EP0226169A2 - Plate-forme de travail - Google Patents

Plate-forme de travail Download PDF

Info

Publication number
EP0226169A2
EP0226169A2 EP86117150A EP86117150A EP0226169A2 EP 0226169 A2 EP0226169 A2 EP 0226169A2 EP 86117150 A EP86117150 A EP 86117150A EP 86117150 A EP86117150 A EP 86117150A EP 0226169 A2 EP0226169 A2 EP 0226169A2
Authority
EP
European Patent Office
Prior art keywords
working platform
platform
segments
holder
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP86117150A
Other languages
German (de)
English (en)
Other versions
EP0226169A3 (fr
Inventor
Maciej Nowak
Fryderyk Gawron
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Przedsiebiorstwo Robot Izolacyjnych
Original Assignee
Przedsiebiorstwo Robot Izolacyjnych
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Przedsiebiorstwo Robot Izolacyjnych filed Critical Przedsiebiorstwo Robot Izolacyjnych
Publication of EP0226169A2 publication Critical patent/EP0226169A2/fr
Publication of EP0226169A3 publication Critical patent/EP0226169A3/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/22Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/045Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally

Definitions

  • the subject of this present invention is a working platform intended for doing work at some heights, such as painting, washing and cleaning structures, windows and skylights under the ceilings of rooms, particularly industrial shops.
  • work was done with the application of scaffoldings or mechanically lifted platforms, these units being in both the cases placed at the floor level of industrial shops.
  • Such designs fulfilled their role only where process equipment and lines had not been installed.
  • process equipment and lines had not been installed.
  • it was necessary to repair and maintain operating equipment this was too onerous or impossible and, besides, highly expensive due, for example, to the need to stop the operation of a definite shop of a manufacturing works for the period of maintenance or repairs.
  • the aim of this present invention has been to avoid the above-mentioned disadvantages by developing a working platform which will enable maintenance and repair work to be done on operating equipment without needing to stop or Limit the normal operation of works production shops.
  • the working platform as per this present invention consists of an upper and a lower segments slideably mounted in relation to each other, thereby providing a working surface for carrying out any maintenance or repair.
  • the working platform comprises a proper number of hangers used for fixing the platform at a proper height, particularly to the structural components located under the ceilings of industrial shops.
  • the longitudinal components of the upper and lower segments are trusses and the transversal components of these same segments are made from beams and barriers, the beams secured to the lower beams of the trusses.
  • the upper and lower segments are slid by means of a system of ties wound with cranks onto the drums preferably located on the upper segment and the rolling components shifting in guides, the range of sliding being determined by the position of limiters.
  • the upper and lower segments are slid alternately forwards or backwards by the length of the stroke determined by the position of the limiters.
  • the working surface of the platform is formed from light landing grates arranged on beams, whereas the hanger comprises a holder, preferably self-clamping under the effect of the action of the force originating from the weight of the working platform and workers and adapted to the shape of the structural components to which the working platform is attached.
  • An importent step of preparing the platform for operation is the proper levelling of the upper and lower segments and, consequently, the length of each of the hangers is adjusted, preferably by means of a turnbuckle.
  • the length of the beams is adjusted for the proper attachment of the segments.
  • the hanger holder comprises a lock preventing the hanger from undesirably disengaging from the structural components, the holder comprising feet or clamps used for attaching the holders to gusset or truss girders depending on the.shape of the same components to which the working platform is attached,
  • the working platform is slid directly at a height, whereby the time taken to get the working zone ready is shorter relative conventional designs.
  • the simple construction of the working platform guarantees its long life and dependability.
  • FIG. 1 shows the working platform in axonometry
  • Fig. 2 shows a diagram of the tie system for shifting the segments of the working platform in the original position
  • Fig. 3 shows a diagram of the position of the tie system for shifting the lower segment to the right of the upper segment
  • Fig. 4 shows the section marked in Fig. 1 and presenting a rolling component of the working platform in a guide
  • Fig. 5 shows the alternative position of the rolling component in a guide.
  • Fig. 6 shows a hanger with self-clamping holder
  • Fig 7 shows the hanger holder for attaching the working platform to a gusset girder
  • Fig. 1 shows the working platform in axonometry
  • Fig. 2 shows a diagram of the tie system for shifting the segments of the working platform in the original position
  • Fig. 3 shows a diagram of the position of the tie system for shifting the lower segment to the right of the upper segment
  • Fig. 4 shows the section marked in Fig. 1 and presenting
  • FIG. 8 shows the hanger holder for attaching the working platform to a truss girder
  • Fig 9- shows in diagram the shifting phases of the platform
  • the working platform consists of upper segment 1 and lower segment 2 which are slideably_mounted relative each other.
  • the longitudinal components of upper segment 1 and lower segment 2 are trusses 3 and the transversal components are formed from beams 4 and barriers 5, beams 4 being attached to lower booms 6 of trusses 3.
  • Light landing grates 7 are arranged on beams 4 to form working surface 8 of the working platform.
  • Upper 1 and lower 2 segments slide relative each other by means of ties 9 wound with cranks 10 onto drums 11 and rolling components 12 moving in guides 13.
  • the mutual position of upper 1 and lower 2 segments relative each other is possible within the range determined by the location of limiters 14.
  • Each of segments 1 and 2- is attached to the structural components of an industrial shop, for example truss girders or gusset by means of hangers 15 of adjustable length and provided with self-clamping holder 16 with lock 17, the length of the hanger being adjusted with turnbuckle .18.
  • the working platform is attached to gusset girders holder 16 is provided with feet 19, whereas in case the working platform is attached to truss girders holder 16 is provided with overlapping clamps 20.
  • the lengths of beams 4 and barriers 5 are adjusted.
  • the lengths of the longitudinal components of segments 1 and 2 in the form of trusses 3 are a multiple of the structural module of industrial shops.
  • Entry to the working platform level can be gained through manhole 21 made in working surface 8 of the platform.
  • segments 1 and 2 are placed one above the other.
  • a shift of the working platform to the right, for example, as shown in Fig. 3 involves removing hangers 15 from the structural shop components and, then advancing lower segment 2 by the magnitude of the stroke determined by the position of limiters 14 and turning cranks 10 in agreement with the direction marked in Figs 2 and 3.
  • Tie system 9 wound onto drum 11 causes lower segment 2 to slide to the right until the position of limiters 14 has been reached, whereafter lower segment 2 should again be secured with hangers 14 to the structural shop components.
  • the working platform can be moved longitudinally forward or backward.
EP86117150A 1985-12-11 1986-12-09 Plate-forme de travail Withdrawn EP0226169A3 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PL1985256760A PL143813B2 (en) 1985-12-11 1985-12-11 Working platform
PL256760 1985-12-11

