DE3719078A1 DE19873719078 DE3719078A DE3719078A1 DE 3719078 A1 DE3719078 A1 DE 3719078A1 DE 19873719078 DE19873719078 DE 19873719078 DE 3719078 A DE3719078 A DE 3719078A DE 3719078 A1 DE3719078 A1 DE 3719078A1
Authority
DE
Germany
Prior art keywords
elimination according
elimination
sealing
seal
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19873719078
Other languages
German (de)
Inventor
Aloys Schluetter
Klaus Kaewert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIEDERBERG CHEMIE
Original Assignee
NIEDERBERG CHEMIE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIEDERBERG CHEMIE filed Critical NIEDERBERG CHEMIE
Priority to DE19873719078 priority Critical patent/DE3719078A1/en
Publication of DE3719078A1 publication Critical patent/DE3719078A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21FPROTECTION AGAINST X-RADIATION, GAMMA RADIATION, CORPUSCULAR RADIATION OR PARTICLE BOMBARDMENT; TREATING RADIOACTIVELY CONTAMINATED MATERIAL; DECONTAMINATION ARRANGEMENTS THEREFOR
    • G21F9/00Treating radioactively contaminated material; Decontamination arrangements therefor
    • G21F9/28Treating solids
    • G21F9/34Disposal of solid waste

Abstract

According to the invention, worn-out nuclear facilities are lowered into the underlying earth with the help of self-advancing supports. This allows advantageous horizontal sealing and vertical sealing with plastic sealing sheets.

Description

Die Erfindung betrifft die Beseitigung ausgedienter Kernanlagen, insbesondere von Atomkraftwerken durch Absenken der Kraftwerke in das darunterliegende Erd­ reich unter Einkapselung des Kraftwerks in Beton und in eine Kunststoffabdichtung, wobei das sich unter der Kraftwerksanlage befindliche Erdreich unter gleich­ zeitiger hydraulischer Abstützung des Kraftwerkes abgebaut wird.The invention relates to the disposal of disused Nuclear facilities, especially from nuclear power plants Lowering the power plants into the underlying earth rich in encapsulation of the power plant in concrete and in a plastic seal, which is under the Power plant located under the same soil early hydraulic support of the power plant is broken down.

Bei Kernanlagen stellt sich das Problem strahlender Teile. Ein Abbruch des Kraftwerkes muß daher zwangs­ läufig zu einer Strahlengefährdung für die Umgebung bzw. das Abbruchpersonal führen.The problem arises more radically in nuclear plants Parts. The power plant must therefore be demolished common to a radiation hazard to the environment or manage the demolition staff.

Nach einem unveröffentlichten älteren Vorschlag ist vorgesehen, ausgediente Atomkraftwerke in Beton einzugießen und in darunterliegendem Erdreich zu versenken. Zugleich ist vorgeschlagen worden, die so eingekapselte Anlage in einer Kunststoffabdichtung zu umgeben, um eine Durchfeuchtung zu verhindern.According to an unpublished older proposal provided, disused nuclear power plants in concrete pour in and in the underlying soil sink. At the same time, it has been proposed that so encapsulated system in a plastic seal surrounded to prevent moisture penetration.

Kunststoffabdichtungen besitzen jedoch eine relativ geringe mechanische Festigkeit, so daß eine Verletzung der Kunststoffabdichtung beim Absenken zu befürchten ist.Plastic seals, however, have a relative low mechanical strength, so that an injury to fear the plastic seal when lowering is.

Der Erfindung liegt die Aufgabe zugrunde, eine Ab­ dichtung zu schaffen, die ausreichende Dichtheit gewährleistet. Nach der Erfindung wird das durch Verwendung eines Schreitausbaus aus dem Steinkohle­ bergbau ermöglicht. Ein Schreitausbau besitzt eine Vielzahl von in einer Linie angeordneten Ausbauschilde. Jeder Ausbauschild besitzt eine Hangendkappe, mindestens eine Liegendkufe. Hangendkappe und Liegendkufe sind über Hydraulikstempel und Bruchschild miteinander gelenkig verbunden. Hangendkappe, Liegendkufe, Hydraulikstempel und Bruchschild bilden ein sogenanntes Viergelenkgetriebe. Ein Viergelenkgetriebe ermöglicht eine Parallelbewegung von Liegendkufe und Hangendkappe.The invention is based, an Ab seal to create the adequate tightness guaranteed. According to the invention Use of a cry extension from the hard coal mining enabled. A step expansion has one Plenty of expansion shields arranged in a line. Every removal sign has a hanging end cap, at least a lying skid. Hanging cap and lying skids are via hydraulic ram and break plate together articulated. Hanging cap, lying skid,  Hydraulic stamp and break plate form a so-called Four-bar gearbox. A four-bar gearbox enables a parallel movement of the lying skid and the hanging end cap.

Die Ausbauschilde sind über sogenannte Rückzylinder mit einem Kettenförderer bzw. einem die Bewegungsbahn für ein Abbaugerät bildenden Rahmen verbunden. Übliche Abbaugeräte sind sogenannte Schrämwalzenlader und Hobel.The removal shields are connected via so-called back cylinders a chain conveyor or the movement path for a frame forming a mining device. Usual Dismantling devices are so-called cutter loaders and Planer.

