EP1498551A1 - A method and equipment for strengthening a piles wall - Google Patents
A method and equipment for strengthening a piles wall Download PDFInfo
- Publication number
- EP1498551A1 EP1498551A1 EP04291663A EP04291663A EP1498551A1 EP 1498551 A1 EP1498551 A1 EP 1498551A1 EP 04291663 A EP04291663 A EP 04291663A EP 04291663 A EP04291663 A EP 04291663A EP 1498551 A1 EP1498551 A1 EP 1498551A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- anchoring
- piles
- strengthening
- intervals
- holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000005728 strengthening Methods 0.000 title claims abstract description 29
- 238000004873 anchoring Methods 0.000 claims abstract description 55
- 239000000463 material Substances 0.000 claims abstract description 21
- 238000005553 drilling Methods 0.000 claims abstract description 14
- 239000004567 concrete Substances 0.000 claims abstract description 10
- 239000011440 grout Substances 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 claims description 5
- 244000273618 Sphenoclea zeylanica Species 0.000 claims 2
- 208000014617 hemorrhoid Diseases 0.000 description 44
- 239000002689 soil Substances 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 3
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 238000010420 art technique Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 239000011152 fibreglass Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000002990 reinforced plastic Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/10—Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/207—Securing of slopes or inclines with means incorporating sheet piles or piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/10—Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
- E02D5/12—Locking forms; Edge joints; Pile crossings; Branch pieces
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Definitions
- the present invention relates to a method for strengthening a piles wall and an equipment to implement the method.
- the invention relates to the building of a strengthening structure such as a lining wall over a "wall" comprising a plurality of concrete piles separated by intervals.
- the interval between two piles can consist of the remaining ground within which the piles have been made.
- the interval can also consist of intermediate piles disposed between two main piles made of reinforced concrete.
- the intermediate piles are made of a grout which is less hard than the reinforced concrete.
- FIG 1 illustrates a piles wall provided with a lining wall.
- Figure 1 shows the alignments A, B and C of concrete piles D.
- the piles are obtained by drilling vertical boreholes within the ground, filling up the boreholes with concrete and disposing a reinforcement structure into the boreholes. Then the ground within the volume limited by the alignments of piles A, B, C and D is excavated. As a result, the intervals between the piles consist of the remaining soil or ground.
- Such a piles wall is generally called a "contiguous bored piles wall" (C.B.P.W.).
- S.P.W. Another type of piles wall called "secant piles wall” (S.P.W.) consists of an alternation of primary piles made of harder concrete and secondary piles made of softer material such as grout, the secondary piles being located between two primary piles.
- a vertical lining wall LW is built over the pile wall.
- the lining wall should be anchored within the pile wall. In some other cases, a lining wall is not necessary. It is sufficient to anchor strengthening sections such as a steel section between the piles. To achieve this anchoring, holes are drilled in the piles and anchoring members are inserted and fixed within these holes.
- a first object of the present invention is to provide a method for strengthening a piles wall (C.B.P.W. or S.P.W.) which does not present the above-mentioned drawbacks.
- the method for strengthening a wall comprising a plurality of piles made of concrete and separated by intervals consisting of less hard material said method comprises the steps of:
- the anchoring members are firmly secured even though the material which forms the intervals between the piles is softer.
- a second object of the present invention is to provide an equipment to implement the method of strengthening the piles walls (C.B.P.W. or S.P.W.).
- the equipment for strengthening a wall comprising a plurality of piles made of concrete separated by intervals consisting of less hard material, the equipment comprises:
- Figure 2 shows two contiguous bored piles 10 and 12 and the interval 14, consisting of remaining soil, between the two piles.
- the piles are made of reinforced concrete and their diameter is from 300 to 2100 mm.
- the length L of the interval 14 is from 50 to 300 mm, typically 150 mm.
- anchoring members are inserted into the holes 16 and fixed within them.
- the anchoring members consist of expansible bolts such as bolt 24. These bolts are generally called “Jeffer bolts”.
- the bolt 24 comprises an expansible end 26 and a threaded head 28.
