EP0260197A1 - Reinforced concrete bridge with integrated shuttering - Google Patents

Reinforced concrete bridge with integrated shuttering Download PDF

Info

Publication number
EP0260197A1
EP0260197A1 EP87402002A EP87402002A EP0260197A1 EP 0260197 A1 EP0260197 A1 EP 0260197A1 EP 87402002 A EP87402002 A EP 87402002A EP 87402002 A EP87402002 A EP 87402002A EP 0260197 A1 EP0260197 A1 EP 0260197A1
Authority
EP
European Patent Office
Prior art keywords
tubes
formwork
bridge
reinforced concrete
strips
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP87402002A
Other languages
German (de)
French (fr)
Inventor
Maurice Pingon
Pierre Joseph De Pingon
Original Assignee
Maurice Pingon
de Pingon, Pierre Joseph
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to FR8612603A priority Critical patent/FR2603627B1/en
Priority to FR8612603 priority
Application filed by Maurice Pingon, de Pingon, Pierre Joseph filed Critical Maurice Pingon
Publication of EP0260197A1 publication Critical patent/EP0260197A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Abstract

The shuttering consists of parallel steel tubes 5-9, extending between the bridge supports. They are connected at their lower part by connection strips 10, 11, 12, 14. <IMAGE>

Description

  • L'invention concerne les ponts en béton armé, à coffrage intégré.The invention relates to reinforced concrete bridges with integrated formwork.
  • Les ponts en béton armé sont d'une manière classique coulés sur un coffrage en bois ou métallique ou mixte : cela revient à construire un pré-pont, opération longue et coûteuse.Reinforced concrete bridges are conventionally poured onto wooden or metallic or mixed formwork: this amounts to building a pre-bridge, a long and costly operation.
  • Trois solutions ont été mises en oeuvre pour éliminer cette opération de coffrage :
    • 1- La préfabrication de poutres de la longueur d'une travée soit en béton armé ou précontraint, soit métalliques, sur lesquelles, après leur mise en place, on coule une dalle en béton armé ou précontraint qui, solidarisée avec les poutres, devient dalle de compression et chaussée : néanmoins, cette solution nécessite de très gros moyens de fabrication, de transport et de manutention ainsi qu'un coffrage important.
    • 2- La préfabrication d'éléments courts en béton comportant poutres, dalle de compression et chaussée, solidarisés par précontrainte après mise en place. C'est une technique très élaborée qui nécessite également des moyens très importants.
    • 3- La constitution de coffrage en profils laminés ou reconstitués, sur lesquels on coule le béton, et qui participent, l'ouvrage terminé, à la résistance. Ce n'est pas très rationnel car le poids mort est très important et l'on peut s'interroger sur l'homogénéité de l'ouvrage, le béton étant découpé par les profilés.
    Three solutions have been implemented to eliminate this formwork operation:
    • 1- The prefabrication of beams the length of a span either in reinforced or prestressed concrete or metal, on which, after their installation, a slab of reinforced or prestressed concrete is poured which, secured to the beams, becomes slab compression and pavement: however, this solution requires very large means of manufacture, transport and handling as well as a large formwork.
    • 2- The prefabrication of short concrete elements comprising beams, compression slab and pavement, secured by prestressing after installation. It is a very sophisticated technique which also requires very significant resources.
    • 3- The constitution of formwork in laminated or reconstituted profiles, on which the concrete is poured, and which participate, the finished work, in the resistance. It is not very rational because the dead weight is very important and one can wonder about the homogeneity of the structure, the concrete being cut by the profiles.
  • Le but de la présente invention est de proposer une solution qui permet la mise en place très rapide, sans moyens autres que courants, d'un coffrage peu coûteux.The object of the present invention is to propose a solution which allows very inexpensive formwork to be put in place very quickly, without means other than current.
  • Ce coffrage participant ensuite, une fois le béton armé coulé, à la résistance de l'ouvrage, remplace ainsi pour partie les armatures du béton armé et, de ce fait, n'apporte pas de supplément au prix de l'ouvrage, le coffrage étant de plus très rapidement posé.This formwork then participating, once the reinforced concrete is poured, in the resistance of the structure, thus partially replaces the reinforcement of the reinforced concrete and, therefore, does not add any additional cost to the structure, the formwork being moreover very quickly posed.
