EP1852562A2 - Bracket for roof equipment, roof protection system and method for mounting a roof protection system - Google Patents
Bracket for roof equipment, roof protection system and method for mounting a roof protection system Download PDFInfo
- Publication number
- EP1852562A2 EP1852562A2 EP07445019A EP07445019A EP1852562A2 EP 1852562 A2 EP1852562 A2 EP 1852562A2 EP 07445019 A EP07445019 A EP 07445019A EP 07445019 A EP07445019 A EP 07445019A EP 1852562 A2 EP1852562 A2 EP 1852562A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- roof
- hole
- receiving
- bracket
- holding profile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 8
- 239000002184 metal Substances 0.000 claims description 7
- 238000003780 insertion Methods 0.000 claims description 2
- 230000037431 insertion Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/10—Snow traps ; Removing snow from roofs; Snow melters
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/12—Devices or arrangements allowing walking on the roof or in the gutter
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3261—Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3261—Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
- E04G21/3276—Arrangements on buildings for connecting safety-lines
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3261—Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
- E04G21/3276—Arrangements on buildings for connecting safety-lines
- E04G21/329—Arrangements on buildings for connecting safety-lines with measures for dampening the fall
Definitions
- the invention concerns a bracket for roof equipment according to the preamble of claim 1.
- the invention also concerns a roof protection system and a method for mounting a roof protection system.
- Roof equipment in the form of snow racks which are intended to comprise blockings against roof avalanches are typically mounted as close to the base of the roof as possible.
- a known bracket for such a roof equipment consists of a metal plate bent in L-shape, which is fastened to the roof in a way which depends on the type of roofing and which comprises a number of holes for snow rack pipes.
- the known bracket has also been possible to use for fastening holding profiles in the form of so called profile boards, which are comprised of metal plate profiles which, by having a more considerable covering in vertical direction than three rack pipes (which is a common equipment) provide a more effective protection against roof avalanches.
- these holding profiles are equipped with special fittings, which are inserted sideways of the holding profile and fixed by screw fasteners in holes in each bracket positioned along the base of the roof.
- the construction of the receiving hole should further connect as close as possible (connect) to the shape of the holding profile, such that unnecessary play is avoided without for that sake the insertion through a plurality of brackets positioned after one another is made difficult.
- the widened hole portions are dimensioned for receiving and cooperation with conventional rack pipes. This way it is achieved that the bracket will become a combination bracket which can be used for different applications with further improved economy.
- the bracket has a weakened deformation portion for the reception of loads over a pre-determined level. This is an essential advantage when using a roof protection system for anchoring life lines for roof workers.
- bracket and/or the holding profile being made in a metal plate material, the use of simple and economic machining methods and low manufacturing costs are possible.
- the invention also concerns a roof protection system including a plurality of brackets and at least one holding profile and a method for mounting a roof protection system.
- the roof protection system in Fig. 1 includes two brackets 1 and 1' and a holding profile 4.
- Each bracket is made from a shaped and bent metal plate detail and includes a fastening portion 2 for fastening to a substrate in the form of a roof and a portion bent upwardly to an angle of essentially 90° thereto in the form of an engagement portion 3 which is constructed for cooperation with different types of roof equipment.
- the bracket 1 has a receiving hole 5 for receiving the holding profile 4.
- the holding profile 4 has a shallow U-shape with a web 7 and two, essentially in a right angle thereto, upstanding legs 8 and 9, which each one ends in rounded portions 10. These rounded portions are directed upwardly in the direction along the roof and through the rounded configuration the holding profile 4 comprises a good and gentle anchoring point for a life line for a roof worker.
- Fig. 2 is shown, for explanatory purposes, the roof protection system in Fig. 1 in the process of inserting the holding profile 4 into the receiving hole 5 in the bracket 1'.
- the bracket 1 in Fig. 3 is shown in a larger scale, whereof is shown the fastening portion 2 and the engagement portion 3, whereof the latter comprises the receiving hole 5.
