DE8336561U1 - DEVICE FOR LAYING EDGE BLOCKS OD. DGL. - Google Patents

DEVICE FOR LAYING EDGE BLOCKS OD. DGL.

Info

Publication number
DE8336561U1
DE8336561U1 DE19838336561 DE8336561U DE8336561U1 DE 8336561 U1 DE8336561 U1 DE 8336561U1 DE 19838336561 DE19838336561 DE 19838336561 DE 8336561 U DE8336561 U DE 8336561U DE 8336561 U1 DE8336561 U1 DE 8336561U1
Authority
DE
Germany
Prior art keywords
boom
lifting
attachment
rail
fork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19838336561
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GROETZ GEORG 7563 LOFFENAU DE
Original Assignee
GROETZ GEORG 7563 LOFFENAU DE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GROETZ GEORG 7563 LOFFENAU DE filed Critical GROETZ GEORG 7563 LOFFENAU DE
Priority to DE19838336561 priority Critical patent/DE8336561U1/en
Publication of DE8336561U1 publication Critical patent/DE8336561U1/en
Priority to DE19843446231 priority patent/DE3446231A1/en
Expired legal-status Critical Current

Links

Description

Vorrichtung zum Verlegen von Randsteinen od.dgI.Device for laying curbs or the like.

Die Neuerung betrifft eine Vorrichtung zum Verlegen von Randsteinen od.dgI. im Straßen- und Wegebau mittels eines Radladers, an dessen Hubarm ein mehrere Randsteine aufnehmendes Anbaugerät, z.B. eine Hubgabel schwenkbar gelagert und parallel geführt ist.The innovation relates to a device for laying curbs or the like. in road and path construction by means of a wheel loader, on the lifting arm of which an attachment that can take several curb stones, e.g. a lifting fork, can be swiveled is stored and guided in parallel.

Randsteine werden bislang von Hand verlegt. Dabei handelt es sich insbesondere aufgrund des hohen Gewichtes dieser Steine um eine schwere, mühsame, reit- und personal aufwendige Arbeit. Die Randsteine werden zum Verlegenmeist von jeweils zwei Personen gemeinsam von Hand aufgenommen. Häufig ist es dann erforderlich, die so aufgenommenen Steine zur Einbaustelle zu tragen. Schließlich werden die Steine an der Einbaustelle unter möglichst exakter Positionierung abgesetzt.Kerbstones have so far been laid by hand. This is in particular Due to the heavy weight of these stones, it is a difficult, laborious, riding and personnel-intensive work. The curbs will usually picked up by hand by two people at a time. It is then often necessary to carry the stones picked up in this way to the installation site. Eventually the stones will be in place deposited with the most exact positioning possible.

Spezielle GerMte zum Verlegen sind nicht bekannt oder auch nur mit Menschenkraft zu verwenden.Special devices for laying are not known or even only with human strength to use.

Der Neuerung liegt die Aufgabe zugrunde, eine Gerätschaft zu schaffen, mit deren Hilfe Randsteine in müheloser personal sparender Arbeitsweise verlegt werden können.The innovation is based on the task of creating a piece of equipment with whose help curbs can be laid in an effortless, labor-saving way of working.

Zur Lösung der Aufgabe geht die Neuerung von einem an praktisch jeder Baustelle vorhandenen Radlader aus, der erfindungsgemäß weitergebildet wird durch einen an ihm, z.B. an seinem Heck, an einem gesonderten Rahmen, an dem Anbaugerät oder am Hubarm, abgestützten Aufbau mit einem mit Abstand über dem Anbaugerät auskragenden, in horizontaler Ebene schwenkbaren Ausleger mit einer Laufschiene, auf der eine Laufkatze mit einem Hubpeschirrund einem Greifer für wenigstens einen Randstein geführt ist.To solve the task, the innovation goes from one to practically every construction site existing wheel loader, which is developed according to the invention by a superstructure supported on it, e.g. on its rear, on a separate frame, on the attachment or on the lifting arm with a Distance above the attachment cantilevered, horizontally pivotable boom with a running rail on which a trolley with a lifting gear a gripper is performed for at least one curb.

