EP0445187A1 - Procede et dispositif pour la construction et/ou l'execution de travaux sur des parois de batiments - Google Patents

Procede et dispositif pour la construction et/ou l'execution de travaux sur des parois de batiments

Info

Publication number
EP0445187A1
EP0445187A1 EP89913169A EP89913169A EP0445187A1 EP 0445187 A1 EP0445187 A1 EP 0445187A1 EP 89913169 A EP89913169 A EP 89913169A EP 89913169 A EP89913169 A EP 89913169A EP 0445187 A1 EP0445187 A1 EP 0445187A1
Authority
EP
European Patent Office
Prior art keywords
self
beams
climbing
bridge
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP89913169A
Other languages
German (de)
English (en)
French (fr)
Inventor
Alain Duez
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0445187A1 publication Critical patent/EP0445187A1/fr
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/163Jacks specially adapted for working-up building elements

Definitions

  • the present invention relates to a process for the construction and / or execution of works on the walls of buildings, such as concrete, floors, walls, partitions, ceilings.
  • IT is also a device or an installation allowing the implementation of this process and using a tool-carrying beam, which can be moved above the prefabrication area of the della or planking.
  • the object of the present invention is therefore to remedy the drawbacks and inadequacies of the methods and devices for constructing buildings using a tool-carrying bridge moving over a working surface.
  • this objective is achieved thanks to to a process and a device according to which the ends of the tool-holder bridge are supported and guided by two self-climbing beams, installed or intended to be installed along and outside at least two opposite facades of the building under construction, these two self-climbing beams being, preferably, constituted by self-climbing walkways of circulation and work L.
  • This process and this device confer many and important advantages, mainly in their application to the realization of houses or small multi-storey buildings. They make possible in particular a very advanced mechanization and robotization of construction, 'which makes it possible to very significantly reduce the duration and the cost price of this one.
  • the device according to the invention can have a very versatile character by the fact that it can be used not only for carrying out work on underlying areas, but also for interventions on vertical walls (for example the brushing of formwork walls) or superimposed (for example screwing of devices or various accessories under a roof).
  • the process and the device according to the invention can be combined with installations and construction methods making it possible to raise the degree of mechanization and automation thereof, AND IMPROVE PRODUCTIVITY IN CONSTRUCTION, SUCH AS: “dLLES L EVEES” CONSTRUCTION METHODS, "RAISABLE” CONSTRUCTION PROCESS, TRANSPORTATION AND DISTRIBUTION ESTABLISHMENT OF MATERIALS AND / OR MATERIALS ON THE OUTSIDE OF THE construction, etc.
  • Figure 1 is an elevational and schematic view of an exemplary embodiment of the device according to the invention positioned at the upper part of a building under construction and whose tool holder bridge is shown in its lower position The most common, for the execution of pLanchers.
  • FIG. 2 is an elevation view and schematic showing the upward transLation of the device along hoisting masts.
  • FIG. 3 is an elevation view of a schematic nature showing the tool-holder bridge positioned in the waiting position, under the roof, while the self-climbing circulation and work passers have been lowered to their previous position.
  • Figure 4 is an elevational view and schematic illustrating on the one hand, the use of the device for performing an intervention on a vertical wall, and, on the other hand, the combination of this device with an installation allowing the transport and distribution of materials and / or materials on the outskirts of the building under construction.
  • Figure 5 is an elevational view in schematic showing the use of the device for the execution of an intervention on a ceiling.
  • This system mainly comprises:
  • At least two self-climbing beams each identified as a whole by reference 2.
  • the tool-holder bridge comprises a robust horizontal beam 3 executed using any material and any technique allowing the desired stiffness and solidity to be obtained.
  • This beam is, for example, constituted by a sufficient connection of members and '' metal spacers.
  • It can be formed in one piece, or have a variable length and include a main body of great length and one or two end portions assembled telescopically to this main body, for example to allow, if necessary, the crossing facade recesses.
  • the beam 3 is equipped with at least one tool-carrying carriage 4, and it is arranged to serve as a rolling track for this carriage which is provided with suitable rolling or sliding members.
  • the ends of the tool-holder bridge 1 are provided with rolling or sliding members such as gals 5 with perpendicular axes of rotation, allowing it to be supported and guided on two parallel paths.
  • the motorization ensuring the transverse displacements of the mobi bridge 1 and of the carriage 4 or of the carriages equipping said bridge is carried out in any manner known per se and which can be chosen according to the nature of the displacement (rolling or g Smoothing).
  • the ends of the tool-carrying bridge 1 are supported and guided by two self-climbing beams 2 installed or intended to be installed horizontally along and outside at least two opposite facades F of the building B under construction.
  • the self-climbing beams are constituted by self-climbing circulation and work passers and, for example, by self-climbing passers of the kind described in the document WO 88/08909.
  • the beams-passereL Self-climbing 2 mainly comprises a robust structure or framework, a pLateLage and a railing.
  • the gangways or other kinds of self-climbing beams include, advantageously, a vertical wall 2a, the upper part 2b of which serves as lateral guidance to the tool bridge and of which the portion remaining constitutes a shuttering wall 2c and, more specifically, the edge formwork of the pLanchers or daLLes P.
  • the gangways 2 or other kinds of self-climbing beams that are installed, perfectly level, from the building under construction, are subject to a lifting system, which can be of a type known per se, and allowing L 'vertical evolution of said gangways or beams by keeping them level, as the construction rises.
  • the lifting system allowing the hoisting of the pass-beams
  • the 2 or other kinds of beams and giving them their self-climbing character can be constituted by lifting masts 6 bearing on the soL and equipped with elevating devices 7 subject to said passereLLes or beams. It can also be constituted by various other hoisting systems known per se, such as a system using an evolutive hanging method to the lower walls.
  • the lifting system can also include a rigid raising structure arranged above the prefabrication area and subject to the lifting devices 7 of the lifting masts 6, this rigid raising structure can advantageously be constituted by the definitive roof 8 of the building in progress. of construction. In that case.
  • the beams-passereLLes 2 or other type of self-climbing beams are suspended, using all suitable fastening elements, from said rigid superimposed structure.
  • Self-climbing passers 2 can advantageously be of the kind which is incorporated in the device for transporting and distributing materials and / or materials on the periphery of a building, described in the document.
  • W0 88/08909 the main part of which resides in the fact that it comprises a carriage 9 comprising at least one sliding or rolling part connecting it to at least one solid longitudinal element of the structure of the 2d railing.
  • this passereLLe suitable for serving as a guide track for said carriage.
  • the gangways 2 which serve as guide and rolling tracks to the tool-holder bridge 1 can be connected by two identical gangways arranged perpendicularly, so as to completely surround the building.
  • the self-climbing beams which surround the building can thus constitute the formwork of the edge of the plank P cast inside the vertical walls 2a of this formwork.
  • the tool-carrying bridge 1 and its trolley 4 can be used for the realization of pLanchers of all kinds, in concrete, wood, metal, etc., and for all types of intervention related to this realization: work of materials, layout, etc.
  • the tool-carrying bridge 1 can be fitted with a second tool-carrying trolley or more than two tool-carrying trolleys. As shown in Figure 5, the tool deck is equipped with two tool trolleys 4 and 10, one of which can move along and below said deck, while the other can run along and above it.
  • the upper tool-holder trolley can be used for work on a ceiling under a roof 8 placed above the range of the said trolley or for carrying out work such as screwing equipment or organs various on the underside of La charpente de Ladite toiture.
  • the tool trolley or each tool trolley can also be used for carrying out work in vertical plans.
  • FIG. 4 represents, by way of example, a carriage 4 equipped with a brush 0 allowing the cleaning of the formwork face 2c of the formwork 2a.
  • the trolley or Trolleys 4 and 10 can be designed and arranged to be able to carry very diverse tools or apparatuses whose drive can be provided by a motor fitted to said trolleys or incorporated into said tools or apparatuses.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)
EP89913169A 1988-11-25 1989-11-23 Procede et dispositif pour la construction et/ou l'execution de travaux sur des parois de batiments Withdrawn EP0445187A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR8816175A FR2639664B1 (fr) 1988-11-25 1988-11-25 Procede et dispositif pour la construction et/ou l'execution de travaux sur des parois de batiments
FR8816175 1988-11-25

