- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 230000004888 barrier function Effects 0.000 title abstract description 13
- 230000007246 mechanism Effects 0.000 claims abstract description 3
- 239000004567 concrete Substances 0.000 description 12
- 238000009415 formwork Methods 0.000 description 12
- 238000010276 construction Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3219—Means supported by the building wall, e.g. security consoles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3223—Means supported by building floors or flat roofs, e.g. safety railings
- E04G21/3233—Means supported by building floors or flat roofs, e.g. safety railings without permanent provision in the floor or roof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3223—Means supported by building floors or flat roofs, e.g. safety railings
- E04G21/3233—Means supported by building floors or flat roofs, e.g. safety railings without permanent provision in the floor or roof
- E04G21/3242—Means supported by building floors or flat roofs, e.g. safety railings without permanent provision in the floor or roof using clamps
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/045—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G2005/148—Railings latticed or netted
Definitions
- THE PRESENT INVENTION relates to a scaffold clamp, and more particularly, relates to a scaffold clamp for supporting a barrier-post, the barrier-post being arranged to support a temporary safety barrier.
- temporary safety barriers comprise a plurality of wire mesh panels, which are each supported at both ends by a substantially vertical barrier-post.
- the temporary safety barrier can be spaced significantly from the edge of the floor structure, leaving a dangerous gap.
- a scaffold clamp for supporting a barrier-post comprising: a pair of clamping members, at least one of which is moveable; a mechanism operable to urge the at least one moveable clamping member towards the other said clamping member in a clamping manner; and a support arrangement configured to engage and support the lower end of a barrier-post in at least two discrete positions on the clamp.
- the support arrangement comprises a pair of spaced apart sockets, each socket being sized to receive the lower end of a barrier-post.
- the support arrangement comprises a pair of spaced apart spigots, each spigot being sized to be received within the lower end of a barrier-post.
- the scaffolding clamp has a barrier-support located between said two discrete positions, to support the lower edge of a safety-barrier carried by a barrier-post supported in one of said positions.
- said discrete positions are spaced from one another along an axis substantially parallel to or coincident with the direction of movement of the or each clamping member.
- Scaffold clamp 1 comprises an elongate longitudinal shaft 2, which preferably has a uniform, substantially square or rectangular cross-section. However, it is also possible for the shaft to have a circular section.
- One end of the longitudinal shaft 2 is received, as a close sliding fit, within a sleeve 3.
- the same end of the longitudinal shaft 2 carries a smaller diameter threaded bar 4, which extends completely through the sleeve 3.
- a clamping handle 5 is threadedly engaged on the threaded bar 4 and is arranged to bear against the adjacent end 6 of the sleeve 3. Therefore, it will be appreciated that rotation of the clamping handle 5 on the threaded bar 4, in a direction appropriate to move the clamping handle 5 to the right as illustrated in Figure 1, is effective to urge the sleeve 3 over the longitudinal shaft 2 such that an increased length of the longitudinal shaft 2 is accommodated within the sleeve 3.
- the opposite end 7 of the sleeve 3 carries an upwardly and forwardly-directed member 8.
- the longitudinal shaft 2 carries a support arrangement 10 which, in the embodiment illustrated in Figure 1, comprises a pair of spaced-apart cylindrical sockets 11, 12. Both of the sockets 11 are oriented such that their respective longitudinal axes are substantially perpendicular to the longitudinal axes of the shaft 2.
- the socket 11 is provided at the extreme end of the shaft 2, whilst the other socket 12 is spaced from the socket 11 and extends outwardly from the shaft 2 at a position spaced slightly from its extreme end 9.
- the two sockets 11, 12 are substantially parallel to one another and a support platform 13 is provided which extends between the two sockets 11,12 and which is secured to the longitudinal shaft 2 therebetween.
- Each socket 11, 12 is provided with a pair of orthogonal through-bores 14,15 which extend transversely across each socket 11,12 to receive a locking pin therethrough.
