EP0431092B1 - Process for continuous welding of track sections, and set of wagons especially equipped for its implementation - Google Patents

Process for continuous welding of track sections, and set of wagons especially equipped for its implementation Download PDF

Info

Publication number
EP0431092B1
EP0431092B1 EP90907036A EP90907036A EP0431092B1 EP 0431092 B1 EP0431092 B1 EP 0431092B1 EP 90907036 A EP90907036 A EP 90907036A EP 90907036 A EP90907036 A EP 90907036A EP 0431092 B1 EP0431092 B1 EP 0431092B1
Authority
EP
European Patent Office
Prior art keywords
welding
train
rail sections
set forth
operations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP90907036A
Other languages
German (de)
French (fr)
Other versions
EP0431092A1 (en
Inventor
Sergio Valditerra
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAMPER CORP
Original Assignee
TAMPER CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAMPER CORP filed Critical TAMPER CORP
Priority to AT90907036T priority Critical patent/ATE92559T1/en
Publication of EP0431092A1 publication Critical patent/EP0431092A1/en
Application granted granted Critical
Publication of EP0431092B1 publication Critical patent/EP0431092B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • E01B29/17Lengths of rails assembled into strings, e.g. welded together
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers

Definitions

  • the sections of rail to be laid were traditionally placed on the ground next to the railway line, but it is already known by improvements previously carried by the same applicant to load sections to the length of 144 meters on special wagons, on which the sleepers are also loaded, and which are equipped with guides for a gantry crane, which is used to transport the sleepers to be laid and, possibly, the old carried sleepers.
  • the rails are loaded in a position below the sleeper load, and either the rails or the sleepers are fed to a special machine that is part of the operator train, which provides for the laying of new sleepers and rails, if applicable take the old sleepers and rails to be replaced, and possibly also to perform other operations.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

A process for the continuous welding of railway track sections (3) during installation, in which a set of wagons, especially equipped for the purpose (5-5'), and made up of one or more wagons (5, 5') with an extra-low load plane, is introduced into the line of operation, between the wagons (1) carrying the new track sections (3) and the new cross beams (2) and the operating machine installing said beams and sections. The operations aligning, levelling and butting successive track sections (3) take place on said set of wagons (5-5'), as does the welding of said sections, which involves the movement of welding machines (15-17) on a trolley (8) along the set of wagons (5-5'). The welding operations are carried out during a run of the trolley (8) along with the welding machines (15-17) in the opposite direction to that of the advancing line of operation. This welding run is then compensated by a return run of the trolley (8) and welding machines (15-17) in the same direction as the line of operation. In this way, all the welding takes place on the operation line itself, installation being carried out by the corresponding operating machine on tracks which are now continuous.

Description

DOMAINE TECHNIQUETECHNICAL AREA

La présente invention a pour objet un procédé pour le soudage en continu de tronçons de rail ferroviaire en cours de pose, et une rame spécialement équipée pour la mise en oeuvre de ce procédé.The subject of the present invention is a process for the continuous welding of sections of railway rail during laying, and a train specially equipped for the implementation of this process.

TECHNIQUE ANTERIEUREPRIOR ART

Suivant la manière classique de procéder à la pose des rails ferroviaires, des tronçons de rail, venant en général de l'usine de fabrication en des longueurs de 36 mètres, sont soudés l'un en bout de l'autre jusqu'à former des tronçons de 144 mètres, qui sont transportés sur le lieu de pose. Ici, après avoir été mis en position moyennant un train opérateur, les tronçons sont soudés l'un en bout de l'autre jusqu'à former des longueurs définitives de 288 mètres, de 432 mètres, ou autre longueur fixée. Le soudage est effectué par un procédé électrique à étincellement, ou bien par un procédé aluminothermique, sur les rails déjà posés. Les tronçons de rail à poser étaient traditionnellement déposés sur le sol à côté de la ligne ferroviaire, mais il est déjà connu par des perfectionnement précédemment portés par la même demanderesse de charger des tronçons à la longueur de 144 mètres sur des wagons spéciaux, sur lesquels sont aussi chargées les traverses, et qui sont équipés de guides pour une grue à portique, laquelle est utilisée pour le transport des traverses à poser et, éventuellement, des vieilles traverses emportées. Les rails sont chargés en une position au-dessous de la charge de traverses, et soit les rails, soit les traverses sont alimentés à une machine spéciale faisant partie du train opérateur, laquelle pourvoit à la pose des traverses et des rails nouveaux, le cas échéant à emporter les traverses et les rails vieux à remplacer, et éventuellement aussi à effectuer d'autres opérations. Toutefois, l'opération de soudage des tronçons de rail déjà posés en oeuvre doit être effectuée moyennant une machine soudeuse à étincellement installée sur un véhicule ferroviaire spécial qui travaille à la suite du train opérateur, et une telle machine est coûteuse et demande du personnel préposé. De plus, des opérations non simples, des équipements spéciaux et la main d'oeuvre spécialisée correspondante sont nécessaires pour aligner et niveler les abouts des rails à souder et pour maintenir les abouts des rails en cours de pose poussés contre les abouts des tronçons de rail déjà posés. Il est nécessaire, en outre, de démonter temporairement des traverses (et ensuite de monter à nouveau) un certain nombre de plaques d'appui, ainsi que les chevilles de fixation correspondantes, qui se trouvent dans la région dans laquelle doit travailler la tête de la machine soudeuse.According to the conventional way of laying the railway rails, sections of rail, generally coming from the manufacturing plant in lengths of 36 meters, are welded one end of the other until forming sections of 144 meters, which are transported to the installation site. Here, after having been brought into position by means of an operator train, the sections are welded one at the end of the other until forming permanent lengths of 288 meters, 432 meters, or other fixed length. Welding is carried out by an electrical spark process, or by an aluminothermic process, on the rails already laid. The sections of rail to be laid were traditionally placed on the ground next to the railway line, but it is already known by improvements previously carried by the same applicant to load sections to the length of 144 meters on special wagons, on which the sleepers are also loaded, and which are equipped with guides for a gantry crane, which is used to transport the sleepers to be laid and, possibly, the old carried sleepers. The rails are loaded in a position below the sleeper load, and either the rails or the sleepers are fed to a special machine that is part of the operator train, which provides for the laying of new sleepers and rails, if applicable take the old sleepers and rails to be replaced, and possibly also to perform other operations. However, the welding operation of the rail sections already laid in operation must be carried out by means of a spark welding machine installed on a special railway vehicle which works after the operator train, and such a machine is expensive and requires staff. . In addition, non-simple operations, special equipment and the corresponding specialized manpower are necessary to align and level the ends of the rails to be welded and to maintain the ends of the rails being laid pushed against the ends of the rail sections. already laid. It is necessary, moreover, to temporarily disassemble the crosspieces (and then to mount again) a number of support plates, as well as the corresponding fixing pins, which are located in the region in which the head of the work is to work. the welding machine.