- the threaded head 28 is the end of a stem 30 which is used to expand the bolt.
- the threaded head 28 of the bolt is also used to fix an anchoring structure such as a mesh 32.
- the portion of the mesh 32 surrounding the head 28 is secured to the bolt 24 by means of a nut 34 and a washer 36.
- the end 26 of the bolt 24 is expanded in the enlarged portion 22 of the hole 16. So, the bolt 24 is firmly anchored in the material forming the interval 14 between the two piles 10 and 12 and the mesh 32 is fixed to the bolts 24.
- the lining wall 38 can be built with any convenient material (please give examples of material).
- the mesh 32 has a double function. Firstly, the mesh serves as an anchoring structure for anchoring the lining wall over the piles wall. Secondly, the mesh serves as a reinforcement for the lining wall itself.
- the same building method can be implemented in the case of a secant piles wall.
- the method for fixing the anchoring members e.g. Jeffer bolts
- the reinforcing structure such as a mesh
- steel sections or similar structures which are fixed or tied by means of the anchoring members.
- the tool sections can extend over the whole piles wall or only over the intervals between the piles.
- the drilling tool 18 is schematically shown in figure 5.
- the tool comprises a stem 50 and a drilling head 52.
- the stem 50 is provided with a flight 54 to remove the spoil.
- the tool is provided with a pivoting blade 56.
- the blade 56 has a first end 56a which is pivotally mounted on the stem and an intermediate portion 56b which is connected to a control arm 58.
- the second end of the arm 58 is connected to an inner or outer control sleeve not shown in figure 5.
- the arm 58 is moved and the blade 56 is pivoted about its end 56a. The pivoting of the blade 56 allows the performance of the enlarged portion 22 of the anchoring holes 16.
- FIG. 6 shows a Jeffer bolt 24 which can be used as an anchoring member to implement the building method.
- the bolt comprises a cylindrical body 60, the distal end 62 thereof being split to define two expansible wings 64 and 66.
- a central stem 68 is slidably mounted within the body 60.
- the stem 68 is provided with an expansion head 70 and a threaded end 72. When the stem is moved with respect to the body 60; by means of the nut 34 and the washer 36, the control head 70 produces the expansion of the wings 64 and 66.
- the method and the equipment for building the lining wall has many advantages compared to the prior art techniques.
- the building of the lining wall is easier and the lining wall has a higher mechanical strength. This is very important when the purpose of the lining wall is to resist the bending force developed by the soil between the piles and the pressure of the water contained in the soil.
- the stem 68 of the bolt can be hollow to allow the injection of grout or similar material into the anchoring hole.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Piles And Underground Anchors (AREA)
Abstract
- drilling anchoring holes into the material forming said intervals;
- fixing anchoring members (24) within said anchoring holes, said anchoring members having heads which project out of said material;
- fixing a strengthening structure (32) to the heads of said anchoring members, said strengthening structure facing at least said intervals between said piles.
Description
- The present invention relates to a method for strengthening a piles wall and an equipment to implement the method.
- More precisely, the invention relates to the building of a strengthening structure such as a lining wall over a "wall" comprising a plurality of concrete piles separated by intervals. The interval between two piles can consist of the remaining ground within which the piles have been made. The interval can also consist of intermediate piles disposed between two main piles made of reinforced concrete. The intermediate piles are made of a grout which is less hard than the reinforced concrete.
- Enclosed figure 1 illustrates a piles wall provided with a lining wall. Figure 1 shows the alignments A, B and C of concrete piles D. The piles are obtained by drilling vertical boreholes within the ground, filling up the boreholes with concrete and disposing a reinforcement structure into the boreholes. Then the ground within the volume limited by the alignments of piles A, B, C and D is excavated. As a result, the intervals between the piles consist of the remaining soil or ground. Such a piles wall is generally called a "contiguous bored piles wall" (C.B.P.W.).
- Another type of piles wall called "secant piles wall" (S.P.W.) consists of an alternation of primary piles made of harder concrete and secondary piles made of softer material such as grout, the secondary piles being located between two primary piles.