Damit ist der Radlader durch seinen speziellen kranartigen Aufbau einem .{With its special crane-like structure, the wheel loader is a. {

neuen Verwendungszweck zugeführt. Zum Verlegen wird der mit Randsteinen beladene Radlader zunächst an die Einbaustell e gefahren. Danach wird das an der Laufkatze auf der Laufschiene des Auslegers geführte Hubgeschirr durch Verschieben in Position über die auf der Hubgabel lagernden Randsteine gebracht und sodann der Greifer durch Betätigen des Hubgeschirrs abgesenkt, bis er einen Randstein untergreifen kann. Der ergriffene Stein wird danach durch Betätigen des Hubgeschirrs angehoben. Der Ausleger wird dann in eine Stellung geschwenkt, in der er sich über die Einbaustelle erstreckt und der Stein durch Verschieben des Hubgeschirrs in Position direkt über die Einbaustelle gebracht. Danach wird der Stein unter Betätigen des Hubgeschirrs abgesenkt und exakt positioniert abgesetzt. Schließlich wird der Greifer gelöst. Das Verlegen der Randsteine stellt somit eine leichte, keineswegs mühsame Arbeit dar, die ohne weiteres auch von einer Person al leine ausgeführt werden kann.new use. The one with kerbstones is used for laying The loaded wheel loader is first driven to the installation site. After that it will Lifting gear guided on the trolley on the running rail of the boom Move it into position over the curbs on the lifting fork and then lower the gripper by operating the lifting gear, until it can reach under a curb. The gripped stone is then lifted by operating the lifting gear. The boom is then turned into a Pivoted position in which it extends over the installation point and the Stone by moving the lifting gear into position directly over the installation point brought. Then the stone is lowered by actuating the lifting gear and placed in exactly the right position. Finally the gripper is released. That Laying the curbs is therefore an easy, by no means arduous work, which can easily be carried out by one person alone can.

Zweckmäßigerweise ist vorgesehen, daß der Ausleger gegenüber dem Anbaugerät odfer dem Hubarm drehbar gelagert ist. In einer Ausführung weist der ( Ausleger eine in Arbeitslage vertikal nach unten ragende Auflagerstütze auf,Appropriately, it is provided that the boom is rotatably mounted relative to the attachment or the lifting arm. In one embodiment, the ( boom has a support post that protrudes vertically downwards in the working position,

die mit ihrem unteren Ende in einem an der Hubgabel angeordneten Drehlagerwith their lower end in a pivot bearing arranged on the lifting fork

: um ihre vertikale Längsachse drehbar abgestützt ist. Dabei kann vorteilhafter-: is supported rotatably about its vertical longitudinal axis. It can be more advantageous-

' weise zwischen dem auskragenden Abschnitt des Auslegers und der Auflagerstütze eine Stützstrebe angeordnet sein. Die Stütze kann auch am Heck des . Laders unmittelbar auf einem hydraulischen Drehmotor sitzen«'wise between the cantilevered portion of the boom and the support post a support strut can be arranged. The support can also be at the rear of the. Loader sit directly on a hydraulic rotary motor «

·; Gemäß einem bevorzugten Ausführungsbeispiel ist vorgesehen, daß der·; According to a preferred embodiment it is provided that the

J Aufbau eine an dem Anbaugerät befestigte, das Anbaugerät nach oben überragende Stütze aufweist, die im Bereich ihres oberen Endes ein Drehlager !;' für den Ausleger aufweist. Mit Vorteil ist ein mit dem Ausleger verbundenerJ Construction of a fixed to the attachment that protrudes above the attachment Has support that has a pivot bearing in the area of its upper end!; ' for the boom. One connected to the boom is advantageous

Drehantrieb vorgesehen. Vorzugsweise ist der Drehantrieb ein hydraulischer oder pneumatischer Druckmittel zylinder.· Durch Betätigen des Druckmittel-Zylinders erfolgt das Schwenken des Auslegers. Das Ausrichten des Auslegers läßt sich somit auf besonders einfache Weise durchführen.Rotary drive provided. The rotary drive is preferably a hydraulic one or pneumatic pressure medium cylinder. · By actuating the pressure medium cylinder the boom is swiveled. The alignment of the boom can thus be carried out in a particularly simple manner.