Par le document FR-A-1.571.796 on connait un procédé pour le soudage en continu de tronçons de rail ferroviaire en cours de pose, comportant les opérations d'insérer dans un train opérateur comprenant des wagons qui portent des nouveaux tronçons de rail et des nouvelles traverses, et une machine opératrice qui en fait la pose, entre lesdits wagons et ladite machine opératrice, une rame spécialement équipée, et d'effectuer sur cette rame équipée les opérations d'alignement, de nivellement et d' aboutement des tronçons successifs de rail, et leur soudage, de sorte que tout le cycle d'opérations se rapportant au soudage est effectué sur le train opérateur lui-même et la pose est effectuée par la machine opératrice sur des rails désormais continus. Il est bien évident toutefois que, pendant le temps nécessaire pour le soudage des rails, ceux-ci doivent être stationnaires par rapport aux équipements de soudage installés sur une rame, et de ce fait cette rame, et donc le train opérateur tout entier, doit être arrêté pendant les temps de soudage. Cela comporte une perte de temps et surtout trouble la régularité des autres opérations effectuées par le train opérateur.Document FR-A-1,571,796 discloses a process for the continuous welding of rail sections of rail during installation, comprising the operations of inserting into an operator train comprising wagons which carry new rail sections and new sleepers, and an operating machine which places them, between said wagons and said operating machine, a specially equipped train, and performing on this equipped train the operations of alignment, leveling and abutment of successive sections of rail, and their welding, so that the whole cycle of operations relating to welding is carried out on the operator train itself and the laying is carried out by the operating machine on rails which are now continuous. It is quite obvious however that, during the time necessary for the welding of the rails, these must be stationary with respect to the welding equipment installed on a train, and therefore this train, and therefore the entire operator train, must be stopped during welding times. This involves a loss of time and above all disturbs the regularity of the other operations carried out by the train operator.

EXPOSE DE L'INVENTIONSTATEMENT OF THE INVENTION

Le but de la présente invention est de rendre plus rationnel le procédé par lequel les tronçons de rail en cours de pose sont soudés aux tronçons de rail déjà posés, entre autre en évitant tout nécessité d'arrêter le train opérateur.The object of the present invention is to make the process by which the rail sections being laid are welded to the already installed rail sections more rational, inter alia by avoiding any need to stop the train operator.

A' cet effet, le procédé suivant l'invention est caractérisé en ce que ladite opération de soudage est effectuée moyennant des machines soudeuses mouvant le long de ladite rame équipée, les opérations de soudage étant effectuées pendant une course relative des machines soudeuses par rapport à la rame, dans le sens opposé au sens d'avancement du train opérateur, et ladite course de soudage étant ensuite compensée par une course de retour des machines soudeuses par rapport à la rame équipée, dans le même sens de l'avancement du train opérateur.To this end, the method according to the invention is characterized in that said welding operation is carried out by means of welding machines moving along said equipped train, the operations of welding being carried out during a relative stroke of the welding machines with respect to the train, in the direction opposite to the direction of advancement of the operator train, and said welding stroke being then compensated by a return stroke of the welding machines with respect to the equipped train, in the same direction of the advancement of the operator train.

En considération de cette manière de procéder, tous les travaux de préparation et toute opération d'alignement, de nivellement, d'aboutement et de soudage, successive à la pose en oeuvre des rails, sont évités, et toutes les opérations ont lieu à bord du train opérateur, et donc avec l'aide de tout équipement approprié pour rendre ces opérations plus faciles, justes et protégées. En particulier, il n'est plus nécessaire d'employer une machine soudeuse installée sur un véhicule ferroviaire spécial qui travaille à la suite du train opérateur, ainsi évitant le prix de revient élevé d'une telle machine et la main d'oeuvre nécessaire pour sa manoeuvre, ainsi que lesdites opérations de démontage et de remontage d'un certain nombre de plaques d'appui et de chevilles de fixation dans la région de soudage.In consideration of this way of proceeding, all the preparation work and any alignment, leveling, abutment and welding operation, successive to the installation of the rails, are avoided, and all the operations take place on board. of the train operator, and therefore with the help of all appropriate equipment to make these operations easier, fair and protected. In particular, it is no longer necessary to use a welding machine installed on a special railway vehicle which works following the operator train, thus avoiding the high cost price of such a machine and the manpower necessary for its operation, as well as said disassembly and reassembly operations of a number of support plates and fixing pins in the welding region.

La rame équipée destinée à permettre la mise en oeuvre du procédé suivant l'invention comporte un ou plusieurs wagons au plan de charge surbaissé, qui portent des machines soudeuses capables d'effectuer le soudage mutuel des abouts mis en contact des tronçons de rail.The equipped train intended to allow the implementation of the process according to the invention comprises one or more wagons with a lowered load plane, which carry welding machines capable of carrying out mutual welding of the ends put into contact with the rail sections.

Selon l'invention ladite rame équipée comprend: des premières guides latérales pour le passage d'une grue à portique pour le transport des traverses; des secondes guides, ayant un écartement plus réduit de celui desdites premières guides; et un chariot automoteur mouvant sur lesdites secondes guides et portant les machines soudeuses.According to the invention, said equipped train comprises: first lateral guides for the passage of a gantry crane for the transport of sleepers; second guides, having a narrower spacing from that of said first guides; and a self-propelled carriage moving on said second guides and carrying the welding machines.

