DE19647515A1 - Windkonvertermontageeinrichtung - Google Patents

Windkonvertermontageeinrichtung

Info

Publication number
DE19647515A1
DE19647515A1 DE19647515A DE19647515A DE19647515A1 DE 19647515 A1 DE19647515 A1 DE 19647515A1 DE 19647515 A DE19647515 A DE 19647515A DE 19647515 A DE19647515 A DE 19647515A DE 19647515 A1 DE19647515 A1 DE 19647515A1
Authority
DE
Germany
Prior art keywords
tower
crane
wind
head
foot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19647515A
Other languages
English (en)
Other versions
DE19647515B4 (de
Inventor
Gerd-Albrecht Otto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OTTO GERD ALBRECHT
Original Assignee
OTTO GERD ALBRECHT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OTTO GERD ALBRECHT filed Critical OTTO GERD ALBRECHT
Priority to DE19647515A priority Critical patent/DE19647515B4/de
Publication of DE19647515A1 publication Critical patent/DE19647515A1/de
Application granted granted Critical
Publication of DE19647515B4 publication Critical patent/DE19647515B4/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/207Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided by wind turbines
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2230/00Manufacture
    • F05B2230/60Assembly methods
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2230/00Manufacture
    • F05B2230/60Assembly methods
    • F05B2230/61Assembly methods using auxiliary equipment for lifting or holding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/91Mounting on supporting structures or systems on a stationary structure
    • F05B2240/916Mounting on supporting structures or systems on a stationary structure with provision for hoisting onto the structure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Description