- To improve the sealing and/or the mechanical strength of the piles wall, a vertical lining wall LW is built over the pile wall. The lining wall should be anchored within the pile wall. In some other cases, a lining wall is not necessary. It is sufficient to anchor strengthening sections such as a steel section between the piles. To achieve this anchoring, holes are drilled in the piles and anchoring members are inserted and fixed within these holes.
- This way of anchoring the strengthening structure such as the lining wall on the piles wall has many drawbacks. Since the holes must be drilled in a hard material with a percussive drilling tool, this operation is time-consuming. Generally, the piles are reinforced so there is a risk of hitting the reinforcement.
- Finally, this drilling technique creates problems of "health and safety" (dust and "white hand, etc.).
- A first object of the present invention is to provide a method for strengthening a piles wall (C.B.P.W. or S.P.W.) which does not present the above-mentioned drawbacks.
- To achieve this object, according to the invention, the method for strengthening a wall comprising a plurality of piles made of concrete and separated by intervals consisting of less hard material said method comprises the steps of:
- drilling anchoring holes into the material forming said intervals;
- fixing anchoring members within said anchoring holes, said anchoring members having heads which project out of said material;
- fixing a strengthening structure to the heads of said anchoring members, said strengthening structure facing at least said intervals between said piles.
- It will be understood that, because the holes are to be drilled in a softer material, it is not necessary to implement the percussive-drilling techniques and the risks of hitting the reinforcement of the piles are avoided.
- Preferably, said anchoring holes have a first portion opening into the outside surface of said intervals and an inner second portion having an enlarged size and said anchoring members are bolts having a head and an expansible end and being provided with means to expand said end.
- Thanks to the particular shape of the holes and the type of bolts which are used, the anchoring members are firmly secured even though the material which forms the intervals between the piles is softer.
- A second object of the present invention is to provide an equipment to implement the method of strengthening the piles walls (C.B.P.W. or S.P.W.).
- To achieve this object, according to the invention, the equipment for strengthening a wall comprising a plurality of piles made of concrete separated by intervals consisting of less hard material, the equipment comprises:
- a tool for drilling anchoring holes into the material forming said intervals,
- a plurality of anchoring members having a head, said member being adapted for fixing within said anchoring holes; and
- a strengthening structure adapted for fixing to the head of said anchoring members.
- Other features and advantages of the invention will appear clearer on reading the following description of various preferred embodiments of the invention given as non-limiting examples. The description refers to the accompanying figures in which :
- Figure 1, described above, shows a piles wall provided with a lining wall according to the prior art;
- Figure 2 illustrates the first step of the strengthening method according to the invention in the case of a lining wall;
- Figure 3 illustrates the second step of the building method;
- Figure 4 illustrates the third step of the building method;
- Figure 5 shows an example of a reaming tool for implementing the strengthening method; and
- Figure 6 shows an example of a Jeffer bolt adapted for use as an anchoring member.
- Referring now to figures 2 to 4, the method of the invention applied to the building of a lining wall will be described in detail.