- the clamp 1 is provided with a second clamping member 16 which is secured to the inner of the two sockets 12 and which extend upwardly and rearwardly in a direction generally towards the first clamping member 8.
- the scaffold clamp 1 is illustrated supporting a barrier-post 19 in an initial position appropriate for the barrier-post 19 to support a mesh safety barrier 20 at a position spaced sufficiently from the girder 18 to allow erection of formwork (illustrated schematically at 21) for use in fabrication of a concrete floor structure supported by the girder 18.
- formwork illustrated schematically at 21
- the mesh panel has a forwardly-angled top flange 22 which fits over the barrier-post 19, and a rearwardly-directed lower flange 23 which rests upon the support platform 13 extending between the two sockets 11, 12. It will therefore be seen that the support platform 13 supports the lowermost edge of the mesh barrier panel 20.
- Figure 4 illustrates the scaffold clamp 1 during an alternate stage of its use, in which it engages and supports the barrier-post 19 in an alternate position, closer to the structural girder 18.
- the lower end of the barrier-post 19 is slidably engaged in the inner socket 12 which is located immediately adjacent the clamping member 16 and is hence located much closer to the girder 18 than the first socket 11.
- This support position for the barrier-post 19 is appropriate for use in supporting a barrier panel 20 after the concrete floor 24 has been constructed and the formwork 21 has been completely removed. It will be seen that, in this configuration, the lowermost edge of the barrier panel 20 rests on the concrete floor 24 itself.
- the above-described scaffold clamp 1 defines two discreet positions, each of which is spaced from the structural girder 18 to which the clamp 1 is secured by different distances.
- the barrier-post 19 can be securely retained within the respective sockets 11,12 by the insertion of a locking pin (not shown) through either or both of the bores 14, 15 in the socket, the locking pin passing through an aligned bore provided through the barrier-post 19.
- the two support sockets 11, 12 could be replaced with a pair of upstanding support spigots (not illustrated) configured to be slidably received within the lower end of a tubular barrier-post.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
- THE PRESENT INVENTION relates to a scaffold clamp, and more particularly, relates to a scaffold clamp for supporting a barrier-post, the barrier-post being arranged to support a temporary safety barrier.
- It is well known, in the construction industry, to provide temporary safety barriers around the perimeter of the floor of a multi-storey or high-rise building during its construction, in order to provide protection for construction workers working on those floors, at positions raised significantly above the ground. Typically, temporary safety barriers of this type comprise a plurality of wire mesh panels, which are each supported at both ends by a substantially vertical barrier-post.
- It is also very well know to fabricate the floor structure of such buildings using reinforced concrete, and the concrete is usually poured into appropriate "moulds" defined by removable formwork. Because the formwork must be provided around the region in which the concrete is to be poured, it will be appreciated that the formwork must extend past the edge of the resulting concrete floor, in order properly to define the edge of the floor.
- It is necessary, not only to provide temporary safety barriers for construction workers during the stages of erecting the formwork and pouring the concrete, but also to provide temporary safety barriers around the resulting concrete floor structure, after the formwork has been removed, and during subsequent stages of the building's construction.
- It should therefore be appreciate that, if a temporary safety barrier is provided around the formwork to provide proper protection to construction workers during the erection of the formwork and pouring of the concrete, when the formwork is subsequently removed, leaving behind the concrete floor structure, the temporary safety barrier can be spaced significantly from the edge of the floor structure, leaving a dangerous gap.
- It is an object of the present invention to provide an improved scaffold clamp for supporting a barrier-post.
- According to the present invention, there is provided A scaffold clamp for supporting a barrier-post, the clamp comprising: a pair of clamping members, at least one of which is moveable; a mechanism operable to urge the at least one moveable clamping member towards the other said clamping member in a clamping manner; and a support arrangement configured to engage and support the lower end of a barrier-post in at least two discrete positions on the clamp.
- Preferably, the support arrangement comprises a pair of spaced apart sockets, each socket being sized to receive the lower end of a barrier-post.
- Advantageously, the support arrangement comprises a pair of spaced apart spigots, each spigot being sized to be received within the lower end of a barrier-post.
