EP0967331A1 - Guide barrier - Google Patents
Guide barrier Download PDFInfo
- Publication number
- EP0967331A1 EP0967331A1 EP99111757A EP99111757A EP0967331A1 EP 0967331 A1 EP0967331 A1 EP 0967331A1 EP 99111757 A EP99111757 A EP 99111757A EP 99111757 A EP99111757 A EP 99111757A EP 0967331 A1 EP0967331 A1 EP 0967331A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- post
- support
- elements
- guide
- support elements
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F13/00—Arrangements for obstructing or restricting traffic, e.g. gates, barricades ; Preventing passage of vehicles of selected category or dimensions
- E01F13/02—Arrangements for obstructing or restricting traffic, e.g. gates, barricades ; Preventing passage of vehicles of selected category or dimensions free-standing; portable, e.g. for guarding open manholes ; Portable signs or signals specially adapted for fitting to portable barriers
- E01F13/022—Pedestrian barriers; Barriers for channelling or controlling crowds
Definitions
- the invention relates to a person guide with at least one post and with at least one shut-off part, which with the help of a projection a receiving device located on the post and held by a support device can be locked.
- the closest prior art includes one for self-service markets and the like certain leadership, which in DE 197 03 835 A1.
- This leadership has at least one Post and one pushed onto the post and fixed to the post arranged retaining ring on the circumference with wedge-shaped grooves Is provided.
- a locking part can be inserted into the grooves a shut-off part, for example arranged on a pipe or a piece of rope is.
- This structure also includes an annular cladding, which can be placed on the post and on the retaining ring, in order not to to cover a locking part occupied grooves of the retaining ring.
- the costume is equipped with segments that correspond to the pitch of the grooves.
- the solution to the problem is that the receiving device two has mutually screwable support elements for receiving the Projection of at least one shut-off part are determined.
- the support elements preferably disc-shaped, since this then advantageously the support device and a large part cover the protrusion of a shut-off part. Take over the support elements thus the function of a cladding, so that segments as at the beginning described as waste pieces no longer arise.
- the support elements but also take over the locking of at least one projection, there this is inserted between the two support elements and from the support elements is held or tensioned. This double function of the support elements proves to be extremely beneficial. If the support device can be screwed onto the post, another can be attached To gain an advantage. In this case, the screw connection between the two Support elements are loosened somewhat, so that the projections to better adjustment of the shut-off parts, circular between the support elements are arranged movably.
- Fig. 1 shows part of a guided tour 1.
- she has at least one that can be set up or attached to the floor Post 2 and is equipped with at least one shut-off part 4.
- the Example shows two posts 2 and three shut-off parts 4 in the form of tubes.
- Each post 2 carries a receiving device 11.
- the receiving devices 11 each have two support elements 12, 13, which on a support device 7 are arranged.
- At least one of the shut-off parts 4 Projection 5 is provided, which is locked in the receiving device 11.
- a receiving device 11 in a sectional view a section of a shut-off part 4.
- a support device 7 is arranged in the form of a support ring 8.
- the support ring 8 is pushed onto the round tubular post 2 and clamped by small screws 9 to the post 2, so that the Support ring 8 can no longer be moved along the longitudinal axis 3 of the post 2 is.
- the receiving device 11 also has two on the post 2 Slidable disc-shaped support elements 12, 13 on an upper one (12) and a lower support element 13.
- Each support element 12, 13 is with an annular or circumferential recess 14 or groove.
- both parts 12, 13 are usually mirror images arranged, but always so that both recesses 14 have a common one form undercut groove 15.
- the support elements 12, 13 are mutual screwable, namely the longitudinal axes 20 of the screw elements 19 parallel to the longitudinal axis 3 of the post 2. In screwed and usable The condition of the two support elements 12, 13 becomes this pressed against the support ring 8. In this situation, however, there is still one horizontally arranged annular gap 16 is formed, through which a a locking part 4 located projection 5 is passed. On his Free end, the projection 5 has a thickening 6 or the like on, which approximately claims the cross-sectional shape of the common groove 15.