Luftströmungskonverter werden mit im Bauwesen üblichen Krananlagen errichtet. Diese Montageeinrichtungen sind nicht speziell für die Errichtung von Windenergieanlagen hergerichtet und sind demzufolge hochaufwendige Montagehilfen zur Realisierung dieser speziellen Hochbauwerke. Insbesondere werden die Türme von Windenergieanlagen in Sektionen oder Turmteilen hergestellt und konzentrisch übereinander gestellt und über Flanschkonstruktionen miteinander verschraubt. Die Ausleger der konventionellen fahrbaren Krananlagen sind auf Errichtungsnabenhöhen der Windkraftanlagen von 50 bis 70 m beschränkt, so daß günstige Windnutzungshöhen von über 100 m für derzeitige Leistungsbereiche der Windenergieanlagen mit herkömmlichen Krananlagen im unwegsamen Gelände, wie Ackerland oder bergiges Forstland, hochaufwendige Zuwegungen erfordern. So sind für die Errichtung hochleistungsfähiger Windkraftanlagen derzeitig stark überdimensionierte Krananlagen erforderlich, um die Nabenhöhen von auch nur 50 bis 70 m erreichen, obwohl für diesen Errichtungsaufwand nur relativ geringe Einzellasten zu bewältigen sind. Diese Lastaufnahme wird mit der erfindungsgemäßen Einrichtung nun dem Windkraftanlagenfundament selbst zugeordnet; dadurch werden technische Vereinfachungen in der Handhabung und Technologie geschaffen und ökonomische Vorteile erzielt.
Durch die im Patentanspruch angegebene Lösung der Erfindung wird erreicht, daß eine spezielle relativ leichte kranartige Montagehilfe auf einem speziellen Fahrzeug auch im relativ unwegsamen Gelände ohne aufwendige Befestigung der Zuwegung an den Montageort gebracht werden kann und die erfindungsgemäße Einrichtung für den Errichtungszeitraum Bestandteil des Errichtungsgegenstandes der Windkraftanlage bleibt.
Die Erfindung sieht vor, daß sie selbst eine relativ kleine, dem Zweck entsprechende Ausführung einer Hilfskrananlage verwirklicht, die mit der Errichtung des Windenergiekonverters an dem Turm des zu errichtenden Windenergiekonverters mit dem Zuwachs aufsteigt und mit ihrer Hilfe in Bauabschnitten die einzelnen Turmteile nacheinander übereinander aufstellt. Schließlich hat die Erfindung auch die Aufgabe, an der Turmspitze arretiert, alle Windenergiekonverterbaugruppen, wie Gondel, Generator, Nabe, Getriebe und Rotorblätter als Baukran und Montagehilfe genutzt zu werden. Nach Abschluß der Montage der Windenergieanlage kann sie selbst Bestandteil der Anlage werden und für Havariefälle verbleiben oder durch selbständiges Absteigen und mittels eines Spezialfahrzeuges abtransportiert werden. Wird im letzteren Fall nach Jahren für einen Getriebewechsel eine Krananlage benötigt, so wird sie zum Aufstieg wieder Bestandteil des Turmes und als Montagehilfe für den Getriebewechsel verwendet. Der besondere Vorteil der Erfindung liegt nicht nur darin, Turmhöhen über 70 m von bis zu 200 m ohne größeren Aufwand als bisher für 40 bis 60 m Turmhöhen zu errichten; sondern vornehmlich und mit hohem wirtschaftlichen Vorteil darin, daß keine besonderen Zuwegungen für Schwerlastkrane von 300 bis 600 t erforderlich sind, die hochaufwendige Befestigungsmaßnahmen der Zuwegung voraussetzen und so leicht 10% der Anlageninvestition bedürfen.
Ein weiterer ökonomischer Vorteil ist, daß besondere Verfestigungen des Aufstellungsortes für die bislang notwendigen und mobilen schweren Auslegerkrananlagen entfallen und statt dessen das Fundament der Windkraftanlage schon mit der Errichtung zweckmäßige Einbeziehung erfährt und auf ihm alle Montagearbeiten allein ausreichend dimensioniert ausgeführt werden können. Gerade dieser besondere technisch vorteilige und ökonomische Errichtungsaufwand ist auch nach der Errichtung der Anlage im Falle einer Havariebeseitigung von besonderer Aufwandserleichterung bezüglich des Kostenaufwandes für die Demontage und Montage von Anlagenteilen in großer Höhe nach einer Havarie.
An Hand von Zeichnungen werden Ausführungsbeispiele erläutert, die einzelnen Abbildungen zeigen:
Fig. 1 Windkonvertermontageeinrichtung mit verschraubbaren Fuß- und Kopfteil in mehreren Arbeitsstufen.
Fig. 2 Windkonvertermontageeinrichtung in Steigstellung mit Arretierbügeln.
Fig. 3 Windkonvertermontageeinrichtung in beispielsweise sehr hoher Ausführungsvariante und bisheriger Aufstellungskrananlage.
Fig. 4 Windkonvertermontageeinrichtung mit Seilzug-Steigeeinrichtung.
Fig. 5 Windkonvertermontageeinrichtung mit lösbarem Fuß- und Kopfteil.
Nach Fig. 1 wird die Windkonvertermontageeinrichtung auf dem Kranfahrzeug 7 an das Fundament 9 der zu errichtenden Windenergieanlage herangefahren und das erste Turmteil 8.1 mit dem Kopfteil 2 über die Kranschere 3, 4 verbunden. Nun wird über eine handelsübliche hydraulische Steuerung die Kranschere 3; 4 der Windkonvertermontageeinrichtung aufgespreizt, so daß Teil 8.1 senkrecht über dem Fundament 9 auf das Fundament zentriert abgesetzt werden kann und mit dem Fundament zu verschrauben ist. Jetzt wird das Fußteil 1 vom Kranwagen gelöst und die Kranschere 3, 4 zusammengeführt, so daß das Fußteil 1 von a nach b bewegt wird und die Stellung b, c einnimmt. Im Bereich b ist eine nicht besonders dargestellte Zusammenführung vorgesehen, die eine automatische Zentrierung der Lochreihen realisiert. In dieser Stellung wird das Fußteil 1 mit dem Turmteil 8.1 verschraubt und danach das Kopfteil 2 vom Turmteil 8.1 gelöst. Nun wird mittels Seilzug 11 das Turmteil 8.2 auf das Turmteil 8.1 aufgesetzt und mit diesem verschraubt. Danach wird das Kopfteil 2 mit dem Ausleger 4 der Kranschere 3, 4 beweglich verbunden und dann das Fußteil 1 gelöst. Wird nun die Kranschere 3, 4 über die Hydraulik, mittels Hydraulikzylinder 5 zusammengezogen, so wird nach kurzer Zeit die Stellung b, c am oberen Ende des Turmteils 8.2 erreicht. Nun wiederholen sich die Steigfolgen in der bis hier beschriebenen Folge bis zum höchsten Turmteil des Turmes 8. Sodann werden alle Turmkopfmontagen mit der Windkonvertermontageeinrichtung bis zur Endmontage vorgenommen.
Zum Abstieg der Windkonvertermontageeinrichtung wird eine zweite, bei der Herstellung des Turmes bereits vorbereitete Lochanordnung am Turmkopf für das Kopfteil 2 zur Arretierung benötigt. Der Abstieg der Windkonvertermontageeinrichtung erfolgt in umgekehrter Schraubfolge für das Kopf- und Fußteil. Schließlich kann die gesamte Windkonvertermontageeinrichtung auf dem am Fuß des Turmes stehenden Kranwagen verladen und zur nächsten Errichtung einer Windkraftanlage gefahren werden.
Es kann aber auch über den eigenen Seilzug 11 oder einen im Turmkopf verbleibenden Wartungsseilzug die Windkonvertermontageeinrichtung herabgelassen werden.
In Fig. 2 wird ein Ausführungsbeispiel dargestellt, das ohne innige Befestigung mit dem Turm für die Aufstiegsschritte nur mit zwei Arretierringen 12 am Fuß und Kopfteil der Kranschere 3, 4 ausgerüstet ist. In dieser Ausführung wird mit Hilfe des Arretierringes 12 eine Klemmeinrichtung jeweils am Kopf und Fußteil realisiert, die am Turm eine rutschfeste wechselseitige Arretierung für die Steigschritte bewirkt.