- the receiving hole 5 has a slot-shaped hole portion 11 with a central web portion 12 and two leg portions 15 and 16 at an angle to the web portion 12.
- the leg portions 15 and 16 widen from the web portion 12 and are terminated in widened hole portions 13 and 14, which are formed with such dimensions that they, on a one hand, are capable of receiving rack pipes, when the bracket is to be used for fastening one or more roof racks, on the other hand, be adapted to with good fit receive the rounded portions 10 of the holding profile 4.
- the bracket 1 further comprises a deformation portion 6, which allows deformation and tearing apart, respectively, at loads exceeding pre-determined values for the purpose of preventing inelastic pull from a falling person having a life line fastened in a rack pipe or a holding profile which is arranged a the bracket 1.
- the bracket 1 also comprises a support 18 for fastening a per se known holder for a roof/walking bridge.
- the bracket When using the bracket for rack pipes or a rolled profile in the hole portion 13, at a certain load on the pipe in the direction in a downward direction, in the direction of the roof pitch, (downwardly to the right as seen in Fig. 3), the bracket will be deformed in such a way that the pipe is pressed down into the web portion 12 down against the fastening portion 2 of the bracket. This happens by the pipe being brought down into the leg portion 15 which becomes evenly narrower in the direction from the widened hole portion 13, which results in that the bracket is given a possibility to stay with its fasteners in a roof despite a strong pull-load.
- Fig. 4 shows a bracket 21 mounted on a roof with a roof plane indicated with interrupted line at 22.
- a holding profile 25 is inserted into the receiving hole of the bracket.
- a roof bridge 24 is mounted on the bracket 21 over a holder 23.
- the holder 23 is formed as an arch of a circle in order to adjoin to a contacting surface against a corresponding support surface 26 which is formed as an arch of a circle on the bracket.
- This construction results in that the holder can be fixed in different positions such that the roof bridge 24 can be mounted horizontally, essentially irrespective of the prevailing roof pitch.
- With 28 is indicated a fastener (corresponding to the fastener 18 in Fig. 3) for fastening the holder 23.
- the holder is fixed to the bracket by for example screw fasteners.
- the roof bridge is fixed to the holder by for example screw fasteners.
- the holding profile can be positioned on an optimal position on a roof as seen from a snow protection point of view without this being a bar against the positioning of the roof bridge in the same place.
- the holding profile mounted close to the roof bridge, since the latter can prevent that certain tools and certain work material used by a roof worker falls down from the roof. Further it is easy for the roof worker to apply his life line (see above).
- bracket and the holding profile are manufactured as bent metal plate details, but also other solutions such as welded details can come into question.
- the receiving hole in the bracket can be shaped differently for adapting to a holding profile with different configuration. It is, however, an advantage to shape the bracket with widened hole portions that can be used for more than one purpose.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Emergency Lowering Means (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
Description
- The invention concerns a bracket for roof equipment according to the preamble of claim 1. The invention also concerns a roof protection system and a method for mounting a roof protection system.
- Roof equipment in the form of snow racks which are intended to comprise blockings against roof avalanches are typically mounted as close to the base of the roof as possible. A known bracket for such a roof equipment consists of a metal plate bent in L-shape, which is fastened to the roof in a way which depends on the type of roofing and which comprises a number of holes for snow rack pipes.
- The known bracket has also been possible to use for fastening holding profiles in the form of so called profile boards, which are comprised of metal plate profiles which, by having a more considerable covering in vertical direction than three rack pipes (which is a common equipment) provide a more effective protection against roof avalanches. For fastening, these holding profiles are equipped with special fittings, which are inserted sideways of the holding profile and fixed by screw fasteners in holes in each bracket positioned along the base of the roof.
- Mounting of holding profiles in this way is, however, laborious and requires accurate fitting work, i.a. since the spacing between the holes of the holding profile not always corresponds to the position of the brackets.
- Further, provision of special fittings adapted to the holding profiles are required as well as individual fastening at the respective bracket which altogether results in a costly and laboriously applicable solution.