- the diameter A of the pitch circle of the common groove 15 is larger than the diameter B of the pitch circle for the arrangement of the screw elements 19.
- the Barrier part 4 can therefore, viewed from above, at any angle, so steplessly arrange on post 2. This proves during assembly of guided tours 1 as useful if many posts 2 with rod-shaped shut-off parts 4 are to be connected. Occurring dimensions and This allows better tolerances to be bridged.
- Fig. 3 shows an alternative arrangement.
- the post 2 and the two screwable Support elements 12, 13 of the receiving device 11 are approximately designed like the functionally the same parts in Fig. 2, but different
- the selected support device 7 is shown here 2 screwed onto the tubular post 2 is now the support device 7 by at least one plugged Ring section 10 is formed, which has a circumferential inclined surface 17.
- the Upper support element 12 rests on the ring section 10 and both support elements 12, 13 are connected to one another via the screw elements 19.
- a so-called support device 7 can also be used in such an embodiment, which is not shown in the drawing, the support elements 12, 13 have two annular depressions which adjoin the cylindrical outer surface of the post 2.
- the annular, horizontally arranged depressions together form one on the outer surface of the post 2 adjoining annular space in which the O-ring pushed onto the post lies in.
- the cross-section of the space is matched to the cross-section of the O-ring in such a way that when the support elements are screwed to the screw elements 19 the O-ring is squeezed and against the lateral surface of the post and against the wall surfaces of the jointly formed space is pressed and the receiving device 11 designed in this way is arranged in a fixed manner on the post 2.
- the projection 5 is again received by at least one shut-off part 4 as already described.
Abstract
Description
Die Erfindung betrifft eine Personenführung mit wenigstens einem Pfosten und mit mindestens einem Absperrteil, das mit Hilfe eines Vorsprunges in einer am Pfosten befindlichen, von einer Stützeinrichtung gehaltenen Aufnahmeeinrichtung arretierbar ist.The invention relates to a person guide with at least one post and with at least one shut-off part, which with the help of a projection a receiving device located on the post and held by a support device can be locked.
Zum nächstliegenden Stand der Technik zählt eine für Selbstbedienungsmärkte und dergleichen bestimmte Personenführung, die in der DE 197 03 835 A1 beschrieben ist. Diese Personenführung weist mindestens einen Pfosten und einen auf den Pfosten aufgeschobenen und ortsfest am Pfosten angeordneten Haltering auf, der an seinem Umfang mit keilförmigen Nuten ausgestattet ist. In die Nuten kann ein Rastteil eingeschoben werden, das an einem Absperrteil, beispielsweise an einem Rohr oder einem Seilstück angeordnet ist. Zu diesem Aufbau gehört auch eine ringförmige Verkleidung, die auf den Pfosten und auf den Haltering aufsetzbar ist, um die nicht von einem Rastteil besetzten Nuten des Halteringes abzudecken. Die Verkleidung ist mit Segmenten ausgestattet, die der Teilung der Nuten entspricht. Dort wo ein Rastteil in eine der Nuten eingesetzt ist, muß aus der Verkleidung ein Segment herausgebrochen werden, damit die Verkleidung aufgesetzt werden kann. Das herausgebrochene Segment kann nicht mehr benutzt werden und wandert in den Abfall. Mit der Menge der Pfosten steigt aber auch die Anzahl der herausgebrochenen Segmente und damit die Abfallmenge. Dies ist nachteilig.The closest prior art includes one for self-service markets and the like certain leadership, which in DE 197 03 835 A1. This leadership has at least one Post and one pushed onto the post and fixed to the post arranged retaining ring on the circumference with wedge-shaped grooves Is provided. A locking part can be inserted into the grooves a shut-off part, for example arranged on a pipe or a piece of rope is. This structure also includes an annular cladding, which can be placed on the post and on the retaining ring, in order not to to cover a locking part occupied grooves of the retaining ring. The costume is equipped with segments that correspond to the pitch of the grooves. Where a locking part is inserted into one of the grooves, it must come out of the panel a segment can be broken out so that the cladding is put on can be. The broken segment can no longer be used become and migrates into the garbage. However, the amount of posts increases also the number of segments broken out and thus the amount of waste. This is a disadvantage.