Nachdem gemäß Fig. 2 das Fundament 9 mit dem Fundamentring abgebunden ist, fährt das Kranfahrzeug mit der Windkonvertermontageeinrichtung bestückt an das Fundament 9 heran und wird als Hilfseinrichtung für die Aufstellung des ersten Turmteiles 8.1 zum Einsatz gebracht. Danach umringt das Fußteil 1 über einen Arretierring 12 das Turmteil 8.1 lose, indem der Arretierring um den Turm gelegt wird, so daß auf dem Fahrzeug 7 stehend die Windkonvertermontageeinrichtung noch die Stellung b-c einnimmt. Jetzt wird das Fußteil 1 vom Fahrzeug 7 gelöst und selbst weggefahren. Die Windkonvertermontageeinrichtung liegt nun in Stellung a dem Turm an.
Über eine konventionelle Kransteuerung wird nun die Hydraulik der Windkonvertereinrichtung in Gang gesetzt, so daß sich das Kopfteil in die Stellung c bewegt. Wird nun die Richtung der Hydraulik umgeschaltet, tritt eine Arretierung in Stellung c ein und das Fußteil 1 wird von der Stellung a in die Stellung b gefahren. Wird nun erneut die Hydraulik umgeschaltet, wird das Fußteil 1 in Stellung b verklemmt und das Kopfteil 2 mit dem Arretierring 12 vom Turmteil 8.1 abgestreift. In Stellung d wird der Seilzug 11 zum Heben des Turmteil 8.2 betätigt und dazu benutzt das Turmteil 8.2 auf das Turmteil 8.1. konzentrisch aufzusetzen und mit dem Turmteil 8.1 zu verschrauben. Indem nun das Kopfteil 2 mittels Ring 12 über das Turmteil 8.2 geführt wird, arretiert der Ring 12 im Bereich d die Kranschere 3, 4 und beginnt das Fußteil 1 aus Stellung b in Richtung d zu bewegen. Durch Umschaltung der Hydraulik wird nun am Turmteil 8.2 das Fußteil 1 etwa in Stellung e arretiert und der Ring 12 in Stellung d freigegeben. Nun kann Turmteil 8.3 in gleicher Folge wie Turmteil 8.2 aufgesetzt werden. Am letzten Turmteil 8. angekommen und verklemmt, dient die Windkonvertersteigeinrichtung als Montagehilfe für alle Baugruppen des Turmkopfes bis zur Inbetriebnahme der Windenergieanlage. Sie steigt dann entsprechend gegenläufig ab und kann jederzeit bei Havariefällen aufsteigen und als Demontage- und Montage-Einrichtung Verwendung finden.
In Fig. 3 ist ein Windenergiekonverter mit Turm und Windkonvertermontageeinrichtung dargestellt. In dieser Darstellung ist die Windenergiemontageeinrichtung am obersten Turmteil als Montagehilfe für die Installation aller Baugruppen des Windenergiekonverters dargestellt. Am Fuße des Turmes wird beispielsweise gezeigt, daß mit derzeitiger schwerer mobiler Krantechnik Nabenhöhen von nur zwischen 40 und 60 Meter mit relativ hohem technischem Aufwand zu realisieren sind. Mit dieser Darstellung wird angedeutet, daß auch schon bei zwei bis drei Turmsektionen die erfindungsgemäße Ausführung der Windkonvertermontageeinrichtung den ökonomischen Aufwand beträchtlich reduziert. Diese beispielsweise Darstellung zeigt, daß Turmhöhen über 100 Meter Nabenhöhe mit Hilfe der erfindungsgemäßen Einrichtung ermöglicht werden, die aus technischer ökonomischer Sicht mit konventioneller Krantechnik nicht oder nur hochaufwendig zu realisieren sind.
Eine weitere Variante der Windkonvertermontageeinrichtung wird in Fig. 4 dargestellt, die nur mit einem Steig- und Arretierwerk 14 versehen ist, sonst aber in gleicher Weise als Montagehilfe für die Errichtung von Windenergiekonvertern Verwendung findet. Das Steigen der Windkonvertermontageeinrichtung wird hier über einen besonderen Steigseilzug 13 vorgenommen, indem dieser Seilzug am jeweils oberen Ende des Turmes befestigt wird und mittels einer dezentralen Seilzugwinde 15.1 oder einer zentralen Seilzugwinde 15.2 aus der jeweiligen Stellung a nach b gezogen wird und beispielsweise über hydraulische Klemmen 16 jeweils am oberen Turmteilende arretierbar ist. Der Steigseilzug muß so bemessen sein, daß ein Abstieg und auch ein Aufstieg in einem Zug über alle Turmteile möglich ist.
In Fig. 5 wird eine Variante der erfindungsgemäßen Ausführung gezeigt, die darstellt, wie für den Aufstieg von Turmteil zu Turmteil des Turmes 8 flexible lösbare Umschlingungen 17 dem Fußteil 1 zugeordnet sind, die mittels hydraulischen Klemmzylinder 10 eine rutschfeste lösbare Halterung mit dem Turm eingehen, dabei kann der Turm auch Rillen oder Bohrungen aufweisen, die ein Festhalten zwingend gewährleisten.
In der Fig. 5 ist desweiteren dargestellt, wie das Fußteil 1 von der Ausgangsstellung a in die Stellung b gebracht wurde, indem durch beispielsweise Verschraubung des Kopfteiles 2 am oberen Flansch des Turmteiles 8.1 durch Schließen der Kranschere 3, 4 mittels Hydraulikzylinder 5.1 in Stellung c gebracht wurde. Nachdem die Verklemmung des Fußteiles 1 in Stellung b erfolgt ist, wird das Kopfteil 2 in Stellung c vom Turmteil 8.1 gelöst und beispielsweise in Stellung f gebracht, indem Hydraulikzylinder 5.2 die Kranschere 3, 4 spreizt und Hydraulikzylinder 6 die Kranschere anhebt und gegebenenfalls zusätzlich mit einer am Ausleger 4 konstruktiv einbezogenen hydraulischen Baugruppe um 90 Grad verdreht.
In der gezeigten Stellung wird mittels Seilzug 11 das nächste Turmteil in Position d gebracht. Nachdem 8.1 mit 8.2 verschraubt wurde, wird das Kopfteil 2 mit 8.2 lösbar verbunden und das Fußteil 1 aus der Position b in die Position e gebracht, indem die Kranschere 3 und 4 zusammengezogen wird. Nun wiederholt sich dieser Vorgang bis zur Position b am höchsten Turmteil. Nachdem alle Turmkopfausrüstungen des errichteten Windenergiekonverters mittels dieser Montagehilfe montiert wurden, wird nun die Windkonvertermontageeinrichtung in beliebiger Stellung, aber insbesondere in gestreckter Stellung, am eigenen Zugseil 11 herabgelassen.
Alle Einzelheiten der Ausführungsbeispiele sind auch untereinander austausch- oder kombinierbar, wie insbesondere aus Fig. 5 hervorgeht.
Für den Fall einer Havariebeseitigung am Windenergiekonverter wird die Windkonvertermontageeinrichtung ebenfalls am eigenen Seil heraufgezogen und am höchsten Turmteil montiert. Zum Aufzug des Seilzuges 11 wird der hier nicht besonders dargestellte im Windkonverter fest installierte Wartungsseilzug verwendet. Natürlich kann auch ein schrittweiser Abstieg oder auch Aufstieg wie nach Fig. 1 erfolgen.
Schließlich sei allgemein darauf hingewiesen, daß die erfindungsgemäße Einrichtung auch an beliebigen Bauwerken Anwendung finden kann. Hierzu sind jedoch spezielle Modifizierungen auszuführen notwendig, um sie den baulichen Erfordernissen anzupassen. Der Anwendungsbereich wird jedoch relativ klein bleiben, weil der Vorzug dieser Erfindung nur bei turmartigen Bauwerken - wie Windenergieanlagen - und im unwegsamen Gelände von besonderem ökonomischen Interesse ist.
Bezugszeichenliste
1
Fußteil
2
Kopfteil
3,
4
Kranschere
3
Unterer Ausleger
4
Oberer Ausleger
5
Hydraulikzylinder oder mechanisches Betätigungsglied
5.1
Hydraulikzylinder oder mechanisches Betätigungsglied
5.2
Hydraulikzylinder oder mechanisches Betätigungsglied
6
Hydraulikzylinder oder mechanisches Betätigungsglied
7
Fahrzeug
8
Turm
8.1
bis
8
.n Turmteile
9
Fundament
10
Klemmeinrichtung
11
Seilzug
12
Arretierring
13
Seilzug
14
Arretierwerk
15.1
Seilzugwinde dezentral
15.2
Seilzugwinde zentral
16
Hydraulische Klemmen