- It is an aim of the present invention to provide a bracket as stated initially wherein the problems of the background art are avoided or at least reduced.
- In particular it is an aim to provide an economically more advantageous solution which furthermore is safe and easily mounted.
- These aims are obtained in a bracket of the kind mentioned above through the features of the characterising portion of claim 1.
- Hereby is achieved that a holding profile can be simply inserted into the receiving holes in the brackets mounted on the roof with good fit. This solution results in that besides the fact that the mounting will be fast, in that the holding profile is secured against forces in the direction of the roof pitch, also if the holding profile is not individually fixed to each bracket, since the fact that the construction with a slot-shaped hole portion of the receiving hole such that it closely connects to the shape of the holding profile results in that the latter is secured over its width.
- Further is allowed use of simple fastening means for fixing the holding profile to a bracket, for example ordinary angle-irons and metal plate screws.
- The construction of the receiving hole should further connect as close as possible (connect) to the shape of the holding profile, such that unnecessary play is avoided without for that sake the insertion through a plurality of brackets positioned after one another is made difficult.
- In a preferred embodiment of the invention, the widened hole portions are dimensioned for receiving and cooperation with conventional rack pipes. This way it is achieved that the bracket will become a combination bracket which can be used for different applications with further improved economy.
- It is preferable if the bracket has a weakened deformation portion for the reception of loads over a pre-determined level. This is an essential advantage when using a roof protection system for anchoring life lines for roof workers.
- By the bracket and/or the holding profile being made in a metal plate material, the use of simple and economic machining methods and low manufacturing costs are possible.
- The invention also concerns a roof protection system including a plurality of brackets and at least one holding profile and a method for mounting a roof protection system.
- The invention will now be described in more detail by way of embodiments and with reference to the annexed drawings, wherein:
- Fig. 1 shows a roof protection system including two brackets and a holding profile,
- Fig. 2 shows the roof protection system in Fig. 1 during the process of inserting a holding profile into a bracket,
- Fig. 3 shows a bracket according to the invention in larger scale, and
- Fig. 4 shows in a side view the roof protection system with, besides the holding profile, a roof bridge mounted to the bracket over a holder.
- The roof protection system in Fig. 1 includes two brackets 1 and 1' and a
holding profile 4. Each bracket is made from a shaped and bent metal plate detail and includes afastening portion 2 for fastening to a substrate in the form of a roof and a portion bent upwardly to an angle of essentially 90° thereto in the form of anengagement portion 3 which is constructed for cooperation with different types of roof equipment. - For that purpose the bracket 1 has a receiving
hole 5 for receiving theholding profile 4. Theholding profile 4 has a shallow U-shape with aweb 7 and two, essentially in a right angle thereto,upstanding legs 8 and 9, which each one ends inrounded portions 10. These rounded portions are directed upwardly in the direction along the roof and through the rounded configuration theholding profile 4 comprises a good and gentle anchoring point for a life line for a roof worker. - In Fig. 2 is shown, for explanatory purposes, the roof protection system in Fig. 1 in the process of inserting the
holding profile 4 into thereceiving hole 5 in the bracket 1'. The bracket 1 in Fig. 3 is shown in a larger scale, whereof is shown thefastening portion 2 and theengagement portion 3, whereof the latter comprises the receivinghole 5. - The receiving
hole 5 has a slot-shaped hole portion 11 with acentral web portion 12 and twoleg portions 15 and 16 at an angle to theweb portion 12. Theleg portions 15 and 16 widen from theweb portion 12 and are terminated in widenedhole portions rounded portions 10 of theholding profile 4. - 17 indicates a an additional hole for receiving rack pipes, which is positioned between the widened
hole portions shaped hole portion 11 of the receiving hole 15. - The bracket 1 further comprises a deformation portion 6, which allows deformation and tearing apart, respectively, at loads exceeding pre-determined values for the purpose of preventing inelastic pull from a falling person having a life line fastened in a rack pipe or a holding profile which is arranged a the bracket 1.