Gemäß einem anderen bevorzugten Ausführungsbeispiel ist vorgesehen, daß der Ausleger als in seiner Längsrichtung relativ zur Stütze verschiebbare und festsetzbare Schiene ausgebildet ist. Die Länge des Auslegers kann somit auf die Last abgestimmt werden, dies bedeutet, daß zum Verlegen relativ leichter Randsteine der Ausleger relativ weit auskragend eingestellt werden kann. Damit kann von einer Position des Radladers aus mit jeweils erneut entsprechend ausgerichtetem Ausleger nacheinander eine relativ große Zahl von Randsteinen verlegt werden.According to another preferred embodiment it is provided that the boom is designed as a rail which can be displaced and fixed in place in its longitudinal direction relative to the support. The length of the boom can be thus be matched to the load, this means that the cantilever is set to cantilever relatively far for laying relatively lighter curb stones can be. This allows from one position of the wheel loader with each again appropriately aligned boom one after the other a relatively large one Number of curbs to be laid.

In bevorzugter Ausführung ist vorgesehen, daß die Schiene eine in ihrer Längsrichtung angeordnete Reihe von Löchern aufweist, in einem am Drehlager angebrachten U-Bügel mit Löchern in seinen Schenkeln geführt istIn a preferred embodiment it is provided that the rail is one in their Has longitudinally arranged row of holes, is guided in a mounted on the pivot bearing U-bracket with holes in its legs

und mittels eines die Löcher in den Schenkeln des U-Bügels und in der Schiene durchsteckenden Steckbolzens fixiert ist. Mit dieser Konstruktion ist eine besonders einfache Handhabung bei der Längeneinstellung des Aus· lösers möglich.and by means of one of the holes in the legs of the U-bracket and in the Rail is fixed by pushing pin. This construction makes it particularly easy to use when adjusting the length of the solvers possible.

Gemäß einem besonders bevorzugten Ausführungsbeispiel ist unter Weiterbildung eines Radladers mit einer Hubgabel mit zwei parallelen Gabelzinken zur Aufnahme von Randsteinen vorgesehen, daß der Greifer des Hubgeschirrs maßlich an den Abstand der Gabelzinken angepaßt ist. Dadurch ist ein unkompliziertes und rasches Aufnehmen der Steine mittels des Greifers gewährleistet. According to a particularly preferred embodiment, under further development a wheel loader with a lifting fork with two parallel fork prongs for receiving curbs provided that the gripper of the lifting gear is dimensionally adapted to the distance between the fork prongs. This ensures that the stones can be picked up quickly and easily using the gripper.

Weitere Einzelheiten und Vorteile der Neuerung ergeben sich aus der nachfolgenden Beschreibung, in der zwei Ausführungsbeispiele der Neuerung unter Bezugnahme auf die Zeichnung im einzelnen erläutert sind. Dabei zeigen:Further details and advantages of the innovation emerge from the following Description in which two exemplary embodiments of the innovation are explained in detail with reference to the drawing. Show:

Figur 1 ein Ausführungsbeispiel der Neuerung mit schwenkbarem Ausleger in Seitenansicht;Figure 1 shows an embodiment of the innovation with a pivotable boom in side view;

Figur 2 einen Teilabschnitt des Ausführungsbeispiels der Fig. 1 in perspektivischer Ansicht;FIG. 2 shows a section of the exemplary embodiment in FIG 1 in a perspective view;

Figur 3 eine Hubgabel eines weiteren Ausführungsbeispiels mit einem längs verschiebbaren schwenkbaren Ausleger in perspektivischer Ansicht.Figure 3 shows a lifting fork of a further embodiment with a longitudinally displaceable pivotable Boom in perspective view.