  • L'invention a pour objet un pont en béton armé à coffrage intégré, caractérisé en ce que le coffrage est essentiellement constitué de tubes d'acier parallèles, s'étendant entre les appuis du pont.The subject of the invention is a reinforced concrete bridge with integrated formwork, characterized in that the formwork consists essentially of parallel steel tubes, extending between the supports of the bridge.
  • Selon d'autres caractéristiques de l'invention :
    - les tubes sont juxtaposés et solidarisés entre eux pour constituer le coffrage ;
    - les tubes sont espacés les uns des autres et, entre deux tubes voisins, le coffrage est complété par des bandes de raccordement ;
    - les tubes sont munis de connecteurs pour améliorer leur liaison avec le béton armé du pont ;
    - les bandes de raccordement sont en tôle et susceptibles d'être démontées ;
    - les bandes de raccordement sont en tôle et intégrées au coffrage ;
    - les bandes de raccordement sont en bois et soutenues par des supports ;
    - les bandes de raccordement sont des plaques préfabriquées en béton armé et sont supportées par des taquets .
    According to other characteristics of the invention:
    - The tubes are juxtaposed and joined together to form the formwork;
    - the tubes are spaced from each other and, between two neighboring tubes, the formwork is completed by connecting strips;
    - the tubes are fitted with connectors to improve their connection with the reinforced concrete of the bridge;
    - the connection strips are made of sheet metal and can be dismantled;
    - the connection strips are made of sheet metal and integrated into the formwork;
    - the connection strips are made of wood and supported by supports;
    - the connection strips are prefabricated reinforced concrete plates and are supported by cleats.
  • D'autres caractéristiques ressortent de la description qui suit faite avec référence au dessin annexé sur lequel on peut voir :
    - une vue partielle en coupe transversale selon un plan vertical, d'un exemple de réalisation d'un pont à coffrage intégré selon l'invention.
    Other characteristics appear from the following description made with reference to the attached drawing on which we can see:
    - A partial view in cross section along a vertical plane, of an embodiment of an integrated formwork bridge according to the invention.
  • Sur le dessin, on voit que le pont 1 en béton armé supporte une chaussée 2 et un trottoir latéral 3 muni d'une rambarde 4. Selon l'invention, le coffrage utilisé pour couler le béton du pont est essentiellement constitué par des tubes 5-9 en acier. Ces tubes s'étendent sur toute la longueur du pont, ou au moins sur chaque portée. Ils sont d'un diamètre qui peut aller jusqu'à 1,5 m environ sans que cette dimension constitue une limite. Ces tubes sont juxtaposés ou disposés avec un certain écartement comme représenté au dessin.In the drawing, it can be seen that the reinforced concrete bridge 1 supports a roadway 2 and a sidewalk 3 provided with a guardrail 4. According to the invention, the formwork used for pouring the concrete of the bridge consists essentially of tubes 5 -9 in steel. These tubes extend over the entire length of the bridge, or at least over each span. They are of a diameter which can go up to approximately 1.5 m without this dimension constituting a limit. These tubes are juxtaposed or arranged with a certain spacing as shown in the drawing.
  • Dans ce dernier cas, le coffrage est complété par des bandes de raccordement qui relient les tubes deux-à-­deux. Ces bandes de raccordement sont par exemple : des tôles d'acier pliées et fixées aux tubes à l'extérieur 10 ou à l'intérieur 11 par rapport au béton ; des pièces de bois 12 soutenues par des supports 13 ; ou des plaques préfabriquées 14 en béton armé supportées par des taquets 15. Elles sont en général placées vers la partie inférieure des tubes de façon que la plus grande partie de la circonférence des tubes soit en contact avec le béton.In the latter case, the formwork is completed by connecting strips which connect the pipes two by two. These connecting strips are for example: folded steel sheets fixed to the tubes outside 10 or inside 11 relative to the concrete; pieces of wood 12 supported by supports 13; or prefabricated reinforced concrete plates 14 supported by cleats 15. They are generally placed towards the lower part of the tubes so that the greater part of the circumference of the tubes is in contact with the concrete.
