EP0988424B1 - Modular bridge - Google Patents
Modular bridge Download PDFInfo
- Publication number
- EP0988424B1 EP0988424B1 EP98932046A EP98932046A EP0988424B1 EP 0988424 B1 EP0988424 B1 EP 0988424B1 EP 98932046 A EP98932046 A EP 98932046A EP 98932046 A EP98932046 A EP 98932046A EP 0988424 B1 EP0988424 B1 EP 0988424B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- bridge
- lower chords
- short
- ramp
- modular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
- E01D15/133—Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
Definitions
- the invention relates to a predominantly mobile modular bridge that can be coupled from at least two short bridges.
- a modular bridge is, for example, from US 5,526,544 A. previously known. However, there are the fixed lower chords ("lower chord 2") coupled together ("locking region 9"). An additional displaceable lower chord is not removable in US 5,526,544 A.
- the object of the invention is to provide a modular bridge that is as possible can be quickly built from existing short bridges.
- the modular bridge according to the invention (hereinafter also referred to as a long bridge referred to) is created by coupling two or more short ones together Bridges according to the features of claim 1.
- the short bridges BK each of which represents a load-bearing structure, each comprise two bridge ramp sections BR and an inner bridge section BI (FIGS. 1 and 5, 7).
- the ramp sections BR are connected by means of joints G to the ends of the inner sections BI.
- the inner section BI and the ramp section BR each comprise two track carrier parts, each track carrier part comprising a roadway F and side walls S.
- the road slabs are also the top chord of the bending beam.
- the individual track carrier parts of the inner sections BI are connected to one another by means of cross members Q.
- the bridge sections BI, BR have lower chords U which are firmly connected to the side walls S and which, in the example outlined, have the shape of an inverted u (FIG. 7).
- each of the four U-shaped fixed lower chords U there is a movable lower chord UB which can be moved in the direction of the bridge span and which also has coupling points corresponding to the coupling points of the fixed lower chords U.
- the fixed lower chords U of the individual bridge sections are connected to one another via the displaceable lower chord UB as a flap, the displaceable lower chord UB bearing according to its rigidity.
- the coupling is designed in the form of an eye rod connection by means of bolts BZ (FIG. 7).
- the displaceable lower flange UB which is shown in the embodiment according to FIGS.
- 1 to 4 as a single component can also be designed in several sections that can be displaced independently of one another. This applies in particular to those designs in which the lengths of ramp sections BR and inner sections BI are different or in which more than two short bridges are connected to form a long bridge.
- a load-bearing long bridge BL is created of double length, as shown in Fig. 4.
- the invention is not based on the embodiment of the long one shown in FIGS Bridge limited by exactly two short bridges. Rather, according to the invention any number of short bridges to one long bridge be coupled together. Both parts of the ramp become the inside short bridges swiveled upwards. Length and number of sliding Lower straps are adjusted accordingly.
Description
Die Erfindung betrifft eine vorwiegend mobil einsetzbare modulare Brücke, die aus mindestens zwei kurzen Brücken zusammengekuppelt werden kann.The invention relates to a predominantly mobile modular bridge that can be coupled from at least two short bridges.
Eine modulare Brücke ist etwa aus US 5 526 544 A vorbekannt. Dort sind jedoch die festen Untergurte ("lower chord 2") zusammengekoppelt ("locking region 9"). Ein zusätzlich verschiebbarer Untergurt ist in US 5 526 544 A nicht entnehmbar.A modular bridge is, for example, from US 5,526,544 A. previously known. However, there are the fixed lower chords ("lower chord 2") coupled together ("locking region 9"). An additional displaceable lower chord is not removable in US 5,526,544 A.
Aufgabe der Erfindung ist es, eine modulare Brücke zu schaffen, die möglichst schnell aus vorhandenen kurzen Brücken aufgebaut werden kann.The object of the invention is to provide a modular bridge that is as possible can be quickly built from existing short bridges.
Diese Aufgabe wird mit dem Gegenstand des Patentanspruch 1 gelöst. Vorteilhafte Ausführungen der Erfindung sind Gegenstand von Unteransprüchen.This object is achieved with the subject matter of claim 1. advantageous Embodiments of the invention are the subject of dependent claims.