- Figure 2 shows two contiguous
10 and 12 and thebored piles interval 14, consisting of remaining soil, between the two piles. For example, the piles are made of reinforced concrete and their diameter is from 300 to 2100 mm. The length L of theinterval 14 is from 50 to 300 mm, typically 150 mm. - In a first step, a plurality of anchoring holes such as 16 are drilled into the
interval 14 by means of adrilling tool 18 which will be described in more detail hereinafter. At present, it is sufficient to underline that, because theinterval 14 is softer than the piles, it is not necessary to use a percussive tool. Preferably thehole 16 comprises a firstouter portion 20 having a substantially constant diameter and a secondinner portion 22 which is enlarged. - In a second step illustrated by figure 3, anchoring members are inserted into the
holes 16 and fixed within them. Preferably, the anchoring members consist of expansible bolts such asbolt 24. These bolts are generally called "Jeffer bolts". - The
bolt 24 comprises anexpansible end 26 and a threadedhead 28. The threadedhead 28 is the end of astem 30 which is used to expand the bolt. The threadedhead 28 of the bolt is also used to fix an anchoring structure such as amesh 32. The portion of themesh 32 surrounding thehead 28 is secured to thebolt 24 by means of anut 34 and awasher 36. - In the third step illustrated in figure 4, the
end 26 of thebolt 24 is expanded in the enlargedportion 22 of thehole 16. So, thebolt 24 is firmly anchored in the material forming theinterval 14 between the two 10 and 12 and thepiles mesh 32 is fixed to thebolts 24. - When the mesh is fixed over the whole surface of the piles wall, the
lining wall 38 can be built with any convenient material (please give examples of material). Themesh 32 has a double function. Firstly, the mesh serves as an anchoring structure for anchoring the lining wall over the piles wall. Secondly, the mesh serves as a reinforcement for the lining wall itself. - According to an improved implementation of the method the stem of the
bolts 24 can be hollow. Thus, a grout can be injected into theenlarged portion 22 of thehole 16 to fill it up. The injected grout both improves the anchoring of the bolt and protects the bolt against corrosion. - The same building method can be implemented in the case of a secant piles wall.
- As already explained, the invention is also applicable to the making of a strengthening structure different from a lining wall in the case of both C.B.P. W. or S.P.W.
- In such a case, the method for fixing the anchoring members (e.g. Jeffer bolts) is not changed. The difference consists in the fact that the reinforcing structure such as a mesh is replaced by steel sections or similar structures which are fixed or tied by means of the anchoring members.
- The tool sections can extend over the whole piles wall or only over the intervals between the piles.
- The
drilling tool 18 is schematically shown in figure 5. The tool comprises astem 50 and adrilling head 52. Preferably, thestem 50 is provided with aflight 54 to remove the spoil. - Close to the
drilling head 52, the tool is provided with apivoting blade 56. Theblade 56 has afirst end 56a which is pivotally mounted on the stem and anintermediate portion 56b which is connected to acontrol arm 58. The second end of thearm 58 is connected to an inner or outer control sleeve not shown in figure 5. By moving the sleeve, thearm 58 is moved and theblade 56 is pivoted about itsend 56a. The pivoting of theblade 56 allows the performance of theenlarged portion 22 of the anchoring holes 16. - Figure 6 shows a
Jeffer bolt 24 which can be used as an anchoring member to implement the building method. These bolts are well known so it is not necessary to describe them in detail. The bolt comprises acylindrical body 60, thedistal end 62 thereof being split to define two 64 and 66. A central stem 68 is slidably mounted within theexpansible wings body 60. The stem 68 is provided with anexpansion head 70 and a threadedend 72. When the stem is moved with respect to thebody 60; by means of thenut 34 and thewasher 36, thecontrol head 70 produces the expansion of the 64 and 66.wings - The
bolt 24 can be made of steel, stainless steel, coated steel (to improve durability), glass reinforced plastic, carbon fibres reinforced plastic, etc. - It is apparent from the above description that the method and the equipment for building the lining wall has many advantages compared to the prior art techniques. The building of the lining wall is easier and the lining wall has a higher mechanical strength. This is very important when the purpose of the lining wall is to resist the bending force developed by the soil between the piles and the pressure of the water contained in the soil.
- As previously explained, the stem 68 of the bolt can be hollow to allow the injection of grout or similar material into the anchoring hole.
Claims (15)
- A method for strengthening a wall comprising a plurality of piles made of concrete and separated by intervals consisting of less hard material said method comprising the steps of:drilling anchoring holes into the material forming said intervals;fixing anchoring members within said anchoring holes, said anchoring members having heads which project out of said material;fixing a strengthening structure to the heads of said anchoring members, said strengthening structure facing at least said intervals between said piles.
- A method according to claim 1, wherein said step of fixing strengthening structure consists in fixing strengthening sections to the head of said anchoring members between said piles.
- A method according to claim 2, wherein said strengthening sections are steel sections.
