- extension frame
- frame according
- sub
- lying
- foot part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000463 material Substances 0.000 claims description 20
- 238000010276 construction Methods 0.000 claims description 12
- 238000000034 method Methods 0.000 claims description 6
- 230000035515 penetration Effects 0.000 claims description 3
- 238000005065 mining Methods 0.000 claims description 2
- 238000004873 anchoring Methods 0.000 claims 1
- 101100495270 Caenorhabditis elegans cdc-26 gene Proteins 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000003245 coal Substances 0.000 description 2
- 101150107341 RERE gene Proteins 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 238000007639 printing Methods 0.000 description 1
- KNVAYBMMCPLDOZ-UHFFFAOYSA-N propan-2-yl 12-hydroxyoctadecanoate Chemical compound CCCCCCC(O)CCCCCCCCCCC(=O)OC(C)C KNVAYBMMCPLDOZ-UHFFFAOYSA-N 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
- E21D23/0454—Trailing plates; Coal face or goaf side sprags
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/0004—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
- Tents Or Canopies (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
Der Fußteil des rückwärtigen Teilelements ist zum Durchtritt der Matte während des RückvorgangesThe foot part of the rear sub-element is for the mat to pass through during the return process
verfahren bekanntgeworden, bei dem zunächst eine 50 zweckmäßig vom Liegenden abhebbar. Dies wird in
Oberbank unmittelbar unter dem Flözhangenden und besonders vorteilhafter Weise dadurch erreicht, daß
nachfolgend eine oder mehrere Bänke im Strebbau zwischen der Kappenkonstruktion und dem Fußteil
hereingewonnen werden und bei dem auf dem des rückwärtigen Teilelements mindestens ein doppelt-Liegenden
des Strebes in der Oberbank eine bieg- wirkender Stempel angeordnet ist und daß am Aussame
Matte verlegt wird, die für die Strebe in den 55 baugestell eine Vorrichtung vorgesehen ist, die das
nachfolgend in Verhieb genommenen Bänken zum Absenken der Kappenkonstruktion derartig begrenzt,
Abfangen des Daches dient, wobei ein Vorrat von
Material zur Herstellung der Matte im offengehaltenen Strebraum des Strebes in der Oberbank bereitgehalten
wird, das mit fortschreitendem Abbau kon- 60
tinuierlich an der Rückseite des Strebes auf demprocedure has become known in which initially a 50 can be lifted from the lying person. This is achieved in Oberbank directly below the seam slope and particularly advantageously by subsequently gaining one or more banks in the longwall between the cap structure and the foot part and in the case of the one on the rear sub-element at least one double-lying strut in the upper bank bending-acting punch is arranged and that mat is laid on the seed, which is provided for the strut in the building frame a device that limits the subsequently set benches for lowering the cap structure in such a way as to intercept the roof, with a supply of
Material for the production of the mat is kept ready in the longwall space of the longwall in the upper bench, which is kept open as the degradation progresses
continuously on the back of the strut on the
daß der Fußteil des rückwärtigen Teilelements beim Einfahren des doppeltwirkenden Stempels vom Liegenden abgehoben wird.that the foot part of the rear sub-element when the double-acting punch is retracted from the person lying down is lifted.
Ebenso kann zum Abheben des Fußteiles des rückwärtigen Teilelements vom Liegenden ein zusätzlicher Druckzylinder vorgesehen sein.Likewise, an additional one can be used to lift the foot part of the rear sub-element from the lying person Pressure cylinder may be provided.
Zweckmäßig sind weiterhin an der Rückseite der rückwärtigen Teilelemente Schilde befestigt, die einShields are also expediently attached to the back of the rear sub-elements, which a
Liegenden ausgelegt wird. Diese zusammenhängende biegsame Matte, die beispielsweise aus Maschendraht bestehen kann, überdeckt an der Rückseite des inIs laid out lying down. This cohesive flexible mat, for example made of wire mesh may exist, covered on the back of the in
der Oberbank betriebenen Strebes die gesamte 65 Eindringen von Bruch- oder Versatzmaterial in den Liegendfläche. Auf diese biegsame Matte wird ent- zwischen den Teilelementen vorgesehenen Raum ver-the Oberbank operated Strebes the entire 65 penetration of broken or backfill material into the Lying area. The space provided between the sub-elements is allocated to this flexible mat.
weder Versatz aufgebracht oder man läßt das Han- hindern.neither misalignment applied nor one hindered the hand.