Es ist Aufgabe der Erfindung, eine gattungsgemäße Personenführung so zu gestalten, daß unter Beibehaltung einer sicheren Arretierung des Vorsprunges von wenigstens einem Absperrteil, keine Segmente der eben genannten Art anfallen. Auch soll auf eine separate Verkleidung, wie beim erwähnten Stand der Technik üblich, verzichtet werden können. It is an object of the invention to a generic person management shape that while maintaining a secure locking of the projection of at least one shut-off part, no segments of the aforementioned Kind of accrue. Also should be on a separate panel, as mentioned State of the art, can be dispensed with.
Die Lösung der Aufgabe besteht darin, daß die Aufnahmeeinrichtung zwei miteinander verschraubbare Stützelemente aufweist, die zur Aufnahme des Vorsprunges von wenigstens einem Absperrteil bestimmt sind.The solution to the problem is that the receiving device two has mutually screwable support elements for receiving the Projection of at least one shut-off part are determined.
Es empfiehlt sich, die Stützelemente bevorzugt scheibenförmig zu gestalten, da diese dann in vorteilhafter Weise die Stützeinrichtung und einen Großteil des Vorsprunges eines Absperrteiles abdecken. Die Stützelemente übernehmen somit die Funktion einer Verkleidung, so daß Segmente, wie eingangs beschrieben, als Abfallstücke nicht mehr anfallen. Die Stützelemente übernehmen aber auch das Arretieren von wenigstens einem Vorsprung, da dieser zwischen die beiden Stützelemente eingefügt ist und von den Stützelementen gehalten oder verspannt wird. Diese Doppelfunktion der Stützelemente erweist sich als äußerst vorteilhaft. Ist die Stützeinrichtung am Pfosten anschraubbar, läßt sich ein weiterer Vorteil erzielen. In diesem Falle kann die Verschraubung zwischen den beiden Stützelementen etwas gelockert werden, so daß die Vorsprünge zum besseren Justieren der Absperrteile, zwischen den Stützelementen kreisförmig bewegbar angeordnet sind.It is advisable to make the support elements preferably disc-shaped, since this then advantageously the support device and a large part cover the protrusion of a shut-off part. Take over the support elements thus the function of a cladding, so that segments as at the beginning described as waste pieces no longer arise. The support elements but also take over the locking of at least one projection, there this is inserted between the two support elements and from the support elements is held or tensioned. This double function of the support elements proves to be extremely beneficial. If the support device can be screwed onto the post, another can be attached To gain an advantage. In this case, the screw connection between the two Support elements are loosened somewhat, so that the projections to better adjustment of the shut-off parts, circular between the support elements are arranged movably.
Die Erfindung wird anhand von Ausführungsbeispielen näher erläutert. Es zeigt
- Fig. 1
- einen Teil einer Personenführung;
- Fig. 2
- eine an einem Pfosten vorgesehene Aufnahmeeinrichtung mit Vor sprung und Abstellteil sowie
- Fig. 3
- eine weitere Variante.
- Fig. 1
- part of a guided tour;
- Fig. 2
- a receiving device provided on a post with jump and storage part and
- Fig. 3
- another variant.
Fig. 1 zeigt einen Teil einer Personenführung 1. Wie die Zeichnung bereits
andeutet, kann die Personenführung 1 unterschiedlich gestaltet sein. Sie
weist wenigstens einen am Boden aufstellbaren oder auch befestigbaren
Pfosten 2 auf und ist mit mindestens einem Absperrteil 4 ausgestattet. Das
Beispiel zeigt zwei Pfosten 2 und drei Absperrteile 4 in Form von Rohren.