  • Après avoir monté le coffrage et mis en place les armatures métalliques, on procède à la coulée de béton qui remplit l'espace entre les tubes et s'étend au dessus des tubes pour former une dalle. C'est sur cette dalle que sont disposés la chaussée et le trottoir latéral. Selon l'invention, le coffrage étant en acier, participe à la résistance mécanique du pont et doit être pris en compte dans le calcul de l'ouvrage, ce qui entraîne une économie de fer dans les armatures du béton armé.After mounting the formwork and putting in place the metal reinforcements, concrete is poured which fills the space between the tubes and extends above the tubes to form a slab. It is on this slab that the pavement and the sidewalk are arranged. According to the invention, the formwork being made of steel, contributes to the mechanical strength of the bridge and must be taken into account in the calculation of the structure, which results in an economy of iron in the reinforcements of reinforced concrete.
  • Il faut également que l'ouvrage travaillant pour partie avec le coffrage ait une résistance homogène longitudinalement et transversalement, que le calcul soit classique, sans ambiguïté et que la fiabilité dans le temps soit assurée, ce qui est le cas dans la solution proposée.It is also necessary that the structure working in part with the formwork has a homogeneous resistance longitudinally and transversely, that the calculation is conventional, unambiguous and that reliability over time is ensured, which is the case in the proposed solution.
  • Le coffrage est constitué de tubes de grande dimension de section quelconque et de faible épaisseur. De tels tubes sont fabriqués industriellement à partir de feuillard et sont donc à prix intéressants, voisins de ceux des profilés laminés. Ils ont une bonne inertie dans tous les sens, ce qui permet de les manutentionner facilement en grandes longueurs, étant donné d'autre part leur poids relativement peu important pour leur longueur.The formwork consists of large size tubes of any cross-section and thin. Such tubes are manufactured industrially from strip and are therefore inexpensive, similar to those of laminated sections. They have good inertia in all directions, which makes it easy to handle them in great lengths, given, on the other hand, their relatively small weight for their length.
  • Ils sont fabriqués en grandes longueurs et peuvent être facilement transportés avec des moyens classiques, depuis l'aciérie directement sur le chantier. Arrivés sur le chantier, ces tubes sont constitués en longueurs suffisantes par soudures bout à bout. Leur longueur étant grande au sortir de l'aciérie, généralement une seule soudure est nécessaire. Ils peuvent être cintrés pour réaliser des ouvrages courbes dans le plan horizontal ou vertical. On peut également les précambrer pour compenser la flèche prise entre appuis lors du coulage du béton.They are manufactured in great lengths and can be easily transported with conventional means, from the steelworks directly to the site. When they arrive on site, these tubes are made into sufficient lengths by butt welds. Their length being great at the exit of the steelworks, generally only one welding is necessary. They can be bent to make curved works in the horizontal or vertical plane. They can also be pre-wired to compensate for the deflection taken between supports when the concrete is poured.
  • Ainsi préparés, ils sont posés côte à côte sur les appuis de l'ouvrage, avec l'adjonction d'appuis intermédiaires si nécessaire, en laissant entre eux un intervalle faible dépendant de l'importance de l'ouvrage. Cet intervalle peut être à la limite nul et les tubes devenant alors jointifs, on peut les solidariser par quelques boulons sur la longueur. Il faut remarquer de nouveau que la manutention et la mise en place sur appuis sont aisées car ces tubes sont relativement légers et ont une bonne inertie dans tous les sens.Thus prepared, they are placed side by side on the supports of the structure, with the addition of intermediate supports if necessary, leaving a small interval between them depending on the size of the structure. This interval can be at the zero limit and the tubes then becoming joined, we can secure with a few bolts lengthwise. It should be noted once again that handling and positioning on supports are easy because these tubes are relatively light and have good inertia in all directions.
  • Les tubes ainsi posés, l'intervalle entre les tubes à la partie inférieure est refermé, régularisé et maintenu par un coffrage en bandes fixé aux tubes. Ce coffrage peut être constitué par du bois, des plaques préfabriquées en béton armé, ou des tôles acier. Dans le cas de coffrages acier, ceux-ci peuvent être soit démontés ultérieurement, soit solidarisés avec le béton coulé par des connecteurs et participer ainsi à la résistance de l'ouvrage.The tubes thus laid, the interval between the tubes at the bottom is closed, regularized and maintained by a formwork in strips fixed to the tubes. This formwork can be made of wood, prefabricated reinforced concrete plates, or steel sheets. In the case of steel formwork, these can either be dismantled later, or secured to the poured concrete by connectors and thus participate in the strength of the structure.