Der mit der Neuerung vorgesehene Radlader 1 weist einen am Fahrgestell 2 des Fahrzeugs 3 um eine horizontale Achse schwenkbar gelagerten Hubarm 4 mit einem Anbaugerät in Form einer Hubgabel 5 und einem an der Hubgabel 5 angebrachten Aufbau 6 aus einer Stütze 7 und einem über der Hubgabel 5 auskragenden Ausleger 8 mit darauf verschiebbar geführtem Hubgeschirr 9 auf. Die Hubgabel 5 ist am freien Ende des Hubarms 4 um eine horizontale Achse schwenkbar gelagert.The wheel loader 1 provided with the innovation has one on the chassis 2 of the vehicle 3 pivotably mounted about a horizontal axis lifting arm 4 with an attachment in the form of a lifting fork 5 and one on the lifting fork 5 attached structure 6 consisting of a support 7 and a cantilevered over the lifting fork 5 Boom 8 with lifting gear 9 slidably guided thereon. The lifting fork 5 is at the free end of the lifting arm 4 around a horizontal axis pivoted.

Wie am besten in den Figuren 2 und 3 zu erkennen ist, weist die Hubgabel 5 zwei Zinken 10 auf. Die Zinken 10 bilden den mehrere Randsteine aufnehmenden Boden der Hubgabel 5. Rechtwinklige Fortsätze 11 der Zinken 10 sind über Querträger 12 miteinander verbunden und bilden die Rückenwand der Hubgabel 5 aus. Die Hubgabel 5 ist an ihrer Rückenwand am Hubarm 4 angelenkt und mit einer am Hubarm 4 abgestützten Parallelführung 13 verbunden. Die Parallelführung 13 wird mittels eines am Gestell 2 des Fahrzeugs 3 gelagerten hydraulischen Druckzylinders 14 betätigt. In Arbeitslage der Hubgabel 5 werden die Zinken 10 in im wesentlichen horizontaler Ebene gehalten.As can best be seen in FIGS. 2 and 3, the lifting fork 5 two prongs 10 on. The prongs 10 form the floor of the lifting fork 5 that accommodates several curb stones. Right-angled extensions 11 of the prongs 10 are above Cross members 12 are connected to one another and form the back wall of the lifting fork 5. The lifting fork 5 is articulated on its back wall on the lifting arm 4 and with a parallel guide 13 supported on the lifting arm 4. The parallel guide 13 is actuated by means of a hydraulic pressure cylinder 14 mounted on the frame 2 of the vehicle 3. In the working position of the lifting fork 5 the prongs 10 are held in a substantially horizontal plane.

An den Querträgern 12 der Rückenwand der Hubgabel 5 ist zwischen den Fortsätzen 11 der Zinken 10 die Stütze 7 des Auslegers 8 angebracht. Die Stütze 7 überragt die Hubgabel 5 nach oben, indem sie sich senkrecht zu den Zinken 10 erstreckt. Die Stütze 7 ist somit in Arbeitslage der Hubgabel im wesentlichen vertikal ausgerichtet. Am oberen Ende der Stütze 7 ist ein vertikales Drehlager 16 angeordnet, auf dem der Ausleger 8 fixiert auflagert. Der Ausleger 8 ist um dieses Lager in im wesentlichen horizontaler Ebene schwenkbar.On the cross members 12 of the back wall of the lifting fork 5 is between the Extensions 11 of the prongs 10 attached to the support 7 of the boom 8. The support 7 protrudes beyond the lifting fork 5 upwards by being perpendicular to the Prongs 10 extends. The support 7 is thus in the working position of the lifting fork essentially oriented vertically. At the top of the support 7 is a arranged vertical pivot bearing 16, on which the boom 8 rests in a fixed manner. The boom 8 is around this camp in a substantially horizontal plane pivotable.

Das Ende des kürzeren, von der Hubgabe! 5 abgewandten Abschnitts 17 des Auslegers 8 ist mit einem ah der Stütze 7 angelenkten Drehzylinder 18 verbunden.The end of the shorter, of the lifting gift! 5 facing away from section 17 of The boom 8 is connected to a rotary cylinder 18 hinged to the support 7 tied together.