gende über der Matte zu Bruch gehen, so daß sich Ein Ausführungsbeispiel der Erfindung ist im fol-end over the mat to break, so that an embodiment of the invention is in the following
genden an Hand der Zeichnung näher erläutert. Es dem rückwärtigen Teilelement des Ausbaugestells istare explained in more detail with reference to the drawing. It is the rear part of the extension frame
zeigt unterhalb des hydraulischen Druckzylinders 16 einshows a below the hydraulic pressure cylinder 16
F i g. 1 in Seitenansicht einen Strebausbau mit Raum vorgesehen, der zur Aufnahme eines bestimm-F i g. 1 in a side view of a longwall structure with space provided to accommodate a certain
einem Ausbaugestell gemäß der Erfindung, ten Vorrates von Material für die auszurollendea support frame according to the invention, th supply of material for the rolled out
F i g. 2 ein im Streb der Oberbank eingesetztes 5 Matte 4 dient. Dieser Vorrat besteht in der Regel ausF i g. 2 a 5 mat 4 used in the longwall of the upper bench is used. This supply usually consists of
erfindungsgemäßes Ausbaugestell in Seitenansicht, einer Rolle von Mattenmaterial. Diese Rolle liegt aufexpansion frame according to the invention in side view, a roll of mat material. This role is on
F i g. 3 eine weitere mögliche Ausbildungsform einer schrägen Rampe, die sich an der Rückseite derF i g. 3 Another possible embodiment of an inclined ramp, which is located at the rear of the
eines solchen Ausbaugestells in Seitenansicht, Fußplatte 9 des abbaustoßseitigen Teilelements be-of such a support frame in side view, footplate 9 of the partial element on the face side
F i g. 4 eine mehr ins einzelne gehende Darstellung findet. Die schräge Rampe 9 soll das HerausziehenF i g. 4 finds a more detailed presentation. The inclined ramp 9 is intended to pull out
des in F i g. 3 dargestellten Ausbaugestells, io des Mattenmaterials durch die Austrittsöffnung 5 er-of the in FIG. 3 expansion frame shown, io of the mat material through the outlet opening 5
F i g. 5 eine rückwärtige Ansicht des in F i g. 3 leichtern, die sich zwischen dem Fußteil 12 des rück-F i g. 5 is a rear view of the FIG. 3, which are located between the foot part 12 of the rear
und 4 dargestellten Ausbaugestells und wältigen Teilelements und der Fußplatte 9 des abbau-and 4 shown expansion frame and master sub-element and the base plate 9 of the dismantling
F i g. 6 einen Schnitt entlang der Linie VI-VI in stoßseitigen Teilelements befindet. Die rückwärtigeF i g. 6 is a section along the line VI-VI in the joint-side partial element. The rear
F i g. 4. Rampe an der Grundplatte 9 soll außerdem dazuF i g. 4. Ramp on the base plate 9 should also be used
In F i g. 1 ist ein Schnitt durch ein Kohlenflöz S 15 dienen, ein Hochquellen des Liegenden im Bereich
dargestellt, das eine Mächtigkeit von beispielsweise der von ihr überdeckten Fläche zu vermeiden. Solches
6 m hat und in vier Banken Sl, Sl, S3, S4 im Streb- hochgequollene Material vom Liegenden würde das
bau mit Bruchversatz abgebaut wird. In F i g. 1 sind Herausziehen des Materials für die Matte und somit
lediglich der direkt unter dem Flözhangenden in der einer Herstellung der Matte behindern. Das Material
Oberbank Sl betriebene Streb und nachfolgende 20 für die Herstellung der Matte besteht zweckmäßig
Strebe in den Bänken Sl und S3 dargestellt, die die aus Maschendraht, der durch Stahlstreifen oder
Kohle je in einer Mächtigkeit von 1,5 m herein- andere Materialien verstärkt sein kann,
gewinnen. Ein in F i g. 1 nicht dargestellter vierter Eine weitere mögliche Ausführungsform eines Aus-Streb,
der in der Bank S 4 betrieben wird, schließt baugestells für den in der Oberbank Sl betriebenen
sich an den in der Bank S3 betriebenen Streb an. 95 Streb ist in Fig. 3 dargestellt. Dieses AusbaugestellIn Fig. 1 is a section through a coal seam S 15, which swells up the lying person in the area to avoid the thickness of the area covered by it, for example. Such 6 m has and in four banks Sl, Sl, S3, S4 in the longwall high swollen material from the lying would be dismantled with a fracture offset. In Fig. 1 are pulling out the material for the mat and thus only hinder the production of the mat directly under the seam hanging end. The material Oberbank Sl operated longwall and subsequent 20 for the production of the mat consists expediently brace in the banks S1 and S3, which are made of wire mesh, which is reinforced by steel strips or coal each in a thickness of 1.5 m in other materials can,