  • Le volume délimité par une horizontale légèrement au-­dessus des tubes et le coffrage en bande fixé à la partie inférieure de ces tubes, est celui réservé au béton armé coulé sur le coffrage ainsi constitué. Ce volume est celui d'un pont classique constitué d'une dalle supérieure et de poutres sous cette dalle, avec cependant de très notables avantages sur ce dernier système.
    • a- Les tubes sont pour les quatre cinqièmes environ de leur circonférence extérieure en contact avec le béton. Ce contact est amélioré par des connecteurs. On peut ainsi considérer qu'ils sont intégrés à l'ouvrage sans, grâce à leur forme, découper le béton et rompre son homogénéité et sa continuité. On peut les incorporer au calcul sans problème. Ils remplacent ainsi pour partie les aciers du béton armé.
    • b- La dalle supérieure n'est pas plate mais formée d'une série de voûtes bien plus efficaces pour la répartition des efforts locaux sur les poutres. La liaison de cette dalle avec les poutres est bien meilleure que dans les ponts à poutres et dalle , car elle n'est pas brutale avec un angle rentrant et une faible hauteur, mais arrondie sur la hauteur de la poutre. Les parties basses des tubes forment également liaison entre les parties basses des poutres, liées aux poutres par les connecteurs ou éventuellement le coffrage bas restant en place.
    • c- Même avec l'incorporation des tubes dans le calcul, celui-ci est classique et sans ambiguïté, et la fiabilité dans le temps est assurée.
    • d- La flexion sous un effort local d'une partie de l'ouvrage entraîne par torsion les tubes voisins, qui, justement, ont une très bonne résistance à ce genre de sollicitation. L'ouvrage en est ainsi fortifié et d'une homogénéité beaucoup plus grande qu'un ouvrage classique à dalle et poutres .
    • e- La grande homogénéité de l'ensemble s'oppose beaucoup mieux aux vibrations éventuelles car l'ensemble de l'ouvrage va participer à la résistance qui sera excellente non seulement longitudinalement mais aussi transversalement.
    The volume delimited by a horizontal slightly above the tubes and the strip formwork fixed to the lower part of these tubes, is that reserved for reinforced concrete poured on the formwork thus formed. This volume is that of a conventional bridge consisting of an upper slab and beams under this slab, with however very significant advantages over the latter system.
    • a- The tubes are about four-fifths of their outer circumference in contact with the concrete. This contact is improved by connectors. We can thus consider that they are integrated into the structure without, thanks to their shape, cutting the concrete and breaking its homogeneity and its continuity. They can be incorporated into the calculation without problem. They thus partially replace the reinforced concrete steels.
    • b- The upper slab is not flat but formed by a series of vaults much more effective for the distribution of local forces on the beams. The connection of this slab with the beams is much better than in the beam and slab bridges, because it is not brutal with a re-entrant angle and a low height, but rounded on the height of the beam. The lower parts of the tubes also form a connection between the lower parts of the beams, linked to the beams by the connectors or possibly the low formwork remaining in place.
    • c- Even with the incorporation of the tubes into the calculation, it is classic and unambiguous, and reliability over time is ensured.
    • d- The bending under local force of part of the structure causes the adjacent tubes to twist, which, precisely, have very good resistance to this kind of stress. The structure is thus fortified and of a much greater homogeneity than a conventional structure with slab and beams.
    • e- The great homogeneity of the whole is much better opposed to possible vibrations because the whole of the structure will participate in the resistance which will be excellent not only longitudinally but also transversely.
  • En résumé l'ouvrage selon l'invention peut être réalisé très rapidement avec des moyens tout à fait courants, à des prix nettement inférieurs à ceux des solutions classiques, car en fait le coffrage est facilement et très rapidement posé, et n'entraîne pas de coût supplémentaire car il remplace pour partie les aciers du béton armé. L'intégration des coffrages tubulaires rend l'ouvrage plus homogène, plus résistant. L'ensemble est sans problème de calcul et de longévité.In summary, the structure according to the invention can be produced very quickly with very common means, at prices much lower than those of conventional solutions, because in fact the formwork is easily and very quickly laid, and does not entail additional cost because it partially replaces reinforced concrete steels. The integration of tubular formwork makes the structure more homogeneous, more resistant. The whole is without problems of calculation and longevity.