Jeder Pfosten 2 trägt eine Aufnahmeeinrichtung 11. Die Aufnahmeeinrichtungen
11 weisen jeweils zwei Stützelemente 12, 13 auf, die an einer Stützeinrichtung
7 angeordnet sind. An den Absperrteilen 4 ist wenigstens ein
Vorsprung 5 vorgesehen, der in der Aufnahmeeinrichtung 11 arretiert ist.Fig. 1 shows part of a guided
Fig. 2 zeigt in einer Schnittdarstellung eine Aufnahmeeinrichtung 11 mit
einem Abschnitt eines Absperrteiles 4. Am Pfosten 2, von dem nur ein Teil
dargestellt ist, ist eine Stützeinrichtung 7 in Form eines Stützringes 8 angeordnet.
Der Stützring 8 wird aufden rundrohrförmigen Pfosten 2 geschoben
und durch kleine Schrauben 9 mit dem Pfosten 2 verspannt, so daß der
Stützring 8 nicht mehr entlang der Längsachse 3 des Pfostens 2 verschiebbar
ist. Die Aufnahmeeinrichtung 11 weist zwei ebenfalls auf den Pfosten 2
aufschiebbare scheibenförmige Stützelemente 12, 13 auf und zwar ein oberes
(12) und ein unteres Stützelement 13. Jedes Stützelement 12, 13 ist mit
einer ringförmigen oder umlaufenden Vertiefung 14 oder Nut ausgestattet.
Die Vertiefungen 14 beider Teile 12, 13 sind üblicherweise spiegelbildlich
angeordnet, jedoch immer so, daß beide Vertiefungen 14 eine gemeinsame
hinterschnittene Nut 15 bilden. Die Stütz-elemente 12, 13 sind gegenseitig
verschraubbar und zwar verlaufen die Längsachsen 20 der Schraubelemente
19 parallel zur Längsachse 3 des Pfostens 2. In verschraubtem und gebrauchstauglichen
Zustand der beiden Stützelemente 12, 13 werden diese
gegen den Stützring 8 gepreßt. In dieser Lage ist jedoch immer noch ein
horizontal angeordneter ringförmiger Spalt 16 gebildet, durch den ein an
einem Absperrteil 4 befindlicher Vorsprung 5 hindurchgeführt ist. An seinem
freien Ende weist der Vorsprung 5 eine Verdickung 6 oder dergleichen
auf, die in etwa die Querschnittsform der gemeinsamen Nut 15 beansprucht.
Der Durchmesser A des Teilkreises der gemeinsamen Nut 15 ist größer als
der Durchmesser B des Teilkreises für die Anordnung der Schraubelemente
19. Man kann die Verspannung zwischen beiden Stützelementen 12, 13 so
wählen, daß der Vorsprung 5 durch die Stützelemente 12, 13 festgeklemmt
ist. Lockert man die Verschraubung, läßt sich der Vorsprung 5, und damit
auch das Absperrteil 4, um die Längsachse 3 des Pfostens 2 bewegen. Das
Absperrteil 4 läßt sich daher, von oben betrachtet, in beliebigen Winkeln,
also stufenlos am Pfosten 2 anordnen. Dies erweist sich bei der Montage
von Personenführungen 1 dann als zweckmäßig, wenn viele Pfosten 2 mit
stangenförmigen Absperrteilen 4 zu verbinden sind. Auftretende Maß- und
Lagetoleranzen können dadurch besser überbrückt werden.2 shows a
Fig. 3 zeigt eine alternative Anordnung. Der Pfosten 2 sowie die beiden verschraubbaren
Stützelemente 12, 13 der Aufnahmeeinrichtung 11 sind annähernd
so gestaltet wie die fünktional gleichen Teile in Fig. 2, doch unterscheidet
sich hier die gewählte Stütz-einrichtung 7. Während diese beim
Ausführungsbeispiel nach Fig. 2 am rohrförmigen Pfosten 2 festgeschraubt
ist, wird nunmehr die Stützeinrichtung 7 durch wenigstens einen aufgesteckten
Ringabschnitt 10 gebildet, der eine umlaufende schräge Fläche 17 aufweist.