- The bracket 1 also comprises a
support 18 for fastening a per se known holder for a roof/walking bridge. - When using the bracket for rack pipes or a rolled profile in the
hole portion 13, at a certain load on the pipe in the direction in a downward direction, in the direction of the roof pitch, (downwardly to the right as seen in Fig. 3), the bracket will be deformed in such a way that the pipe is pressed down into theweb portion 12 down against the fasteningportion 2 of the bracket. This happens by the pipe being brought down into the leg portion 15 which becomes evenly narrower in the direction from the widenedhole portion 13, which results in that the bracket is given a possibility to stay with its fasteners in a roof despite a strong pull-load. This is because the lever, which the force on the bracket acts upon, this way will be displaced from the top of thehole portion 13 in the direction against the bottom of the bracket, which results in that there will occur essentially shear forces acting on the fastenings which results in that a pull out from the roof can be avoided. - Fig. 4 shows a
bracket 21 mounted on a roof with a roof plane indicated with interrupted line at 22. Aholding profile 25 is inserted into the receiving hole of the bracket. Further, aroof bridge 24 is mounted on thebracket 21 over aholder 23. Theholder 23 is formed as an arch of a circle in order to adjoin to a contacting surface against acorresponding support surface 26 which is formed as an arch of a circle on the bracket. This construction results in that the holder can be fixed in different positions such that theroof bridge 24 can be mounted horizontally, essentially irrespective of the prevailing roof pitch. With 28 is indicated a fastener (corresponding to thefastener 18 in Fig. 3) for fastening theholder 23. At (one of) the positions marked with F1 the holder is fixed to the bracket by for example screw fasteners. At the positions marked with F2, the roof bridge is fixed to the holder by for example screw fasteners. - It is an advantage to be able to combine the different functions of the inventive bracket into one single unit. On the one hand are achieved advantages with respect to handling such as simpler storage, simpler mounting on site on a roof, reduced tampering on the roof. Further is achieved the advantage that the holding profile can be positioned on an optimal position on a roof as seen from a snow protection point of view without this being a bar against the positioning of the roof bridge in the same place. During work on the roof it can be an advantage having the holding profile mounted close to the roof bridge, since the latter can prevent that certain tools and certain work material used by a roof worker falls down from the roof. Further it is easy for the roof worker to apply his life line (see above).
- The invention can be modified within the scope of the following claims. It is preferred that the bracket and the holding profile are manufactured as bent metal plate details, but also other solutions such as welded details can come into question.
- The receiving hole in the bracket can be shaped differently for adapting to a holding profile with different configuration. It is, however, an advantage to shape the bracket with widened hole portions that can be used for more than one purpose.
Claims (11)
- Bracket (1) for roof equipment (4) including a fastening portion (2) for fastening on a roof and an engagement portion (3) for cooperation with said roof equipment, wherein the engagement portion extends in a direction upwardly from the fastening portion, at an angle to the roof, as seen in a using position, wherein the engagement portion has receiving holes (5) for receiving snow protection equipment, wherein said receiving hole includes a hole portion (11) which connects to widening hole portions (13,14) for forming of a continuous and closed cut-out for a holding profile (4) which comprises said receiving hole, characterised in- that said hole portion (11) which connects to widened hole portions (13,14) is a slot shaped hole portion (11) and- that the slot shaped hole portion (11) has a shallow U-shaped configuration with a web portion (12) essentially extending in said direction and a leg portion (15,16) adjoining to each end of the web portion, each one with an extension at an angle thereto, and each one adjoining to a widened hole portion (13,14),whereby the form of the receiving hole closely connects to the shape of the holding profile.
- Bracket according to claim 1, characterised in that the receiving hole (5) has an extension essentially in said direction.
- Bracket according to claim 1 or 2, characterised in that said widened hole portions (13,14) are dimensioned for receiving and cooperating with rack pipes.