En particulier, lesdites machines soudeuses peuvent comprendre, chacune, une tête soudeuse et un groupe générateur pour son alimentation. Le chariot peut être pourvu de bras télescopiques avec des mâchoires de saisie pour effectuer les opérations de prise et d'aboutement, et éventuellement de premier alignement et de nivellement approximatif des tronçons successifs de rail à souder. Des mâchoires hydrauliques peuvent être prévues pour effectuer automatiquement l'alignement et le nivellement définitif des tronçons de rail à souder.In particular, said welding machines may each comprise a welding head and a generator group for its supply. The carriage can be provided with telescopic arms with gripping jaws for carrying out the gripping and abutment operations, and optionally for first alignment and approximate leveling of the successive sections of rail to be welded. Hydraulic jaws can be provided to automatically carry out the final alignment and leveling of the sections of rail to be welded.

DESCRIPTION SOMMAIRE DES DESSINSSUMMARY DESCRIPTION OF THE DRAWINGS

Les caractéristiques indiquées et d'autres, et les avantages des objets de la présente invention, ressortiront plus clairement de la suivante description d'un mode de réalisation préféré, toutefois ayant le caractère d'un exemple non limitatif, d'une partie d'un train opérateur equipé suivant l'invention, schématiquement représenté dans les dessins annexés, dans lesquels:

  • Fig. 1 et 2, à considérer comme l'une constituant la prosécution de l'autre, montrent à une échelle extrèmement réduite et d'une façon extrèmement schématique une partie d'un train opérateur comprenant, avec des composants connus, la rame équipée suivant l'invention;
  • Fig. 3 montre en vue latérale la partie antérieure d'une rame équipée suivant l'invention, accrochée à la suite d'un wagon pour le transport de rails et de traverses, faisant partie d'un train opérateur;
  • Fig. 4, qui doit être considérée comme la suite de la figure 3, montre de façon similaire la partie postérieure du premier wagon de la rame équipée suivant l'invention, articulé avec un second wagon qui lui fait suite, aussi faisant partie de la rame équipée; et
  • Figs. 5 et 6, à considérer comme l'une constituant la prosécution de l'autre, montrent en plan les mêmes parties du train opérateur représentées respectivement dans les figures 3 et 4.
The characteristics indicated and others, and the advantages of the objects of the present invention, will emerge more clearly from the following description of a preferred embodiment, however having the character of a nonlimiting example, of a part of an operator train fitted according to the invention, schematically represented in the accompanying drawings, in which:
  • Fig. 1 and 2, to be considered as one constituting the prosecution of the other, show on an extremely reduced scale and in an extremely schematic manner a part of an operator train comprising, with known components, the train fitted according to the 'invention;
  • Fig. 3 shows in side view the front part of a train fitted according to the invention, attached following a wagon for transporting rails and sleepers, forming part of an operator train;
  • Fig. 4, which should be considered as the continuation of FIG. 3, similarly shows the rear part of the first wagon of the train fitted according to the invention, articulated with a second wagon which follows it, also forming part of the train fitted ; and
  • Figs. 5 and 6, to be considered as one constituting the prosecution of the other, show in plan the same parts of the operator train represented respectively in FIGS. 3 and 4.

MANIERE PREFEREE DE REALISER L'INVENTIONPREFERRED WAY OF CARRYING OUT THE INVENTION

Le train opérateur schématisé dans les figures 1 et 2 comprend un wagon 1 (connu) portant les matériaux à poser et sur lequel, dans la configuration représentée, se trouve une grue à portique 20 (également connue), une rame équipée (suivant l' invention), composée dans ce cas par deux wagons 5 et 5', et une machine opératrice 21 (connue) qui emporte les vieux rails 0 sur lesquels roulent les wagons 1, 5, 5' et la partie antérieure de la même machine opératrice 21, qui pose les nouveaux rails 3 soudés, et qui accomplit toute autre opération prévue, comme par exemple l'emportement des vieilles traverses sur lesquelles étaient posés les vieux rails 0, et la pose de nouvelles traverses sur lesquelles sont posés les nouveaux rails 3.The operator train shown diagrammatically in FIGS. 1 and 2 comprises a wagon 1 (known) carrying the materials to be placed and on which, in the configuration shown, is a gantry crane 20 (also known), an equipped train (according to invention), composed in this case by two wagons 5 and 5 ', and an operating machine 21 (known) which carries the old rails 0 on which the wagons 1, 5, 5' and the front part of the same operating machine 21, which installs the new welded rails 3, and which performs any other planned operation, such as for example the removal of the old sleepers on which the old rails 0 were laid, and the laying of new sleepers on which are installed the new rails 3.

Faisant référence d'abord aux figures 3 et 5, le numéro 1 désigne ledit wagon, en soi connu, roulant sur les rails 0 à renouveler, portant les matériaux à poser, c'est à dire des nouvelles traverses 2 et des tronçons de rail 3. Le même wagon 1 en une autre région, ou bien des autres wagons (non représentés) disposés devant lui, peuvent aussi recevoir les vieux matériaux emportés, si une opération d'emportement des vieux matériaux est aussi effectuée par le train opérateur. Le wagon 1 est pourvu latéralement, d'une façon connue, de guides 4 destinées à être parcourues par la grue à portique 20 (connue en soi et schématisée dans la figure 1). La grue 20 transporte périodiquement les nouvelles traverses à poser à partir du wagon 1 jusqu'à la machine opératrice 21 (schématisée dans la figure 2) située plus en arrière dans le train opérateur. Le cas échéant, la même grue 20 porte aussi vers le wagon 1 les vieilles traverses emportées par la machine opératrice 21.Referring first to Figures 3 and 5, the number 1 designates said wagon, in itself known, rolling on the rails 0 to be renewed, carrying the materials to be laid, that is to say new sleepers 2 and sections of rail 3. The same wagon 1 in another region, or else other wagons (not shown) placed in front of it, can also receive the old materials taken away, if an operation to take away the old materials is also carried out by the train operator. The wagon 1 is provided laterally, in a known manner, with guides 4 intended to be traversed by the gantry crane 20 (known per se and shown diagrammatically in FIG. 1). The crane 20 periodically transports the new sleepers to be laid from the wagon 1 to the operating machine 21 (shown diagrammatically in FIG. 2) located further back in the operator train. Where appropriate, the same crane 20 also carries the old sleepers carried by the operating machine 21 to wagon 1.