Claims (4)

1. Windkonvertermontageeinrichtung, dadurch gekennzeichnet, daß eine wenigstens zweiarmige Kranschere (3) und (4) mit einem Fußteil (1) und einem Kopfteil (2) vergehen ist und mit dem Konverterturm (8) zeitweise eine Einheit bildet, indem jeweils das Fußteil (1) und/oder Kopfteil (2) mit dem jeweiligen Turmteil (8) lösbar verbunden ist und die Kranschere (3) und (4) mit mindestens zwei Hydraulikzylindern versehen ist, die den Steigrhythmus a-b-c realisieren und der Ausleger (4) der Kranschere mit einem Seilzug (11) ausgerüstet ist, mit dessen Hilfe die Turmteile des Turmes (8) nacheinander aufeinander gestellt werden und der Konverterkopf mit Gondel, Getriebe, Generator und Rotorblätter etc. montiert wird und der Abstieg mittels der Kranschere in umgekehrter Steigfolge c, b, a erfolgt.
2. Windkonvertermontageeinrichtung nach Anspruch 1, dadurch gekennzeichnet, daß eine Kranschere (3, 4), bestehend aus dem unteren Ausleger (3) mit einem Fußteil (1) und dem oberen Ausleger (4) mit dem Kopfteil (2) jeweils versehen sind und damit geeignet sind, einen Windkonverterturm zu besteigen, hierzu sind die Ausleger (3) und (4) mit Hydraulikzylindern versehen, die über eine Fernsteuerung so betätigt werden, daß entweder das Fußteil (1) oder das Kopfteil (2) mit dem Turm fest arretiert und aber lösbar verbunden ist, so daß das jeweils andere Teil (1) oder (2) frei beweglich bleibt.
3. Windkonvertermontageeinrichtung, dadurch gekennzeichnet, daß ein Steig- und Arretierwerk (14) als Fußteil (1) ausgebildet ist und mit einer Kranschere (3) und (4) in Verbindung steht und das Arretierwerk (14) den Turm lose umgibt und selbst mit hydraulischen Klemmeinrichtungen (16) rutschfest aber lösbar bestückt ist und über einen Seilzug abschnittsweise hochgezogen werden kann und dieser Seilzug (13) auch so ausgeführt ist, daß er die gesamte Windkonvertermontageeinrichtung in einem Zug auf- oder abwinden kann.
4. Windkonvertermontageeinrichtung, dadurch gekennzeichnet, daß der Ausleger (3) mit einem Hydraulikzylinder (5.1) für das Zusammenziehen der Kranschere und einem Hydraulikzylinder (5.2) für das Spreizen der Kranschere (3, 4) versehen ist und daß das Fußteil (1) mit hydraulischen Klemmeinrichtungen (10) versehen ist, die flexible Umschlingungen (17) festziehen und arretieren und der Seilzug (11) zum Aufstellen der Turmteile (8.1) bis (8.n) und zum Auf- und Abseilen der gesamten Windkonvertermontageeinrichtung aus und in jede Höhe des Windkonverterturmes dient.
DE19647515A 1996-11-16 1996-11-16 Windkonvertermontageeinrichtung Expired - Lifetime DE19647515B4 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19647515A DE19647515B4 (de) 1996-11-16 1996-11-16 Windkonvertermontageeinrichtung