Die erfindungsgemäße modulare Brücke (im folgenden auch als lange Brücke bezeichnet) entsteht durch Zusammenkuppeln von zwei oder mehr kurzen Brücken gemäß den Merkmalen des Anspruchs 1. The modular bridge according to the invention (hereinafter also referred to as a long bridge referred to) is created by coupling two or more short ones together Bridges according to the features of claim 1.
Vorteilhafte Ausführungen der Erfindung werden anhand von Figuren näher erläutert. Es zeigen:
- Fig. 1
- eine kurze Brücke, eingerichtet zum Befahren,
- Fig. 2
- eine kurze Brücke, rechter Rampenabschnitt hochgeschwenkt, verschiebbarer Untergurt nach rechts verschoben (der verschiebbare Untergurt ist zusätzlich getrennt dargestellt),
- Fig. 3
- eine kurze Brücke, linker Rampenabschnitt hochgeschwenkt, verschiebbarer Untergurt nach links verschoben (der verschiebbare Untergurt ist zusätzlich getrennt dargestellt),
- Fig. 4
- eine lange Brücke aus zwei kurzen Brücken, gegenüberliegende Rampenabschnitte hochgeschwenkt und an den Rampenspitzen gekoppelt, verschiebbare Untergurte aufeinanderzu verschoben und gekoppelt (der verschiebbare Untergurt ist zusätzlich getrennt dargestellt),
- Fig. 5
- eine kurze Brücke, Ansicht von oben,
- Fig. 6
- eine lange Brücke aus zwei kurzen Brücken, Ansicht von oben,
- Fig. 7
- den Querschnitt durch den Innenabschnitt einer Brücke.
- Fig. 1
- a short bridge, set up for driving,
- Fig. 2
- a short bridge, right ramp section swung up, sliding lower chord shifted to the right (the sliding lower chord is also shown separately),
- Fig. 3
- a short bridge, left ramp section swung up, displaceable lower chord shifted to the left (the displaceable lower chord is also shown separately),
- Fig. 4
- a long bridge made up of two short bridges, opposite ramp sections swung up and coupled at the ramp tips, displaceable lower chords moved towards and coupled to each other (the displaceable lower chord is also shown separately),
- Fig. 5
- a short bridge, top view,
- Fig. 6
- a long bridge made up of two short bridges, top view,
- Fig. 7
- the cross section through the inner portion of a bridge.
Die kurzen Brücken BK, die jede für sich eine lasttragende Struktur darstellt,
umfassen jeweils zwei Brückenrampenabschnitte BR sowie einen Brückeninnenabschnitt
BI (Fig. 1 und 5,7). Die Rampenabschnitte BR sind mittels Gelenken
G mit den Enden der Innenabschnitte BI verbunden. Innenabschnitt BI
und Rampenabschnitt BR umfassen in dieser Ausführung jeweils zwei Spurträgerteile,
wobei jedes Spurträgerteil eine Fahrbahn F sowie Seitenwände S
umfaßt. Die Fahrbahnplatten sind gleichzeitig Obergurt des Biegeträgers. Die
einzelnen Spurträgerteile der Innenabschnitte BI sind mittels Querträgern Q
miteinander verbunden. Die Brückenabschnitte BI, BR weisen fest mit den Seitenwänden
S verbundene Untergurte U auf, die im skizzierten Beispiel die
Form eines umgekehrten u haben (Fig. 7). In den vier U-förmigen festen Untergurten
U befindet sich jeweils ein beweglicher Untergurt UB, der in Brückenspannweitenrichtung
verschiebbar ist und der entsprechend den Kuppelpunkten
der festen Untergurte U ebenfalls Kuppelpunkte aufweist. Durch Schließen
dieser Kupplungen (Kupplungen sind in den Fig. 1 bis 4 generell mit dem Bezugszeichen
K bezeichnet) werden die festen Untergurte U der einzelnen
Brückenabschnitte über den verschiebbaren Untergurt UB als Lasche miteinander
verbunden, wobei der verschiebbare Untergurt UB entsprechend seiner
Steifigkeit mitträgt. In der hier beispielhaft dargestellten Ausführung ist die
Kupplung in Form einer Augenstabverbindung mittels Bolzen BZ (Fig. 7) ausgebildet.