- A method according to claim 1, wherein said step of fixing strengthening structure consists in:fixing an anchoring structure to the heads of said anchoring members, said anchoring structure facing said piles wall; andbuilding said lining wall over said anchoring structure, said anchoring structure forming a reinforcement for said lining wall.
- A method according to anyone of claims 1 to 4, wherein said anchoring holes have a first portion opening into the outside surface of said intervals and an inner second portion having an enlarged size and said anchoring members are bolts having a head and an expansible end and being provided with means to expand said end.
- A method according to claim 5, wherein said bolts have a hollow stem and grout is injected into said anchoring holes through the hollow stem of said bolts to fill up said second portion of the holes.
- A method according to claim 4, wherein said anchoring structure is a mesh.
- A method according to claim 7, wherein said intervals are formed by the ground wherein the piles are made.
- A method according to claim 7, wherein said intervals include piles made of a grout which is less hard than the concrete piles.
- An equipment for strengthening a wall comprising a plurality of piles made of concrete separated by intervals consisting of less hard material, the equipment comprising:a tool for drilling anchoring holes into the material forming said intervals,a plurality of anchoring members having a head, said member being adapted for fixing within said anchoring holes; anda strengthening structure adapted for fixing to the head of said anchoring members.
- An equipment according to claim 10, wherein said tool includes means for drilling a hole into said intervals and means for enlarging the inner portion of said holes.
- An equipment according to claim 11, wherein said anchoring members are bolts provided with an expansible end.
- An equipment according to claim 10, wherein said strengthening structure includes a plurality of steel section.
- An equipment according to claim 10, wherein said strengthening structure includes an anchoring structure.
- An equipment according to claim 14, wherein said anchoring section is a mesh.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB0316750A GB2403977B (en) | 2003-07-17 | 2003-07-17 | A method of strengthening a piles wall and piles wall strengthening equipment |
| GB0316750 | 2003-07-17 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP1498551A1 true EP1498551A1 (en) | 2005-01-19 |
Family
ID=27764001
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP04291663A Withdrawn EP1498551A1 (en) | 2003-07-17 | 2004-07-01 | A method and equipment for strengthening a piles wall |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP1498551A1 (en) |
| GB (1) | GB2403977B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114908765A (en) * | 2022-04-20 | 2022-08-16 | 济南城建集团有限公司 | Foundation pit non-waist-beam pile-anchor supporting structure and construction process |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110670598A (en) * | 2019-07-24 | 2020-01-10 | 青岛理工大学 | A cold joint treatment structure and method for occlusal pile construction |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB779011A (en) * | 1953-12-29 | 1957-07-17 | Becorit Grubenausbau Gmbh | Improvements in or relating to anchor support systems |
| US4362440A (en) * | 1979-01-27 | 1982-12-07 | Bergwerksverband Gmbh | Tubular lost borehole closure |
| US4402639A (en) * | 1980-03-19 | 1983-09-06 | Hilti Aktiengesellschaft | Anchor bolt |
| US4911583A (en) * | 1984-06-21 | 1990-03-27 | Schnabel Foundation Company | Structure and method for shoring a face of an excavation |
| DE4100137A1 (en) * | 1991-01-04 | 1992-07-16 | Dyckerhoff & Widmann Ag | Underground soil retention wall - consists of piles of non-hardening material, and bridging elements |
| JPH059928A (en) * | 1991-07-03 | 1993-01-19 | Railway Technical Res Inst | Method for making embankment slope steep |
| US6299386B1 (en) * | 1999-06-09 | 2001-10-09 | R. John Byrne | Method and apparatus for a shoring wall |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5934325A (en) * | 1982-08-19 | 1984-02-24 | Shimizu Constr Co Ltd | Method and apparatus for construction of pile-row cut-off wall |