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19647515A DE19647515B4 (de) 1996-11-16 1996-11-16 Windkonvertermontageeinrichtung

Publications (2)

Publication Number Publication Date
DE19647515A1 true DE19647515A1 (de) 1998-05-20
DE19647515B4 DE19647515B4 (de) 2010-04-15

Family

ID=7811912

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19647515A Expired - Lifetime DE19647515B4 (de) 1996-11-16 1996-11-16 Windkonvertermontageeinrichtung

Country Status (1)

Country Link
DE (1) DE19647515B4 (de)

Cited By (60)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19741988A1 (de) * 1997-09-23 1999-04-01 Karin Peiter Verfahren und Kran zum Aufbau von Windkraftanlagen
EP1101934A2 (de) 1999-11-18 2001-05-23 Enron Wind GmbH Windkraftanlage mit bewegbarem Bordkran
NL1014553C2 (nl) * 2000-03-03 2001-09-04 Lagerwey Windturbine B V Hijsinrichting en werkwijze voor samenbouwen van een windmolen, alsmede een windmolen.
WO2001094249A1 (de) * 2000-06-06 2001-12-13 Demag Mobile Cranes Gmbh Verfahren und vorrichtung zur montage einer windkraftanlage
DE10028513A1 (de) * 2000-06-06 2002-01-03 Atecs Mannesmann Ag Verfahren und Vorrichtung zur Montage einer Windkraftanlage
DE10119429A1 (de) * 2001-04-20 2002-10-24 Enron Wind Gmbh Windkraftanlage mit verschiebbarem Behälter
US6522025B2 (en) * 2000-05-02 2003-02-18 Valmont Industries, Inc. Method and means for mounting a wind turbine on a tower
US6614125B2 (en) * 2000-05-02 2003-09-02 Valmont Industries, Inc. Method and means for mounting a wind turbine on a tower
WO2003100248A1 (en) * 2002-05-28 2003-12-04 Boreas Consultants Limited Method and crane for installing, maintaining and decommission ing wind turbines
WO2003100249A1 (en) * 2002-05-27 2003-12-04 Vestas Wind Systems A/S Methods of handling wind turbine blades and mounting said blades on a wind turbine, system and gripping unit for handling a wind turbine blade
WO2004088133A1 (es) * 2003-04-01 2004-10-14 Alberto Munarriz Aldaz Equipo de montaje de aerogeneradores
WO2005005822A1 (en) * 2003-07-09 2005-01-20 Oreada Limited Apparatus and method for clamping friction surfaces to a tubular structure
WO2006077358A1 (en) 2005-01-19 2006-07-27 Iti Scotland Limited A clamp, self-advancing climbing device, and method of coupling same to a tubular
EP1857670A1 (de) 2006-05-20 2007-11-21 W2E Wind to Energy GmbH Verfahren und Vorrichtung zum Errichten eines aus einzelnen Turmsegmenten zusammengesetzten Turms einer Windenergieanlage
FR2903739A1 (fr) * 2006-07-12 2008-01-18 Eole Overseas Company Ltd "dispositif et procede de demontage rapide d'un rotor et d'une nacelle du mat d'une eolienne,ainsi qu'une eolienne pourvue d'un tel dispositif"
CN100390404C (zh) * 2002-06-01 2008-05-28 艾劳埃斯·乌本 安装/拆卸风力发电设备构件的系统和方法
WO2008088408A3 (en) * 2006-10-02 2008-11-20 Wind Tower Systems Llc Lifting system and appartus for constructing and enclosing wind turbine towers
EP2075464A2 (de) * 2007-12-27 2009-07-01 General Electric Company Kopfteil eines vorgeneigten Turms
WO2009080047A2 (en) * 2007-12-21 2009-07-02 Vestas Wind Systems A/S A method for handling and/or servicing components of a wind turbine and a gripping apparatus for performing the method
WO2010066173A1 (zh) * 2008-12-10 2010-06-17 三一电气有限责任公司 一种攀爬装置、攀爬系统、攀爬起吊系统及攀爬方法
DE102009002248A1 (de) * 2009-04-07 2010-10-14 Max Bögl Bauunternehmung GmbH & Co. KG Verfahren zum Errichten einer Off-Shore-Anlage und Off-Shore-Anlage
WO2010094536A3 (de) * 2009-02-18 2010-12-16 Berbuer Juergen Fördervorrichtung zur montage eines turms
EP2286046A1 (de) * 2008-05-07 2011-02-23 Babcock & Wilcox Power Generation Group, Inc. Erregungsverfahren für solarempfänger und stützturm
WO2010083837A3 (en) * 2009-01-20 2011-04-14 Vestas Wind Systems A/S A gripping apparatus for handling and/or servicing components of a wind turbine, and a method and a wind turbine tower therefore
WO2010136026A3 (de) * 2009-05-29 2011-05-19 Ebf Dresden Gmbh Vorrichtung für inspektions- und wartungsarbeiten an rotorblättern und/ oder der turmoberfläche grosser windkraftanlagen, insbesondere off-shore-anlagen
WO2011134477A1 (en) * 2010-04-29 2011-11-03 Vestas Wind Systems A/S Crane for handling of wind turbine generator components and method of hoisting of such a crane
EP2388480A1 (de) * 2010-08-31 2011-11-23 Mitsubishi Heavy Industries, Ltd. Wartungsverfahren für einen windturbinengenerator
CN102398860A (zh) * 2011-07-12 2012-04-04 武汉高智创新科技有限公司 一种海上风电设备的安装装置及方法
CN101535582B (zh) * 2006-10-02 2013-03-27 通用风能有限责任公司 用于构建和包覆风力涡轮机塔架的提升系统及装置
CN103130106A (zh) * 2011-12-02 2013-06-05 华锐风电科技(集团)股份有限公司 吊装设备
CN103145051A (zh) * 2013-03-13 2013-06-12 杭州国电大力机电工程有限公司 一种海上风电机组分体吊装装置及安装方法
WO2013109720A1 (en) * 2012-01-20 2013-07-25 Illinois Tool Works Inc. Wind turbine tower erecting system
EP2693045A1 (de) * 2012-08-01 2014-02-05 Rotor Control GmbH Befahranlage zur Durchführung von Inspektions- und Wartungsarbeiten an turmartigen Bauwerken
CN101614083B (zh) * 2005-01-19 2014-09-24 Iti苏格兰有限公司 夹具、自移式爬升装置和联接夹具与管形件的方法
CN104477788A (zh) * 2014-11-20 2015-04-01 青岛中天斯壮科技有限公司 风力发电塔跨越自爬式平移吊机
US9022332B2 (en) 2008-05-08 2015-05-05 Iti Scotland Limited Clamping system and self advancing support platform
ES2540790A1 (es) * 2014-01-11 2015-07-13 Cástor CASAS TOJO Sistema de grúas autoescalables y autoajustables para aerogeneradores
EP2933399A1 (de) * 2014-04-14 2015-10-21 K.I.G. Heerenveen B.V. Mastsystem für den aufbau eines mast
WO2015158713A1 (de) * 2014-04-15 2015-10-22 X-Tower Constructions Gmbh Mobile kranvorrichtung sowie verfahren zur temporären montage einer solchen kranvorrichtung
DE102016004348A1 (de) 2015-04-12 2016-10-13 Philipp Wagner Mobile Kranvorrichtung sowie Verfahren zur temporären Montage einer solchen Kranvorrichtung
DK178765B1 (da) * 2007-08-17 2017-01-09 Iti Scotland Ltd En klemmeindretning, en selvfremrykkende klatreindretning og en fremgangsmåde til at koble samme til en rørformet konstruktion
WO2018132010A1 (en) * 2017-01-16 2018-07-19 Mammoet Holding B.V. Method for onshore or offshore erecting an upstanding construction
NL2019462A (en) * 2017-01-16 2018-07-23 Mammoet Holding B V Method for onshore or offshore erecting an upstanding construction
NL2019075A (en) * 2017-01-16 2018-07-23 Mammoet Holding B V Method for onshore or offshore erecting an upstanding con-struction
WO2018178409A1 (es) * 2017-03-30 2018-10-04 Sling Supply International, S.A. Sistema para el montaje/desmontaje de aerogeneradores
CN109231026A (zh) * 2018-10-19 2019-01-18 上海峙狄机械设备有限公司 用于海上风电机组关键零部件的吊装装置
US10364789B2 (en) 2014-05-15 2019-07-30 Illinois Tool Works Inc. Pumped hydro tower
US10392827B2 (en) 2014-02-27 2019-08-27 Parsons Corporation Wind tower erection system
WO2020043255A1 (en) * 2018-08-31 2020-03-05 Maersk Supply Service A/S A method of installing a crane on a portion of an offshore wind turbine generator and a vessel therefor
RU2729342C1 (ru) * 2015-10-01 2020-08-06 Лагервей Винд Б.В. Подъемная система для установки ветряной турбины
CN112855475A (zh) * 2021-01-12 2021-05-28 哈尔滨理工大学 一种可自动更换风力发电机主轴轴承的装置
US11274465B2 (en) 2020-01-03 2022-03-15 Nov Canada Ulc Tower erection and climbing systems
WO2022200268A1 (en) 2021-03-23 2022-09-29 Fred. Olsen Ocean Ltd. Operations and maintenance arrangement and method
EP4140932A1 (de) * 2021-08-30 2023-03-01 Siemens Gamesa Renewable Energy Innovation & Technology S.L. Kletterkran zum aufrichten einer windturbine und verfahren zum aufrichten einer windturbine mit einem kletterkran
US11754048B2 (en) 2021-03-25 2023-09-12 National Oilwell Varco, L.P. Tower erection system
US11795038B2 (en) 2019-11-26 2023-10-24 General Electric Renovables Espana, S.L. Cranes and methods for erecting a tower
CN117514627A (zh) * 2024-01-05 2024-02-06 山西寰安建设工程有限公司 一种风力发电装置的安装座及其安装方法
EP4345291A1 (de) * 2022-09-27 2024-04-03 Nordex Energy SE & Co. KG Verfahren zur montage einer windturbine und windturbinenanordnungssystem sowie verfahren zur montage eines windparks und windparkanordnungssystem
EP4345292A1 (de) * 2022-09-27 2024-04-03 Nordex Energy Spain, S.A.U. Adapter, turm mit dem adapter und windturbine mit dem turm und windpark mit mindestens einer windturbine
EP4345290A1 (de) * 2022-09-27 2024-04-03 Nordex Energy Spain, S.A.U. Hebesystem für ein windturbinenmontagesystem und zugehöriges hebeverfahren

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7877934B2 (en) 2005-12-30 2011-02-01 Wind Tower Systems, Llc Lifting system and apparatus for constructing wind turbine towers
US8069634B2 (en) 2006-10-02 2011-12-06 General Electric Company Lifting system and apparatus for constructing and enclosing wind turbine towers
US8016268B2 (en) 2008-05-30 2011-09-13 Wind Tower Systems, Llc Wind tower service lift
BRPI0917769A2 (pt) 2008-12-15 2016-02-23 Wind Tower Systems Llc formato estrutural para membros de torre eolica
US20160369778A1 (en) * 2011-05-11 2016-12-22 Daniel E. Davis Method of assembling a wind turbine
CN111977506B (zh) * 2020-08-26 2023-09-26 福建金风科技有限公司 俯仰旋转机构和叶片吊装工装

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE194961C (de) * 1906-10-30 1908-02-06 Brown Hoisting Machinery Co Verfahren und vorrichtung zum aufstellen von aus übereinandergesetzten röhren bestehenden metallmasten
GB703577A (en) * 1951-10-03 1954-02-03 Folland Aircraft Ltd Improvements in or relating to mountings for wind motors
DE2823525B1 (de) * 1978-05-30 1979-08-16 Maschf Augsburg Nuernberg Ag Verfahren zum Errichten einer Windenergieanlage
DE2324843C2 (de) * 1973-05-17 1982-04-15 Brown, Boveri & Cie Ag, 6800 Mannheim Vorrichtung zur Montage von mehrteiligen Masten
US4775276A (en) * 1987-05-18 1988-10-04 Industrial Truck Sales & Service, Inc. Loader attachment for handling and transporting utility poles and cylindrical articles
DE9414643U1 (de) * 1994-09-09 1994-11-17 Ernst Kroeger Gmbh Vorrichtung zur Montage von Bauwerkabschnitten übereinander

