the seabed provides large resistance to short-term large loads.
  • a further benefit of the present invention comes from the use of a pivoting harness/yoke assembly or linking plate member to provide a means of mechanical connection and disconnection of the structure to/from the mooring system.
  • This allows the structure to be connected or disconnected in rough seas without having to have personnel board the structure itself.
  • the pivoting yoke mechanism or linking plate can be recovered to the deck of an installation/recovery vessel by retrieval of the recovery line remote from the machine and the various connections can then be attended to from the comparative safety of the vessel.
  • Such a provision is vital to allow intervention activities to be carried out safely in large seas, thereby reducing the weather dependence of these operations and the associated cost and risk.
  • the yoke assembly also provides restraint to the WEC or structure in combination with the suspended tether weight(s).
  • the harness and tether weight provide additional roll restraint to the moored structure. This is beneficial as it reduces the requirement for ballast on or in the structure to provide roll stability.
  • the reduction in the ballast required can reduce the size, mass and volume of the structure, directly reducing the cost thereof.
  • the provision on the yoke of the electrical or other (e.g. hydraulic or pneumatic) utility interconnections alongside the mechanical attachment means ensures that these can be connected or disconnected at the same time as the mechanical attachment without personnel having to board the WEC or other marine/offshore installation.
  • a benefit is also provided in connecting the rear anchor line to the lower end bottom of the yoke or the linking plate member.
  • connection or disconnection of the rear anchor line can be done at the same time as the connection or disconnection of the main connecting line(s).
  • the rear anchor line acts as a surge restraint to prevent the system surging forward under the action of small waves from an offshore direction, or tidal currents when waves are small.
  • Sufficient slack in the complete system is provided to allow the lower end of the yoke or linking plate to be recovered to the deck of a support vessel without moving or recovering any of the anchor/reaction points.
  • the use of heavy suspended tether weights hanging from the end of the yoke and linked to the main mooring lines is also advantageous, as this is what provides the means of restraint to the system.
  • the combination of the yoke, tether line(s) and tether weight(s) behaves like a pendulum to provide location restraint to the system being moored.
  • the tether weights are effectively fixed in location by the main mooring lines.
  • the system provides a 'soft' or low-rate spring restraint which stops 'snatching' of the mooring lines under extreme motions.
  • the new arrangement of tether weight used in the present invention also has advantages of known arrangements.
  • the tether weight of the present invention can descend to, rest on and rise from the sea bed with progressive loss and recovery of suspended weight. This is done thanks to the suspended and interlinked chain segments.
  • the new tether weight can rest close to (or even partially on) the seabed, maximising the length of the tether assembly and, as a result, its range of motion for a given range of tether/yoke angle to the vertical. This allows the mooring system of the present invention to be used in siting WECs or other installations in shallower water depths near the shore/coastline and in energetic wave regimes.
  • the provision of the retrieval apparatus on the back of the support vessel ensures that the lower end of the yoke or linking plate can be recovered onto the back of the support vessel without direct human intervention. This allows the mechanical connections between the yoke or linking plate and the remainder of the mooring system and also the umbilical utility lines to be attached or detached in safety from the deck of the support vessel. Thus, personnel do not need to board the WEC or other structure/installation in heavy seas or similarly adverse conditions.
  • the tether weights of the illustrated embodiments are shown suspended off the sea bed in the rest position, they may alternatively be partially resting on the sea bed in the rest position. It should also be understood that additional clump weights or any other form of anchorage such as suction anchors or piles may be used in addition to or instead of the conventional anchors described above.
  • the rear anchor and yaw lines may be disconnected prior to the disconnection of the tether line. In this way, the same vessel could do both tasks and there would be no need for a second vessel.
  • the recovery lines used in the recovery procedure can be attached to the WEC or structure by release means which are remotely controlled. The lines can therefore be remotely released from the WEC and then recovered to the vessel without intervention required on the machine.
EP09163320.6A 2003-09-17 2004-09-17 Vertäuungssystem Not-in-force EP2110307B1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GBGB0321768.4A GB0321768D0 (en) 2003-09-17 2003-09-17 Mooring system
EP04768543A EP1670675B1 (de) 2003-09-17 2004-09-17 Festmachesystem