Durch Betätigen des Drehzylinders 18 erfolgt das Schwenken des Auslegers.By actuating the rotary cylinder 18, the boom is pivoted.

Der Ausleger 8 ist als Laufschiene ausgebildet beispielsweise als T-Profilschiene, die mit der Außenseite ihres horizontalen Schenkels auf dem Drehlagerteller 16 aufliegt. Auf dem über der Hubgabel 5 auskragenden Abschnitt 19 des Auslegers 8 bzw. der Laufschiene ist eine Laufkatze 20, die das Hub geschirr 9, bestehend aus einem Flaschenzug 21 und einem Greifer 22 trägt, verschiebbar geführt. Der Flaschenzug 21 wird zum Heben und Senken des Greifers 22 elektrisch beaufschlagt. Zur Betätigung des Flaschenzugs 21 ist ein Handsteuergerät 23 vorgesehen, das durch sein elektrisches Verbindungskabel 24 gehalten vom Ausleger 8 herabhängt. Stattdessen kann auch hydraulisches Hebezeug verwendet werden. The boom 8 is designed as a running rail, for example as a T-profile rail, which rests with the outside of its horizontal leg on the rotary bearing plate 16. On the cantilevered over the lifting fork 5 portion 19 of the boom 8 or the running rail is a trolley 20, which carries the lifting harness 9, consisting of a block and tackle 21 and a gripper 22 , slidably guided. The pulley block 21 is acted upon electrically to raise and lower the gripper 22. To operate the pulley block 21, a manual control device 23 is provided, which is held by its electrical connecting cable 24 and hangs from the boom 8. Hydraulic hoists can be used instead.

Bei dem in Figur 3 dargestellten Ausführungsbeispiel ist die Länge des auskragenden Abschnitts 19 des Auslegers 8 durch Längsverschieben des Auslegers variabel einstellbar. Der als T-Profi!schiene ausgebildete Ausleger 8 ist durch einen auf dem Lagerteller 25 angebrachten U-Bügel 26 durchgesteckt und mittels eines durch fluchtende Löcher 27, 28 in den gegenüberliegenden Schenkeln 29 des U-Bügels 26 bzw. im vertikalen Schenkel 30 des T-Profi Is durchgesteckten Steckbolzens 31 festgelegt. Der vertikale Schenkel 30 der T-ProfiIschiene weist mehrere in Längsreihe angeordnete Löcher 28 auf. Damit läßt sich die Profilschiene in einer Reihe von in Längsrichtung verschobenen Position feststellen. Ferner kann bei dieser Ausführung der Ausleger ohne weiteres abgenommen werden. Dies ist vorteilhaft, wenn der Radlader anders eingesetzt wird, als mit der Erfindung vorgesehen oder beim Transport des Radladers.In the embodiment shown in Figure 3, the length of the cantilevered Section 19 of the boom 8 can be variably adjusted by moving the boom lengthways. The boom designed as a T-Profi! 8 is pushed through a U-bracket 26 attached to the bearing plate 25 and by means of one through aligned holes 27, 28 in the opposite legs 29 of the U-bracket 26 or in the vertical leg 30 of the T-Profi Is inserted bolt 31 is set. The vertical leg 30 of the T-profile rail has several arranged in a longitudinal row Holes 28. This allows the profile rail in a number of in the longitudinal direction determine the shifted position. Furthermore, the boom can be easily removed in this embodiment. This is beneficial when the wheel loader is used differently than provided with the invention or when transporting the wheel loader.