En application de l'invention, au wagon 1 est accrochée une rame équipée comportant un premier wagon 5 au plan surbaissé, roulant par des bogies 6 sur les rails 0. Un autre wagon identique 5' (figures 4 et 6) appuyé sur des bogies 6', ou bien aussi plusieurs autres wagons identiques (non représentés), peuvent faire suite au wagon 5 lorsque la longueur de celui-ci n'est pas suffisante pour autoriser les courses opératives nécessaires aux effets de l'invention. Le wagon 5 est pourvu de premières guides latérales 4, identiques et correspondantes aux guides 4 du wagon 1, pour permettre le roulement de la grue à portique 20 déjà mentionnée. Sur le wagon 5 sont en outre installées des secondes guides 7, dont l'écartement est plus réduit que celui des premières guides 4, et qui de préférence sont situées au-dessous des premières guides 4. Dans le cas où plusieurs wagons 5, 5' et ainsi de suite sont prévus pour constituer la rame équipée, on doit assurer entr'eux la continuité des secondes guides 7, et de plus on doit assurer, soit entr'eux, soit par rapport aux wagons précédents et suivants dans le train opérateur, la continuité des premières guides 4.In application of the invention, on wagon 1 is hung an equipped train comprising a first wagon 5 in the lowered plane, rolling by bogies 6 on rails 0. Another identical wagon 5 '(Figures 4 and 6) supported on bogies 6 ′, or also several other identical wagons (not shown), may follow wagon 5 when the length thereof is not sufficient to authorize the operating strokes necessary for the effects of the invention. The wagon 5 is provided with first lateral guides 4, identical and corresponding to the guides 4 of the wagon 1, to allow the rolling of the gantry crane 20 already mentioned. On the wagon 5 are also installed second guides 7, the spacing of which is narrower than that of the first guides 4, and which preferably are located below the first guides 4. In the case where several wagons 5, 5 'and so on are provided for constitute the equipped train, one must ensure between them the continuity of the second guides 7, and moreover one must ensure, either between them, or with respect to the preceding and following wagons in the operator train, the continuity of the first guides 4.

Sur les guides 7 de la rame équipée est monté, roulant au moyen de groupes de roues 9, un chariot (de préférence automoteur) 8. Près de l'extrémité antérieure du chariot 8 est installé un poste de manoeuvre 10, dans lequel un opérateur unique peut commander toutes les opérations se rapportant directement ou indirectement au soudage des tronçons de rail. Sur le chariot 8 sont montés et articulés deux bras 11, extensibles télescopiquement et actionnés hydrauliquement, qui se terminent par des mâchoires 12 et qui peuvent être orientés en hauteur moyennant des cylindres hydrauliques 13 et latéralement moyennant des cylindres hydrauliques 14.On the guides 7 of the equipped train is mounted, rolling by means of groups of wheels 9, a carriage (preferably self-propelled) 8. Near the front end of the carriage 8 is installed an operating station 10, in which an operator single can control all operations directly or indirectly related to the welding of rail sections. On the carriage 8 are mounted and articulated two arms 11, telescopically extendable and hydraulically actuated, which end in jaws 12 and which can be oriented in height by means of hydraulic cylinders 13 and laterally by means of hydraulic cylinders 14.

Sur le chariot 8 sont aussi montées deux têtes soudeuses 15, chacune desquelles est précédée et suivie par des mâchoires hydrauliques 16 disposées pour aligner et niveler des tronçons de rail. De préférence sont aussi prévues des guides 17', convergent vers les mâchoires 16 antérieures, pour faciliter l'introduction des tronçons de rail 3 dans lesdites mâchoires. En considération de l'opportunité d'installer les générateurs d'énergie électrique d'alimentation pour les têtes soudeuses 15 le plus possible près d'elles, il est préférable que le chariot 8 porte encore deux groupes motogénérateurs 17 pour pourvoir à cette alimentation, bien que ces générateurs pourraient aussi, le cas échéant, trouver une disposition différente dans le train opérateur. Enfin, toute autre appareil de service approprié peut être installé sur le chariot 8.On the carriage 8 are also mounted two welding heads 15, each of which is preceded and followed by hydraulic jaws 16 arranged to align and level sections of rail. Preferably, guides 17 ′ are also provided, converging towards the anterior jaws 16, to facilitate the introduction of the rail sections 3 into said jaws. In consideration of the advisability of installing the electrical power supply generators for the welding heads 15 as close as possible to them, it is preferable that the carriage 8 still carries two generator sets 17 to provide this supply, although these generators could also, if necessary, find a different arrangement in the operator train. Finally, any other suitable service device can be installed on the carriage 8.

De préférence, la rame équipée toute entière est couverte par une marquise 18 et elle est protégée latéralement par un filet 19 (ces parties étant partiellement emportées dans les figures à l'effet de montrer les composants intérieurs de la rame), de sorte que toutes les opérations sont effectuées à l'abri des agents atmosphériques et que les opérateurs sont protégés aussi par rapport aux trains qui peuvent éventuellement rouler sur des lignes situées côte à côte de la ligne en travail.Preferably, the entire equipped train is covered by a canopy 18 and is laterally protected by a net 19 (these parts being partially carried away in the figures in order to show the interior components of the train), so that all operations are carried out sheltered from atmospheric agents and that operators are also protected from trains which may possibly roll on lines located next to the working line.

Le fonctionnement de l'appareillage décrit, qui réalise le procédé suivant l'invention, est le suivant.The operation of the apparatus described, which carries out the method according to the invention, is as follows.

On suppose que le chariot 8 se trouve dans la position montrée, c'est à dire déplacé vers l'extrémité antérieure du premier wagon 5 de la rame équipée, et qu'une couple de tronçons de rail déjà soudés en précédence aux tronçons de rail en cours de pose coulisse par rapport au wagon 5. Ce coulissement des rails par rapport à la rame est dû, en effet, au fait que le train opérateur, et avec lui la rame équipée avec le wagon 5, roule sur les rails 0, tandis que les tronçons de rail 3 mentionnés, étant déjà soudés aux tronçons en cours de pose et aux tronçons déjà posés, demeurent immobiles par rapport au sol et, par conséquent, se déplacent en arrière par rapport à la rame.It is assumed that the carriage 8 is in the position shown, that is to say moved towards the anterior end of the first wagon 5 of the equipped train, and that a couple of rail sections already welded in advance of the rail sections during installation slides relative to wagon 5. This sliding of the rails relative to the train is due, in fact, to the fact that the operator train, and with it the train equipped with wagon 5, rolls on the rails 0, while the rail sections 3 mentioned, being already welded to the sections in the process of being laid and to the sections already laid, remain stationary with respect to the ground and, consequently, move backwards with respect to the train.