Publications (1)

Publication Number Publication Date
EP0445187A1 true EP0445187A1 (fr) 1991-09-11

Family

ID=9372741

Family Applications (1)

Application Number Title Priority Date Filing Date
EP89913169A Withdrawn EP0445187A1 (fr) 1988-11-25 1989-11-23 Procede et dispositif pour la construction et/ou l'execution de travaux sur des parois de batiments

Country Status (8)

Country Link
EP (1) EP0445187A1 (fi)
JP (1) JPH04503384A (fi)
AU (1) AU639422B2 (fi)
DK (1) DK95991A (fi)
ES (1) ES2017237A6 (fi)
FI (1) FI912484A0 (fi)
FR (1) FR2639664B1 (fi)
WO (1) WO1990006410A1 (fi)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383613A (zh) * 2011-11-11 2012-03-21 天津电力工程监理有限公司 发电厂主厂房钢屋架吊装施工方法及专用吊装起重装置

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3622630A (en) * 1968-07-03 1971-11-23 Smith Kline French Lab 10-aminoalkyl-9,10-dihydroanthracenes
US3800044A (en) * 1971-05-10 1974-03-26 Smithkline Corp Pharmaceutical methods using a substituted 10-aminoalkyl-9,10-dihydroanthracene
US5881504A (en) * 1995-05-15 1999-03-16 Obayashi Corporation Temporary frame system for construction