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
EP04768543.3 Division 2004-09-17
EP04768543A Division EP1670675B1 (de) 2003-09-17 2004-09-17 Festmachesystem

Publications (3)

Publication Number Publication Date
EP2110307A2 true EP2110307A2 (de) 2009-10-21
EP2110307A3 EP2110307A3 (de) 2011-09-07
EP2110307B1 EP2110307B1 (de) 2013-12-25

Family

ID=29227247

Family Applications (2)

Application Number Title Priority Date Filing Date
EP04768543A Not-in-force EP1670675B1 (de) 2003-09-17 2004-09-17 Festmachesystem
EP09163320.6A Not-in-force EP2110307B1 (de) 2003-09-17 2004-09-17 Vertäuungssystem

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP04768543A Not-in-force EP1670675B1 (de) 2003-09-17 2004-09-17 Festmachesystem

Country Status (15)

Country Link
US (1) US20070240624A1 (de)
EP (2) EP1670675B1 (de)
JP (1) JP2007505784A (de)
CN (1) CN1882472A (de)
AT (1) ATE434557T1 (de)
AU (1) AU2004272356B2 (de)
BR (1) BRPI0414530A (de)
CA (1) CA2539373A1 (de)
DE (1) DE602004021709D1 (de)
GB (1) GB0321768D0 (de)
IS (1) IS8419A (de)
NO (1) NO20061707L (de)
NZ (1) NZ546579A (de)
WO (1) WO2005025978A2 (de)
ZA (1) ZA200603040B (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3566941A1 (de) 2014-10-27 2019-11-13 Principle Power, Inc. Verbindungssystem für array-kabel von lösbaren offshore-energievorrichtungen

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO336329B1 (no) 2006-01-16 2015-08-03 Fobox As Forankringssystem
ES2456345T3 (es) 2008-04-23 2014-04-22 Principle Power, Inc. Plataforma de alta mar estabilizada por columnas con planchas de atrapamiento de agua y sistema de amarre asimétrico para soporte de turbinas eólicas de alta mar
AU2009334427A1 (en) * 2009-01-05 2011-08-18 Dehlsen Associates, L.L.C. Method and apparatus for converting ocean wave energy into electricity
GB2484018A (en) * 2009-05-12 2012-03-28 Single Buoy Moorings 2 Step cam system
US20110057448A1 (en) * 2009-09-08 2011-03-10 Joseph Page Wave energy converters
EP2531397B1 (de) * 2010-02-03 2014-09-17 Viking Seatech Norge AS Verbesserte vorrichtung und verfahren zur bildung einer ankerspreizung
CN102582790A (zh) * 2012-02-21 2012-07-18 福建省水产研究所 一种母子锚及其设置方法
US20150292471A1 (en) * 2012-11-15 2015-10-15 Atmocean, Inc. Hydraulic Pressure Generating System
PL3366567T3 (pl) 2013-05-20 2020-07-13 Principle Power, Inc. System i sposób sterowania morskimi pływającymi platformami turbin wiatrowych
AU2014321620A1 (en) * 2013-09-18 2016-03-10 Shell Internationale Research Maatschappij B.V. Tandem and side-by-side mooring offloading systems and associated methods
DE102013111115B3 (de) 2013-10-08 2015-01-22 Linnhoff Offshore AG Schwimmfähige Offshore-Windkraftanlage
NO338076B1 (no) * 2014-11-28 2016-07-25 Cefront Tech As Back-up fortøyningsarrangement
WO2016205746A1 (en) 2015-06-19 2016-12-22 Principle Power, Inc Floating wind turbine platform structure with optimized transfer of wave and wind loads
CN105584603B (zh) * 2016-03-18 2017-08-08 中国海洋大学 单点系泊浮式结构物的倾覆自动扶正装置
US10514019B2 (en) 2016-07-26 2019-12-24 Gaynor Dayson Floating piezoelectric assembly for generating energy from waves
US10578075B2 (en) * 2017-02-25 2020-03-03 Lone Gull Holdings, Ltd. Self-propelled buoyant energy converter and method for deploying same
US11248580B2 (en) 2017-03-18 2022-02-15 Lone Gull Holdings, Ltd. Wave energy converter with surface electric grid
JP6554706B1 (ja) * 2018-03-15 2019-08-07 株式会社環境資源開発コンサルタント 係留アンカー装置
CN109094739B (zh) * 2018-07-26 2023-06-20 国家海洋局第一海洋研究所 适用于浮标码头测试时吊放回收的r形锚系与方法
US11225945B2 (en) 2019-05-30 2022-01-18 Principle Power, Inc. Floating wind turbine platform controlled to optimize power production and reduce loading
KR102162463B1 (ko) * 2019-11-08 2020-10-06 포항공과대학교 산학협력단 부유식 방파제 시스템
KR102438840B1 (ko) * 2021-04-08 2022-08-31 삼성중공업 주식회사 비대칭 스프레드 무어링 시스템이 적용된 부유식 해상구조물