L'opérateur, dans le poste de manoeuvre 10, actionne les bras télescopiques 11 de sorte à saisir par les mâchoires 12 une couple des tronçons de rail 3 chargés sur le wagon 1, et il les déplace de sorte qu'ils aboutent, et ensuite demeurent aboutés, contre les abouts des tronçons de rail déjà soudés, en cours de pose. Cette manoeuvre peut être effectuée de préférence en une seule phase, si l'on fait de sorte que la longueur du champ d'opération des bras télescopiques 11 et l'aménagement des tronçons de rail 3 l'autorisent; sinon, en tous cas, la manoeuvre peut être effectuée par plusieurs phases d'extension et de retrait des bras télescopiques 11. Les guides 17' facilitent la direction des nouveaux tronçons de rail 3 vers les mâchoires 16 antérieures. Par l'aide de répères appropriées, cette opération est poursuivie jusqu'à ce que les régions de séparation entre les abouts des tronçons de rail 3 ainsi aboutés se trouvent en correspondence des têtes soudeuses 15.The operator, in the operating station 10, actuates the telescopic arms 11 so as to grasp by the jaws 12 a couple of the rail sections 3 loaded on the wagon 1, and he moves them so that they abut, and then remain butted, against the butt ends of rail sections already welded, during installation. This maneuver can preferably be carried out in a single phase, if it is done so that the length of the operating field of the telescopic arms 11 and the arrangement of the rail sections 3 allow it; otherwise, in any case, the maneuver can be carried out by several phases of extension and withdrawal of the telescopic arms 11. The guides 17 ′ facilitate the direction of the new rail sections 3 towards the anterior jaws 16. By means of appropriate markers, this operation is continued until the regions of separation between the ends of the rail sections 3 thus joined are in correspondence with the welding heads 15.

A ce point les mâchoires hydrauliques 16 sont serrées et elles pourvoient à niveler et à aligner exactement les tronçons de rail aboutés. En même temps ces mâchoires solidarisent temporairement le chariot 8 aux tronçons de rail soudés en cours de pose. On peut alors porter en position de travail les têtes de soudage 15 et les mettre en fonction pour produire un étincellement entre les abouts des tronçons de rail 3, qui se font face, ainsi produisant leur fusion et leur soudage. Cela comporte un refoulement des régions de conjunction, et de ce fait pendant cette opération on doit desserrer les mâchoires hydrauliques 16 antérieures, de sorte à permettre un avancement approprié des tronçons de rail qu'elles serraient. De leur côté, les mâchoires 12 des bras télescopiques peuvent être desserrées elles aussi, et les bras 11 peuvent être libérés, n'étant temporairement plus nécessaire leur opération.At this point the hydraulic jaws 16 are clamped and they provide for leveling and aligning exactly the butted rail sections. At the same time, these jaws temporarily secure the carriage 8 to the sections of rail welded during installation. The welding heads 15 can then be brought into the working position and put into operation for produce a spark between the ends of the sections of rail 3, which face each other, thus producing their fusion and their welding. This involves a displacement of the regions of conjunction, and therefore during this operation it is necessary to loosen the anterior hydraulic jaws 16, so as to allow an appropriate advancement of the sections of rail which they clamped. For their part, the jaws 12 of the telescopic arms can also be loosened, and the arms 11 can be released, being temporarily no longer necessary for their operation.

Du fait que par le serrage des mâchoires 16 et par la mise en fonction des têtes de soudage 15 ces parties et le chariot 8 qui les porte sont devenus solidaires des tronçons de rail déjà soudés et en cours de pose, ils en suivent le déplacement par rapport à la rame équipée, et donc le chariot 8 tout entier se déplace vers l'extrémité postérieure du train opérateur. Ce comportement se prolonge jusqu'à ce que le soudage en cours dans les têtes soudeuses 15 est terminé et que le matériau fondu s'est solidifié; le temps nécessaire pour ces opérations peut être, par exemple et typiquement, de 180 minutes secondes environ. Après le temps nécessaire les têtes de soudage 15 peuvent être désactivées et les mâchoires 16 postérieures peuvent être desserrées.Because by clamping the jaws 16 and by putting the welding heads 15 into operation, these parts and the carriage 8 which carries them have become integral with the sections of rail already welded and being laid, they follow the movement thereof by compared to the fitted train, and therefore the entire carriage 8 moves towards the rear end of the operator train. This behavior continues until the welding in progress in the welding heads 15 is completed and the molten material has solidified; the time required for these operations can be, for example and typically, approximately 180 minutes seconds. After the necessary time, the welding heads 15 can be deactivated and the rear jaws 16 can be loosened.

Suite à ces dernières opérations, le chariot 8 arrête son déplacement de retrait par rapport à la rame équipée, et il peut être déplacé à nouveau en avant pour rejoindre sa position avancée de départ, représentée dans les dessins. Ce déplacement de retour du chariot 8 peut être effectué par tout moyen préféré, mais il est d'avantage que, à cet effet, le chariot 8 soit automoteur. Lorsque le chariot 8 a rejoint sa position de départ, le cycle décrit peur recommencer dès son début pour souder deux nouveaux tronçons de rail 3.Following these latter operations, the carriage 8 stops its withdrawal movement relative to the equipped train, and it can be moved again forward to reach its advanced starting position, shown in the drawings. This return movement of the carriage 8 can be carried out by any preferred means, but it is advantageous that, for this purpose, the carriage 8 is self-propelled. When the carriage 8 has returned to its starting position, the cycle described may start again from the start to weld two new sections of rail 3.

L'ampleur du déplacement du chariot 8 par rapport à la rame équipée dépend de différents facteurs, comme la vitesse d'avancement du train opérateur, les temps de soudage et de refroidissement et ainsi de suite. Si cette ampleur de déplacement peut être contenue dans les limites de la longueur admise pour un wagon 5 seulement, la rame équipée peut être constituée par ce seul wagon 5. Toutefois dans certains cas il est nécessaire, ou tout au moins il est à propos, de faire usage de plusieurs wagons 5, 5' et ainsi de suite, qui se suivent dans le train opérateur pour constituer la rame équipée. Alternativement on peut accepter de ralentir ou d'arrêter momentanément le train opérateur pendant l'exécution des soudages.The extent of movement of the carriage 8 relative to the equipped train depends on various factors, such as the speed of advancement of the operator train, the welding and cooling times and so on. If this extent of displacement can be kept within the limits of the length allowed for a wagon 5 only, the equipped train may be constituted by this only wagon 5. However in certain cases it is necessary, or at least it is appropriate, to make use of several wagons 5, 5 'and so on, which follow one another in the train operator to constitute the train equipped. Alternatively, it is possible to accept slowing down or temporarily stopping the operator train during the execution of the welds.