- Bracket according to any of the previous claims, characterised in that it has a fastener (18,28) for fastening a holder (23) for a roof/walking bridge (24).
- Bracket according to any of the previous claims, characterised in that it has a weakened deformation portion (6) for receiving loads above a pre-determined level.
- Bracket according to any of the previous claims, characterised in that it is comprised of a metal plate detail with the engagement portion (3) bent in an essentially right angle to the fastening portion (2).
- Bracket according to any of the previous claims, characterised in that it has additional hole (17) for rack pipes.
- Bracket according to any of the previous claims, characterised in that at least one outer leg portion (15) evenly transforms narrowing in the direction from an outer hole portion (13).
- Roof protection system including a plurality of brackets (1,1') according to any of the previous claims, characterised in that it includes at least one holding profile (4), which has a web (7) and two legs (8,9) which are terminated with rounded chute-shaped profile portions (10), wherein the holding profile has a transversal sectional shape which is adapted for insertion into the receiving holes of the brackets, such that the form of the receiving hole closely connects to the shape of the holding profile.
- Roof protection system according to claim 9, characterised in that the web (7) of the holding profile along it's length exhibits distributed holes (19) having collared edges.
- Method for mounting a roof protection system according to claim 8 or 9, wherein a holding profile (4) which has a web and two legs which are terminated with rounded chute-shaped profile portions are inserted into receiving holes arranged in a plurality of brackets, said receiving holes including a slot-shaped hole portion which connects to widened hole portions for forming a continuous and closed hole, whereby the shape of the receiving holes closely connects to the shape of the holding profile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL07445019T PL1852562T3 (en) | 2006-05-05 | 2007-05-04 | Bracket for roof equipment and roof protection system with that bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE0601005A SE531440C2 (en) | 2006-05-05 | 2006-05-05 | Device for roof protection systems |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1852562A2 true EP1852562A2 (en) | 2007-11-07 |
EP1852562A3 EP1852562A3 (en) | 2012-04-11 |
EP1852562B1 EP1852562B1 (en) | 2013-05-01 |
Family
ID=38255491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07445019.8A Active EP1852562B1 (en) | 2006-05-05 | 2007-05-04 | Bracket for roof equipment and roof protection system with that bracket |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1852562B1 (en) |
PL (1) | PL1852562T3 (en) |
SE (1) | SE531440C2 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010091671A2 (en) * | 2009-02-14 | 2010-08-19 | Energiebau Solarstromsysteme Gmbh | Carrier for the protruding element of a roof support |
CN103046762A (en) * | 2012-12-18 | 2013-04-17 | 中建三局第一建设工程有限责任公司 | Hard safety protective tool capable of circularly rotating and applied to hydraulic climbing form technology |
ITMI20122082A1 (en) * | 2012-12-06 | 2014-06-07 | Luca Bertolini | DEVICE FOR PREVENTING THE SLIP OF THE SNOW ACCUMULATASO ON A ROOF WITH PIT, WITH AN INTEGRATED AN ANCHORAGE POINT FOR INDIVIDUAL PROTECTION DEVICES |
EP3045610A1 (en) * | 2015-01-19 | 2016-07-20 | Skylotec GmbH | Roof securing holder |
EP3176343A1 (en) * | 2015-12-01 | 2017-06-07 | ATL Limited | Attachment bracket for roof equipment |
RU2654091C1 (en) * | 2017-07-04 | 2018-05-16 | Владимир Степанович Григорьев | Method for collecting atmospheric precipitation from a pitched roof of a building and device for implementation thereof |
DE202018106454U1 (en) | 2018-11-14 | 2018-11-21 | Tigasafe Gmbh | fall Protection |
AT520447A4 (en) * | 2017-12-12 | 2019-04-15 | Tigasafe Gmbh | fall Protection |
CN110185208A (en) * | 2019-06-24 | 2019-08-30 | 浙江岐达科技股份有限公司 | A kind of accumulated snow anti-fall device of snow removing type photovoltaic roof |