Das Rücken des Schreitausbaus erfolgt in der Weise, daß z. B. beginnend mit dem ersten, dritten, fünften, siebten usw. Ausbauschilde die Hangendkappe dieser Ausbauschilde unter entsprechender Betätigung der Stempel abgesenkt wird. Gleichzeitig bleiben der zweite, vierte, sechste usw. Ausbauschild in ihrer Stutzstellung unter dem Hangenden. Mit der abgesenkten Hangendkappe lassen sich die Ausbauschilde von den Rückzylindern leicht vorwärts oder rückwärts schieben. Anschließend wird die Hangendkappe wieder gegen das Hangende gefahren. Sofern eine weitere Vorwärts- oder Rückwärtsbewegung erforderlich ist, wird die Hangend­ kappe des zweiten, vierten, sechsten usw. Ausbau­ schildes abgesenkt, während der erste, dritte, fünfte usw. Ausbauschild in Stützstellung bleiben. In der Stellung mit abgesenkter Hangendkappe können der zweite, vierte, sechste usw. Ausbauschild gleichfalls mit ihren Rückzylindern vorwärts oder rückwärts ver­ fahren werden.The back of the stride is done in such a way that e.g. B. starting with the first, third, fifth, seventh and so on Removal plates with the appropriate actuation of Stamp is lowered. At the same time, the second, fourth, sixth etc. extension sign in your Support position under the hanging. With the lowered The end shields can be removed from the Push back cylinders slightly forward or backward. Then the hanging cap is again against that Driven hanging. Unless another forward or Backward movement is required, the Hangend cap of the second, fourth, sixth etc. expansion shield lowered while the first, third, fifth etc. remain in support position. In the Position with lowered hanging end cap can second, fourth, sixth, etc. removal sign likewise ver with their back cylinders forward or backward will drive.

In o. b. Weise entsteht eine schrittweise Bewegung des Ausbaus. Daher resultiert die Bezeichnung Schreitausbau. In o. B. In this way a gradual movement of the Expansion. This is the reason for the designation of stepping out.  

Der Schreitausbau folgt jeweils der Abbaufront. Nach der Erfindung wird der Schreitausbau entweder zu einem scheibenweisen Abbau des Erdreichs unterhalb der Kernanlage oder zu einem sprialförmig verlaufenden oder zickzackförmig nach unten verlaufenden Abbau unter der Kernanlage genutzt. Der spiralförmige Abbau bedingt eine kreisende Bewegung des Schreitausbaus unterhalb der Kernanlage. Dabei stehen die Liegendkufe und die Hangendkappe ständig in einem Winkel zueinander, während im Steinkohlebergbau eine Parallel-Lage vorgesehen ist. Die Winkelstellung resultiert aus der Neigung der jeweiligen Sohle zur Kernanlagenunterseite. Das bedingt nach jedem Vorwärtsrücken ein deutlich größeres Auseinanderfahren von Hangendkappe und Liegendkufe als im Steinkohlebergbau.The step expansion follows the dismantling front. To the invention, the step expansion is either one slice-wise mining of the soil below the Nuclear plant or to a spiral or downward zigzag degradation used under the core system. The spiral breakdown requires a circular movement of the step extension below the nuclear facility. The lying skids are standing and the hanging cap is always at an angle to each other, while in coal mining a parallel situation is provided. The angular position results from the Inclination of the respective sole towards the bottom of the core system. This means a clear after each forward move larger spreading of hanging end cap and Horizontal skids than in hard coal mining.

Die zick-zack-förmige Schreitausbaubewegung sieht eine Vorwärts-Rückwärtsbewegung vor, wobei die Sohle bei der Vorwärtsbewegung in genau entgegengesetzter Richtung zur Rückwärtsbewegung geneigt ist.The zigzag-shaped walking expansion movement sees one Forward-backward movement forward, with the sole at the movement in the opposite direction Is inclined towards the backward movement.

Bei scheibenförmigen Abbau ist von dem Schreitausbau gleichfalls eine Neigung zu überwinden. Es handelt sich um den Übergang von einer fertiggestellten Scheibe zum Beginn der nächsten Abbauscheibe.In the case of disc-shaped dismantling is the step expansion also a tendency to overcome. It deals deal with the transition from a completed Disc at the beginning of the next dismantling disc.

Für die Anpassung der Schildausbaueinheiten an die jeweilige Neigung ist es von Vorteil, wenn die Hydraulikstempel in der Hangendkappe und Liegendkappe gegen Herausziehen gesichert sind.For adapting the shield removal units to the respective inclination, it is advantageous if the Hydraulic stamp in the hanging cap and lying cap secured against being pulled out.

