EP1760224A2 - Guardrall attachement means for scaffolding towers - Google Patents
Guardrall attachement means for scaffolding towers Download PDFInfo
- Publication number
- EP1760224A2 EP1760224A2 EP20060018366 EP06018366A EP1760224A2 EP 1760224 A2 EP1760224 A2 EP 1760224A2 EP 20060018366 EP20060018366 EP 20060018366 EP 06018366 A EP06018366 A EP 06018366A EP 1760224 A2 EP1760224 A2 EP 1760224A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- scaffolding
- guard rail
- assembly
- guardrail
- handgrip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 230000000903 blocking effect Effects 0.000 claims description 10
- 230000007246 mechanism Effects 0.000 description 4
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/28—Scaffolds primarily resting on the ground designed to provide support only at a low height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/147—Railings specially adapted for mounting prior to the mounting of the platform
Definitions
- Scaffolding has long been used in industry for gaining access to high and awkward locations. Whilst scaffolding provides a safe environment for operatives to work this is not always the case for the persons erecting and dismantling scaffolding structures. Various systems exist for providing temporary safety rails guard rails in advance of the erection of the scaffolding tower but they are often difficult to install and adjust.
- This invention relates to a releasable attachment system whereby the guardrail system may be easily adjusted within the scaffolding tower.
- the guard rail system is independent from the scaffolding structure and is arranged such that the scaffolding can be erected and dismantled whilst within the perimeter of the guard rail system.
- the guard rail system may be progressively relocated to higher levels in the scaffold tower providing a safe place of work for the scaffolder to erect further equipment and to erect the permanent guardrail system.
- the safety rail system may be progressively relocated to lower levels within the scaffold tower to provide a safe working environment for the operatives.
- the Invention comprises of scaffolding frames 1-4 which incorporate vertical frame members 5 and 6 and multiple, equally pitched, horizontal frame members 7 forming a ladder like structure. These frames together with tie members 8 and bracing members 9 and 10 are coupled together using releasable hook members to form a scaffolding structure.
- Platform units 11 may be positioned on any rung position to provide a level working platform. The platform must be provided with a safely guarded area for the scaffolding erector to work. This is achieved by attaching a guard rail system comprising of end frames 20 & 21 and telescopic guard rails 22 & 23 which are pivotally and releasably attached to the end frames. This 'guard rail assembly' may be attached to the scaffolding rungs by remotely releasable hook devices.
- the guard rail end frames 20 & 21 comprise upright members 30 & 31 together with upper and intermediate horizontal members 32 & 33 together with a spacing member 34 which connect the upright members together.
- Releasable couplings 35 are incorporated near to the upper and intermediate rail positions for the releasable attachment of the telescopic guard rails.
- Each end frame upright member incorporates a lower hook assembly 36 incorporating twin downward facing receiving apertures 37 & 38 which are dimensioned such that they are a close fit around the scaffolding frame rung members.
- third and fourth receiving members 39 incorporating horizontally facing receiving apertures 40 are attached to the end frame members at such a position as to present the apertures at a position relating to the position of a frame horizontal member.
- Hook member 51 are attached to each of the third and fourth receiving members and incorporates an abutment portion 52 and a limiting portion 53 and is pivotally attached to the second receiving member such that the end of the hook member 55 partially blocks the receiving aperture.
- the end frame upright members each incorporate a sliding member 61 which is located around the upright frame member and incorporates blocking pieces 62 and pairs of operating hand grips 63 and 64 similarly located around the vertical member which are connected to the sliding member by a linking member 65 such that when either the upper or lower hand grips are raised or lowered the sliding member incorporating the blocking piece is raised in unison.
- Raising of the blocking piece releases the rotating hook such that the hook is free to rotate allowing the restriction in the horizontal receiving aperture to be removed, lowering the blocking device causes the blocking piece to push onto the surface 62 causing the hook to rotate into the blocking position thus preventing the release of the frame from the scaffolding.