Der verschiebbare Untergurt UB, der in der Ausführung nach Fig. 1 bis 4 als ein
einzelnes Bauteil dargestellt ist, kann auch in mehrere Abschnitte, die unabhängig
voneinander verschiebbar sind, ausgeführt sein. Das trifft insbesondere
für solche Ausführungen zu, bei denen die Längen von Rampenabschnitten BR
und Innenabschnitten BI unterschiedlich sind oder bei denen mehr als zwei
kurze Brücken zu einer langen Brücke verbunden werden.The short bridges BK, each of which represents a load-bearing structure, each comprise two bridge ramp sections BR and an inner bridge section BI (FIGS. 1 and 5, 7). The ramp sections BR are connected by means of joints G to the ends of the inner sections BI. In this embodiment, the inner section BI and the ramp section BR each comprise two track carrier parts, each track carrier part comprising a roadway F and side walls S. The road slabs are also the top chord of the bending beam. The individual track carrier parts of the inner sections BI are connected to one another by means of cross members Q. The bridge sections BI, BR have lower chords U which are firmly connected to the side walls S and which, in the example outlined, have the shape of an inverted u (FIG. 7). In each of the four U-shaped fixed lower chords U there is a movable lower chord UB which can be moved in the direction of the bridge span and which also has coupling points corresponding to the coupling points of the fixed lower chords U. By closing these couplings (couplings are generally designated by the reference symbol K in FIGS. 1 to 4), the fixed lower chords U of the individual bridge sections are connected to one another via the displaceable lower chord UB as a flap, the displaceable lower chord UB bearing according to its rigidity. In the embodiment shown here by way of example, the coupling is designed in the form of an eye rod connection by means of bolts BZ (FIG. 7).
The displaceable lower flange UB, which is shown in the embodiment according to FIGS. 1 to 4 as a single component, can also be designed in several sections that can be displaced independently of one another. This applies in particular to those designs in which the lengths of ramp sections BR and inner sections BI are different or in which more than two short bridges are connected to form a long bridge.
Durch Öffnen der Untergurtkupplungen ist es möglich (Fig. 2 und 3)
Mittels Kuppelstellen KV, die in dem verschiebbaren Untergurt UB vorgesehenen sind, können die festen Untergurte U der einzelnen Brückenabschnitte BI, BR bei nach oben verschwenktem Rampenabschnitt BR und verschobenem Untergurt UB wieder verbunden werden, so daß die kurze Brücke BK in dieser Konfiguration eine lasttragende Struktur darstellt.By means of coupling points KV, which are provided in the sliding lower flange UB the fixed lower chords U of the individual bridge sections BI, BR with ramp section BR pivoted upwards and shifted Lower chord UB are connected again, so that the short bridge BK in this Configuration represents a load-bearing structure.
Durch entsprechende Wahl der Gesamtlänge des beweglichen Untergurts UB können zwei derart konfigurierte kurze Brücken BK gemäß Fig. 2 und 3 an den verschobenem Untergurten UB und an den Rampenspitzen RS der Rampenabschnitte BR gekoppelt werden. Es entsteht eine lasttragende lange Brücke BL von doppelter Länge, wie in Fig. 4 dargestellt.By selecting the total length of the movable lower chord UB two short bridges BK configured in this way according to FIGS shifted lower chords UB and at the ramp tips RS of the ramp sections BR can be coupled. A load-bearing long bridge BL is created of double length, as shown in Fig. 4.
Die Erfindung ist nicht auf die in den Fig. 4,6 dargestellte Ausführung der langen Brücke aus genau zwei kurzen Brücken beschränkt. Vielmehr kann erfindungsgemäß eine beliebige Zahl von kurzen Brücken zu einer langen Brücke zusammengekoppelt werden. Dabei werden beide Rampenteile der innenliegenden kurzen Brücken nach oben verschwenkt. Länge und Anzahl der verschiebbaren Untergurte werden entsprechend angepaßt.The invention is not based on the embodiment of the long one shown in FIGS Bridge limited by exactly two short bridges. Rather, according to the invention any number of short bridges to one long bridge be coupled together. Both parts of the ramp become the inside short bridges swiveled upwards. Length and number of sliding Lower straps are adjusted accordingly.
Claims (6)
- Modular bridge (BL) which is produced by at least two short coupled-together bridges (BK), a short bridge (BK) having, in the bridge-span direction, the following components:a bridge inner section (BI), on the right and left,two bridge-ramp sections (BR) which, in the installed state, can be pivoted upwards,lower chords (U) which are fixedly connected to the bridge inner section (BI) and the bridge-ramp sections (BR),lower chords (UB) which can be displaced in the bridge-span direction in relation to the fixedly connected lower chords (U),
- Modular bridge (BL) according to Claim 1, characterized in that the lower chords (U) of the upwardly pivoted bridge-ramp sections (BR) of the short bridges (BK), said chords being fixedly connected to the ramp tips, form diagonal struts of the coupled-together bridge (BL).