Ferner ist ein Abbaugerät von Vorteil, welches unter­ schiedliche Sohlenneigungen herstellen kann und sowohl vor als auch hinter den Schildausbaueinheiten eingesetzt werden kann. Ein dazu geeignetes Gerät ist ein Roboter mit schwenkbaren Fräskopf. Derartige Roboter sind üblicherweise zugleich mit einer Aufnahme für den Ausbruch versehen. Die Aufnahme geschieht in unterschiedlicher Weise, z. B. mit Greiferarmen oder mit gegenläufigen Greiferrädern. Der Ausbruch gelangt dann auf eine Fördereinrichtung. Vorzugsweise wird der Ausbruch vom Roboter auf den üblicherweise am Schreit­ ausbau vorhandenen Kettenförderer gefördert, der zugleich als Hilfe für das Rücken der Schildausbauein­ heiten dient.Furthermore, a mining device is advantageous, which under can produce different slope inclinations and both in front of and behind the shield removal units can be used. A suitable device is  a robot with swiveling milling head. Such Robots are usually at the same time with one shot provided for the outbreak. The recording happens in different ways, e.g. B. with gripper arms or with counter-rotating gripper wheels. The outbreak arrives then on a conveyor. Preferably the Outbreak from the robot to the one usually screaming expansion of existing chain conveyors at the same time as an aid for the back of the shield removal serves.

Wenn auf o. b. Weise unter Absenkung der Kernanlage die vorgesehene letzte Sohle erreicht ist, kann auf der Sohle eine Kunststoffabdichtung aufgebracht werden. Vorzugsweise besteht die Kunststoffabdichtung aus einzelnen Bahnen, die überlappend verlegt und mit­ einander verschweißt werden. Dabei ermöglicht der Schreitausbau eine vollflächige Verlegung der Kunst­ stoffabdichtung, indem der Schreitausbau nach Verlegen eines Teils der Abdichtung auf die Abdichtung gerückt wird und anschließend der Rest der Abdichtung herge­ stellt wird. Im Hinblick auf die relativ geringe mechanische Festigkeit üblicher Kunststoffbahnen ist vorzugsweise unterhalb der Abdichtungsbahn als auch oberhalb der Abdichtungsbahn eine mineralische Schutz­ schicht vorgesehen. Die unten liegende Schutzschicht bildet zugleich eine Glätteschicht, um ein einwand­ freies Verlegen der Kunststoffabdichtung zu fördern.If on o. B. Way while lowering the nuclear plant intended final sole is reached, can be on the Sole a plastic seal can be applied. The plastic seal preferably consists of individual sheets, laid overlapping and with are welded to each other. The Stepping out a full-scale laying of art fabric sealing by the step expansion after laying part of the seal moved onto the seal and then the rest of the seal is posed. In view of the relatively small mechanical strength of conventional plastic sheets preferably below the waterproofing membrane as well mineral protection above the waterproofing membrane layer provided. The protective layer below at the same time forms a smooth layer to create a perfect to promote free installation of the plastic seal.

Um eine gleichmäßige Flächenpressung am Ende des Absenkungsvorganges durch die Kernanlage herbeizu­ führen, sind nach der Erfindung zwei Alternativen vorgesehen. Die eine ist eine Konturbildung der auf der Abdichtungsbahn vorgesehenen Schutzschicht. Diese Konturbildung kann mit Hilfe von Sand und geringer Verfestigung des Sandes herbeigeführt werden. Aufgrund der Konturbildung wird ein vollflächiges Anlegen der Anlagenunterseite an die Schutzschicht gewährleistet.To ensure an even surface pressure at the end of the Lowering process by the nuclear plant lead are two alternatives according to the invention intended. One is a contour formation on the Sealing membrane provided protective layer. These Contouring can be done with the help of sand and less Solidification of the sand can be brought about. Because of the contour formation is a full-surface creation of the  System underside to the protective layer guaranteed.

Von besonderem Vorteil ist das Offenlassen eines Hohlraumes unter der Kraftwerksanlage. Der Hohlraum ist vorgesehen zwischen der mineralischen Schutzschicht auf der Kunststoffabdichtung und der Anlagenunterseite. Nach der Erfindung wird dieser Hohlraum mit Baustoff verfüllt. Der Baustoff übernimmt die Stützfunktion des Schreitausbaus, so daß nach einiger Hohlraumverfüllung der Schreitausbau abgezogen werden kann. Als Baustoff eignet sich Bentonit. Bentonit läßt sich als Schlamm unter entsprechender Verschalung bzw. Dammbildung in den vorgesehenen Hohlraum pumpen. Vorzugsweise wird der Bentonit durch bereits beigemengten Zement oder nachträglich injizierten Zement verfestigt.It is particularly advantageous to leave one open Cavity under the power plant. The cavity is provided between the mineral protective layer the plastic seal and the underside of the system. According to the invention, this cavity with building material backfilled. The building material takes on the supporting function of the Stepping out so that after some void filling the step expansion can be deducted. As a building material bentonite is suitable. Bentonite can be used as sludge with appropriate formwork or dam formation in pump the intended cavity. Preferably the Bentonite due to cement or subsequently injected cement solidified.

