EP1573486A2 - Engineering data interface and electrical specification tracking and ordering system - Google Patents
Engineering data interface and electrical specification tracking and ordering systemInfo
- Publication number
- EP1573486A2 EP1573486A2 EP03813428A EP03813428A EP1573486A2 EP 1573486 A2 EP1573486 A2 EP 1573486A2 EP 03813428 A EP03813428 A EP 03813428A EP 03813428 A EP03813428 A EP 03813428A EP 1573486 A2 EP1573486 A2 EP 1573486A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- data
- project
- information
- products
- identification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Definitions
- the invention relates to a hardware assisted system and business method for integrating work process and design data for the customization and delivery of products and services, management of project tasks and timelines, and management of materials within construction projects.
- An aspect of the present invention is a portable system comprising a host system, and a field system that can communicate with the host system, said portable system capable of receiving engineering information related to at least a portion of a construction project, such as an electrical subproject, from a database or spreadsheet, formatting the information into a suitable format to be used for one or more of printing identification product, preparing work packages, tracking materials used, and reporting materials used for the construction project.
- a construction project such as an electrical subproject
- An embodiment of the portable system is capable of generating orders for identification products and managing fulfillment of the orders, which may include generating a termination report and/or generating a pull card.
- Another embodiment of the portable system is capable of providing remote tracking capability to verify and quantify project progress as measured by one or more of materials used and man-hours used.
- Another embodiment of the portable system includes a printing system that can communicate with one or both of the host and field systems.
- the host and/or field system may communicate information regarding label contents, formatting, and printing sequence to the printing system.
- At least one label or marker ordered is for an electrical device, a cable, or an electrical termination.
- the labels may be delivered together with a termination report and/or a cable accessory kit.
- Another embodiment of the portable system is capable of generating reports covering one or more of estimates of cable length requirements, field installation logs, the actual length of cable used, and the reel from which it was pulled.
- portable system orders are generated for at least one master carton containing multiple identification products for the same construction area and level criteria for the contents of the master carton have been pre-selected.
- Another aspect of the invention is a business method comprising receiving written or electronic engineering data for a construction project or subproject and transferring the data to a software program that organizes the data into a suitable format to be used for one or more of printing identification products, preparing work packages, tracking materials used, and reporting materials used for the construction project.
- the formatted information can be used for one or more of making identification products according to one or more different levels, establishing marking requirements, and making project management calculations.
- Another embodiment of the business method includes generating orders for identification products. The identification products are generated and/or delivered according to project milestones.
- Another embodiment of the business method includes generating reports covering one or more of estimates of cable length requirements, field installation logs, the actual length of cable used, and the reel from which it was pulled.
- Another embodiment of the business method includes the following: receiving written or electronic engineering data for an electrical subproject of a construction project, creating in a software program a unique template that translates the received data into a format understood by the user, transferring the data to said software program to provide termination point data for use in determining specific identification product requirements, determining marking requirements, and making electrical project management calculations, managing the termination point data for cabling, routing, and marking purposes in a common format in said software program, managing changes to engineering data, analyzing how changes to the data effect identification products needed, and generating reports on any changes to said data, tracking progress of the project by work completion, distributing information by means of the software using the Internet, sorting termination data by specific area, device, system, cable, or wire, generating orders for electrical identification products, and integrating supply chain process flow information into the process as automated steps for ordering, processing, and fulfillment.
- tracking progress of the project by work completion may be accomplished by tracking earned hours to calculate percentage of completion.
- Another embodiment of the business method includes utilizing radio frequency identification for one or more of product ordering, product re-ordering, material management, and project tracking.
- Another embodiment of the business method includes a step in which the software electronically generate invoices for products ordered and delivers the invoices via the Internet.
- the invoices may be sent by e-mail.
- identification products in various forms and combinations can be ordered using the portable system.
- a kit containing a set of wire markers meeting specific requirements for an electrical subproject may be ordered.
- the markers may be printed off site and delivered in a labeled package designating the intended location of said markers.
- Identification products that have been ordered can be organized into at least one master carton.
- a master carton can include identification products for a single device or area of a construction project configured by the portable system.