- Conveniently, the scaffolding clamp has a barrier-support located between said two discrete positions, to support the lower edge of a safety-barrier carried by a barrier-post supported in one of said positions.
- Preferably, said discrete positions are spaced from one another along an axis substantially parallel to or coincident with the direction of movement of the or each clamping member.
- So that the invention may be more readily understood, and so that further features thereof may be appreciated, an embodiment of the present invention will now be described, by way of example, with reference to the accompanying drawings, in which :-
- FIGURE 1 is a side view of a scaffold clamp in accordance with the present invention, illustrating the clamp in a first, open, condition;
- FIGURE 2 is a view corresponding generally to that of Figure 1, but illustrates the scaffold clamp clampingly engaged to a structural girder;
- FIGURE 3 is a view corresponding generally to that of Figure 2, but illustrating the scaffold clamp supporting a barrier-post in a first position to allow erection of formwork; and
- FIGURE 4 is a view corresponding generally to that of Figure 3, but illustrating the scaffold clamp supporting a barrier-post in a second, alternate, position to provide edge protection to a finished concrete floor.
-
- Referring initially to Figure 1, there is illustrated a scaffold clamp in accordance with an embodiment of the present invention.
Scaffold clamp 1 comprises an elongatelongitudinal shaft 2, which preferably has a uniform, substantially square or rectangular cross-section. However, it is also possible for the shaft to have a circular section. One end of thelongitudinal shaft 2 is received, as a close sliding fit, within asleeve 3. The same end of thelongitudinal shaft 2 carries a smaller diameter threadedbar 4, which extends completely through thesleeve 3. - A
clamping handle 5 is threadedly engaged on the threadedbar 4 and is arranged to bear against theadjacent end 6 of thesleeve 3. Therefore, it will be appreciated that rotation of theclamping handle 5 on the threadedbar 4, in a direction appropriate to move theclamping handle 5 to the right as illustrated in Figure 1, is effective to urge thesleeve 3 over thelongitudinal shaft 2 such that an increased length of thelongitudinal shaft 2 is accommodated within thesleeve 3. - The
opposite end 7 of thesleeve 3 carries an upwardly and forwardly-directedmember 8. - At its
end 9, opposite the end to which the threadedbar 4 is attached, thelongitudinal shaft 2 carries asupport arrangement 10 which, in the embodiment illustrated in Figure 1, comprises a pair of spaced-apart 11, 12. Both of thecylindrical sockets sockets 11 are oriented such that their respective longitudinal axes are substantially perpendicular to the longitudinal axes of theshaft 2. Thesocket 11 is provided at the extreme end of theshaft 2, whilst theother socket 12 is spaced from thesocket 11 and extends outwardly from theshaft 2 at a position spaced slightly from itsextreme end 9. The two 11, 12 are substantially parallel to one another and asockets support platform 13 is provided which extends between the two 11,12 and which is secured to thesockets longitudinal shaft 2 therebetween. - Each
11, 12 is provided with a pair of orthogonal through-socket 14,15 which extend transversely across eachbores 11,12 to receive a locking pin therethrough.socket - The
clamp 1 is provided with asecond clamping member 16 which is secured to the inner of the twosockets 12 and which extend upwardly and rearwardly in a direction generally towards thefirst clamping member 8. - Figure 1 illustrates the
clamp 1 in an initial, open condition. - Figure 2 illustrates the above-described
clamp 1 in an operative position in which it is clampingly engaged to the lower flange 17 of a structural I-section girder 18. Thegirder 18 would typically be a structural girder of a partially-constructed building, and would be configured to support a concrete floor structure to be fabricated thereabove. -
- As can be seen from a simple comparison with Figure 2 of Figure 1, the
clamping handle 5 has been rotated on the threadedbar 4 so as to drive thesleeve 3, and its associatedclamping member 8 towards theclamping member 16 carried by theshaft 2, so that the two 8,16 clampingly engage the flange 17 of theclamping members girder 18. - Turning now to consider Figure 3, the