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE194961C (de) * 1906-10-30 1908-02-06 Brown Hoisting Machinery Co Verfahren und vorrichtung zum aufstellen von aus übereinandergesetzten röhren bestehenden metallmasten
GB703577A (en) * 1951-10-03 1954-02-03 Folland Aircraft Ltd Improvements in or relating to mountings for wind motors
DE2324843C2 (de) * 1973-05-17 1982-04-15 Brown, Boveri & Cie Ag, 6800 Mannheim Vorrichtung zur Montage von mehrteiligen Masten
DE2823525B1 (de) * 1978-05-30 1979-08-16 Maschf Augsburg Nuernberg Ag Verfahren zum Errichten einer Windenergieanlage
US4775276A (en) * 1987-05-18 1988-10-04 Industrial Truck Sales & Service, Inc. Loader attachment for handling and transporting utility poles and cylindrical articles
DE9414643U1 (de) * 1994-09-09 1994-11-17 Ernst Kroeger Gmbh Vorrichtung zur Montage von Bauwerkabschnitten übereinander

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HENN,Erich: Windkraftanlagen, Springer-Verlag, Berlin, Heidelberg, New York, London, Paris, Tokyo, 1988, S.448-457 *

Cited By (96)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19741988A1 (de) * 1997-09-23 1999-04-01 Karin Peiter Verfahren und Kran zum Aufbau von Windkraftanlagen
EP1101934A2 (de) 1999-11-18 2001-05-23 Enron Wind GmbH Windkraftanlage mit bewegbarem Bordkran
DE19955516C1 (de) * 1999-11-18 2001-12-20 Tacke Windenergie Gmbh Windkraftanlage und Verfahren zum Aus- und Einbau der Hauptkomponenten des Maschinengehäuses einer Windkraftanlage
NL1014553C2 (nl) * 2000-03-03 2001-09-04 Lagerwey Windturbine B V Hijsinrichting en werkwijze voor samenbouwen van een windmolen, alsmede een windmolen.
US6614125B2 (en) * 2000-05-02 2003-09-02 Valmont Industries, Inc. Method and means for mounting a wind turbine on a tower
US6522025B2 (en) * 2000-05-02 2003-02-18 Valmont Industries, Inc. Method and means for mounting a wind turbine on a tower
WO2001094249A1 (de) * 2000-06-06 2001-12-13 Demag Mobile Cranes Gmbh Verfahren und vorrichtung zur montage einer windkraftanlage
DE10028513A1 (de) * 2000-06-06 2002-01-03 Atecs Mannesmann Ag Verfahren und Vorrichtung zur Montage einer Windkraftanlage
US6750559B2 (en) 2001-04-20 2004-06-15 General Electric Company Wind power plant with a movable container
DE10119429A1 (de) * 2001-04-20 2002-10-24 Enron Wind Gmbh Windkraftanlage mit verschiebbarem Behälter
WO2003029650A1 (en) * 2001-08-17 2003-04-10 Valmont Industries, Inc. Method and means for mounting a wind turbine on a tower
WO2003100249A1 (en) * 2002-05-27 2003-12-04 Vestas Wind Systems A/S Methods of handling wind turbine blades and mounting said blades on a wind turbine, system and gripping unit for handling a wind turbine blade
US7207777B2 (en) 2002-05-27 2007-04-24 Vesta Wind Systems A/S Methods of handling wind turbine blades and mounting said blades on a wind turbine, system and gripping unit for handling a wind turbine blade
CN100526639C (zh) * 2002-05-27 2009-08-12 威斯塔斯风力系统公开有限公司 操纵和安装风轮机叶片的方法和设备
WO2003100248A1 (en) * 2002-05-28 2003-12-04 Boreas Consultants Limited Method and crane for installing, maintaining and decommission ing wind turbines
CN100390404C (zh) * 2002-06-01 2008-05-28 艾劳埃斯·乌本 安装/拆卸风力发电设备构件的系统和方法
WO2004088133A1 (es) * 2003-04-01 2004-10-14 Alberto Munarriz Aldaz Equipo de montaje de aerogeneradores
ES2235599A1 (es) * 2003-04-01 2005-07-01 Alberto Munarriz Aldaz Equipo de montaje de aerogeneradores.
WO2005005822A1 (en) * 2003-07-09 2005-01-20 Oreada Limited Apparatus and method for clamping friction surfaces to a tubular structure
WO2006077358A1 (en) 2005-01-19 2006-07-27 Iti Scotland Limited A clamp, self-advancing climbing device, and method of coupling same to a tubular
CN101614083B (zh) * 2005-01-19 2014-09-24 Iti苏格兰有限公司 夹具、自移式爬升装置和联接夹具与管形件的方法
US8201787B2 (en) 2005-01-19 2012-06-19 Iti Scotland Limited Clamp, self-advancing climbing device, and method of coupling same to a tubular
EP1857670A1 (de) 2006-05-20 2007-11-21 W2E Wind to Energy GmbH Verfahren und Vorrichtung zum Errichten eines aus einzelnen Turmsegmenten zusammengesetzten Turms einer Windenergieanlage
FR2903739A1 (fr) * 2006-07-12 2008-01-18 Eole Overseas Company Ltd "dispositif et procede de demontage rapide d'un rotor et d'une nacelle du mat d'une eolienne,ainsi qu'une eolienne pourvue d'un tel dispositif"
WO2008059118A1 (fr) * 2006-07-12 2008-05-22 Eole Overseas Company Limited Dispositif et procédé de démontage rapide d'un rotor et d'une nacelle du mât d'une éolienne, ainsi qu'une éolienne pourvue d'un tel dispositif
WO2008088408A3 (en) * 2006-10-02 2008-11-20 Wind Tower Systems Llc Lifting system and appartus for constructing and enclosing wind turbine towers
CN101535582B (zh) * 2006-10-02 2013-03-27 通用风能有限责任公司 用于构建和包覆风力涡轮机塔架的提升系统及装置
DK178765B1 (da) * 2007-08-17 2017-01-09 Iti Scotland Ltd En klemmeindretning, en selvfremrykkende klatreindretning og en fremgangsmåde til at koble samme til en rørformet konstruktion
US8939299B2 (en) 2007-12-21 2015-01-27 Vestas Wind Systems A/S Method for handling and/or servicing components of a wind turbine and a gripping apparatus for performing the method
WO2009080047A3 (en) * 2007-12-21 2010-09-23 Vestas Wind Systems A/S A method for handling and/or servicing components of a wind turbine and a gripping apparatus for performing the method
WO2009080047A2 (en) * 2007-12-21 2009-07-02 Vestas Wind Systems A/S A method for handling and/or servicing components of a wind turbine and a gripping apparatus for performing the method
CN101983287B (zh) * 2007-12-21 2013-04-17 维斯塔斯风力系统集团公司 用于操作和/或维修风轮机部件的方法以及用于执行该方法的夹持装置
EP2075464A2 (de) * 2007-12-27 2009-07-01 General Electric Company Kopfteil eines vorgeneigten Turms
EP2075464A3 (de) * 2007-12-27 2012-12-19 General Electric Company Kopfteil eines vorgeneigten Turms
EP2286046A4 (de) * 2008-05-07 2014-06-25 Babcock & Wilcox Power Generat Erregungsverfahren für solarempfänger und stützturm
EP2286046A1 (de) * 2008-05-07 2011-02-23 Babcock & Wilcox Power Generation Group, Inc. Erregungsverfahren für solarempfänger und stützturm
US9022332B2 (en) 2008-05-08 2015-05-05 Iti Scotland Limited Clamping system and self advancing support platform
WO2010066173A1 (zh) * 2008-12-10 2010-06-17 三一电气有限责任公司 一种攀爬装置、攀爬系统、攀爬起吊系统及攀爬方法
CN101481069B (zh) * 2008-12-10 2012-09-05 三一电气有限责任公司 一种攀爬系统和攀爬起吊系统
WO2010083837A3 (en) * 2009-01-20 2011-04-14 Vestas Wind Systems A/S A gripping apparatus for handling and/or servicing components of a wind turbine, and a method and a wind turbine tower therefore
WO2010094536A3 (de) * 2009-02-18 2010-12-16 Berbuer Juergen Fördervorrichtung zur montage eines turms
DE102009002248A1 (de) * 2009-04-07 2010-10-14 Max Bögl Bauunternehmung GmbH & Co. KG Verfahren zum Errichten einer Off-Shore-Anlage und Off-Shore-Anlage