Bien entendu, lorsque les soudages ont été effectués, les régions de soudure sont encore usinées d'une façon bien connue, en emportant par des outils le métal refoulé et ensuite en meulant et corrigeant le profil du champignon des rails. Ces opérations peuvent être effectuées par des appareillages (non représentés) ménagés en des positions appropriées sur la rame équipée, avant d'acheminer les rails aux organes de pose de la machine de pose 21.Of course, when the welds have been carried out, the weld regions are still machined in a well-known manner, by removing the repressed metal by tools and then by grinding and correcting the profile of the rail head. These operations can be carried out by apparatus (not shown) arranged in appropriate positions on the equipped train, before routing the rails to the laying members of the laying machine 21.

L'action des mâchoires hydrauliques 16 rend possible d'effectuer automatiquement le nivellement et l'alignement des tronçons de rail, ainsi réalisant en un temps réduit des résultats plus parfaits de ceux qu'on obtient habituellement sur les rails en oeuvre après des opérations relativement longues et difficiles. L'exécution des soudages dans les têtes soudeuses 15 prévues à cet effet peut avoir lieu en des conditions et par des procédés plus parfaits de ceux qu'on peut appliquer sur les rails posés en oeuvre. Le procédé suivant la présente invention peut être combiné avantageusement avec un procédé de régulation thermique, et dans ce cas les rails posés peuvent être fixés aux traverses immédiatement après le passage du train opérateur, parce qu'il n'est plus exigée aucune intervention sur ces rails. Bien que les appareillages de soudage installés sur le chariot 8 peuvent être plus avancés de ceux employés habituellement, leur prix de revient est néanmoins bien plus réduit que celui d'une machine soudeuse à étincellement installée sur un véhicule ferroviaire spécial pour travailler sur des rail déjà posés. Enfin, l'emploi de main d'oeuvre est réduit d'une facon draconienne.The action of the hydraulic jaws 16 makes it possible to automatically level and align the rail sections, thus achieving in a reduced time more perfect results than those usually obtained on the rails in operation after relatively operations. long and difficult. The execution of the welds in the welding heads 15 provided for this purpose can take place under conditions and by methods more perfect than those which can be applied to the rails laid in use. The method according to the present invention can advantageously be combined with a thermal regulation method, and in this case the installed rails can be fixed to the sleepers immediately after the passage of the operator train, because there is no longer required any intervention on these rails. Although the welding equipment installed on the carriage 8 may be more advanced than that usually used, their cost price is nevertheless much lower than that of a spark welding machine installed on a special railway vehicle for working on already existing rails. posed. Finally, the use of labor is drastically reduced.

Du fait de l'emploi du procédé suivant l'invention et de sa mise en oeuvre moyennant la rame équipée, constituant elle aussi un objet de l'invention, on peut donc simplifier, organiser mieux et rendre plus économiques les opérations de pose des rails soudés, en réduisant les frais d'appareillages et de main d'oeuvre et en assurant l'obtention de résultats techniquement plus parfaits.Due to the use of the method according to the invention and its implementation by means of the equipped train, which also constitutes an object of the invention, it is therefore possible to simplify, organize better and make more economical the operations of laying welded rails, reducing the costs of equipment and labor and ensuring the obtaining of technically more perfect results.

La prévision du chariot 8 portant les machines soudeuses autorise l'exécution de toutes les opérations se rapportant au soudage sans ralentir ou arrêter le train opérateur, ou tout au moins en limitant les ralentissements et les périodes d'arrêt.The provision of the carriage 8 carrying the welding machines authorizes the execution of all the operations relating to welding without slowing down or stopping the train operator, or at least by limiting the slowing downs and the stopping periods.

Bien que l'invention a été décrite en faisant référence à un mode de réalisation spécifique, les différentes modifications indiquées et autres, et tout remplacement de aryens techniquement équivalents, peuvent être portées dans le domaine des revendications.Although the invention has been described with reference to a specific embodiment, the various modifications indicated and others, and any replacement of technically equivalent Aryans, can be brought within the scope of the claims.

POSSIBILITES D'APPLICATION INDUSTRIELLEPOSSIBILITIES OF INDUSTRIAL APPLICATION

L'invention peut être appliquée en général dans toutes les opérations industrielles de réalisation ou/et de renouvellement de voies ferroviaires qui comportent la pose de tronçons de rail destinés à être soudés aux tronçons de rail déjà posés précédemment.The invention can be applied in general in all industrial operations for the production or / and renewal of railway tracks which involve the laying of rail sections intended to be welded to the rail sections already laid previously.

Claims (11)