scaffold clamp 1 is illustrated supporting a barrier-post 19 in an initial position appropriate for the barrier-post 19 to support amesh safety barrier 20 at a position spaced sufficiently from thegirder 18 to allow erection of formwork (illustrated schematically at 21) for use in fabrication of a concrete floor structure supported by thegirder 18. It should be noted, in particular, that the lower end of the barrier-post 19 is slidingly received within thefirst socket 11 provided at theextreme end 9 of thelongitudinal shaft 2. The mesh panel has a forwardly-angledtop flange 22 which fits over the barrier-post 19, and a rearwardly-directedlower flange 23 which rests upon thesupport platform 13 extending between the two 11, 12. It will therefore be seen that thesockets support platform 13 supports the lowermost edge of themesh barrier panel 20. - As illustrated in Figure 3, because the
end socket 11 is spaced substantially from thestructural girder 18, sufficient space is provided between thegirder 18 and themesh panel 20 to allow theformwork 21 to extend past thegirder 18. - Figure 4 illustrates the
scaffold clamp 1 during an alternate stage of its use, in which it engages and supports the barrier-post 19 in an alternate position, closer to thestructural girder 18. In this position, the lower end of the barrier-post 19 is slidably engaged in theinner socket 12 which is located immediately adjacent theclamping member 16 and is hence located much closer to thegirder 18 than thefirst socket 11. This support position for the barrier-post 19 is appropriate for use in supporting abarrier panel 20 after theconcrete floor 24 has been constructed and theformwork 21 has been completely removed. It will be seen that, in this configuration, the lowermost edge of thebarrier panel 20 rests on theconcrete floor 24 itself. - It should therefore be appreciated that the above-described
scaffold clamp 1 defines two discreet positions, each of which is spaced from thestructural girder 18 to which theclamp 1 is secured by different distances. - In either of the positions illustrated in Figure 3 or 4, the barrier-
post 19 can be securely retained within the 11,12 by the insertion of a locking pin (not shown) through either or both of therespective sockets 14, 15 in the socket, the locking pin passing through an aligned bore provided through the barrier-bores post 19. - Whilst the present invention has been described above with reference to a particular embodiment, it should be appreciated that certain modifications or alterations could be made to the scaffold clamp without departing from the scope of the present invention. For example, it is envisaged that, in alternative embodiments of the invention, the two
11, 12 could be replaced with a pair of upstanding support spigots (not illustrated) configured to be slidably received within the lower end of a tubular barrier-post.support sockets - In the present specification "comprises" means "includes or consists of' and "comprising" means "including or consisting of'.
- The features disclosed in the foregoing description, or the following claims, or the accompanying drawings, expressed in their specific forms or in terms of a means for performing the disclosed function, or a method or process for attaining the disclosed result, as appropriate, may, separately, or in any combination of such features, be utilised for realising the invention in diverse forms thereof.
Claims (5)
- A scaffold clamp for supporting a barrier-post, the clamp comprising: a pair of clamping members, at least one of which is moveable; a mechanism operable to urge the at least one moveable clamping member towards the other said clamping member in a clamping manner; and a support arrangement configured to engage and support the lower end of a barrier-post in at least two discrete positions on the clamp.
- A scaffold clamp according to claim 1, wherein the support arrangement comprises a pair of spaced apart sockets, each socket being sized to receive the lower end of a barrier-post.
- A scaffold clamp according to claim 1, wherein the support arrangement comprises a pair of spaced apart spigots, each spigot being sized to be received within the lower end of a barrier-post.
- A scaffold clamp according to any preceding claim, having a barrier-support located between said two discrete positions, to support the lower edge of a safety-barrier carried by a barrier-post supported in one of said positions.