Publications (2)

Publication Number Publication Date
EP0226169A2 true EP0226169A2 (fr) 1987-06-24
EP0226169A3 EP0226169A3 (fr) 1988-09-07

Family

ID=20029447

Family Applications (1)

Application Number Title Priority Date Filing Date
EP86117150A Withdrawn EP0226169A3 (fr) 1985-12-11 1986-12-09 Plate-forme de travail

Country Status (2)

Country Link
EP (1) EP0226169A3 (fr)
PL (1) PL143813B2 (fr)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994000656A1 (fr) * 1992-06-26 1994-01-06 John Clement Preston Systeme de collecte de dechets sur un site de construction
FR2694323A1 (fr) * 1992-07-29 1994-02-04 France Etat Armement Dispositif d'accrochage de charges suspendues, notamment de plateformes ou d'échafaudages.
FR2763619A1 (fr) * 1997-05-20 1998-11-27 Frederic Buchmann Procede d'installation d'une structure utilisee pour effectuer des travaux sous plafond eleve
GB2409851A (en) * 2004-01-12 2005-07-13 Aus Struct Services Pty Ltd Work Platform
FR2865753A1 (fr) * 2004-01-31 2005-08-05 Stacco Plate-forme de securite et construction comportant une telle plate-forme.
AU2004200088B2 (en) * 2002-03-21 2009-09-10 Aus Struct Services Pty Ltd Work platform
CN107119897A (zh) * 2017-06-29 2017-09-01 中国五冶集团有限公司 滑模施工用支撑平台
CN109025234A (zh) * 2018-07-28 2018-12-18 北京建工集团有限责任公司 一种建筑高空悬空施工用可水平、垂直行走的轨道吊船
CN109057309A (zh) * 2018-09-13 2018-12-21 中信国安建工集团有限公司 一种悬挂式操作平台及其装拆方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191006943A (en) * 1910-03-19 1910-11-17 Hadrian Bayley Improvements in Fire-escapes.
GB191109147A (en) * 1911-04-12 1912-04-11 Percy Edgar Beaumont Improvements in Slung Cradles or Staging for Builders & the like.
US3096064A (en) * 1961-03-23 1963-07-02 Henderson G Leonard Suspension structure for demountable scaffolds
CH493719A (de) * 1969-05-08 1970-07-15 Charles Coombs William Hängegerüst
US3945462A (en) * 1975-06-18 1976-03-23 Griswold James D Hanger brackets
EP0094297A1 (fr) * 1982-05-11 1983-11-16 Daniel Gautier Nacelle mobile par rapport à une structure et procédé de déplacement d'une telle nacelle