In gleicher Weise wie Bentonitschlamm läßt sich Erd­ beton in den Hohlraum pumpen.Earth can be extracted in the same way as bentonite mud Pump concrete into the cavity.

Von besonderem Vorteil ist die Verwendung von Baustoffen mit großer Frühtragfestigkeit. Das sind kurzfristig abbindende Baustoffe. Als solche Baustoffe eignen sich Alphasulfat-Halbhydrat und Beta-Sulfat-Halb­ hydrat. Solche Baustoffe lassen sich aus den Rückständen der Kalkwäsche von Steinkohlenkraftwerken gewinnen, deren Entsorgung ein Umweltproblem ist. Hier bietet sich jedoch eine problemlose Entsorgung.The use of is of particular advantage Building materials with great early strength. These are building materials that set at short notice. As such building materials Alpha sulfate hemihydrate and beta sulfate half are suitable hydrate. Such building materials can be made from the residues the lime washing of hard coal power plants, their disposal is an environmental problem. Here offers However, there is no problem with disposal.

Derartige Baustoffe werden pneumatisch angefordert und mit Wasser versetzt angespritzt. In wenigen Stunden ist eine hohe Tragfestigkeit gegeben.Such building materials are requested pneumatically and sprayed with water. Is in a few hours given a high load-bearing capacity.

Die vorgesehene Sohlabdichtung bildet die Horizontalab­ dichtung.The sole seal provided forms the horizontal poetry.

Die Vertikalabdichtung wird durch Schlitzwände gebildet. Die Schlitzwände werden vor dem Beginn der Absenkbewegung fertiggestellt. Vorteilhaft ist, wenn die Schlitzwände möglichst dicht an der Kernanlage gesetzt werden. Als Schlitzwände sind besonders Betonwände geeignet. Von Vorteil ist auch, wenn mit fortschreitender Absenkbe­ wegung eine Hohlraumbildung zwischen Anlage und Schlitz­ wänden durch Ausbetonieren oder Nachfüllen von Erdreich oder dergleichen verhindert wird. Der Beton und das Erdreich bilden dann eine Stützmasse und Strahlenschutz. Als Stützmasse und Strahlenschutz kann auch der unten gewonnene Ausbruch verwendet werden.The vertical seal is formed by diaphragm walls. The diaphragm walls are before the start of the lowering movement completed. It is advantageous if the diaphragm walls  as close as possible to the core system. As Diaphragm walls are particularly suitable for concrete walls. From It is also an advantage if the lowering progresses movement creates a cavity between the system and the slot walls by concreting or refilling soil or the like is prevented. The concrete and that Soil then form a support mass and radiation protection. The support below and radiation protection can also be used below won outbreak can be used.

Für den Materialtransport und den Transport des Aus­ bruchs ist mindestens ein Förderschacht vorgesehen. Wahlweise befindet sich der Förderschacht innerhalb des von der Schlitzwand umschlossenen Raumes. Der Förderschacht macht dann die Absenkbewegung mit. Von Vorteil ist, wenn der Förderschacht an der Kernanlage verankert wird. Dann ist lediglich oben ein Weiterbau erforderlich.For the transport of materials and the transport of the off breakage, at least one conveyor shaft is provided. The conveyor shaft is located inside the of the space enclosed by the diaphragm wall. The The conveyor shaft then takes part in the lowering movement. From The advantage is if the conveyor shaft at the core plant is anchored. Then there is only a further building above required.

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung dargestellt.In the drawing, an embodiment of the Invention shown.

Fig. 1 zeigt den zu beseitigenden, strahlengefähr­ lichen Teil 1 eines Atomkraftwerkes. Die Fundamente des Teiles 1 reichen bis zu einer Tiefe 2 in das Erdreich. Vor Beginn des Absenkens des Teiles 1 wird oben um den Teil 1 herum eine Schlitzwand 3 eingebracht. Die Schlitzwand 3 wird aus Beton mit innenliegender Kunst­ stoffabdichtung hergestellt. Ferner wird der den Teil 1 umgebende Raum 4 so ausbetoniert, daß der Teil 1 am Fuß einen Kragen erlangt. Der Kragen schützt einen an­ schließend unter dem Teil 1 geschaffenen Hohlraum 5. In dem Hohlraum 5 sind zwei einander gegenüberliegende positionierte Schreitausbauten 6 und 7 vorgesehen. Jeder Schreitausbau 6, 7 besteht aus Ausbauschilden mit Hangendkappe und Liegendkufe. Die Hangendkappe steht in der Darstellung nach Fig. 1 in Berührung mit der Fundamentplatte des Teiles 1, die Liegendkufe mit der Sohle 8. Die Hangendkappe 9 und die Liegendkufe 10 eines jeden Ausbauschildes sind durch ein Bruchschild 11 und Hydraulikstempel 12 miteinander gelenkig verbunden. Fig. 1 shows the part 1 of a nuclear power plant to be eliminated. The foundations of part 1 extend to a depth of 2 in the ground. Before the start of the lowering of part 1 is introduced above the part 1 around a diaphragm wall. 3 The diaphragm wall 3 is made of concrete with internal plastic sealing. Furthermore, the space 4 surrounding the part 1 is concreted in such a way that the part 1 attains a collar at the foot. The collar protects a closing 5 created under part 1 . In the cavity 5 , two mutually positioned walking extensions 6 and 7 are provided. Each step extension 6 , 7 consists of extension shields with hanging end caps and lying skids. In the illustration according to FIG. 1, the hanging end cap is in contact with the foundation plate of part 1 , the lying skid with the sole 8 . The hanging cap 9 and the lying skid 10 of each removal plate are connected to one another in an articulated manner by a break plate 11 and hydraulic ram 12 .