- A scaffold clamp according to any preceding claim, wherein said discrete positions are spaced from one another along an axis substantially parallel to or coincident with the direction of movement of the or each clamping member.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB0324311 | 2003-10-16 | ||
| GB0324311A GB2407123A (en) | 2003-10-16 | 2003-10-16 | Scaffold clamp for supporting safety barrier posts |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP1524386A1 true EP1524386A1 (en) | 2005-04-20 |
Family
ID=29559455
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP04024772A Withdrawn EP1524386A1 (en) | 2003-10-16 | 2004-10-18 | A scaffold clamp for supporting a barrier post |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP1524386A1 (en) |
| GB (1) | GB2407123A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2177690A1 (en) | 2008-10-18 | 2010-04-21 | Georg Weglage | Holding device for a safety component, in particular for security walls or nets |
| DE102008052242A1 (en) * | 2008-10-18 | 2010-04-22 | Georg Weglage | Holder for protection module, particularly for catching wall, catching network or fall protection during staging, has clamping unit such that holder is fixed at part of building or supported in clamping position |
| WO2014167275A3 (en) * | 2013-04-12 | 2014-12-24 | Loadhog Limited | Attaching arrangement |
| WO2022036445A1 (en) * | 2020-08-17 | 2022-02-24 | Charitou George | Guardrail post holder for construction platform |
| FR3116844A1 (en) * | 2020-11-30 | 2022-06-03 | Frenehard | Railing bracket including two waits |
| WO2024134187A1 (en) * | 2022-12-21 | 2024-06-27 | Checkmate Lifting & Safety Ltd | Trench box or parapet wall guardrail receiver |
| DE202024104394U1 (en) | 2024-08-05 | 2024-08-09 | Erblin Lekaj | Safety assembly for safety walls, safety nets or the like |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB0423488D0 (en) * | 2004-10-22 | 2004-11-24 | Guard Uk Ltd K | Mounting elements to supports |
| GB2429031A (en) * | 2005-08-08 | 2007-02-14 | Mark Derek Harris | A scaffolding clamp |
| GB2471829B (en) * | 2009-06-12 | 2014-04-09 | Mke Services Ltd | Structural support |
| FR3062666B1 (en) * | 2017-02-03 | 2020-10-16 | Alphi | DEVICE FOR FIXING A POST |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2525263A1 (en) * | 1982-04-15 | 1983-10-21 | Moreau Pierre | Method of constructing prefabricated buildings - comprises casting preliminary flooring slabs which incorporate lifting points allowing installation using cranes |
| FR2666610A1 (en) * | 1990-09-11 | 1992-03-13 | Ouest Etancheite | Support for guardrail post |
| AU626247B3 (en) * | 1988-07-11 | 1992-06-04 | Dgs Property Pty Ltd | A stanchion assembly |
| GB2299827A (en) * | 1995-04-12 | 1996-10-16 | J P Whelan & Sons | Guardrail support |
| DE29818252U1 (en) * | 1998-10-13 | 1999-02-25 | Heinz, Alfred, 54662 Beilingen | Bracket for side protection elements that can be connected to a T-beam of a steel structure |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2113284B (en) * | 1982-01-06 | 1985-10-23 | John Fleming Sorbie | Scaffolding clamp |
| GB2229216B (en) * | 1989-03-16 | 1991-07-31 | J P Whelan & Sons | Guardrail support |
| AU7994791A (en) * | 1989-12-14 | 1991-07-18 | Industrial Innovations Limited | Structure support means |
| GB2291920B (en) * | 1994-07-29 | 1997-08-20 | Alexander Robertson Sneddon | Method of mounting a rail |
-
2003
- 2003-10-16 GB GB0324311A patent/GB2407123A/en not_active Withdrawn
-
2004
- 2004-10-18 EP EP04024772A patent/EP1524386A1/en not_active Withdrawn
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2525263A1 (en) * | 1982-04-15 | 1983-10-21 | Moreau Pierre | Method of constructing prefabricated buildings - comprises casting preliminary flooring slabs which incorporate lifting points allowing installation using cranes |
| AU626247B3 (en) * | 1988-07-11 | 1992-06-04 | Dgs Property Pty Ltd | A stanchion assembly |