- the scaffolder positions himself in a position within the permanent guarding on the tower and with two hands grips either the upper or lower hand grips whichever is most convenient. Raising both mechanisms simultaneously causes both hook blocking piece to be raised (arrow 'A'), by then drawing the end frame towards himself rotationally (arrow 'C') the hook members are caused to rotate (arrow 'B') opening the jaws of the horizontal receiving aperture.
- the end frame and attached handrails may be lifted from the tower and may be repositioned at a higher or lower position within the scaffold.
- guardrail end frames at an inclination to the scaffolding tower frames such that further frame members may be installed or removed. This is achieved by locating the alternative lower hook jaws 38 around the scaffolding rung member such that when the end frame is relocated and locked onto the scaffolding frame an angle is formed between the scaffolding frame 4a and the guardrail end frame member.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
A guard rail assembly which may be releaseably attached to a scaffolding structure incorporating remotely releasable hook (55) devices and hand grips (63,64) such that the guard rail (20-23) assembly may be easily repositioned within the scaffolding structure to provide a safely guarded perimeter to the scaffolding platform at all times. The sliding handgrips may be used to carry the weight of the guardrail assembly (20-23) such that the assembly may be reloeated on the scaffolding without having to release hold of the handgrip (63,64) and such that on lowering the guardrail frame assembly into the desired final position the locking device may be reapplied in one movement sequence only releasing the handgrip (63,64) when the final locked state is achieved.
Description
- Scaffolding has long been used in industry for gaining access to high and awkward locations. Whilst scaffolding provides a safe environment for operatives to work this is not always the case for the persons erecting and dismantling scaffolding structures. Various systems exist for providing temporary safety rails guard rails in advance of the erection of the scaffolding tower but they are often difficult to install and adjust.
- This invention relates to a releasable attachment system whereby the guardrail system may be easily adjusted within the scaffolding tower.
- The guard rail system is independent from the scaffolding structure and is arranged such that the scaffolding can be erected and dismantled whilst within the perimeter of the guard rail system.
- Once in place on the scaffold at ground level, the guard rail system may be progressively relocated to higher levels in the scaffold tower providing a safe place of work for the scaffolder to erect further equipment and to erect the permanent guardrail system. During dismantling the safety rail system may be progressively relocated to lower levels within the scaffold tower to provide a safe working environment for the operatives.
- When the scaffold tower is erected to the required height, it is not necessary to remove the upper guardrail system which may be left in place as a permanent safety system until such time as dismantling of the scaffolding is performed.
- The invention will now be described with reference to the following drawings in which:-
- Fig.1 shows a front elevation, side elevation and plan view of a typical scaffolding tower together with the guardrail system.
- Fig.2, & Fig.3, show side elevations of the guardrail system used in the vertical mode incorporating the locking and release mechanism.
- Fig.4 shows a side elevation of the guardrail system used in the angled mode incorporating the locking and release mechanism.