- Modular bridge (BL) according to Claim 1 or 2, characterized in that the displaced lower chords (UB) of the short bridges (BK) form lower chords of the coupled-together bridge (BL).
- Modular bridge (BL) according to one of the preceding claims, characterized in that the fixedly connected lower chords (U) have a U-shaped cross section in which the displaceable lower chords (UB) are located.
- Modular bridge (BL) according to one of the preceding claims, characterized in that the fixedly connected lower chords (U) of the upwardly pivoted bridge-ramp sections (BR) are coupled together with the displaced lower chords (UB).
- Modular bridge (BL) according to one of the preceding claims, characterized in that a displaceable lower chord (UB) comprises a plurality of sections which can be displaced independently of one another.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19724771A DE19724771C1 (en) | 1997-06-12 | 1997-06-12 | Modular bridge structure |
DE19724771 | 1997-06-12 | ||
PCT/DE1998/001214 WO1998056994A1 (en) | 1997-06-12 | 1998-05-02 | Modular bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0988424A1 EP0988424A1 (en) | 2000-03-29 |
EP0988424B1 true EP0988424B1 (en) | 2002-04-03 |
Family
ID=7832232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP98932046A Expired - Lifetime EP0988424B1 (en) | 1997-06-12 | 1998-05-02 | Modular bridge |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP0988424B1 (en) |
JP (1) | JP3849806B2 (en) |
KR (1) | KR20010012204A (en) |
DE (2) | DE19724771C1 (en) |
WO (1) | WO1998056994A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1584748A2 (en) | 2004-04-07 | 2005-10-12 | Rheinmetall Landsysteme GmbH | Bridge laying arrangement |
EP1584749A2 (en) | 2004-04-07 | 2005-10-12 | Rheinmetall Landsysteme GmbH | Bridge-laying unit |
DE102007001778B3 (en) * | 2007-01-05 | 2008-05-29 | Rheinmetall Landsysteme Gmbh | Bridge laying vehicle, has moving module shifted in displacing position at nose-lateral end of base vehicle, support arranged nose-laterally at base vehicle, where moving module is supported front laterally at support in position |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10307858B3 (en) * | 2003-02-25 | 2004-06-09 | Dornier Gmbh | Transportable bridge structure has end sections compensating length differences between modular longitudinal supports and suspension arcs |
GB2533818B (en) | 2015-01-05 | 2021-03-03 | Bae Systems Plc | Mobile bridge apparatus |
GB2533817A (en) * | 2015-01-05 | 2016-07-06 | Bae Systems Plc | Mobile bridge module |
CN107190629A (en) * | 2017-06-05 | 2017-09-22 | 浙江省送变电工程公司 | It is a kind of to can adjust suspension bridge across cable duct |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3911266A1 (en) * | 1989-04-07 | 1990-10-11 | Krupp Industrietech | LAYABLE BRIDGE AND SYSTEM FOR LAYING THE BRIDGE |
DE4209316A1 (en) * | 1992-03-23 | 1993-09-30 | Krupp Industrietech | Layable bridge |
DE4305764A1 (en) * | 1993-02-25 | 1994-09-01 | Krupp Foerdertechnik Gmbh | Layable bridge and device for laying the bridge |
EP0640722A1 (en) * | 1993-08-31 | 1995-03-01 | Krupp Fördertechnik GmbH | Portable bridge |
DE4439844A1 (en) * | 1994-11-08 | 1996-05-30 | Krupp Foerdertechnik Gmbh | Device for the automatic coupling of transportable or dismantled bridges |
-
1997
- 1997-06-12 DE DE19724771A patent/DE19724771C1/en not_active Expired - Fee Related
-
1998
- 1998-05-02 JP JP50124799A patent/JP3849806B2/en not_active Expired - Fee Related
- 1998-05-02 WO PCT/DE1998/001214 patent/WO1998056994A1/en not_active Application Discontinuation
- 1998-05-02 EP EP98932046A patent/EP0988424B1/en not_active Expired - Lifetime
- 1998-05-02 DE DE59803628T patent/DE59803628D1/en not_active Expired - Lifetime
- 1998-05-02 KR KR19997010153A patent/KR20010012204A/en not_active Application Discontinuation
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1584748A2 (en) | 2004-04-07 | 2005-10-12 | Rheinmetall Landsysteme GmbH | Bridge laying arrangement |
EP1584749A2 (en) | 2004-04-07 | 2005-10-12 | Rheinmetall Landsysteme GmbH | Bridge-laying unit |
DE102004016974A1 (en) * | 2004-04-07 | 2005-11-03 | Rheinmetall Landsysteme Gmbh | Bridge-laying unit |
DE102004016983A1 (en) * | 2004-04-07 | 2005-11-17 | Rheinmetall Landsysteme Gmbh | Bridge laying device |