Jeder Schreitausbau 6 und 7 besitzt noch einen front­ seitig angeordneten Kettenförderer 13. Der Ketten­ förderer 13 ist über nicht dargestellte Rückzylinder mit den Liegendkufen 10 verbunden.Each step extension 6 and 7 also has a chain conveyor 13 arranged at the front. The chain conveyor 13 is connected to the lying runners 10 via back cylinders, not shown.

Jeder Schreitausbau 6 bzw. 7 kann in der Zeichnungs­ ebene nach links und rechts dadurch gerückt werden, daß eine schrittweise Bewegung der Schildausbaueinheiten stattfindet. Im Ausführungsbeispiel beginnt die schritt­ weise Bewegung mit einem Absenken der Hangendkappe 9 am ersten, dritten, fünften usw. Ausbauschild. Daran schließt sich eine Betätigung des Rückzylinders an, der bei einer Bewegung zur Mitte des Teiles 1 hin den Ausbauschild zum Kettenförderer 13 hinzieht. Dabei wird der Kettenförderer 13 von denjenigen Ausbauschilden in Position gehalten, die in Stützstellung verblieben sind. Es handelt sich um die Schilde 2, 4, 6 usw. Danach werden die Hangendkappen von den Hydraulik­ stempeln 12 wieder gegen die Fundamente des Teiles 1 in Stützstellung gefahren. Daran kann sich ein Absenken der Hangendkappen 9 der Ausbauschilde 2, 4, 6 und deren Rücken in gleicher Richtung mit Hilfe der Rückzylinder anschließen. Nach Rücken der gesamten Schildausbauein­ heiten eines Schreitausbaus 6 bzw. 7 wird der zuge­ hörige Kettenförderer 13 mit Hilfe der Rückzylinder neu positioniert. Each step expansion 6 or 7 can be moved to the left and right in the drawing level in that a gradual movement of the shield removal units takes place. In the exemplary embodiment, the step-by-step movement begins with a lowering of the hanging end cap 9 on the first, third, fifth, etc. removal plate. This is followed by an actuation of the back cylinder, which pulls the removal plate toward the chain conveyor 13 when moving toward the center of part 1 . The chain conveyor 13 is held in position by those removal plates which have remained in the supporting position. It is the shields 2 , 4 , 6 , etc. Then the hanging caps are stamped by the hydraulics 12 again against the foundations of part 1 in support position. This can be followed by a lowering of the hanging caps 9 of the expansion shields 2 , 4 , 6 and their backs in the same direction with the aid of the rear cylinders. After moving the entire Schildausbauein units of a step extension 6 or 7 , the associated chain conveyor 13 is repositioned with the help of the back cylinder.

Die o. b. Bewegung läßt sich sowohl zur Mitte des Teiles 1 hin als auch von der Mitte des Teiles 1 weg durchführen. Die Schreitausbaubewegung findet statt, wenn mit Hilfe eines Abbaugerätes, z. B. eines Roboters zwischen den Schreitausbauten 6 und 7 eine strichpunk­ tiert dargestellte Vertiefung 14 in der Sohle 8 ausge­ hoben worden ist. Dann werden die Schrittausbauten 6 und 7 in die Vertiefung 14 verfahren, die in der Zeichnung unmaßstäblich dargestellt ist. Nach dieser Bewegung der Schreitausbauten 6 und 7 wird die Ver­ tiefung der Sohle 8 in dem Bereich fortgesetzt, in dem vorher die Schreitausbauten 6 und 7 gestanden haben. Es entsteht eine neue Sohle.The movement can be carried out both towards the center of part 1 and away from the center of part 1 . The step expansion movement takes place if with the help of a mining device, e.g. B. a robot between the walking extensions 6 and 7 a dash-dotted animal depression 14 in the sole 8 has been lifted out. Then the step extensions 6 and 7 are moved into the depression 14 , which is shown to scale in the drawing. After this movement of the walking extensions 6 and 7 , the deepening of the sole 8 is continued in the area in which the walking extensions 6 and 7 previously stood. A new sole is created.