| GB8514710D0 (en) * | 1985-06-11 | 1985-07-10 | Stent Foundations Ltd | Retaining walls |
-
2003
- 2003-07-17 GB GB0316750A patent/GB2403977B/en not_active Expired - Fee Related
-
2004
- 2004-07-01 EP EP04291663A patent/EP1498551A1/en not_active Withdrawn
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB779011A (en) * | 1953-12-29 | 1957-07-17 | Becorit Grubenausbau Gmbh | Improvements in or relating to anchor support systems |
| US4362440A (en) * | 1979-01-27 | 1982-12-07 | Bergwerksverband Gmbh | Tubular lost borehole closure |
| US4402639A (en) * | 1980-03-19 | 1983-09-06 | Hilti Aktiengesellschaft | Anchor bolt |
| US4911583A (en) * | 1984-06-21 | 1990-03-27 | Schnabel Foundation Company | Structure and method for shoring a face of an excavation |
| DE4100137A1 (en) * | 1991-01-04 | 1992-07-16 | Dyckerhoff & Widmann Ag | Underground soil retention wall - consists of piles of non-hardening material, and bridging elements |
| JPH059928A (en) * | 1991-07-03 | 1993-01-19 | Railway Technical Res Inst | Method for making embankment slope steep |
| US6299386B1 (en) * | 1999-06-09 | 2001-10-09 | R. John Byrne | Method and apparatus for a shoring wall |
Non-Patent Citations (1)
| Title |
|---|
| PATENT ABSTRACTS OF JAPAN vol. 0172, no. 82 (M - 1420) 31 May 1993 (1993-05-31) * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114908765A (en) * | 2022-04-20 | 2022-08-16 | 济南城建集团有限公司 | Foundation pit non-waist-beam pile-anchor supporting structure and construction process |
Also Published As
| Publication number | Publication date |
|---|---|
| GB2403977B (en) | 2006-10-11 |
| GB2403977A (en) | 2005-01-19 |
| GB0316750D0 (en) | 2003-08-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100598024B1 (en) | Wedge anchor | |
| RU2278941C2 (en) | Method and device for well drilling and anchor support fastening in borehole | |
| KR20100010891A (en) | Steel pipe pile and phc pile with inner pipe for air injection and grouting | |
| KR100966148B1 (en) | Ground adhering soil nailing structure and ground reinforcement method using the same | |
| JP4901593B2 (en) | Underground bite type anchor and its anchor method | |
| US7338233B2 (en) | Soil nail and method of installing a subsurface support | |
| KR100870410B1 (en) | Slope reinforcement nail | |
| KR100908085B1 (en) | Soil pressure nail structure and soil reinforcement method | |
| JP2011021401A (en) | Self-drilling anchor and earth and sand ground reinforcement method using the same | |
| JPH02289718A (en) | Drilling method of expanded head pile hole, constructing method of expanded head pile and pile hole drill | |
| KR101017412B1 (en) | Tribological permanent anchor and its construction method | |
| KR100366156B1 (en) | Soil nailing by pressure grouting | |
| GB2403977A (en) | Strengthening pile walls | |
| JP2000220142A (en) | Nailing device | |
| KR20140014739A (en) | Pile with non-closed channel shape of plural non-flat in the end of pile and method of construction of pile by using the same | |
| KR100720685B1 (en) | Nailing device | |
| AU1326300A (en) | Method and device in down-the-hole drilling | |
| JPH0820945A (en) | Foundation pile consolidation method and its equipment | |
| JPS6149473B2 (en) | ||
| JP3586839B2 (en) | In-situ formed concrete pile and its forming method | |
| JP2001323461A (en) | Drill bit and method of installing rod steel member or anchor tension steel | |
| JP2003184499A (en) | Large diameter lock bolt anchor for natural ground reinforcement | |
| JP4608327B2 (en) | The tip structure of a steel pipe pile used in the medium digging method. | |
| JP2001271347A (en) | Sinking method for ready-made piles | |
| JP2000345560A (en) | Building structure of ground anchor its building method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL HR LT LV MK |
|
| AKX | Designation fees paid | ||
| 17P | Request for examination filed |
Effective date: 20050706 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: 8566 |
|
| 17Q | First examination report despatched |
Effective date: 20060124 |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SOLETANCHE FREYSSINET |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20130201 |