WO2010136026A3 (de) * 2009-05-29 2011-05-19 Ebf Dresden Gmbh Vorrichtung für inspektions- und wartungsarbeiten an rotorblättern und/ oder der turmoberfläche grosser windkraftanlagen, insbesondere off-shore-anlagen
US20130098859A1 (en) * 2010-04-29 2013-04-25 Vestas Wind Systems A/S Crane for handling of wind turbine generator components and method of hoisting of such a crane
US9802795B2 (en) * 2010-04-29 2017-10-31 Jeppe Sartori Søe Crane for handling of wind turbine generator components and method of hoisting of such a crane
WO2011134477A1 (en) * 2010-04-29 2011-11-03 Vestas Wind Systems A/S Crane for handling of wind turbine generator components and method of hoisting of such a crane
EP2388480A4 (de) * 2010-08-31 2012-07-25 Mitsubishi Heavy Ind Ltd Wartungsverfahren für einen windturbinengenerator
US8371030B2 (en) 2010-08-31 2013-02-12 Mitsubishi Heavy Industries, Ltd. Maintenance method of wind turbine generator
EP2388480A1 (de) * 2010-08-31 2011-11-23 Mitsubishi Heavy Industries, Ltd. Wartungsverfahren für einen windturbinengenerator
CN102398860A (zh) * 2011-07-12 2012-04-04 武汉高智创新科技有限公司 一种海上风电设备的安装装置及方法
CN103130106A (zh) * 2011-12-02 2013-06-05 华锐风电科技(集团)股份有限公司 吊装设备
CN103130106B (zh) * 2011-12-02 2016-01-13 华锐风电科技(集团)股份有限公司 吊装设备
WO2013109720A1 (en) * 2012-01-20 2013-07-25 Illinois Tool Works Inc. Wind turbine tower erecting system
US9140029B2 (en) 2012-01-20 2015-09-22 Illinois Tool Works Inc. Tower erecting system
US10934735B2 (en) 2012-01-20 2021-03-02 Illinois Tool Works Inc. Tower erecting systems and methods
EP2693045A1 (de) * 2012-08-01 2014-02-05 Rotor Control GmbH Befahranlage zur Durchführung von Inspektions- und Wartungsarbeiten an turmartigen Bauwerken
CN103145051A (zh) * 2013-03-13 2013-06-12 杭州国电大力机电工程有限公司 一种海上风电机组分体吊装装置及安装方法
ES2540790A1 (es) * 2014-01-11 2015-07-13 Cástor CASAS TOJO Sistema de grúas autoescalables y autoajustables para aerogeneradores
US10392827B2 (en) 2014-02-27 2019-08-27 Parsons Corporation Wind tower erection system
EP2933399A1 (de) * 2014-04-14 2015-10-21 K.I.G. Heerenveen B.V. Mastsystem für den aufbau eines mast
NL2012614A (nl) * 2014-04-14 2016-01-27 Kig Heerenveen Bv Mastsysteem voor het opbouwen van een mast.
WO2015158713A1 (de) * 2014-04-15 2015-10-22 X-Tower Constructions Gmbh Mobile kranvorrichtung sowie verfahren zur temporären montage einer solchen kranvorrichtung
US10364789B2 (en) 2014-05-15 2019-07-30 Illinois Tool Works Inc. Pumped hydro tower
CN104477788A (zh) * 2014-11-20 2015-04-01 青岛中天斯壮科技有限公司 风力发电塔跨越自爬式平移吊机
DE102016004348A1 (de) 2015-04-12 2016-10-13 Philipp Wagner Mobile Kranvorrichtung sowie Verfahren zur temporären Montage einer solchen Kranvorrichtung
RU2729342C1 (ru) * 2015-10-01 2020-08-06 Лагервей Винд Б.В. Подъемная система для установки ветряной турбины
US10843907B2 (en) 2015-10-01 2020-11-24 Lagerwey Wind B.V. Hoisting system for installing a wind turbine
NL2018176B1 (en) * 2017-01-16 2018-07-26 Mammoet Holding B V Method for onshore or offshore erecting an upstanding construction
US11939951B2 (en) 2017-01-16 2024-03-26 Mammoet Holding B.V. Apparatus for onshore or offshore erecting an upstanding construction
US11231015B2 (en) 2017-01-16 2022-01-25 Mammoet Holding B.V. Method for onshore or offshore erecting an upstanding construction
EP3568372B1 (de) 2017-01-16 2021-10-20 Mammoet Holding B.V. Verfahren zum onshore oder offshore aufrichten einer aufrechtstehenden anlage
WO2018132010A1 (en) * 2017-01-16 2018-07-19 Mammoet Holding B.V. Method for onshore or offshore erecting an upstanding construction
NL2019075A (en) * 2017-01-16 2018-07-23 Mammoet Holding B V Method for onshore or offshore erecting an upstanding con-struction
NL2019462A (en) * 2017-01-16 2018-07-23 Mammoet Holding B V Method for onshore or offshore erecting an upstanding construction
US10865077B2 (en) 2017-03-30 2020-12-15 Sling Supply International, S.A. System for assembling/disassembling windmills
EP3406896A4 (de) * 2017-03-30 2019-02-27 Sling Supply International, S.A. System zur montage und demontage von windturbinen
WO2018178409A1 (es) * 2017-03-30 2018-10-04 Sling Supply International, S.A. Sistema para el montaje/desmontaje de aerogeneradores
WO2020043255A1 (en) * 2018-08-31 2020-03-05 Maersk Supply Service A/S A method of installing a crane on a portion of an offshore wind turbine generator and a vessel therefor
CN109231026A (zh) * 2018-10-19 2019-01-18 上海峙狄机械设备有限公司 用于海上风电机组关键零部件的吊装装置
CN109231026B (zh) * 2018-10-19 2023-09-29 上海峙狄机械设备有限公司 用于海上风电机组关键零部件的吊装装置
US11795038B2 (en) 2019-11-26 2023-10-24 General Electric Renovables Espana, S.L. Cranes and methods for erecting a tower
US11274465B2 (en) 2020-01-03 2022-03-15 Nov Canada Ulc Tower erection and climbing systems
CN112855475A (zh) * 2021-01-12 2021-05-28 哈尔滨理工大学 一种可自动更换风力发电机主轴轴承的装置
CN112855475B (zh) * 2021-01-12 2021-11-26 哈尔滨理工大学 一种可自动更换风力发电机主轴轴承的装置
WO2022200268A1 (en) 2021-03-23 2022-09-29 Fred. Olsen Ocean Ltd. Operations and maintenance arrangement and method
US11754048B2 (en) 2021-03-25 2023-09-12 National Oilwell Varco, L.P. Tower erection system
EP4140932A1 (de) * 2021-08-30 2023-03-01 Siemens Gamesa Renewable Energy Innovation & Technology S.L. Kletterkran zum aufrichten einer windturbine und verfahren zum aufrichten einer windturbine mit einem kletterkran
WO2023030731A1 (en) * 2021-08-30 2023-03-09 Siemens Gamesa Renewable Energy Innovation & Technology S.L. Climbing crane for erecting a wind turbine and method for erecting a wind turbine with a climbing crane
EP4345292A1 (de) * 2022-09-27 2024-04-03 Nordex Energy Spain, S.A.U. Adapter, turm mit dem adapter und windturbine mit dem turm und windpark mit mindestens einer windturbine
EP4345291A1 (de) * 2022-09-27 2024-04-03 Nordex Energy SE & Co. KG Verfahren zur montage einer windturbine und windturbinenanordnungssystem sowie verfahren zur montage eines windparks und windparkanordnungssystem
EP4345290A1 (de) * 2022-09-27 2024-04-03 Nordex Energy Spain, S.A.U. Hebesystem für ein windturbinenmontagesystem und zugehöriges hebeverfahren
WO2024068319A1 (en) * 2022-09-27 2024-04-04 Nordex Energy Spain, S.A.U. Lifting system for a wind turbine assembly system and related lifting method
WO2024068322A1 (en) * 2022-09-27 2024-04-04 Nordex Energy Se & Co. Kg Method of assembling a wind turbine and wind turbine assembly system, and method of assembling a wind farm and wind farm assembly system
WO2024068702A1 (en) * 2022-09-27 2024-04-04 Nordex Energy Se & Co. Kg Adapter, tower comprising the adapter and wind turbine comprising the tower and wind farm comprising at least one wind turbine
CN117514627B (zh) * 2024-01-05 2024-03-12 山西寰安建设工程有限公司 一种风力发电装置的安装座及其安装方法
CN117514627A (zh) * 2024-01-05 2024-02-06 山西寰安建设工程有限公司 一种风力发电装置的安装座及其安装方法