Beim Einsatz des Radladers zum Verlegen der Randsteine werden zunächst an einer Lagerstelle mehrere Randsteine auf die Hubgabel 5 so aufgeladen, daß sie sich jeweils auf den beiden Zinken 10 abstützen und dabei LängsseiteWhen using the wheel loader to lay the curbs, several curbs are first loaded onto the lifting fork 5 at a storage point so that they are each supported on the two prongs 10 and on the long side

Il III·Il III

an Längsseite nebeneinander lagern. Die Randsteine werden beispielsweise mittels der Hubgabel einer Palette entnommen. Der .Radlader kann dann mit angehobener Hubgabel 5 an die Einbaustelle gefahren werden. Dort wird der Auslege/ 8 über der Einbaustelle ausgerichtet, indem er bei dem Ausführungsbeispiel der Fig. 3 von Hand oder beim Ausführungsbeispiel der Fig. 1 und 2 über Betätigung des Drehzylinders in die entsprechende Position geschwenkt wird. Danach wird durch Verschieben der Laufkatze und Einstellen des Flaschenzugs 21 der Greifer 22 in eine Position zur Aufnahme eines der auf den Zinken 10 lagernden Randsteine gebracht. Der Greifer 22 kann beispielsweise als Winkelstück mit horizontaler Auflagefläche für einen Randstein ausgebildet sein. In dieser Position ist der Greifer zwischen den Zinken so angeordnet, daß er einen Randstein untergreifen kann. Durch Betätigen des Flaschenzugs 21 wird sodann der betreffende Randstein ergriffen und mit dem Greifer angehoben. Danach wird durch Verschieben der Laufkatze 20 der ergriffene Randstein direkt über die Einbaustelle gebracht und dort durch Betätigen des Flaschenzugs 21 abgesenkt, bis er seine endgültige Einbauposition einnimmt.store next to each other along the long side. The curbs are for example removed from a pallet by means of the lifting fork. The wheel loader can then be driven to the installation site with the lifting fork 5 raised. There, the extension / 8 is aligned over the installation point by placing it at the Embodiment of FIG. 3 by hand or in the embodiment of FIGS. 1 and 2 by actuating the rotary cylinder in the corresponding Position is swiveled. Then, by moving the trolley and adjusting the pulley 21, the gripper 22 is in a position for receiving brought one of the curb stones stored on the prongs 10. The gripper 22 can, for example, be an angle piece with a horizontal support surface be designed for a curb. In this position, the gripper is arranged between the prongs in such a way that it grips under a curb can. By operating the pulley system 21, the curb in question is then gripped and lifted with the gripper. After that, will by moving the trolley 20, the gripped curb is brought directly over the installation site and lowered there by actuating the pulley system 21, until it is in its final position.

Claims (9)