- area means a three dimensional geographical area within a construction proj ect.
- masterpak and "master carton” mean a carton containing multiple products related to one device within a specific system(s) or area(s) in the project.
- the products may be similar, identical or totally different from one another.
- terminal point refers to data regarding the point at which an electrical connection is made.
- raceway refers to a holder for wires or cables, such as a conduit or cable tray.
- full means providing the products ordered, packaging them as requested and delivering them in a timely fashion to the requested location.
- portable system means that the system is usable at different locations including mobile locations. While the field system may contain portable hardware, the term does not mean or require that all hardware for both the host system and the field system must be portable.
- mirror dataset means a copy of the original dataset. 7.
- identification product means a copy of the original dataset. 7.
- label is used interchangeably.
- level refers to the different categories of specificity in a construction project; e.g., the following are levels of increasing specificity: area, system, device, cable/circuit, and wire.
- An advantage of at least one embodiment of the present invention is the elimination or minimization of inefficiencies and slowdowns due to a mistake in carrying out tasks such as providing information for markers, determining the method of printing the markers, formatting the information to be on the markers, and printing the markers
- An advantage of at least one embodiment of the present invention is reducing the amount of labor required to print and organize identification products.
- An advantage of at least one embodiment of the present invention is providing contractor with a more cost efficient way of labeling electrical terminations, cables, conduits, raceways, cable-trays, equipment, and instrumentation.
- An advantage of at least one embodiment of the present invention is improving wire management and risk management, reducing rework, and making the as-built project archive available for the maintenance of a building.
- FIG. 1 is a digital image of an interactive computer screen showing aspects of the present invention in which various categories of information can be entered.
- Fig. 2 is a digital image of an interactive computer screen showing aspects of the present invention in which labels can be selected for ordering.
- Fig. 3 is a digital image of an interactive computer screen showing aspects of the present invention in which a preview of labels to be printed can be reviewed.
- Fig. 4 is a digital image of an interactive computer screen showing aspects of the present invention in which estimated of cable length requirements can be made.
- Fig. 5 is a digital image of an interactive computer screen showing aspects of the present invention in which "pull cards" for cable installation can be generated.
- Fig. 6 is a digital image of an interactive computer screen showing aspects of the present invention in which reports of installed cable can be generated.
- Fig. 7 is a schematic representation of the amount of data input needed based on the wanted by the user from the portable system of the present invention.
- Fig. 8 is a schematic representation of the communication flow of one aspect of the portable system of the present invention.
- Fig. 9 is a schematic representation of the work process and material staging benefits provided by use of the portable system and business method of the present invention.
- Fig. 10 is a digital image of an interactive computer screen showing aspects of the present invention in which the reels from which cable are pulled for a particular circuit can be recorded.
- Fig. 11 is a digital image of an interactive computer screen showing aspects of the present invention in which reports of installed cable by type/area can be generated.
- Fig. 12 is a digital image of an interactive computer screen showing aspects of the present invention in which reports of man hours by type/area can be generated.
- Fig. 13 is a digital image of an interactive computer screen showing aspects of the present invention in which reports of cable inventory and usage can be generated.
- An aspect of the invention provides a portable system including a host system, a field system, and optionally a printer system.
- the host system typically contains a hardware component and at least one software program.
- the field system, and the optional printer system share the software with the host system and include a hardware component such as a computer or personal digital assistant that can receive engineering information related to a construction project from a database or spreadsheet, format the information so that it can be used to create an overall specification and provide products and services to that specification for a specific construction project.
- the portable system can generate custom orders for products, manage fulfillment of the orders, and provide remote tracking capability using the computer via a PDA to verify and quantify project progress.
- Another aspect of the invention provides a method of doing business creating customized orders for construction products by use of a host system which receives written or electronic information from an engineering company for a construction project, transfers the information to a software program that re-formats the information to provide data at the component level that is used in determining specific products, marking requirements and making electrical project management calculations.
- the method of doing business provides automated information at the "termination point” level for electrical features of the project that is used in determining specific products, marking requirements and making electrical project management calculations for electrical components and subcomponents required.