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191006943A (en) * 1910-03-19 1910-11-17 Hadrian Bayley Improvements in Fire-escapes.
GB191109147A (en) * 1911-04-12 1912-04-11 Percy Edgar Beaumont Improvements in Slung Cradles or Staging for Builders & the like.
US3096064A (en) * 1961-03-23 1963-07-02 Henderson G Leonard Suspension structure for demountable scaffolds
CH493719A (de) * 1969-05-08 1970-07-15 Charles Coombs William Hängegerüst
US3945462A (en) * 1975-06-18 1976-03-23 Griswold James D Hanger brackets
EP0094297A1 (fr) * 1982-05-11 1983-11-16 Daniel Gautier Nacelle mobile par rapport à une structure et procédé de déplacement d'une telle nacelle

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994000656A1 (fr) * 1992-06-26 1994-01-06 John Clement Preston Systeme de collecte de dechets sur un site de construction
FR2694323A1 (fr) * 1992-07-29 1994-02-04 France Etat Armement Dispositif d'accrochage de charges suspendues, notamment de plateformes ou d'échafaudages.
FR2763619A1 (fr) * 1997-05-20 1998-11-27 Frederic Buchmann Procede d'installation d'une structure utilisee pour effectuer des travaux sous plafond eleve
AU2004200088B2 (en) * 2002-03-21 2009-09-10 Aus Struct Services Pty Ltd Work platform
GB2409851A (en) * 2004-01-12 2005-07-13 Aus Struct Services Pty Ltd Work Platform
GB2409851B (en) * 2004-01-12 2006-06-07 Aus Struct Services Pty Ltd Work platform
FR2865753A1 (fr) * 2004-01-31 2005-08-05 Stacco Plate-forme de securite et construction comportant une telle plate-forme.
CN107119897A (zh) * 2017-06-29 2017-09-01 中国五冶集团有限公司 滑模施工用支撑平台
CN109025234A (zh) * 2018-07-28 2018-12-18 北京建工集团有限责任公司 一种建筑高空悬空施工用可水平、垂直行走的轨道吊船
CN109057309A (zh) * 2018-09-13 2018-12-21 中信国安建工集团有限公司 一种悬挂式操作平台及其装拆方法

Also Published As

Publication number Publication date
EP0226169A3 (fr) 1988-09-07
PL143813B2 (en) 1988-03-31
PL256760A2 (en) 1986-11-04

Similar Documents

Publication Publication Date Title
EP0226169A2 (fr) Plate-forme de travail
US3524520A (en) Traveling scaffold
ES2036368T3 (es) Dispositivo rodante.
IE45970B1 (en) Means for renovating and refurbishing of overhead structures
JPH0860620A (ja) 主桁架設方法
US4319374A (en) Method of constructing a stayed girder bridge
JPH07103679B2 (ja) 吊り足場組立て工法とそれに使用される足場材
KR100377529B1 (ko) 교량공사용 이동 작업대
EP0001342A1 (fr) Equipement prenant appui sur une poutre
KR102380334B1 (ko) 박공 지붕양식으로 시공된 건축물의 보수 작업시 작업자의 안전을 2중으로 보장할 수 있는 블록체인형 로프 고정기구
JPH0372165A (ja) 吊上げ用具
RU2298423C2 (ru) Способ страховки рабочего при производстве ремонтно-строительных, реставрационных и профилактических работ на вертикальной поверхности зданий и сооружений и устройство - страховочная система для его осуществления
SU872708A1 (ru) Кондуктор
SU663806A1 (ru) Способ монтажа трубчатых строительных лесов
IT202100015329A1 (it) Metodo di montaggio per la realizzazione di piani di lavoro sospesi
JP2621748B2 (ja) 全天候型仮設上屋
JPH0740594Y2 (ja) 吊り足場部材
SU75489A1 (ru) Передвижные подмости дл ремонта и осмотра мостов с балочными перекрыти ми
SU499204A1 (ru) Грузоподъемна балка
SU727793A1 (ru) Подвесные подмости
SU670523A1 (ru) Кранова эстакада
SU614012A1 (ru) Кранова установка
GB2085824A (en) Rail system for use in refurbishing overhead structures
JPH0372166A (ja) 吊上げ用具
SU502828A1 (ru) Способ монтажа подкрановых путей

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH DE ES FR GB IT LI NL SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE ES FR GB IT LI NL SE

17P Request for examination filed

Effective date: 19890126

17Q First examination report despatched

Effective date: 19900207

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19900619

RIN1 Information on inventor provided before grant (corrected)

Inventor name: NOWAK, MACIEJ

Inventor name: GAWRON, FRYDERYK