Also Published As

Publication number Publication date
DE19647515B4 (de) 2010-04-15

Similar Documents

Publication Publication Date Title
DE19647515B4 (de) Windkonvertermontageeinrichtung
EP2715115B1 (de) Verfahren zum errichten einer windkraftanlage
EP2715113B1 (de) Verfahren zum errichten, warten und demontieren einer windenergieanlage
EP1857670B1 (de) Vorrichtung zum Errichten eines aus einzelnen Turmsegmenten zusammengesetzten Turms einer Windenergieanlage
DE102015000818B3 (de) Windenergieanlagenturm
WO2011066819A2 (de) Windenergieanlage mit hebevorrichtung
DE102013110464A1 (de) Vorrichtung und Verfahren zur Handhabung, Montage oder Demontage von Komponenten einer Windkraftanlage
DE102011116189B3 (de) Lasthandhabungsvorrichtung zum Anheben von Rotorblättern in eine Montageposition und Verfahren zur Montage von Rotorblättern an der Rotornabe einer Windenergieanlage
EP3047083B1 (de) Variables schutzdach
DE102017217513A1 (de) Höhenverstellbarer Turm mit einem Führungssystem
DE102005053782A1 (de) Selbstkletternde Vorrichtung
EP3464754B1 (de) Steigvorrichtung zur ausführung einer bewegung relativ zu einem turm und verfahren zur herstellung eines turms
DE19803954B4 (de) Verfahren und Vorrichtung zum Erhöhen von Masten
WO2004076781A1 (de) Vorrichtung zur errichtung einer windenergieanlage
DE2749349A1 (de) Kuehlturm
EP2129609B1 (de) Wippausleger-turmdrehkran
DE10206242B4 (de) Windkraftanlage und zugehöriger Mast
DE102009023538A1 (de) Turm einer Windkraftanlage, Windkraftanlage sowie Verfahren zum Anheben von Komponenten einer Windkraftanlage
DE102019219722A1 (de) Verfahren zum Errichten einer Windenergieanlage
DE102017217514A1 (de) Höhenverstellbarer Turm mit überlappenden Turmkomponenten
DE2756390C3 (de) Kletterrüstung zum Bauen von Kühlturmschalen aus Stahlbeton mit horizontalen Versteifungsringen
EP3839252A1 (de) Montagevorrichtung für rotorblätter einer windenergieanlage
DE2743390A1 (de) Auf tuermen errichtbare bauwerke
DE102020006544A1 (de) Verfahren und Ausrüstung zum Errichten, Ausrüsten und Betreiben von Binnenwindanlagen großer Höhen und Leistung
WO2020094735A1 (de) Hebezeugbefestigung und hebezeug für windkraftturbinen

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
8110 Request for examination paragraph 44
8339 Ceased/non-payment of the annual fee
8370 Indication of lapse of patent is to be deleted
8364 No opposition during term of opposition