Claims (8)

1. Pont en béton armé à coffrage intégré, caractérisé en ce que le coffrage est essentiellement constitué de tubes d'acier (5-9) parallèles, s'étendant entre les appuis du pont.1. Reinforced concrete bridge with integrated formwork, characterized in that the formwork consists essentially of parallel steel tubes (5-9), extending between the supports of the bridge.
2. Pont selon la revendication 1, caractérisé en ce que les tubes sont juxtaposés et solidarisés entre eux pour constituer le coffrage.2. Bridge according to claim 1, characterized in that the tubes are juxtaposed and secured together to form the formwork.
3. Pont selon la revendication 1, caractérisé en ce que les tubes sont espacés les uns des autres et, entre deux tubes voisins, le coffrage est complété par des bandes de raccordement.3. Bridge according to claim 1, characterized in that the tubes are spaced from each other and, between two adjacent tubes, the formwork is completed by connecting strips.
4. Pont selon la revendication 1, caractérisé en ce que les tubes sont munis de connecteurs pour améliorer leur liaison avec le béton armé du pont.4. Bridge according to claim 1, characterized in that the tubes are provided with connectors to improve their connection with the reinforced concrete of the bridge.
5. Pont selon la revendication 3, caractérisé en ce que les bandes de raccordement (10) sont en tôle et susceptibles d'être démontées ;5. Bridge according to claim 3, characterized in that the connecting strips (10) are sheet metal and capable of being dismantled;
6. Pont selon la revendication 3, caractérisé en ce que les bandes de raccordement (11) sont en tôle et intégrées au coffrage.6. Bridge according to claim 3, characterized in that the connecting strips (11) are made of sheet metal and integrated into the formwork.
7. Pont selon la revendication 3, caractérisé en ce que les bandes de raccordement (12) sont en bois et soutenues par des supports (13).7. Bridge according to claim 3, characterized in that the connecting strips (12) are made of wood and supported by supports (13).
8. Pont selon la revendication 3, caractérisé en ce que les bandes de raccordement (14) sont des plaques préfabriquées en béton armé et sont supportées par des taquets (15).8. Bridge according to claim 3, characterized in that the connecting strips (14) are prefabricated reinforced concrete plates and are supported by cleats (15).
EP87402002A 1986-09-09 1987-09-08 Reinforced concrete bridge with integrated shuttering Withdrawn EP0260197A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR8612603A FR2603627B1 (en) 1986-09-09 1986-09-09 REINFORCED CONCRETE BRIDGE WITH INTEGRATED FORMWORK
FR8612603 1986-09-09

Publications (1)

Publication Number Publication Date
EP0260197A1 true EP0260197A1 (en) 1988-03-16

Family

ID=9338797

Family Applications (1)

Application Number Title Priority Date Filing Date
EP87402002A Withdrawn EP0260197A1 (en) 1986-09-09 1987-09-08 Reinforced concrete bridge with integrated shuttering

Country Status (2)

Country Link
EP (1) EP0260197A1 (en)
FR (1) FR2603627B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19719409A1 (en) * 1997-05-12 1998-11-26 Noell Stahl Und Maschinenbau G Support especially to carry magnetic trains

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE659107A (en) *
US2022784A (en) * 1933-08-04 1935-12-03 Rice George Peter Concrete floor construction
US3343320A (en) * 1965-06-23 1967-09-26 Krajcinovic Peter Construction of channeled steel beams
FR1500825A (en) * 1966-05-06 1967-11-10 Mixed slab formed from long metal pieces in thin veil and concrete
DE1916904A1 (en) * 1969-04-02 1970-10-08 Thyssen Industrie Composite ceiling
DE2520105A1 (en) * 1975-05-06 1976-11-18 Richard Dipl Ing Laumer Composite construction interrupted reinforced concrete slab - has parts linked by girders with cutouts or latticed
EP0010733A1 (en) * 1978-10-27 1980-05-14 Stephen Parazader Guideway units for elevated guideways