An der schrägen Fläche 17 liegt paßgenau eine weitere ringförmige
schräge Fläche 18 an, die sich am unteren Stützelement 13 befindet. Das
obere Stützelement 12 liegt am Ringabschnitt 10 auf und beide Stützelemente
12, 13 sind über die Schraub-elemente 19 miteinander verbunden.
Anhand der Zeichnung ist leicht vorstellbar, daß bei einem weiteren Verschrauben
der Stützelemente 12, 13 bedingt durch die schrägen Flächen 17,
18 eine gegenseitige Verspannung der Stützelemente 12, 13 mit dem
Ringabschnitt 10 und mit dem Pfosten 2 erfolgt, so daß die so geschaffene
Aufnahmeeinrichtung 11, ohne daß eine Schraubverbindung mit dem Pfosten
2 besteht, durch bloßes Anziehen der Schraubelemente 19 am Pfosten 2
ortsfest arretierbar ist. Auch bei diesem Ausführungsbeispiel wird durch die
Stützelemente 12, 13 eine gemeinsame umlaufende Nut 15 gebildet, die zur
ortsfesten oder beweglichen Aufnahme des Vorsprunges 5 von wenigstens
einem Absperrteil 4 bestimmt ist.Fig. 3 shows an alternative arrangement. The
Anstelle eines Ringabschnittes 10 kann auch als Stützeinrichtung 7 ein sogenannter
O-Ring" treten. Bei einem derartigen, zeichnerisch nicht dargestellten
Ausführungsbeispiel weisen die Stützelemente 12, 13 zwei ringförmige
Vertiefungen auf, die an die zylindrische Mantelfläche des Pfostens
2 angrenzen. Der ringförmigen, horizontal angeordneten Vertiefungen bilden
gemeinsam einen an die Mantelfläche des Pfostens 2 sich anschließenden
ringförmigen Raum, in welchem der aufden Pfosten aufgeschobene O-Ring
einliegt. Der Querschnitt des Raumes ist auf den Querschnitt des O-Ringes
so abgestimmt, daß bei einem Verschrauben der Stützelemente mit
den Schraub-elementen 19 der O-Ring gequetscht und gegen die Mantelfläche
des Pfostens und gegen die Wandflächen des gemeinsam gebildeten
Raumes gepreßt wird und die so gestaltete Aufnahmeeinrichtung 11 ortsfest
am Pfosten 2 angeordnet ist. Die Aufnahme des Vorsprunges 5 von wenigstens
einem Absperrteil 4 erfolgt wieder so, wie bereits beschrieben.Instead of a ring section 10, a so-called
Claims (10)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19828746A DE19828746B4 (en) | 1998-06-27 | 1998-06-27 | Tour guide |
DE19828746 | 1998-06-27 |
Publications (1)
Publication Number | Publication Date |
---|---|
EP0967331A1 true EP0967331A1 (en) | 1999-12-29 |
Family
ID=7872240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP99111757A Withdrawn EP0967331A1 (en) | 1998-06-27 | 1999-06-18 | Guide barrier |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0967331A1 (en) |
DE (1) | DE19828746B4 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005016310B4 (en) * | 2005-04-09 | 2007-04-05 | Storebest Gmbh & Co. Kg | Tour guide |
DE202014100325U1 (en) | 2014-01-24 | 2014-05-22 | Proline Systems Gmbh & Co. Kg | Holding device for a personal guidance system |
WO2017009834A1 (en) * | 2015-07-13 | 2017-01-19 | Lil Monkey Ltd. | Modular rotatable connecting joint |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2068499A (en) * | 1980-01-07 | 1981-08-12 | Secretary Environment Brit | Releasable joint for railings |
GB2102466A (en) * | 1981-06-10 | 1983-02-02 | Marler Haley Exposystems Ltd | Barrier systems |
GB2225800A (en) * | 1988-11-25 | 1990-06-13 | Ww Design Systems Limited | Portable barrier |
GB2260550A (en) * | 1991-10-16 | 1993-04-21 | Thomas Joseph Connolly | A guide rail assembly |