  1. A process for the continuous welding of railroad rail sections during the laying down thereof, including the operations of inserting into an operating train comprising trucks (1) which carry new rail sections (3) and new ties (2), and an operating machine (2) which performs the laying down thereof, between said trucks (1) and said operating machine (21), a particularly equipped train set (5-5'), and to perform on this equipped train set (5-5') the operations for arranging to line, to level and to abutment the subsequent rail sections (3), as well as their welding, whereby the whole cycle of operations having reference to the welding is accomplished on board of the operating train itself, and the laying down is done by the operating machine (21) on already continuous rails,
       characterized in that said welding operation is done by means of welding machines (15-17) which are movable along the equipped train set (5-5'), the welding operation being performed during a stroke of the welding machines with respect to the train set in a direction opposite the forward direction of the operating train, and said welding stroke being subsequently compensated by a return stroke of the welding machines with respect to the equipped train set, in the same direction as the forward direction of the operating train, whereby there is no need for interrupting the advancement of the train during the welding operation.
  2. A process as set forth in Claim 1, characterized in that it includes using means (11-14) for seizing and displacing the new rail sections (3) to be welded, for their transfer from the truck (1) which carries them to the equipped train set (5-5'), and for abutting them against the already welded rail sections.
  3. A process as set forth in Claim 1, characterized in that it includes using hydraulic jaws (16) arranged for automatically putting to line and level the rail sections (3) before activating the welding machines (15-17).
  4. A process as set forth in Claim 1, characterized in that it includes performing on board of the equipped train set (5-5'), before forwarding to the laying down, all mechanical operations needed by the regions of the rail sections (3) whereon the weldings have been performed.
  5. An equipped train set intended to carry out a process as set forth in Claim 1, comprising one or more tracks (5,5') each having a lowered load platform, and welding machines (15-17) mounted onto said trucks (5,5'), suitable for mutually welding the abutting ends of the rail sections, characterized in that it comprises: first side guides (4) for the travel of a portal crane (20) intended for transporting ties (2); second side guides (7), having a gauge smaller than that of said first guides (4); and a trolley (8) which travels on said second guides (7) and carries said welding machines (15-17).
  6. An equipped train set as set forth in Claim 6, characterized in that said trolley (8) is self propelling.
  7. An equipped train set as set forth in Claim 6, characterized in that each said welding machine (15-17) comprises a welding head (15) and a current generator group (17) for feeding the same.
  8. An equipped train set as set forth in Claim 6, characterized in that it includes telescopic arms (11), said telescopic arms having grasping jaws (12) in order to effect the operations for seizing, abutting and, in case, approximately putting to line and level the subsequent rail sections (3) to be welded.
  9. An equipped train set as set forth in Claim 5, characterized in that it comprises hydraulic jaws (16) located in front and at rear said welding machines (15), arranged for automatically carrying out the final operation for putting to line and level the rail sections (3) to be welded.
  10. An equipped train set as set forth in Claim 9, wherein said welding machines are mounted onto a movable trolley (8), characterized in that at least a part of said hydraulic jaws (16) also has the task of rendering said trolley (8) solid with the already welded rail sections (3) to be laid down.
  11. An equipped train set as set forth in Claim 5, characterized in that it is provided with a roofing (18) for covering and protecting the equipment and the operators, and with a side net (19) for protection with respect to the railroad lines located sidewise.
EP90907036A 1989-05-23 1990-05-08 Process for continuous welding of track sections, and set of wagons especially equipped for its implementation Expired - Lifetime EP0431092B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT90907036T ATE92559T1 (en) 1989-05-23 1990-05-08 PROCESS FOR CONTINUOUS WELDING OF RAILWAYS AND TRACTION VEHICLE FOR THEIR IMPLEMENTATION.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT6738689 1989-05-23
IT8967386A IT1232099B (en) 1989-05-23 1989-05-23 PROCEDURE FOR THE CONTINUOUS WELDING OF RAIL TRUNKS, ROTABLE AND EQUIPPED FOR ITS IMPLEMENTATION

Publications (2)

Publication Number Publication Date
EP0431092A1 EP0431092A1 (en) 1991-06-12
EP0431092B1 true EP0431092B1 (en) 1993-08-04

Family

ID=11301964

Family Applications (1)

Application Number Title Priority Date Filing Date
EP90907036A Expired - Lifetime EP0431092B1 (en) 1989-05-23 1990-05-08 Process for continuous welding of track sections, and set of wagons especially equipped for its implementation

Country Status (7)

Country Link
US (1) US5195436A (en)
EP (1) EP0431092B1 (en)
AU (1) AU635934B2 (en)
CA (1) CA2033177C (en)
DE (1) DE69002592T2 (en)
IT (1) IT1232099B (en)
WO (1) WO1990014470A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7895950B2 (en) 2004-08-20 2011-03-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT400339B (en) * 1991-09-10 1995-12-27 Plasser Bahnbaumasch Franz MACHINE ARRANGEMENT FOR RENEWING A TRACK
FR2684396B1 (en) * 1991-11-29 1994-01-07 Commissariat A Energie Atomique VEHICLE FOR AUTOMATIC LAYING OF A TRACK BY A VEHICLE MOVING ON THIS TRACK, AND TRACK DESIGNED TO BE INSTALLED BY SUCH A VEHICLE.
CH689643A5 (en) * 1994-02-18 1999-07-30 Speno International An installation for reprofiling the rails of a railway.
DE4418303B4 (en) * 1994-05-26 2010-12-30 Robel Bahnbaumaschinen Gmbh Rail loading train for transporting long rails
ATE197179T1 (en) * 1995-01-03 2000-11-15 Plasser Bahnbaumasch Franz MACHINE AND SYSTEM FOR CARRYING OUT TRACK CONSTRUCTION WORK
DE19524285A1 (en) * 1995-07-04 1997-01-09 Robel Georg Gmbh & Co Rail loading wagons
DK0835712T3 (en) * 1996-10-11 2000-05-22 Scheuchzer Sa Method for welding at least one rail string and machine for carrying out the method
US6163003A (en) * 1998-06-12 2000-12-19 Chemetron-Railway Products, Inc. Method and apparatus for controlling forging force during flash butt welding of railway rails
AU2006338034A1 (en) * 2006-02-09 2007-08-16 Sprintex Australasia Pty Ltd A supercharging system
FR2904335B1 (en) * 2006-07-25 2009-09-18 Tso Sa "METHOD FOR SUBSTITUTING RAILS ON A HIGH SPEED LINE"
US8658935B2 (en) * 2008-12-24 2014-02-25 Chemetron-Railway Products, Inc. Welding process with jerk compensation
US8181577B2 (en) * 2009-08-21 2012-05-22 Herzog Contracting Corp. Rail train
US8590454B2 (en) * 2009-08-21 2013-11-26 Herzog Contracting Corp. Clamp assembly
FR2968018B1 (en) * 2010-11-29 2013-08-16 Europ De Travaux Ferroviaires Etf PROCESS FOR CONSTRUCTING RAILWAY.
CN102425084B (en) * 2011-12-13 2014-03-05 中国北车集团沈阳机车车辆有限责任公司 Long steel-rail train
EP2971358B1 (en) 2013-03-11 2019-11-20 Herzog Contracting Corp. Clamp assembly
US10286460B2 (en) 2017-04-07 2019-05-14 Robert J. Murphy Single-pass, single-radial layer, circumferential-progression fill-welding system, apparatus and method for refurbishing railway and other transit rails