Wahlweise wird in dem Bereich, in dem die Schreitaus­ bauten 6 und 7 vorher gestanden haben auch eine gegen­ über der Vertiefung 14 größere Vertiefung 15 angelegt. Dann werden die Schreitausbauten 6 und 7 in die Vertiefungen 15 gerückt. Das kann fortgesetzt werden, bis gemäß Fig. 2 die endgültige Sohle 20 erreicht ist. Dann wird auf der Sohle 20 eine mineralische Schutz­ schicht 21 aufgebracht. Die mineralische Schutzschicht bildet zugleich eine Glätteschicht für eine Kunststoff­ abdichtung 22. Die Kunststoffabdichtung 22 setzt sich aus einzelnen Bahnen zusammen, die überlappend verlegt und im Überlappungsbereich miteinander verschweißt werden. Die Kunststoffabdichtung 22 wird überdeckt mit einer weiteren mineralischen Schicht 23. Die Schutz­ schicht 23 schützt die Kunststoffabdichtung, wenn der Aufbau der Schichten 20 bis 23 bis an die Schreitaus­ bauten 6 und 7 herangekommen ist und die Schreitaus­ bauten 6 und 7 auf die obere Schutzschicht 23 gerückt werden. Das geschieht unter entsprechender Verringerung der Bauhöhe. Optionally, in the area in which the Schreitaus buildings 6 and 7 previously stood, a larger recess 15 is created opposite the recess 14 . Then the walking extensions 6 and 7 are moved into the recesses 15 . This can continue until, according to FIG. 2, the final sole 20 is reached. Then a mineral protective layer 21 is applied to the sole 20 . The mineral protective layer also forms a smooth layer for a plastic seal 22 . The plastic seal 22 is composed of individual sheets which are laid overlapping and welded to one another in the overlap area. The plastic seal 22 is covered with a further mineral layer 23 . The protective layer 23 protects the plastic seal when the structure of the layers 20 to 23 to the Schreitaus structures 6 and 7 has come and the Schreitaus structures 6 and 7 are moved onto the upper protective layer 23 . This is done with a corresponding reduction in the overall height.

Danach kann der Schichtenaufbau 20 bis 23 fertigge­ stellt werden. Nach Fertigstellung der unteren Ab­ dichtung, welche eine Horizontalabdichtung bildet, wird der Hohlraum bis zur Fundamentplatte des Teiles 1 mit einem frühtragenden Baustoff wie Alpha-Sulfat-Halb­ hydrat ausgefüllt. Das geschieht durch Anspritzung. Die damit gegebene Ausfüllung 24 des Hohlraumes bildet eine ausreichende Abstützung, um die Schreitausbauten 6 und 7 zu demontieren und abzutransportieren.The layer structure 20 to 23 can then be completed. After completion of the lower seal, which forms a horizontal seal, the cavity is filled up to the foundation plate of part 1 with an early bearing building material such as alpha sulfate half hydrate. This is done by gating. The resulting filling 24 of the cavity forms sufficient support to disassemble and remove the walking extensions 6 and 7 .

Die Materialförderung und die Abförderung des gewonnenen Ausbruches erfolgen durch einen nicht dargestellten Schacht, der durch eine Stahlkonstruktion gebildet wird, welche am Teil 1 fixiert ist.The material is conveyed and the excavated excavation is removed through a shaft, not shown, which is formed by a steel structure which is fixed to part 1 .

Mit dem in Fig. 1 dargestellten fortschreitenden Abbau findet eine Absenkbewegung des Teiles 1 statt. Gleich­ zeitig mit der Absenkbewegung wird der entstehende Raum zwischen den Schlitzwänden 3 und dem Teil 1 ausgefüllt. Im Ausführungsbeispiel wird der Raum ausbetoniert.With the progressive degradation shown in Fig. 1, a lowering movement of part 1 takes place. At the same time as the lowering movement, the space created between the diaphragm walls 3 and part 1 is filled. In the exemplary embodiment, the room is concreted.

Wahlweise wird die o. b. Horizontalabdichtung mit einer besonderen Kunststoffvertikalabdichtung kombiniert. Die besondere Kunststoffvertikalabdichtung tritt dann anstelle der Kunststoffabdichtung in den Betonschlitz­ wänden 3.Optionally, the horizontal seal can be combined with a special plastic vertical seal. The special plastic vertical seal then takes the place of the plastic seal in the concrete slot walls 3 .

Die besondere Vertikalabdichtung entsteht in der Weise, daß vor Betonieren des Raumes 4 dort Kunststoff­ abdichtungsbahnen von der Rolle in den Raum 4 abgesenkt werden. Es sind nach der Erfindung am gesamten Umfang des Ringraumes 4 Rollen Kunststoffabdichtungsbahnen angeordnet, so daß nach Absenken jeder Kunststoffab­ dichtungsbahn in den Raum 4 Bahnenlappen ragen, die miteinander verschweißt werden können. Vorzugsweise wird nach Verschweißen der Abdichtungsbahnen die untere Kante mit Sand oder einem anderen Material eingehüllt, so daß die Kante zumindest nach Beendigung der Absenk­ bewegung des Teiles 1 freigelegt werden kann.The special vertical seal is created in such a way that before the room 4 is concreted, plastic sealing sheets are lowered from the roll into the room 4 . There are 4 rolls of plastic sealing sheets arranged according to the invention on the entire circumference of the annular space, so that after lowering each plastic sealing sheet protrude into the space 4 sheet lobes that can be welded together. Preferably, after welding the sealing sheets, the lower edge is enveloped with sand or another material, so that the edge can be exposed at least after the lowering movement of the part 1 .