DE102004016983B4 (en) * | 2004-04-07 | 2006-01-19 | Rheinmetall Landsysteme Gmbh | Bridge laying device |
DE102007001778B3 (en) * | 2007-01-05 | 2008-05-29 | Rheinmetall Landsysteme Gmbh | Bridge laying vehicle, has moving module shifted in displacing position at nose-lateral end of base vehicle, support arranged nose-laterally at base vehicle, where moving module is supported front laterally at support in position |
Also Published As
Publication number | Publication date |
---|---|
JP3849806B2 (en) | 2006-11-22 |
KR20010012204A (en) | 2001-02-15 |
EP0988424A1 (en) | 2000-03-29 |
WO1998056994A1 (en) | 1998-12-17 |
DE19724771C1 (en) | 1998-10-01 |
DE59803628D1 (en) | 2002-05-08 |
JP2002508816A (en) | 2002-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1915316B1 (en) | Folding boom | |
EP0956465B1 (en) | Chain link with insertable separating pins | |
EP2288765A2 (en) | Lattice support structure | |
DE4419203C2 (en) | Bridge composed of longitudinal beam sections, cross beams and road slabs | |
EP2500230B1 (en) | Bridge for the intersection of two vehicle sections with a jointed connection | |
EP0391149B1 (en) | Portable bridge and system for placing the bridge | |
EP0283808B1 (en) | Dual switching system for simultaneous use by rail and magnetic vehicles | |
EP0612886B1 (en) | Portable bridge and device for placing the bridge | |
EP0988424B1 (en) | Modular bridge | |
EP2599923A1 (en) | Work equipment with an extension | |
EP1110482B1 (en) | Guide and roller system for a drawer | |
EP3287305B1 (en) | Scissor-type stand and transition with scissor-type stand | |
WO1993019974A1 (en) | Variable gauge running gear | |
DE2047400A1 (en) | Transportation facility | |
DE1680207C3 (en) | MOTOR VEHICLE WITH A DEVICE FOR TRANSPORTING AND LAYING A FOLDING BRIDGE WITH ACCESS Ramps | |
DE2535131C2 (en) | Sliding roof, especially for trucks and trailers | |
DE3400703C2 (en) | Convergent-divergent nozzle, especially for a jet engine | |
EP0916769B1 (en) | Bridge element for making portable bridges with a laying vehicle | |
EP0541948B1 (en) | Bridge | |
DE1658621A1 (en) | Motor vehicle with a device for transporting and laying a folding bridge provided with ramps | |
DE3508437C2 (en) | Truss bridge that can be dismantled from individual segments | |
DE3910180C2 (en) | ||
DE4213288C2 (en) | Hydraulic push and pull device, in particular for railroad tracks | |
DE2931243C2 (en) | Switch for trough-like roads | |
DE2641257C2 (en) | Vehicle with a removable ramp for building bridges, in particular floating bridges and ferries |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19991021 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE FR GB NL SE |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
17Q | First examination report despatched |
Effective date: 20010410 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE FR GB NL SE |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20020502 Year of fee payment: 5 |
|
REF | Corresponds to: |
Ref document number: 59803628 Country of ref document: DE Date of ref document: 20020508 |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20020701 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20030106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030503 |
|
EUG | Se: european patent has lapsed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20040429 Year of fee payment: 7 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E |
|
NLS | Nl: assignments of ep-patents |
Owner name: EUROBRIDGE MOBILE BRUECKEN GMBH |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: TP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20051201 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 20051201 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20120523 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20120601 Year of fee payment: 15 Ref country code: GB Payment date: 20120522 Year of fee payment: 15 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20130502 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131203 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20140131 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 59803628 Country of ref document: DE Effective date: 20131203 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130502 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130531 |