| FR2666610A1 (en) * | 1990-09-11 | 1992-03-13 | Ouest Etancheite | Support for guardrail post |
| GB2299827A (en) * | 1995-04-12 | 1996-10-16 | J P Whelan & Sons | Guardrail support |
| DE29818252U1 (en) * | 1998-10-13 | 1999-02-25 | Heinz, Alfred, 54662 Beilingen | Bracket for side protection elements that can be connected to a T-beam of a steel structure |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2177690A1 (en) | 2008-10-18 | 2010-04-21 | Georg Weglage | Holding device for a safety component, in particular for security walls or nets |
| DE102008052242A1 (en) * | 2008-10-18 | 2010-04-22 | Georg Weglage | Holder for protection module, particularly for catching wall, catching network or fall protection during staging, has clamping unit such that holder is fixed at part of building or supported in clamping position |
| WO2014167275A3 (en) * | 2013-04-12 | 2014-12-24 | Loadhog Limited | Attaching arrangement |
| GB2527708A (en) * | 2013-04-12 | 2015-12-30 | Loadhog Ltd | Attaching arrangement |
| WO2022036445A1 (en) * | 2020-08-17 | 2022-02-24 | Charitou George | Guardrail post holder for construction platform |
| FR3116844A1 (en) * | 2020-11-30 | 2022-06-03 | Frenehard | Railing bracket including two waits |
| WO2024134187A1 (en) * | 2022-12-21 | 2024-06-27 | Checkmate Lifting & Safety Ltd | Trench box or parapet wall guardrail receiver |
| DE202024104394U1 (en) | 2024-08-05 | 2024-08-09 | Erblin Lekaj | Safety assembly for safety walls, safety nets or the like |
| WO2026032829A1 (en) | 2024-08-05 | 2026-02-12 | Reachteq L.L.C. | Securing assembly for fall arrest walls, fall arrest nets or the like |
Also Published As
| Publication number | Publication date |
|---|---|
| GB2407123A (en) | 2005-04-20 |
| GB0324311D0 (en) | 2003-11-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20150240505A1 (en) | Safety Barrier Netting System | |
| US12173501B2 (en) | Modular space frame support system, work platform system and methods of erecting the same | |
| WO2013074062A1 (en) | Guardrail stanchion and system | |
| GB2407123A (en) | Scaffold clamp for supporting safety barrier posts | |
| US12134903B1 (en) | Suspended translating platform | |
| AU2021319450A1 (en) | Formwork system and method | |
| AU2019392578B2 (en) | Building floor-edge protection system | |
| CN114508231B (en) | Quick combination construction method for I-steel component | |
| KR101243178B1 (en) | Apparatus for constructing scaffolding capable of complex process and safety ensurance | |
| JP2015004213A (en) | Panel for suspension scaffold and construction method of panel for suspension scaffold and panel unit for suspension scaffold | |
| KR20160142928A (en) | Built-up scaffold for construction field) | |
| KR101966440B1 (en) | work safety scaffolding for installation in roof structure | |
| US2916245A (en) | Adjustable scaffold bracket | |
| EP0350525B1 (en) | Method for producing building-walls and a shuttering system | |
| WO2023012274A1 (en) | Formwork system for a wall element, comprising a combination of formwork and a frame section | |
| GB2229216A (en) | Guardrail support | |
| EP2516773B1 (en) | Protective rail support | |
| KR102370425B1 (en) | The safety rail of the formwork | |
| KR101635931B1 (en) | Framework scaffold system with improved security and functionality | |
| KR102437398B1 (en) | Easy-to-install integrated slab euroform system | |
| WO2019126187A1 (en) | Integrated construction system | |
| EP1555098A2 (en) | Method for fabricating composite elements | |
| KR20210001746U (en) | Rail type safety hook | |
| KR200300595Y1 (en) | Scaffolding equipment | |
| WO2002066766A1 (en) | Components for assembling a scaffolding system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL HR LT LV MK |
|
| AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
| RTI1 | Title (correction) |
Free format text: A SCAFFOLD CLAMP FOR SUPPORTING A BARRIER POST |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20051021 |