Mit fortschreitender Absenkbewegung werden die Kunst­ stoffbahnen dann weiter von der Rolle abgezogen. Es findet eine Verschweißung zwischen den Kunststoffbahnen statt.As the lowering movement progresses, art webs of fabric are then further pulled off the roll. It finds a weld between the plastic sheets instead of.

Nach Erreichen der in Fig. 2 dargestellten Endstellung wird die freigelegte Kante der Kunststoffabdichtung mit der Kunststoffabdichtung 22 verbunden. Das geschieht wahlweise durch eine Abdichtungsbahn, die umlaufend verlegt wird.After reaching the end position shown in FIG. 2, the exposed edge of the plastic seal is connected to the plastic seal 22 . This can be done using a waterproofing membrane, which is laid all around.

Claims (16)

1. Beseitigung ausgedienter Kernanlagen, insbesondere von Atomkraftwerken durch Absenken der Kraftwerke in das darunterliegende Erdreich unter Einkapselung der Kraftwerke in Beton und in einer Kunststoffab­ dichtung, wobei das sich unter der Kraftwerksanlage befindliche Erdreich unter gleichzeitiger hydrau­ lischer Abstützung des Kraftwerkes abgebaut wird, gekennzeichnet durch die Verwendung eines Schreit­ ausbaus (6, 7) aus dem Steinkohlebergbau und scheibenweisen Abbau mit Anfangsneigung des Schreitausbaus oder spiralförmig verlaufendem oder zick-zack-förmig nach unten verlaufendem Abbau.1. Elimination of obsolete nuclear plants, in particular of nuclear power plants by lowering the power plants into the underlying soil by encapsulating the power plants in concrete and in a plastic seal, whereby the soil located under the power plant is degraded with simultaneous hydraulic support of the power plant, characterized by the Use of a cry extension ( 6 , 7 ) from hard coal mining and slice-wise mining with an initial tendency to crate or spiral or zig-zag down mining. 2. Beseitigung nach Anspruch 1, gekennzeichnet durch die Verwendung eines Roboters mit schwenkbarem Fräskopf als Abbaueinrichtung.2. Elimination according to claim 1, characterized by the use of a robot with swiveling Milling head as a dismantling device. 3. Beseitigung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Abbaueinrichtung den Ausbruch auf Kettenförderer (13) des Schreitausbaus fördert, der als Schreithilfe für den Schreitausbau (6, 7) dient.3. Elimination according to claim 1 or 2, characterized in that the dismantling device promotes the outbreak on chain conveyor ( 13 ) of the walking extension, which serves as a walking aid for the walking extension ( 6 , 7 ). 4. Beseitigung nach einem oder mehreren der Ansprüche 1 bis 3, gekennzeichnet durch eine Kunststoffsohlab­ dichtung durch Auslegen und Verschweißen von Abdichtungsbahnen nach Erreichen der Endteufe.4. Elimination according to one or more of the claims 1 to 3, characterized by a plastic sole sealing by laying out and welding Sealing membranes after reaching the final depth. 5. Beseitigung nach Anspruch 4, gekennzeichnet durch vorheriges Aufbringen einer mineralischen Glätte- und Schutzschicht (21). 5. Elimination according to claim 4, characterized by previous application of a mineral smooth and protective layer ( 21 ). 6. Beseitigung nach Anspruch 4 oder 5, gekennzeichnet durch das Aufbringen einer weiteren mineralischen Schutzschicht (23) auf der Kunststoffabdichtung (22).6. Elimination according to claim 4 or 5, characterized by the application of a further mineral protective layer ( 23 ) on the plastic seal ( 22 ). 7. Beseitigung nach Anspruch 6, gekennzeichnet durch eine Konturbildung der weiteren Schutzschicht (23).7. Elimination according to claim 6, characterized by a contour formation of the further protective layer ( 23 ). 8. Beseitigung nach einem oder mehreren der Ansprüche 1 bis 6, gekennzeichnet durch Offenlassung eines Hohlraumes unter der Kraftwerksanlage (1) und Ausfüllen des Hohlraumes mit Baustoff.8. Elimination according to one or more of claims 1 to 6, characterized by leaving a cavity under the power plant ( 1 ) and filling the cavity with building material. 9. Beseitigung nach Anspruch 8, gekennzeichnet durch Bentonit oder Erdbeton oder Alpha-Sulfat-Halbhydrat oder Beta-Sulfat-Halbhydrat aus der Rückstandsauf­ bereitung der Kalkwäsche von Kohlekraftwerken als Baustoff.9. Elimination according to claim 8, characterized by Bentonite or earth concrete or alpha sulfate hemihydrate or beta sulfate hemihydrate from the residue preparation of lime washing of coal power plants as Building material. 10. Beseitigung nach einem oder mehreren der Ansprüche 1 bis 9, gekennzeichnet durch Schlitzwände 3, die die Anlage einschließen.10. Elimination according to one or more of claims 1 to 9, characterized by diaphragm walls 3 which enclose the system. 11. Beseitigung nach Anspruch 10, gekennzeichnet durch mindestens einen zwischen der Kraftwerksanlage und der umschließenden Schlitzwand (3) angeordneten Förderschacht.11. Disposal according to claim 10, characterized by at least one between the power plant and the surrounding diaphragm wall ( 3 ) arranged conveyor shaft. 12. Beseitigung nach einem oder mehreren der Ansprüche 1 bis 11, gekennzeichnet durch Auffüllung des sich beim Absenken der Anlage bildenden Hohlraumes. 12. Elimination according to one or more of the claims 1 to 11, characterized by filling the when lowering the system-forming cavity.   13. Beseitigung nach Anspruch 12, gekennzeichnet durch Ausbetonieren des Raumes.13. Elimination according to claim 12, characterized by Concreting the room. 14. Beseitigung nach einem oder mehreren der Ansprüche 1 bis 13, gekennzeichnet durch eine sich aus einzelnen Abdichtungsbahnen zusammensetzenden Vertikalabdichtung.14. Elimination according to one or more of the claims 1 to 13, characterized by one individual waterproofing membranes Vertical sealing. 15. Beseitigung nach Anspruch 14, dadurch gekenn­ zeichnet, daß die Vertikalabdichtung durch Ab­ senken und Verschweißen der miteinander abge­ senkten Abdichtungsbahnen gebildet wird.15. Elimination according to claim 14, characterized records that the vertical seal by Ab lower and weld the abge lowered waterproofing membranes is formed. 16. Beseitigung nach Anspruch 14 oder 15, gekenn­ zeichnet durch Freilegen der unteren Kante der Vertikalabdichtung und Verschweißen der unteren Kante mit einer die Vertikalabdichtung mit der Horizontalabdichtung verbindenden Abdichtungsbahn.16. Elimination according to claim 14 or 15, marked draws by exposing the bottom edge of the Vertical sealing and welding of the lower ones Edge with a the vertical seal with the Horizontal membrane connecting sealing membrane.
DE19873719078 1987-06-06 1987-06-06 Disposal of worn-out nuclear facilities Withdrawn DE3719078A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19873719078 DE3719078A1 (en) 1987-06-06 1987-06-06 Disposal of worn-out nuclear facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19873719078 DE3719078A1 (en) 1987-06-06 1987-06-06 Disposal of worn-out nuclear facilities