- the automated system manages the "termination point” data for cabling, routing, marker etc in a standard format and in one software package, manages revision levels and changes to engineering data among several entities, analyzes data and reports only "changes", tracks progress of the project in terms of work completion and productivity, distributes information that has been re-formatting by the software using email to support portability in the field, sorts termination data by specific location, device or system, and generates orders for electrical identification products to be delivered.
- Another embodiment of the method of doing business selects an area, enclosure or device, groups required labels according to such area, enclosure or device and prints all labels in the group. No further data entry is required.
- Another aspect of the present invention is a portable electronic engineering data interface and tracker that includes a host system which receives written or electronic engineering data from an engineering company for a construction project or subproject, transfers the information to a software program that re-formats the information to provide device or product level data for use in determining specific products, marking requirements, and making project management calculations, manages the data in a standard format and in one software package, manages revision levels and changes to engineering data from a field system shared among several entities, analyzes data and reports any changes to said data, tracks progress of the project by work completion, distributes information by means of the software using email for portability, sorts termination data by specific location, device, or system, and generates orders for products to be delivered.
- Another aspect of the present invention is an electronic data interface system that is based on a mapped work process and the input of engineering data to include termination point information.
- the invention is a tool that provides a standard format for collecting, filtering, and organizing data; generating sequences of data for identification products; engineering revision communications, material and workflow customization; detailed project management tracking and analysis; and material management and trending as related to the construction side of a particular project. This is possible through the use of product level, or for electrical projects "termination point" data essential for material estimating and specifications, progress reporting, trending analysis and electrical identification.
- Another aspect of the invention provides for the collection of information, e.g., from the engineering design company, that describes the electrical design data for both the power and instrumentation portions of a construction project.
- This type of information pertains to, e.g., the installation of raceways, devices, identification materials and electrical termination and the generation of records and reports based on the receipt and/or input of the design information.
- Another aspect of the invention provides a method for collecting installation dates, actual lengths of raceways and cables installed, project notes, field design changes.
- Another aspect of the invention provides marker formatting, ordering, and printing.
- Another aspect of the invention facilitates organizing work packages and cable management.
- Another aspect of the invention provides these functions along with performing engineering calculations, and running data queries for tracking and work productivity.
- aspects of the invention combine two or more of the previous aspects.
- one aspect provides the combination of all of the previous aspects in one integrated system. Combining these aspects can provide increased productivity, accurate tracking and reporting of materials used, efficient preparation of work packages and printed labels, and improved cable management.
- aspects of the invention will allow project managers to focus on the project and not on the task of printing and organizing markers.
- the physical system has at least two interfacing components: a host system, a field system, and optionally a printing system.
- the systems are based on software that create the portable system including the host, field, and printer systems.
- the software may be licensed to the user, label printer, and anyone else who needs to use it to complete the project.
- the host system may comprise a master database and can be the central hub for data transfers. It will typically comprise at least one software program and at least one hardware component.
- the host system can have interfaces for a processor, database, administrator, user, manufacturer, printer, etc.
- the host system can contain records of all projects entered onto the system.
- the field system can be a distributed database in a remote location. It will typically comprise a hardware component such as a computer or personal digital assistant.
- the field system will typically be designed to be used by a contractor and engineer.
- the printer system is an interface database for receiving print jobs, including information that needs to be printed; printing information, including formatting, font size; printing labels; and providing print project status. Host system
- Engineering data is input into a host system directly or via the field system.
- Data may be entered into the field system using a keyboard, point-and-click, or both, by, data base entry (text), or bar code entry.
- Data my be input manually, but is preferably transmitted electronically, e.g., via a disk or e-mail, preferably in the form of a spreadsheet.
- the host database can allow the design, implementation, and maintenance of customer-specific templates. For example, various data category can be established. Each category may have different alpha-numeric identifiers and sequences.
- the categories of information can be presented in a controlled, consistent manner using dropdown menus, check boxes, and the like. This is illustrated in Fig. 1, which is a data entry screen of the field system. In this manner, the user is forced to enter data from a controlled vocabulary or controlled set of selections.
- the template can be customized to use the unique terminology of the user.
- Fig. 2 Information from different identification categories will populate a label screen, as shown in Fig. 2. This information can be printed on labels to convey specific information regarding locations of terminations.