Family Cites Families (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3111926A (en) * 1961-12-07 1963-11-26 Shell Oil Co Apparatus for anchoring underwater vessels
US4155673A (en) * 1977-05-26 1979-05-22 Mitsui Engineering & Shipbuilding Co. Ltd. Floating structure
US4193368A (en) * 1978-01-20 1980-03-18 Chicago Bridge & Iron Company Offshore mooring system for vessel or ship
GB2034652B (en) * 1978-11-14 1983-04-20 Seaflo Systems Nv Single-point mooring systems
GB2043008B (en) * 1979-03-08 1983-04-13 Bluewater Terminal Systems Nv Permanent single-point mooring system
GB2075096B (en) * 1980-04-30 1984-08-08 Brown & Root Mooring and supporting apparatus and methods for a guyed marine structure
DE3043755A1 (de) * 1980-11-20 1982-05-27 Blohm + Voss Ag, 2000 Hamburg Dauerhafte verankerung von schwimmenden bauwerken
JPS57105890A (en) * 1980-12-20 1982-07-01 Toshiba Corp Semiconductor storage device
GB2096963B (en) * 1981-04-22 1984-09-05 Exxon Production Research Co Off-shore mooring system
US4509448A (en) * 1983-10-13 1985-04-09 Sonat Offshore Drilling Inc. Quick disconnect/connect mooring method and apparatus for a turret moored drillship
US4727819A (en) * 1984-04-24 1988-03-01 Amtel, Inc. Single line mooring system
FR2574043B1 (fr) * 1984-11-30 1987-02-20 Emh Dispositif de connexion ou deconnexion facilitant l'amarrage ou le desamarrage d'un navire a une structure d'amarrage; ainsi qu'un bras d'amarrage
US4602586A (en) * 1984-12-24 1986-07-29 Exxon Production Research Co. Motion decoupling mechanism for fluid swivel stack
JPS61155506A (ja) * 1984-12-28 1986-07-15 Mitsui Eng & Shipbuild Co Ltd 一点係留装置
US4781023A (en) * 1987-11-30 1988-11-01 Sea Energy Corporation Wave driven power generation system
US5061131A (en) * 1990-03-05 1991-10-29 Odeco, Inc. Structure and method for restraining motion of a marine structure
US5044297A (en) * 1990-09-14 1991-09-03 Bluewater Terminal Systems N.V. Disconnectable mooring system for deep water
US5505646A (en) * 1994-08-15 1996-04-09 Single Buoy Moorings Incorporated Floating unit-buoyant body assembly
US5544608A (en) * 1995-11-29 1996-08-13 Deep Oil Technology, Inc. Method of installing or retrieving mooring lines indeep water
JP3745440B2 (ja) * 1996-03-13 2006-02-15 カヤバ システム マシナリー株式会社 標的艇
IT1283548B1 (it) * 1996-03-21 1998-04-22 Tecnomare Spa Metodo e sistema di monormeggio per attracco di navi in mare aperto
JPH1098973A (ja) * 1996-09-30 1998-04-21 Teruo Kinoshita 海洋プランクトン養殖ユニット
US5743207A (en) * 1997-03-12 1998-04-28 International Design Systems Company Anchoring apparatus and method of anchoring
EP0878388A1 (de) * 1997-05-15 1998-11-18 Single Buoy Moorings Inc. Halb-schwenkendes Verankerungssystem
US6467423B1 (en) * 1998-12-24 2002-10-22 Single Buoy Moorings Inc. Semi-weathervaning anchoring system
JP2001182663A (ja) * 1999-12-24 2001-07-06 Toshiba Eng Co Ltd 深層水回収装置
GB0002703D0 (en) * 2000-02-08 2000-03-29 Victoria Oilfield Dev Limited Mooring and flowline system
KR20030036643A (ko) * 2000-07-27 2003-05-09 크리스토퍼 하네빅 풍력터빈을 해양에 설치하기 위한 부유구조물
US6983712B2 (en) * 2001-08-03 2006-01-10 Fmc Technologies, Inc. Offloading arrangements and method for spread moored FPSOs
EP1283159A1 (de) * 2001-08-06 2003-02-12 Single Buoy Moorings Inc. Übergabesystem für Kohlenwasserstoffe
JP2003212181A (ja) * 2002-01-22 2003-07-30 Nippon Steel Corp 小型作業船および小型作業船の回収・進水方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3566941A1 (de) 2014-10-27 2019-11-13 Principle Power, Inc. Verbindungssystem für array-kabel von lösbaren offshore-energievorrichtungen