Publications (1)

Publication Number Publication Date
DE3719078A1 true DE3719078A1 (en) 1988-12-15

Family

ID=6329246

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19873719078 Withdrawn DE3719078A1 (en) 1987-06-06 1987-06-06 Disposal of worn-out nuclear facilities

Country Status (1)

Country Link
DE (1) DE3719078A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1517337A1 (en) 2003-09-16 2005-03-23 Hiroshi Kawai Method for disposing of power station facility directly below the original location

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1517337A1 (en) 2003-09-16 2005-03-23 Hiroshi Kawai Method for disposing of power station facility directly below the original location

Similar Documents

Publication Publication Date Title
DE2905688A1 (en) METHOD AND DEVICE FOR THE PRODUCTION OF BUILDINGS IN THE GROUND WITH VERTICAL WALLS EXITING FROM AN UNDERGROUND CANAL
DE3409591A1 (en) Method and apparatus for producing an underground sealing base
DE4303285A1 (en) Deep soil consolidation method and implementation facility
DE4236766C2 (en) Method for renovating a dam construction for a roadway
DE3607499C2 (en)
DE3605062A1 (en) Sealing of landfill sites
DE3218643A1 (en) Method of producing an underground tunnel structure
DE3719078A1 (en) Disposal of worn-out nuclear facilities
EP1426495A2 (en) Method and device for the construction of a tunnel or a trench
DE2250635A1 (en) PROCEDURE FOR BUILDING A TUNNEL
EP0214359A1 (en) Posterior sealing employing mining techniques
DE3543098C2 (en)
EP0230667B1 (en) Method for the stripe-wise removal of subsoil layers, especially non-rigid ones
EP0233979B1 (en) Sealing of dumps
DE19803074A1 (en) Shaft for buried pipelines etc. made of adjoining wall segments
DE4126408C2 (en) Method and device for producing a sealing wall and sealing wall suitable therefor
DE4439111B4 (en) Containers and process for their manufacture
DE3716750A1 (en) Method of constructing and sinking foundation structures
DE3537816C2 (en)
DE4136610C2 (en) Method for widening a route, in particular a waterway
DE1634431A1 (en) Procedure for restoring the load-bearing capacity of foundation bodies that have become damaged
AT357328B (en) LOST FORMWORK FOR A FOUNDATION OF A SUPPORTING COMPONENT
DE1915091A1 (en) Method and device for the production of channels using the diaphragm wall method
CH686198A5 (en) Method of erecting supporting tunnel wall lining with integral insulation
DE3536990A1 (en) REMOVAL UNDER DEPOSITS