- Fig. 3 shows a screen with a preview of formatted labels.
- "CC391AB” may refer to a circuit number
- "1- C(+)” may refer to a termination point
- “CCR” may refer to a device.
- the host system can create a template based on the unique language/configuration of the user's data and can format the data per the construction project workflow process.
- the host system can set up a template for series of pulltags, wiremarkers, cablemarkers, tray tags, equipment tags, and any other type of identification tags that are needed for a particular construction job.
- Information required from the customer may include cable specifications, circuit and term schedules, and product specification for identification products, such as type of tag, fields and identification series numbers, print font and size, etc. Examples of categories of information that may be loaded and tracked in the system include the following:
- Circuit Information such as Circuit Identification Number, Circuit Identification Suffix (if used), Multiple Cables, Estimated Design Length, Cable Design Information, Electrical Devices Involved, Physical Location of the Circuit, System or Service that the
- Circuits are associated with, Turnover System Information, Drawing Number Circuit is shown on, and User Defined Information;
- Raceway Information such as Raceway Identification Number, Raceway Type or Makeup, Physical Location of the Circuit, System or Service that the Circuits are associated with, Turnover System Information, Drawing Number Raceway is shown on, and User Defined Information;
- Circuit Routing Information such as Raceway Routing for each Circuit, and Sequentially Ordered from a Point-to-Point basis;
- Equipment Identification Number Equipment Identification Number
- Equipment Type Makeup
- Physical Location of the Equipment, System or Service that the Equipment is associated with Turnover System Information, and Drawing Number Equipment is shown on;
- Wire Management such as Wire Reels based on Cable Type, Reels tagged by a
- Installation Tracking such as Circuit Tracking, Raceway Installation Tracking, Equipment Installation Tracking, All Actual Lengths or Quantity as Installed, Provide update of Wire Inventory, and Reporting Needs of the Customer.
- the host systems holds all archived data and manages any revisions or changes that are made to the data by any one of many involved parties such as the owner, an engineer or a contractor. Additional or modified data may be input directly into the host system, or may be submitted via the field system. Any time that data is entered or changed, a report can be sent to the user to validate that the data loaded into the system is complete and accurate. Approval (written or verbal) from the user can be required before the database is finalized.
- the records generated based on the collected information may be stored within a database, where it may be retrieved and used to generate reports. The information also may be useful to project managers for tracking the progress of termination work orders.
- the system can provide reports indicating how changes, such as design changes, will impact what has already been installed including providing information on what additional materials will be required to accommodate a change or correction.
- the reports are exportable and may be delivered to the project managers or others via the computer network for schedule status and tracking.
- the reports may be generated and delivered automatically to the project manager.
- the reports may be delivered via e-mail as an attachment or as a link to a web page.
- the reports may be in the form of word processing documents, spreadsheets or HTML or XML documents. Queries and reports can be created, for example by using a business intelligence software program available under the trade name CRYSTAL REPORTS from Crystal Decisions, Palo Alto, CA, so that the construction company's logo can be on reports sent to the customer.
- the system can generate invoices for products ordered.
- the invoices can be generated electronically and delivered via the Internet, including via e-mail.
- the field system is designed specifically for the construction process and is portable.
- the system can operate on a 32bit operating system such as that available under the trade name WINDOWS, from Microsoft Corporation, Redmond, WA; software available under the trade name WINDOWS is owned and developed by Microsoft Corporation.
- Useful versions of operating software available under the trade name WINDOWS from Microsoft Corporation include WINDOWS 95, WINDOWS 98, WINDOWS ME, WINDOWS NT, WINDOWS 2000, and WINDOWS XP Professional or WINDOWS XP Home. These are compatible with the system, which will also migrate to Apple Computer Inc. operating system Mac Native, if preferable. Hard drive space of 20 megabytes or greater is adequate for use of the system.
- Other suitable operating systems may include Unix and Linux, personal digital assistants (PDA)s based on a Palm, Windows CE, or similar operating system, an interactive kiosk, which may have a touch-screen display, Internet-equipped wireless telephones, and other Internet devices.