- The Invention comprises of scaffolding frames 1-4 which incorporate
vertical frame members 5 and 6 and multiple, equally pitched,horizontal frame members 7 forming a ladder like structure. These frames together with tie members 8 and bracingmembers 9 and 10 are coupled together using releasable hook members to form a scaffolding structure.Platform units 11 may be positioned on any rung position to provide a level working platform. The platform must be provided with a safely guarded area for the scaffolding erector to work. This is achieved by attaching a guard rail system comprising ofend frames 20 & 21 andtelescopic guard rails 22 & 23 which are pivotally and releasably attached to the end frames. This 'guard rail assembly' may be attached to the scaffolding rungs by remotely releasable hook devices. - The guard
rail end frames 20 & 21 compriseupright members 30 & 31 together with upper and intermediatehorizontal members 32 & 33 together with aspacing member 34 which connect the upright members together.Releasable couplings 35 are incorporated near to the upper and intermediate rail positions for the releasable attachment of the telescopic guard rails. Each end frame upright member incorporates alower hook assembly 36 incorporating twin downward facing receivingapertures 37 & 38 which are dimensioned such that they are a close fit around the scaffolding frame rung members. - Additionally third and fourth receiving
members 39 incorporating horizontally facing receivingapertures 40 are attached to the end frame members at such a position as to present the apertures at a position relating to the position of a frame horizontal member. Hookmember 51 are attached to each of the third and fourth receiving members and incorporates anabutment portion 52 and alimiting portion 53 and is pivotally attached to the second receiving member such that the end of thehook member 55 partially blocks the receiving aperture. The end frame upright members each incorporate a slidingmember 61 which is located around the upright frame member and incorporates blocking pieces 62 and pairs of operating 63 and 64 similarly located around the vertical member which are connected to the sliding member by a linkinghand grips member 65 such that when either the upper or lower hand grips are raised or lowered the sliding member incorporating the blocking piece is raised in unison. - Raising of the blocking piece releases the rotating hook such that the hook is free to rotate allowing the restriction in the horizontal receiving aperture to be removed, lowering the blocking device causes the blocking piece to push onto the surface 62 causing the hook to rotate into the blocking position thus preventing the release of the frame from the scaffolding.
- To adjust the position of the guardrail system within the tower structure, the scaffolder positions himself in a position within the permanent guarding on the tower and with two hands grips either the upper or lower hand grips whichever is most convenient. Raising both mechanisms simultaneously causes both hook blocking piece to be raised (arrow 'A'), by then drawing the end frame towards himself rotationally (arrow 'C') the hook members are caused to rotate (arrow 'B') opening the jaws of the horizontal receiving aperture. The end frame and attached handrails may be lifted from the tower and may be repositioned at a higher or lower position within the scaffold.
- The action of holding the handgrips upwards maintains the disengagement of the blocking piece and causes the complete end frame assembly to be carried by the mechanism. To relocate the frame at a new position the
lower hook jaws 37 are reengaged over the required rung position and the frame is pushed away from the operator causing the horizontal apertures to re-engage around the frame rung member. - Lowering the handgrips causes the blocking piece to cause the rotating hook to rotate to the locking position thus securing the end frame at a new position.
- In some circumstances it is necessary to install the guardrail end frames at an inclination to the scaffolding tower frames such that further frame members may be installed or removed. This is achieved by locating the alternative
lower hook jaws 38 around the scaffolding rung member such that when the end frame is relocated and locked onto the scaffolding frame an angle is formed between the scaffolding frame 4a and the guardrail end frame member.
Claims (5)
- A guard rail protection system for use on scaffolding characterised in that the system comprises at least one lockably releasable hook means, a blocking portion and slidable means with at least one grip so operable that when the grip means is raised or lowered the hook means is rotationally released or locked allowing the restriction in the upper receiving aperture to be applied or released.
- A guard rail system for use on scaffolding as claimed in, claim 1, characterised in that end frames and pivotally connected telescopic guard rails with each guard rail end frame upright member incorporating a lower hook assembly incorporating at least one downward facing receiving aperture and incorporating at least one horizontally facing receiving aperture at such a position as to present the apertures at a position relating to the position of a frame horizontal member.
- A guard rail system as claimed in any one of the preceding claims, characterised in that the end frame member may be attached in an angularly situated position in relation to the scaffolding.
- A guard rail system as claimed in any one of the preceding claims, characterised in that the sliding handgrip may be used to carry the weight of the guardrail assembly such that the assembly may be relocated on the scalding without having to release hold of the handgrip and such that on lowering the guardrail frame assembly into the desired final position the locking device may be re-applied in one movement sequence only releasing the handgrip when the final locked state is achieved. When the scaffold tower is erected to the required height, it is not necessary to remove the upper guardrail system which may be left in place as a permanent safety system until such time as dismantling of the scaffolding is performed.