PATENTANWÄLTE ,!..I.. '..··..· dring. HANS LICHTI PATENT LAWYERS,! .. I .. '.. ·· .. · urgent. HANS LICHTI LJETi κι crn ι iruTi D-7500 KARLSRUHE 41 (GROTZINQEN)LJETi κι crn ι iruTi D-7500 KARLSRUHE 41 (GROTZINQEN) D.PL-ING. HEINER LICHTI D.PL-ING. HEINER LICHTI DIPL-PHYS. DR. RER. NAT. JOST LEMPERT TB-: (07») 4 «11 DIPL-PHYS. DR. RER. NAT. JOST LEMPERT TB-: (07 ») 4« 11 Georg GrötzGeorg Grötz Erdbrüchlestraße 3 20. Dezember 1983Erdbrüchlestrasse 3 December 20, 1983 D-7563 Loffenau 7005/83 Lj-KöD-7563 Loffenau 7005/83 Lj-Kö f SCHUTZANSPRÜCHEf PROTECTION CLAIMS i'
t.
f! 1. Vorrichtung zum Verlegen von Randsteinen od. dgl. im Straßen-
i '
t.
f! 1. Device for laying curbs or the like in the street
'■ und Wegaba· mittels eines Radladers, an dessen Hubarm ein'■ and Wegaba · by means of a wheel loader on its lifting arm mehrere Randsteine aufnehmendes Anbaugerät, z.B. eine Hubgabel schwenkbar gelagert und parallel geführt ist, gekennzei chnet durch einen an dem Radlader (1) abgestützten Aufbau (6) mit einem mit Abstand über dem Anbaugerät (5) auskragenden, in horizontaler Ebene schwenkbaren Ausleger (8) mit einer Laufschiene (8) , auf der eine Laufkatze (20) mit einem Hubgeschirr (9) und einem Greifer (22) für wenigstens einen Randstein geführt ist.Attachment that can accommodate several curb stones, e.g. a lifting fork, is pivoted and guided in parallel, gekennzei chnet by a supported on the wheel loader (1) Structure (6) with a jib that protrudes at a distance above the attachment (5) and can be pivoted in a horizontal plane (8) with a running rail (8) on which a trolley (20) with a lifting gear (9) and a gripper (22) for at least a curb.
2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß der2. Apparatus according to claim 1, characterized in that the Ausleger (8) gegen über dem Anbaugerät (5) oder dem Hubarm (4) drehbar gelagert ist.Boom (8) is rotatably mounted relative to the attachment (5) or the lifting arm (4). 3. Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß der Aufbau (6) eine an dem Anbaugerät (5) befestigte, das Anbaugerät (5) nach oben überragende Stütze (7) aufweist, die im Bereich ihres oberen Endes ein Drehlager (16) für den Ausleger aufweist.3. Apparatus according to claim 1 or 2, characterized in that the Structure (6) has a support (7) which is attached to the attachment (5) and protrudes above the attachment (5), which in the area of its has a pivot bearing (16) for the boom at the upper end. 4. Vorrichtung nach Anspruch 2 oder 3, gekennzeichnet durch einen mit dem Ausleger (8) verbundenen Drehantrieb (18).4. Apparatus according to claim 2 or 3, characterized by a with the rotary drive (18) connected to the boom (8). 5. Vorrichtung nach Anspruch 4, dadurch gekennzeichnet, daß dw Drehantrieb (18) ein hydraulischer oder pneumatischer Druckmittelzyrinder("l8) ist.5. Apparatus according to claim 4, characterized in that dw rotary drive (18) is a hydraulic or pneumatic Druckmittelzyrinder ("l8). 6. Vorrichtung nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß der Ausleger aus einem X-Profil (8) gebildet ist.6. Device according to one of claims 1 to 5, characterized in that that the boom is formed from an X-profile (8). 7. Vorrichtung nach einem der Ansprüche 3 bis 6, dadurch gekennzeichnet, daß der Ausleger als in seiner Längsrichtung relativ zur Stütze (7) verschiebbare und festsetzbare Schiene (8, 30) ausgebildet ist.7. Device according to one of claims 3 to 6, characterized in that that the boom is designed as a rail (8, 30) which can be displaced and fixed in its longitudinal direction relative to the support (7). 8. Vorrichtung nach Anspruch 7, dadurch gekennzeichnet, daß die Schiene (8, 30) eine in ihrer Längsrichtung angeordnete Reihe von Löchern (28) aufweist ,in einem amDrehlager (16) angebrachten U-Bügel (26) mit Löchern (27) in seinen Schenkeln (29) geführt ist und mittels eines die Loche.' (27, 28) in den Schenkeln (29) des U-Bügel s (26) und in der Schiene (8, 30) durchsteckenden Steckbolzens (31) fixiert ist.8. Apparatus according to claim 7, characterized in that the rail (8, 30) a row of holes (28) arranged in its longitudinal direction has, in a U-bracket (26) attached to the pivot bearing (16) Holes (27) is guided in its legs (29) and by means of one of the holes. ' (27, 28) in the legs (29) of the U-bracket (26) and in the rail (8, 30) through the plug pin (31) is fixed. 9. Vorrichtung nach einem der Ansprüche 1 bis 8, mit einer Hubgabel mit zwei parallelen Gabelzinken zur Aufnahme von Randsteinen, dadurch gekennzeichnet, daß der Greifer (22) des Hubgeschirrs (9) maßlich an den Abstand der Gabelzinken (10) angepaßt ist.9. Device according to one of claims 1 to 8, with a lifting fork two parallel fork prongs for receiving curb stones, characterized in that the gripper (22) of the lifting gear (9) is dimensionally adapted to the distance between the fork prongs (10) is adapted.
DE19838336561 1983-12-21 1983-12-21 DEVICE FOR LAYING EDGE BLOCKS OD. DGL. Expired DE8336561U1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE19838336561 DE8336561U1 (en) 1983-12-21 1983-12-21 DEVICE FOR LAYING EDGE BLOCKS OD. DGL.
DE19843446231 DE3446231A1 (en) 1983-12-21 1984-12-19 Device for laying edge stones or the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19838336561 DE8336561U1 (en) 1983-12-21 1983-12-21 DEVICE FOR LAYING EDGE BLOCKS OD. DGL.