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT305331B (en) * 1967-06-29 1973-02-26 Plasser Bahnbaumasch Franz Device for the continuously progressive renewal of tracks
US3896734A (en) * 1967-12-29 1975-07-29 Plasser Bahnbaumasch Franz Apparatus for continuously laying track
AT351576B (en) * 1977-06-16 1979-08-10 Plasser Bahnbaumasch Franz MOBILE DEVICE FOR LAYING TRACKS
AT357594B (en) * 1977-12-28 1980-07-25 Plasser Bahnbaumasch Franz MOBILE BURNT-BLOW RAIL WELDING MACHINE WITH WELDING BULB REMOVING DEVICE
AT357595B (en) * 1977-12-28 1980-07-25 Plasser Bahnbaumasch Franz DRIVABLE RAIL WELDING MACHINE
AU534740B2 (en) * 1978-03-15 1984-02-16 Canron Inc.(Montreal) Canada Succursale De Crissier Machine for the renewel of railway tracks
FR2447421A2 (en) * 1979-01-24 1980-08-22 Delachaux C DEVICE FOR ADJUSTING THE ALIGNMENT AND THE INTERSECTION DISTANCE OF TWO END OF TRACKS
FR2487879A2 (en) * 1980-07-30 1982-02-05 Delachaux C DEVICE FOR ADJUSTING TWO END OF TRACKS TO BE CONNECTED BY WELDING
US4414454A (en) * 1981-08-13 1983-11-08 H. A. Schlatter Ag Method of welding continuous rails and apparatus therefor
SU1137137A1 (en) * 1983-11-21 1985-01-30 Ленинградский Ордена Ленина Институт Инженеров Железнодорожного Транспорта Им.Акад.В.Н.Образцова Apparatus for heat treatment of rail lengths before placement
AT383838B (en) * 1984-06-01 1987-08-25 Plasser Bahnbaumasch Franz CONTINUOUSLY TRAVELABLE TRACK LEVELING AND LEVELING MACHINE
IT1179729B (en) * 1984-07-10 1987-09-16 Enrico Valditerra CONVOGLIO FOR THE RENEWAL OF RAILWAY ROADS
GB2172563B (en) * 1985-03-23 1989-06-28 Permanent Way Equip Rail vehicle
US4716836A (en) * 1986-07-14 1988-01-05 H. A. Schlatter Ag Suspended rail welder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7895950B2 (en) 2004-08-20 2011-03-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system

Also Published As

Publication number Publication date
US5195436A (en) 1993-03-23
CA2033177A1 (en) 1990-11-24
CA2033177C (en) 2000-09-26
AU635934B2 (en) 1993-04-08
IT8967386A0 (en) 1989-05-23
AU5653290A (en) 1990-12-18
EP0431092A1 (en) 1991-06-12
DE69002592D1 (en) 1993-09-09
IT1232099B (en) 1992-01-23
WO1990014470A1 (en) 1990-11-29
DE69002592T2 (en) 1994-03-10

Similar Documents

Publication Publication Date Title
EP0431092B1 (en) Process for continuous welding of track sections, and set of wagons especially equipped for its implementation
EP0004985B1 (en) Train for the renewal of a railway track
CA2077855C (en) Method for renewing a track and a machine arrangement
EP0835712A1 (en) Method for welding at least one rail string and machine for using that method
EP0168103B1 (en) Track-renewal train unit
FR2618466A1 (en) EXCHANGE MACHINE OF TRAVERSES
FR2713679A1 (en) Work train to replace old railway sleepers with new sleepers and process for the implementation thereof.
EP0146164B1 (en) Method for the renewal of railroad switches, and railroad machine for carrying it out
US4232610A (en) Mobile apparatus for laying railway track
FR2666102A1 (en) MACHINE FOR REPLACING THE RAILS OF A RAILWAY TRACK.
FR2474554A1 (en) MOBILE APPARATUS FOR THE WELDING OF STUDS TO RAIL INSOLES
EP1127654B1 (en) Metal sheet butt welding method and apparatus
FR3109129A1 (en) mechanism for reciprocating stacks of sleepers and railway vehicle comprising such a mechanism
FR2562572A1 (en) ROLL-UP SYSTEM AND METHOD FOR RECEIVING AND / OR INSTALLING RAILWAY WORKS
EP0467001B1 (en) Train for laying new tracks and method for their laying using such a train
US3969905A (en) Method and apparatus for laying pipelines
US3745319A (en) Apparatus for resistance butt welding of several pipes into extended sections
FR2627521A1 (en) METHOD AND ARRANGEMENT OF LEANING MACHINE, JAM MACHINE AND DRILLING MACHINE, RAILWAY RUNWAY FOR WORKING IN ZONES DE NEIGUILLAGE
EP0551798A1 (en) Apparatus for replacing and neutralizing railway rails
FR2572432A1 (en) RAILWAY TROLLEY FOR REPLACEMENT OR INSTALLATION AND REMOVAL AS WELL AS FOR THE TRANSPORTATION OF RAILWAYS.
FR2666599A1 (en) Method and device for continuous laying and/or replacing of railway tracks
FR2847917A1 (en) Process for installing or renewing railway track rails involves electrically welding together short rails, stored on rear transport wagon, end-to-end to form long rails that are installed from front of train
EP0775780B1 (en) Method for renewing railway tracks
EP2390414B1 (en) Method for mounting a railway track to be anchored to a concrete bed and device for implementing same
JP3552993B2 (en) Continuous supply method of underground buried pipe material and continuous supply device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT CH DE FR GB IT LI

17P Request for examination filed

Effective date: 19910521

17Q First examination report despatched

Effective date: 19920324

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: TAMPER CORP.

RBV Designated contracting states (corrected)

Designated state(s): AT CH DE FR GB LI

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT CH DE FR GB LI

REF Corresponds to:

Ref document number: 92559

Country of ref document: AT

Date of ref document: 19930815

Kind code of ref document: T

REF Corresponds to:

Ref document number: 69002592

Country of ref document: DE

Date of ref document: 19930909

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 19931029

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: CH

Ref legal event code: PUE

Owner name: TAMPER CORPORATION TRANSFER- HARSCO CORPORATION

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

REG Reference to a national code

Ref country code: FR

Ref legal event code: TP

Free format text: CORRECTION

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20090515

Year of fee payment: 20

Ref country code: AT

Payment date: 20090514

Year of fee payment: 20

Ref country code: DE

Payment date: 20090429

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20090513

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20090506

Year of fee payment: 20

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20100507

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20100507

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20100508