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE861018C (de) * 1941-05-29 1952-12-29 Wilhelm Dr-Ing Ludowici Vorrichtung zur Errichtung von gebaeudeumschliessenden oder gebaeudeunterteilenden Mauern
FR941587A (fr) * 1944-06-12 1949-01-14 Perfectionnements au montage d'édifices
FR1546754A (fr) * 1967-10-11 1968-11-22 Appareil élévateur roulant pour la construction de maisons collectives à plusieurs étages, chaque étage étant constitué par la réunion de plusieurs cellules préfabriquées
DE2312509A1 (de) * 1973-03-13 1974-10-10 Kresic Marjan Dipl Ing Verfahren zur errichtung eines mehrgeschoessigen bauwerkes aus stahlbeton, sowie allwetter- vorrichtung zur ausfuehrung des verfahrens
FR2615227B1 (fr) * 1987-05-12 1989-06-30 Duez Alain Dispositif de transport et de distribution de materiaux et/ou de materiel en peripherie d'un batiment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9006410A1 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383613A (zh) * 2011-11-11 2012-03-21 天津电力工程监理有限公司 发电厂主厂房钢屋架吊装施工方法及专用吊装起重装置
CN102383613B (zh) * 2011-11-11 2014-09-17 天津电力工程监理有限公司 发电厂主厂房钢屋架吊装施工方法及专用吊装起重装置

Also Published As

Publication number Publication date
WO1990006410A1 (fr) 1990-06-14
JPH04503384A (ja) 1992-06-18
AU4646089A (en) 1990-06-26
ES2017237A6 (es) 1991-01-01
FI912484A0 (fi) 1991-05-22
DK95991A (da) 1991-06-19
FR2639664B1 (fr) 1991-01-11
DK95991D0 (da) 1991-05-22
AU639422B2 (en) 1993-07-29
FR2639664A1 (fr) 1990-06-01

Similar Documents

Publication Publication Date Title
EP0521745B1 (fr) Procédé de coffrage et de décoffrage de parois en matériau coulé élevées au dessus d'une surface de référence et moyens en vue de la mise en oeuvre de ce procédé
EP0089861A1 (fr) Procédé pour conforter des arches ou des constructions analogues
EP0445187A1 (fr) Procede et dispositif pour la construction et/ou l'execution de travaux sur des parois de batiments
EP2314422B1 (fr) Structure roulante multifonctions pour travaux d'entretien et rénovation de parois et plafonds pour constructions
FR2951206A1 (fr) Panneau de construction composite
FR3058175A1 (fr) Procede de renovation robotisee de facade
FR2780742A1 (fr) Plate-forme horizontale et mobile pour la prefabrication sur le chantier et la pose successive en position de parties d'ouvrages de maconnerie
FR2958873A1 (fr) Moule de prefabrication transportable
FR3005670A1 (fr) Panneau de construction bois-beton
FR2538428A1 (fr) Procede de construction de batiments a l'abri des intemperies
CN113027053B (zh) 一种梯井内用预制装配式楼梯及吊装施工工艺
EP0362246B1 (fr) Dispositif de transport et de distribution de materiaux et/ou de materiel en peripherie d'un batiment
FR2464340A1 (fr) Dispositif pour la liaison de composants de structures en beton, en particulier pour la construction de logements
FR1465539A (fr) Procédé de construction d'immeubles
FR2743585A1 (fr) Procede de fabrication d'un panneau de construction, panneau ainsi obtenu et construction comprenant au moins un tel panneau
FR2574837A1 (fr) Procedes de construction de murs en bordure de planchers de batiments
FR2930575A1 (fr) Dispositif de montage de blocs de construction
BE458504A (fi)
FR2866040A1 (fr) Elements prefabriques verticaux modulaires pour l'elevation de murs d'habitation isoles avec finitions ainsi que leur procede de fabrication
BE507168A (fi)
WO2023083748A1 (fr) Procédé de montage d'une structure pour porte-outils et d'une installation le comportant, structure et installation correspondantes
FR2699582A1 (fr) Piscines modulaires intégrales.
WO2001053624A1 (fr) Procede de construction d'un edifice, bloc de construction, linteau et appui de fenetre pour la mise en oeuvre du procede
WO1990011417A1 (fr) Structure notamment en bois et procede de realisation
FR2559814A1 (fr) Procede de construction de batiments, notamment de maisons individuelles, ainsi que les batiments obtenus conformement a la mise en oeuvre de ce procede

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19910518

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE ES FR GB IT LI LU NL SE

17Q First examination report despatched

Effective date: 19930127

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19940601