- PDA personal digital assistants
- the field system may also be used to generate pull cards, termination cards (to and from), installation logs and termination sheets by device. This is in addition to reports and queries that can be run. These documents can be used to aid the work process, the electrical foreman or superintendent will pass these documents to the electrician or installer.
- the system also allows the user to manage and keep track of day-to-day, installations, material usage, and percentage of job completion. For example, estimates of cable length requirements may be recorded on the system, as shown in Fig. 4.
- a field installation log can be generated that will list all cables that will be pulled through a particular raceway.
- a sample field installation log is shown in Fig. 5. This information can be printed in the form of "pull cards,” which will tell the installer all the cables that need to be pulled for the raceway.
- the actual length of cable used, and the reel from which it was pulled may also be recorded and the information can be generated in report format, as shown in Fig. 6. This cable/wire tracking and management capability helps prevent wire and cable overrun, emergency runs, and rework.
- the field database may provide the users with lists of permissible category selections for data input based on the design engineering company's database.
- This preloaded information may include designations for area, system (e.g., AC), cable and raceway, etc.
- a string of designations indicate the location of the item to be labeled.
- the field database may be activated on a project basis by means of a time sensitive password.
- the field system will cease to accept specified (or all) changes or information after the password, or a specific time period, has expired. This will allow the customer to keep an archival copy of the information, but will prevent the reusing the software for a different project.
- the field system may include the following features: User Set-up;
- Data synchronization including To the Host, From the Host, Label Requests, and Label Status.
- Printing and label assembling services can also be provided.
- the printing may be conducted using the host or field system or a separate printing system may be included in the portable system.
- the printing and label assembling may be done by a third party, e.g., a label-making company.
- the label making company could be under contract with the entity controlling the host system or the entity controlling the field system. Orders for labels may be placed by the entity controlling the host system or the entity controlling the field system.
- the printing system will contain software that formats and prints data in the database on marker labels.
- the software will typically print the tags according to system, device, or cable, that all required the same size and type of tag.
- the tags may then be sorted and grouped as required for customized work packages.
- the printing system may sort and print the data according to area.
- this method of printing may require frequently changing the type of tags on which the information is being printed. If this method were used, the software preferably provides an indication that a new type of tag needs to be placed in the printer and it preferably stops the printing to allow the change to be made.
- the host, field, and printing systems are linked such that they can be synchronized. This will allow the transfer of information and program revisions from one system to another. Modifications and improvements to the software can be electronically sent to the field and printing systems.
- the individual customer determines the level of input for each project and therefore the level of return that can be achieved from the system.
- the customer can order customized electrical identification products to be delivered in a work process format by merely selecting; e.g., clicking on a box within the software, indicating the system marks and labels to be printed ("Labels" at the top of the Fig. 7 pyramid). As seen in the figure, no input is needed for this level of return. If the customer wishes to input information, he can input (or "check") that certain work tasks have been completed; the entire electrical project will have progress and status reporting available (Progress Project Status in Fig. 7).
- Fig. 8 is a schematic representation of the communication flow in the system. Communication of revisions between the "field" data and the previous "engineering" data will b'e managed via the host system. Communications can take place via a SMTP/POP3 server platform through email synchronization. A mirror copy of each dataset resides within the database, and all updates uploaded in the field are downloaded into the server,
- Access to the host, field, and printer system may be controlled by security means such as user identification and passwords.
- security means such as user identification and passwords.
- Fig. 9 is a schematic representation of the work process and material staging benefits provided by use of the portable system and business method of the invention.
- the user can order identification materials, input actuals, and installation dates for project tracking and trending, synchronize with the host system for revision updates and data transfers.
- the "identification" part of the process defines the product specifications to be used for conduit, raceway, equipment, instruments, wires, cables, safety signs, etc. and determines the method of printing, formant, and information to be printed and how those tags will be distributed relative to the work process and schedule.
- Engineers generate designs (Engineering data on Fig. 9); engineering data is then modified from the formats into a usable template that can be based on the user's unique methods of carrying out the construction job, within the host system. As shown in the figure, updates are emailed between the host system and the field system.
- the project data is converted to a field version via the unique template.