Also Published As

Publication number Publication date
EP1670675A2 (de) 2006-06-21
EP2110307A3 (de) 2011-09-07
US20070240624A1 (en) 2007-10-18
JP2007505784A (ja) 2007-03-15
WO2005025978A3 (en) 2006-03-02
GB0321768D0 (en) 2003-10-15
CN1882472A (zh) 2006-12-20
WO2005025978A2 (en) 2005-03-24
ATE434557T1 (de) 2009-07-15
NZ546579A (en) 2009-01-31
CA2539373A1 (en) 2005-03-24
NO20061707L (no) 2006-06-16
EP1670675B1 (de) 2009-06-24
AU2004272356B2 (en) 2010-09-30
DE602004021709D1 (de) 2009-08-06
EP2110307B1 (de) 2013-12-25
IS8419A (is) 2006-04-18
AU2004272356A1 (en) 2005-03-24
ZA200603040B (en) 2007-09-26
BRPI0414530A (pt) 2006-11-07

Similar Documents

Publication Publication Date Title
EP1670675B1 (de) Festmachesystem
US7859128B2 (en) Deployment apparatus for submerged power plant
US8100077B2 (en) Mooring system
US20220060009A1 (en) Inter-array cable for floating platforms
EP3072804B1 (de) Verfahren zum einbauen einer boje an einer verankerungsstelle
AU2013100495A4 (en) Buoy
EP4017792B1 (de) Verfahren zur installation eines auf einer spannungsbeinplattform basierenden schwimmenden objekts
AU2014100817A4 (en) Buoy
KR102648263B1 (ko) 부유식 해상풍력설비의 앵커 파지력 확보방법
US20230110436A1 (en) Mooring system and method
JP2023528164A (ja) 浮体式洋上風力発電所との間及びその内部における電力ケーブルへの損傷を回避するためのシステム
GB2596270A (en) Offshore tidal stream turbine system
Murray et al. Disconnectable Mooring System for Ice Class Floaters

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AC Divisional application: reference to earlier application

Ref document number: 1670675

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

RIN1 Information on inventor provided before grant (corrected)

Inventor name: COLLEE, MICHAEL

Inventor name: SHAW, MARTIN

Inventor name: MAYCOCK, EDWARD

Inventor name: YEMM, RICHARD

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

RIC1 Information provided on ipc code assigned before grant

Ipc: B63B 21/50 20060101AFI20110729BHEP

17P Request for examination filed

Effective date: 20120302

17Q First examination report despatched

Effective date: 20120404

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20130814

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AC Divisional application: reference to earlier application

Ref document number: 1670675

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 646457

Country of ref document: AT

Kind code of ref document: T

Effective date: 20140115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602004044119

Country of ref document: DE

Effective date: 20140213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20131225

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 646457

Country of ref document: AT

Kind code of ref document: T

Effective date: 20131225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140428

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602004044119

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20140926

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602004044119

Country of ref document: DE

Effective date: 20140926

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602004044119

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140917

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602004044119

Country of ref document: DE

Effective date: 20150401

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20150529

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140930

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150401

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140930

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IE

Payment date: 20150922

Year of fee payment: 12

Ref country code: GB

Payment date: 20150923

Year of fee payment: 12

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140326

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20040917

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20160917

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160917

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160917