Publications (1)

Publication Number Publication Date
DE8336561U1 true DE8336561U1 (en) 1984-03-15

Family

ID=6760047

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19838336561 Expired DE8336561U1 (en) 1983-12-21 1983-12-21 DEVICE FOR LAYING EDGE BLOCKS OD. DGL.

Country Status (1)

Country Link
DE (1) DE8336561U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015044186A1 (en) * 2013-09-25 2015-04-02 Keith Annett Self-propelled lifting apparatus for lifting paving slabs, kerb stones and similar heavy objects
GB2537054A (en) * 2014-09-16 2016-10-05 Annett Keith Self-propelled lifting apparatus for lifting paving slabs, kerb stones and similar heavy objects

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015044186A1 (en) * 2013-09-25 2015-04-02 Keith Annett Self-propelled lifting apparatus for lifting paving slabs, kerb stones and similar heavy objects
GB2537054A (en) * 2014-09-16 2016-10-05 Annett Keith Self-propelled lifting apparatus for lifting paving slabs, kerb stones and similar heavy objects

Similar Documents

Publication Publication Date Title
DE3401227A1 (en) PAVING METHOD AND GRIPPERS FOR USE IN THIS METHOD
DE2938643A1 (en) VEHICLE WITH SCISSORS AND TUBE LIFTING DEVICE
DE1506517A1 (en) Extension arm assembly
DE3007162C2 (en) Method for transferring the overhead crane of a tower crane to a surface of a building
DE3446231C2 (en)
DE2318463A1 (en) LIFTING TRUCK WITH DOUBLE EXTENSIBLE REACH
DE3425428C2 (en) Vehicle for transporting prefabricated building parts
DE8336561U1 (en) DEVICE FOR LAYING EDGE BLOCKS OD. DGL.
DE3236779C2 (en) Method and device for dismantling ceiling formwork
DE1941940B2 (en) Vehicle with lifting device for large-volume boxes, preferably made of concrete with recesses in the floor for telescopically adjustable legs of the lifting device
DE8414857U1 (en) CONSTRUCTION DEVICE FOR PUTTING FINISHED PARTS, IN PARTICULAR FIREPLACES
DE2265263C2 (en) Device for laying block or plate-shaped road surface elements
DE19704967C2 (en) Gantry crane, in particular for the construction of buildings
DE2941611C2 (en)
DE3445910A1 (en) Auxiliary building machine
DE2707495B2 (en) Device for laying essentially plate-shaped road surface elements
DE8419848U1 (en) Device for laying curbs or the like.
AT363222B (en) MOBILE, HEIGHT-ADJUSTABLE WORKSTAGE
DE2821102C2 (en) Vehicle, in particular motor vehicle, for the transport of space cells made of reinforced concrete, in particular prefabricated garages
DE2717774A1 (en) LAYING TRUCK FOR COVERING ELEMENTS
DE4126768A1 (en) Transportable rack-climbing building lift - uses platform drive in conjunction with removable platform supporting legs to raise lift base so that trailer can be attached.
DE2628917B2 (en)
DE2315362A1 (en) VEHICLE FOR THE TRANSPORT OF REINFORCED CONCRETE ROOMS, IN PARTICULAR PRE-FABRICATED GARAGES
DE3033400A1 (en) VEHICLE FOR TRANSPORTING AND MOVING PRE-FABRIC GARAGES OR THE LIKE
DE1289787B (en) Loading plate