- This version is provided to the customer, which includes the engineering data and the software tool to be used in the management of the construction process and its assets.
- the system is portable, can be run remotely, and can be updated via the synchronization process described above.
- An aspect of the invention provides a method for doing business that will sort product information for the various projects system, device, area, or other entered criteria for the specific workflow process of that project. For example, information can be sorted to show all identification products, as well as cable lengths and accessories that are needed to install a particular cable tray and all the wires that connect to it. For electrical projects this product information (cable ID, wire ID, equipment ID, conduit and tray ID), is sorted by system, device, area, cable etc. Products are ordered, printed, delivered and staged at the construction site via the selections from the customer. For electrical projects the customer will choose the marker sorting requirements (area, system, device) and will place the order for parts and services.
- RFID radio frequency identification
- the tags may contain identification information, which can be scanned. The scanned information can be used to determine where the tag is located, whether it has been installed.
- RFID tags can assist in product ordering, product re-ordering, material management, and project tracking. This information can be transmitted to the field system, e.g., with a scanner, to update the status of the installation progress. The information may further be transmitted to the host system.
- the unique configuration of the data provides the basis for detailed project management, and materials trending, and reporting. Managing information regarding earned hours, cross sectional analysis, etc. can all be accomplished through the detailed database information based on industry standards and specifications for cables and equipment.
- An aspect of the invention allows for cable management by recording the reel used to provide cable for a particular circuit, as shown in Fig. 10. Information can be reported in different forms. For example, Fig. 11 shows a report of Cable Length Summaries by Type/ Area. Fig. 12 shows a report of Hour Summaries by Type/ Area. Fig. 13 shows a report of cable inventory and usage. Work completion, as-built changes, etc. can be communicated via the synchronization process from a PDA to the field system and from the field system to the host system.
- the field system becomes an "as-built" configuration copy of the project itself and may be used for maintenance functions.
- the as-built configuration copy can help pinpoint future changes that may affect design, materials, or identification products.
- the ability to rebuild portions of the site systems after fire or damage, troubleshooting capability and routine maintenance tracking are all key attributes of having the completed project data.
- the system may be used to provide customized work packages.
- a customized work package is a kit or collection of various types of articles that are needed to complete an area of a project. For example, for a connection that is being made in a power system between a motor and motor control, a customized work package may include a motor connection kit, lugs, hardware, and custom labels for that specific portion of the system.
- a customized work package may include a termination report/log, pull cards, termination cards, cable accessory kit, cable tags, and wire marks, all of which may be organized by device, e.g., air conditioner, boiler, and the like.
- the pull cards, termination cards, and the like may be printed on water-resistant, non-tearing paper so they cannot be damaged by field conditions.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Stored Programmes (AREA)
Abstract
Description
Claims
Applications Claiming Priority (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US10/319,035 US20040117267A1 (en) | 2002-12-13 | 2002-12-13 | Engineering data interface and electrical specification tracking and ordering system |
| US319035 | 2002-12-13 | ||
| US733746 | 2003-12-11 | ||
| US10/733,746 US20040143475A1 (en) | 2002-12-13 | 2003-12-11 | Engineering data interface and electrical specification tracking and ordering system |
| PCT/US2003/039715 WO2004055643A2 (en) | 2002-12-13 | 2003-12-12 | Engineering data interface and electrical specification tracking and ordering system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP1573486A2 true EP1573486A2 (en) | 2005-09-14 |
| EP1573486A4 EP1573486A4 (en) | 2008-02-13 |
Family
ID=32599664
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP03813428A Withdrawn EP1573486A4 (en) | 2002-12-13 | 2003-12-12 | Engineering data interface and electrical specification tracking and ordering system |