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE659107A (en) *
US2022784A (en) * 1933-08-04 1935-12-03 Rice George Peter Concrete floor construction
US3343320A (en) * 1965-06-23 1967-09-26 Krajcinovic Peter Construction of channeled steel beams
FR1500825A (en) * 1966-05-06 1967-11-10 Mixed slab formed from long metal pieces in thin veil and concrete
DE1916904A1 (en) * 1969-04-02 1970-10-08 Thyssen Industrie Composite ceiling
DE2520105A1 (en) * 1975-05-06 1976-11-18 Richard Dipl Ing Laumer Composite construction interrupted reinforced concrete slab - has parts linked by girders with cutouts or latticed
EP0010733A1 (en) * 1978-10-27 1980-05-14 Stephen Parazader Guideway units for elevated guideways

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19719409A1 (en) * 1997-05-12 1998-11-26 Noell Stahl Und Maschinenbau G Support especially to carry magnetic trains
DE19719409C2 (en) * 1997-05-12 1999-06-17 Noell Stahl Und Maschinenbau G Support element and method for producing a support element

Also Published As

Publication number Publication date
FR2603627A1 (en) 1988-03-11
FR2603627B1 (en) 1990-08-03

Similar Documents

Publication Publication Date Title
BE1016053A4 (en) Seal metal lightweight concrete surface.
CA2357919C (en) Reinforcing cage for a reinforced concrete element
EP0369914B1 (en) Method for joining a matrix material to a functional support, and devices manufactured according to this method
FR2622907A1 (en) Civil engineering works, particularly bridges, and processes for their construction
EP0260197A1 (en) Reinforced concrete bridge with integrated shuttering
EP0015213B2 (en) Self supporting roof for buildings, composed of modular vaulted elements
FR2555222A1 (en) CALIPER ARMOR FOR CONSTRUCTION WORKS
EP1135565B1 (en) Wooden trussed structural systems, such as frameworks, bridges, floors
EP1678389B1 (en) Large-span self-supporting metal formwork
EP1418283A1 (en) Modular load carrying structure
FR2656020A1 (en) ASSEMBLY BY EMBOITEMENT OF TWO Z-RIGHT SECTION PROFILES, ESPECIALLY FOR MAKING A FAILURE, A SMOOTH OR A FLOOR SUPPORT.
EP0005092B1 (en) Construction element in the form of a slab and structure comprising such an element
FR2657909A1 (en) SINGLE AND DOUBLE BEAMS AND POSTS, CONSISTING OF THE MEETING OF RIGHT-Z SECTION PROFILES, IN PARTICULAR FOR THE PRODUCTION OF A PORTIC OR A POTENCY FOR A BUILDING CONSTRUCTION.
EP1674631B1 (en) Floor support assembly and production process for such a floor
FR3038327A1 (en) PREFABRICATED BEAM FOR DECK APRON, BRIDGE DECK ASSEMBLY COMPRISING SAID BEAM, AND METHOD FOR MANUFACTURING DECK APRON
FR2474083A1 (en) Pre-fabricated reinforced beam for floors in building renovation - has overlapping vertical stirrups to increase I-section of reinforcing bars
EP3259416A1 (en) Construction element and method for erecting such a construction element
WO2017006160A1 (en) Construction element and method for mounting such a construction element
OA18516A (en) Construction element and method of mounting such a construction element.
FR2843985A1 (en) Prefabricated concrete bridge girder comprises beam with principal section and base plate having portions projecting laterally from principal section having docking face
FR2647138A1 (en) ASSEMBLING AT LEAST ONE HORIZONTAL BEAM AND / OR HORIZONTAL PANEL DETECTION ON A VERTICAL POST ALSO IN REINFORCED CONCRETE, FOR CARRYING OUT A BUILDING STRUCTURE, BEAM AND POLE FOR CARRYING OUT SUCH AN ASSEMBLY, ASSEMBLY METHOD AT LEAST ONE HORIZONTAL BEAM ON THE HEAD OF A VERTICAL POST AND BUILDING STRUCTURE OBTAINED BY CARRYING OUT SAID METHOD
BE850691A (en) FLOOR SLABS OR HOURDIS
BE496394A (en)
FR2738580A1 (en) Composite cast and prefabricated bridge deck construction
BE430921A (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): CH DE ES GB IT LI

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Withdrawal date: 19881013