EP3978706A1 (en) * | 2020-09-30 | 2022-04-06 | CWL Patent AB | Securing arrangement |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE560391C (en) * | 1932-10-03 | Heinrich Oelsner | Snow guard support | |
DE9103193U1 (en) * | 1991-03-15 | 1992-07-16 | Lonevag Beslagfabrikk A/S, Lonevag | Fitting for use on tape-covered roof |
SE0203782L (en) * | 2001-12-28 | 2003-06-29 | Orima Tuote Oy | Mounting plate |
SE0202706L (en) * | 2002-09-12 | 2004-03-13 | Cw Lundberg Ind Ab | Device for attaching roofing equipment |
DE202005000694U1 (en) * | 2005-01-14 | 2005-04-07 | Flender Fa Wilhelm | Clamping arrangement for connecting snow collecting barriers on sloping roofs comprises a lower base part and a higher supporting body formed as a flat elements each having an angular foot |
-
2006
- 2006-05-05 SE SE0601005A patent/SE531440C2/en unknown
-
2007
- 2007-05-04 EP EP07445019.8A patent/EP1852562B1/en active Active
- 2007-05-04 PL PL07445019T patent/PL1852562T3/en unknown
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE560391C (en) * | 1932-10-03 | Heinrich Oelsner | Snow guard support | |
DE9103193U1 (en) * | 1991-03-15 | 1992-07-16 | Lonevag Beslagfabrikk A/S, Lonevag | Fitting for use on tape-covered roof |
SE0203782L (en) * | 2001-12-28 | 2003-06-29 | Orima Tuote Oy | Mounting plate |
SE0202706L (en) * | 2002-09-12 | 2004-03-13 | Cw Lundberg Ind Ab | Device for attaching roofing equipment |
DE202005000694U1 (en) * | 2005-01-14 | 2005-04-07 | Flender Fa Wilhelm | Clamping arrangement for connecting snow collecting barriers on sloping roofs comprises a lower base part and a higher supporting body formed as a flat elements each having an angular foot |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010091671A2 (en) * | 2009-02-14 | 2010-08-19 | Energiebau Solarstromsysteme Gmbh | Carrier for the protruding element of a roof support |
WO2010091671A3 (en) * | 2009-02-14 | 2011-11-24 | Energiebau Solarstromsysteme Gmbh | Carrier for the protruding element of a roof support |
ITMI20122082A1 (en) * | 2012-12-06 | 2014-06-07 | Luca Bertolini | DEVICE FOR PREVENTING THE SLIP OF THE SNOW ACCUMULATASO ON A ROOF WITH PIT, WITH AN INTEGRATED AN ANCHORAGE POINT FOR INDIVIDUAL PROTECTION DEVICES |
WO2014087437A1 (en) * | 2012-12-06 | 2014-06-12 | Luca Bertolini | Device for preventing the sliding of the snow accumulated on a pitched roof, with an anchorage point integrated for anti-fall individual protection devices |
CN103046762A (en) * | 2012-12-18 | 2013-04-17 | 中建三局第一建设工程有限责任公司 | Hard safety protective tool capable of circularly rotating and applied to hydraulic climbing form technology |
EP3045610A1 (en) * | 2015-01-19 | 2016-07-20 | Skylotec GmbH | Roof securing holder |
EP3176343A1 (en) * | 2015-12-01 | 2017-06-07 | ATL Limited | Attachment bracket for roof equipment |
RU2654091C1 (en) * | 2017-07-04 | 2018-05-16 | Владимир Степанович Григорьев | Method for collecting atmospheric precipitation from a pitched roof of a building and device for implementation thereof |
AT520447A4 (en) * | 2017-12-12 | 2019-04-15 | Tigasafe Gmbh | fall Protection |
AT520447B1 (en) * | 2017-12-12 | 2019-04-15 | Tigasafe Gmbh | fall Protection |
DE202018106454U1 (en) | 2018-11-14 | 2018-11-21 | Tigasafe Gmbh | fall Protection |
CN110185208A (en) * | 2019-06-24 | 2019-08-30 | 浙江岐达科技股份有限公司 | A kind of accumulated snow anti-fall device of snow removing type photovoltaic roof |
EP3978706A1 (en) * | 2020-09-30 | 2022-04-06 | CWL Patent AB | Securing arrangement |
Also Published As
Publication number | Publication date |
---|---|
SE0601005L (en) | 2007-11-06 |
SE531440C2 (en) | 2009-04-07 |
EP1852562B1 (en) | 2013-05-01 |
PL1852562T3 (en) | 2013-08-30 |
EP1852562A3 (en) | 2012-04-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1852562B1 (en) | Bracket for roof equipment and roof protection system with that bracket | |
US6725623B1 (en) | Standing seam metal roof wind uplift prevention bar | |
US10676933B2 (en) | Snow brake anchoring system and method | |