Country Status (7)
| Country | Link |
|---|---|
| EP (1) | EP1573486A4 (en) |
| JP (1) | JP2006517041A (en) |
| KR (1) | KR20050084215A (en) |
| AU (1) | AU2003297031A1 (en) |
| CA (1) | CA2505980A1 (en) |
| MX (1) | MXPA05006115A (en) |
| WO (1) | WO2004055643A2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5008326B2 (en) * | 2006-03-27 | 2012-08-22 | 中国電力株式会社 | Electric wire management system and electric wire management method |
| DE102007026318A1 (en) * | 2007-06-06 | 2008-12-24 | Sag Gmbh | Method for laying cables in industrial installations |
| EP4589505A4 (en) * | 2022-09-12 | 2025-08-06 | Sumitomo Electric Industries | CABLE MANAGEMENT SYSTEM AND CABLE MANAGEMENT METHOD |
-
2003
- 2003-12-12 WO PCT/US2003/039715 patent/WO2004055643A2/en not_active Ceased
- 2003-12-12 EP EP03813428A patent/EP1573486A4/en not_active Withdrawn
- 2003-12-12 MX MXPA05006115A patent/MXPA05006115A/en not_active Application Discontinuation
- 2003-12-12 AU AU2003297031A patent/AU2003297031A1/en not_active Abandoned
- 2003-12-12 KR KR1020057010436A patent/KR20050084215A/en not_active Withdrawn
- 2003-12-12 CA CA002505980A patent/CA2505980A1/en not_active Abandoned
- 2003-12-12 JP JP2004560850A patent/JP2006517041A/en not_active Withdrawn
Non-Patent Citations (2)
| Title |
|---|
| See also references of WO2004055643A2 * |
| The technical aspects identified in the present application (Art. 92 EPC) are considered part of common general knowledge. Due to their notoriety no documentary evidence is found to be required. For further details see the accompanying Opinion and the reference below. XP002456252 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CA2505980A1 (en) | 2004-07-01 |
| MXPA05006115A (en) | 2005-09-30 |
| EP1573486A4 (en) | 2008-02-13 |
| JP2006517041A (en) | 2006-07-13 |
| WO2004055643A3 (en) | 2007-02-22 |
| WO2004055643A2 (en) | 2004-07-01 |
| AU2003297031A8 (en) | 2004-07-09 |
| KR20050084215A (en) | 2005-08-26 |
| AU2003297031A1 (en) | 2004-07-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20040143475A1 (en) | Engineering data interface and electrical specification tracking and ordering system | |
| US7051036B2 (en) | Computer-implemented system and method for project development | |
| US7280881B2 (en) | Method and system for reducing lead-time in the packaging industry | |
| US20040024662A1 (en) | Equipment documentation management system, method, and software tools | |
| US20090150663A1 (en) | Method And System For Monitoring A Supply-Chain | |
| US20060288269A1 (en) | System and method for electronic document generation and delivery | |
| US20040122689A1 (en) | Method and apparatus for tracking a part | |
| US20100023422A1 (en) | System and Method for Processing Import/Export Transactions | |
| US20060136902A1 (en) | Mobile process automation method | |
| US8626760B2 (en) | System and method for document management | |
| US20020120493A1 (en) | Flexographic platemaker project management and customer interface system | |
| US20050060243A1 (en) | Method for managing tools in a power plant service environment | |
| JP2008295549A (en) | Amusement stand distribution management system | |
| EP1573486A2 (en) | Engineering data interface and electrical specification tracking and ordering system | |
| US7937414B2 (en) | Fiber splice assignment and management system | |
| US8019573B2 (en) | Drawing conversion assignment and management system | |
| JPH10187859A (en) | Business processing method, business processing system, business processing device, and storage medium storing business processing program | |
| IL182377A (en) | Parts marking system and method | |
| Hoffmann-Walbeck | Scope of Workflows | |
| Bard et al. | Developing a data-collection system for PCB assembly: a case study in software engineering | |
| US20050125303A1 (en) | Split plat assignment and management system | |
| Saaksvuori et al. | Product lifecycle management systems | |
| JP2022118291A (en) | Document management system | |
| Schumacher | Process Improvements in the 60 CRS AGE Flight | |
| Logan et al. | An integrated computerised maintenance system for offshore operations |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20050613 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL LT LV MK |
|
| DAX | Request for extension of the european patent (deleted) | ||
| PUAK | Availability of information related to the publication of the international search report |
Free format text: ORIGINAL CODE: 0009015 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: G06F 9/44 20060101AFI20070412BHEP |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20080115 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|
| 18W | Application withdrawn |
Effective date: 20080424 |