DE19703835A1 (en) | 1996-03-26 | 1997-10-09 | Siegel Geb Gmbh Co Kg | Guide for people in self-service store |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2610679B1 (en) * | 1987-02-10 | 1989-05-05 | Degryse Bernard | DEVICE FOR JOINING AND ASSEMBLING MULTIDIRECTIONAL ELEMENTS OF THREE-DIMENSIONAL STRUCTURES |
CH680525A5 (en) * | 1990-01-31 | 1992-09-15 | Schaerer Soehne Ag Usm U |
-
1998
- 1998-06-27 DE DE19828746A patent/DE19828746B4/en not_active Expired - Fee Related
-
1999
- 1999-06-18 EP EP99111757A patent/EP0967331A1/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2068499A (en) * | 1980-01-07 | 1981-08-12 | Secretary Environment Brit | Releasable joint for railings |
GB2102466A (en) * | 1981-06-10 | 1983-02-02 | Marler Haley Exposystems Ltd | Barrier systems |
GB2225800A (en) * | 1988-11-25 | 1990-06-13 | Ww Design Systems Limited | Portable barrier |
GB2260550A (en) * | 1991-10-16 | 1993-04-21 | Thomas Joseph Connolly | A guide rail assembly |
DE19703835A1 (en) | 1996-03-26 | 1997-10-09 | Siegel Geb Gmbh Co Kg | Guide for people in self-service store |
Also Published As
Publication number | Publication date |
---|---|
DE19828746B4 (en) | 2008-03-06 |
DE19828746A1 (en) | 1999-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0541904B1 (en) | Table used for welding and preparation | |
DE1962465C3 (en) | Device for adjustable fastening of a door or window frame or the like. on the building as well as a socket wrench for operation | |
DE2806797C2 (en) | Drill chuck | |
CH687221A5 (en) | Automatic clamping device for wire rope or round profile | |
DE19604680A1 (en) | Guy wire connection for post | |
DE2415836C3 (en) | Device for defining the nips when separating the rolls of a calender | |
EP0967331A1 (en) | Guide barrier | |
DE2165695A1 (en) | DEVICE FOR ATTACHING AND REMOVING THREADED BOLTS OR THE LIKE | |
EP0443111B1 (en) | Fastener to attach a column to a tubular bar, attached column and assembly with at least a column and a bar | |
DE19739733A1 (en) | Securing system for flat component to bar | |
DE102005016310B4 (en) | Tour guide | |
DE2706499A1 (en) | Mast fitted retaining mechanism for geodesic instruments - has angle bracket with instrument plate at apex and two legs with clamping devices | |
DE3635250A1 (en) | Device for mounting radially elastic rings on pipe or shaft ends and other workpieces | |
DE4011042A1 (en) | Locking telescopic tubes together - involves screw which tilts one tube relative to the other | |
DE3017067C2 (en) | Device for suspending pipes | |
DE177337C (en) | ||
DE102011111174B4 (en) | adjustment | |
DE202019005325U1 (en) | Railing system | |
DE4320978C2 (en) | Flaring tool | |
EP0552713A1 (en) | Tool for rolling threads | |
DE7807785U1 (en) | CASTLER WITH A BRACKET FOR ITS RELEASABLE ATTACHMENT | |
DE8504810U1 (en) | Height-adjustable wall shelf | |
EP1054415A2 (en) | Insulating post | |
DE2620668B2 (en) | Device for adjusting the length of supports for formwork scaffolding or the like | |
DE3512392A1 (en) | Attachment device for horizontal shelf elements using a clamping clip |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19991022 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE FR GB IT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
AKX | Designation fees paid |
Free format text: DE FR GB IT SE |
|
17Q | First examination report despatched |
Effective date: 20030123 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20030603 |