- A guard rail system as claimed in any one of the preceding claims, characterised in that when the scaffold tower is erected to the required height, the upper guardrail system may be left in place as a permanent safety system until such time as dismantling of the scaffolding.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB0517749A GB0517749D0 (en) | 2005-09-01 | 2005-09-01 | Guardrail attachment means for scaffolding towers |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP1760224A2 true EP1760224A2 (en) | 2007-03-07 |
Family
ID=35220638
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP20060018366 Withdrawn EP1760224A2 (en) | 2005-09-01 | 2006-09-01 | Guardrall attachement means for scaffolding towers |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP1760224A2 (en) |
| GB (1) | GB0517749D0 (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2010100013B4 (en) * | 2009-07-01 | 2010-09-09 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
| WO2011062483A3 (en) * | 2009-11-20 | 2011-08-11 | Harsco Infrastructure B.V. | Scaffolding and guard rail for application therein |
| EP2527563A3 (en) * | 2011-05-25 | 2014-01-15 | Harsco Infrastructure B.V. | Scaffolding and guard rail for use therein |
| AU2010224325B2 (en) * | 2010-09-17 | 2016-09-08 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
| CN108589550A (en) * | 2018-06-05 | 2018-09-28 | 中铁宝桥集团有限公司 | A kind of tilting head tower bridge location operation platform |
-
2005
- 2005-09-01 GB GB0517749A patent/GB0517749D0/en not_active Ceased
-
2006
- 2006-09-01 EP EP20060018366 patent/EP1760224A2/en not_active Withdrawn
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2010100013B4 (en) * | 2009-07-01 | 2010-09-09 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
| WO2011062483A3 (en) * | 2009-11-20 | 2011-08-11 | Harsco Infrastructure B.V. | Scaffolding and guard rail for application therein |
| AU2010224325B2 (en) * | 2010-09-17 | 2016-09-08 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
| EP2527563A3 (en) * | 2011-05-25 | 2014-01-15 | Harsco Infrastructure B.V. | Scaffolding and guard rail for use therein |
| CN108589550A (en) * | 2018-06-05 | 2018-09-28 | 中铁宝桥集团有限公司 | A kind of tilting head tower bridge location operation platform |
Also Published As
| Publication number | Publication date |
|---|---|
| GB0517749D0 (en) | 2005-10-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11180956B2 (en) | Ladder docking device | |
| JP5349322B2 (en) | Movable anchor fixed fall prevention device | |
| US9617747B2 (en) | Folding guard rail method and apparatus | |
| US4782914A (en) | Safety guard rail for scaffolding | |
| US6467576B2 (en) | Aerial life saver combine | |
| US9022172B2 (en) | Ladder accessory | |
| US20160177581A1 (en) | Pivoting Horizontal and Vertical Scaffold Members and a Method of Erecting an Offset Scaffold Platform | |
| CA2624748A1 (en) | Safety saffolding | |
| GB2459181A (en) | Safety work platform | |
| CA2284414C (en) | Walk through ladder | |
| RU2400609C2 (en) | Complex system of accident prevention support in construction | |
| CA2353355A1 (en) | Anchor clamp | |
| WO2017024363A1 (en) | Deck for scaffold | |
| WO2012139154A1 (en) | Adjustable safety barrier system | |
| US6095283A (en) | Walk-through ladder | |
| EP1978180A2 (en) | Simplified scaffolding tower | |
| EP1760224A2 (en) | Guardrall attachement means for scaffolding towers | |
| US6006862A (en) | Temporary guard rail assembly for scaffolding | |
| GB2425563A (en) | Guardrail protection system for scaffolding towers | |
| EP2031150A2 (en) | Scaffolding stairway system | |
| WO2003025311A1 (en) | Improvements in and relating to scaffolding | |
| EP3431701B1 (en) | Fixed service ladder | |
| GB2431427A (en) | Scaffolding guard rail | |
| US20050061582A1 (en) | Movable and repositionable safety guard rails for scaffolding | |
| AU2012200673B2 (en) | Barrier |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20100401 |