US5829549A (en) | Walkway with rail system | |
US8776456B1 (en) | Solar panel tile roof mounting device | |
US7174686B1 (en) | Bracket for use in repaneling a structure | |
WO2001088299A1 (en) | Building component spacer brace | |
DE102004057041B4 (en) | Roof mounting system for solar modules | |
SK283528B6 (en) | Adjustable beam hanger | |
WO1995028530A1 (en) | Adjustable beam holder | |
CA2922101C (en) | Bridge tie fastener system | |
EP1882066B1 (en) | Bracket for roof equipment | |
US5335470A (en) | Adjustable beam holder | |
EP0305396B1 (en) | An arrangement in eave gutters | |
US7523894B1 (en) | Eaves trough support bracket | |
US7055289B2 (en) | System and method for forming a structural connection | |
EP2330256A2 (en) | Roof tile with a variable fixing element for roof attachments | |
CA2971620A1 (en) | Bridge tie fastener system | |
JP3673646B2 (en) | Retaining material | |
PL204054B1 (en) | Holding device for holding long objects, especially roof drainage gutters, which are to be attached to a building | |
EP1072733A3 (en) | Device for anchoring rear-ventilated facade panels | |
US6000682A (en) | Fence posts | |
WO2006114177A1 (en) | A cavity wall and a wall anchor for such | |
EP2653632A1 (en) | Assembly for fitting roof accessory elements to inclined building roofs | |
US6634151B1 (en) | Support apparatus for supporting one or more objects from a concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK RS |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04D 13/12 20060101ALI20120308BHEP Ipc: E04D 13/10 20060101AFI20120308BHEP Ipc: E04G 21/32 20060101ALI20120308BHEP |
|
17P | Request for examination filed |
Effective date: 20121005 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 610049 Country of ref document: AT Kind code of ref document: T Effective date: 20130515 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602007030149 Country of ref document: DE Effective date: 20130704 |
|
REG | Reference to a national code |
Ref country code: PL Ref legal event code: T3 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20130501 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130802 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130902 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130901 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130812 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130801 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20140204 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130504 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602007030149 Country of ref document: DE Effective date: 20140204 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130504 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20070504 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 12 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PUE Owner name: CWL PATENT AB, SE Free format text: FORMER OWNER: CW LUNDBERG INDUSTRI AB, SE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602007030149 Country of ref document: DE Representative=s name: EHRNER & DELMAR PATENTBYRA AB, SE Ref country code: DE Ref legal event code: R081 Ref document number: 602007030149 Country of ref document: DE Owner name: CWL PATENT AB, SE Free format text: FORMER OWNER: CW LUNDBERG INDUSTRI AB, MORA, SE |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20210325 AND 20210331 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: PC Ref document number: 610049 Country of ref document: AT Kind code of ref document: T Owner name: CWL PATENT AB, SE Effective date: 20210505 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240527 Year of fee payment: 18 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240530 Year of fee payment: 18 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20240602 Year of fee payment: 18 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20240419 Year of fee payment: 18 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240527 Year of fee payment: 18 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20240419 Year of fee payment: 18 |