to win. One shown in FIG. 1, a fourth, not shown, another possible embodiment of a longwall, which is operated in the bank S 4, connects the construction for the longwall operated in the upper bank S1 to the longwall operated in the bank S3. 95 longwall is shown in FIG. 3. This extension frame
Ein zum Ausbau des in der Oberbank Sl betrie- entspricht weitgehend dem schon an Hand von Fig. 2A for the expansion of the operated in the Oberbank S1 largely corresponds to that already on the basis of FIG. 2
benen Strebes dienendes Ausbaugestell ist in seiner beschriebenen Ausbaugestell. Für die gleichen Teilebenen struts serving support frame is in its described support frame. For the same parts
Gesamtheit mit dem Bezugszeichen 1 versehen. Die sind deshalb die gleichen Bezugszeichen beibehaltenThe whole is provided with the reference number 1. The same reference numbers have therefore been retained
in den nachfolgenden Streben angeordneten Ausbau- worden. Der Konstruktionsunterschied zu dem inbeen arranged in the following struts expansion. The construction difference to the in
gestelle 2 und 3 sind von bekannter Bauart und 30 F i g. 2 dargestellten Ausbaugestell besteht darin, daßframes 2 and 3 are of known design and 30 F i g. 2 expansion frame is that
stützen in Verbindung mit der zusammenhängenden der hydraulische Druckzylinder 16 durch einen Trägersupport in connection with the contiguous the hydraulic pressure cylinder 16 by a carrier
Matte 4 die in den Bänken S2, S3 und S4 betrie- 21 ersetzt ist, der mit der Grundplatte 9 fest verbun-Mat 4 which is operated in banks S2, S3 and S4 is replaced 21 which is firmly connected to the base plate 9
benen Strebe ab. Das Ausbaugestell 1 ist in F i g. 2 den ist. Außerdem ist der Stempel 13 mit einerbenen strut. The extension frame 1 is shown in FIG. 2 den is. In addition, the stamp 13 is with a
näher dargestellt. Es besteht aus einer Fußplatte 9 Manschette 21 α versehen, die höhenverstellbar amshown in more detail. It consists of a base plate 9 cuff 21 α provided, which is adjustable in height on
für das abbaustoßseitige Teilelement, auf dem meh- 35 Stempel 13 befestigt ist. Außerdem sind in F i g. 3for the partial element on the working face side, on which more than 35 punch 13 is attached. In addition, in FIG. 3
rere Stempel 10 angeordnet sind, die in bekannter Druckmittelleitungen 13 a und 13 b dargestellt, dierere stamp 10 are arranged, which are shown in known pressure medium lines 13 a and 13 b , the
Weise eine Kappenkonstruktion 11 tragen. Das rück- zur Druckmittelversorgung des doppeltwirkendenWay to wear a cap construction 11. The back to the pressure medium supply of the double-acting
wärtige Teilelement des Ausbaugestells 1 besteht aus Stempels 13 dienen.Wärtige sub-element of the extension frame 1 consists of stamp 13 are used.
einem Fuß teil 12, auf dem mindestens ein doppelt- Eine große Zahl von Ausbaugestellen der obenwirkender
hydraulischer Stempel 13 angeordnet ist, 40 beschriebenen Art sind in dem in der Oberbank Sl
der eine Kappenkonstruktion 14 unterstützt, die bei betriebenen Streb nebeneinander angeordnet.
15 gelenkig an der Kappenkonstruktion 11 des ab- Das oben beschriebene Ausbausystem funktioniert
baustoßseitigen Teilelements angelenkt ist. Der wie folgt:a foot part 12, on which at least a double A large number of expansion racks of the above-acting hydraulic ram 13 is arranged, 40 described type are supported in the upper bench Sl of a cap structure 14, which are arranged side by side when the longwall is operated.
15 articulated to the cap structure 11 of the ab- The expansion system described above works on the building joint-side sub-element is articulated. Which as follows:
Stempel 13 ist sowohl am Fuß teil 12 als auch an der Zunächst wird in der Bank Sl mit Hilfe einer Ge-Stamp 13 is both on the foot part 12 and on the first is in the bank S1 with the help of a
Kappenkonstruktion 14 zug- und druckfest befestigt. 45 winnungsmaschine eine Schnittbreite des abzubauen-Cap construction 14 fastened in a tensile and pressure-resistant manner. 45 extraction machine a cutting width of the mined
Da zwischen dem Fußteil 9 des abbaustoßseitigen den Minerals hereingewonnen und über den Streb-Teilelements und dem Fußteil 12 des rückwärtigen förderer Cl abgefördert. Dann werden die an den Teilelements keine direkte Verbindung vorgesehen Ausbaugestellen vorgesehenen hydraulischen Rückist, ist zwischen den beiden Teilelementen des Aus- zylinder 19 ausgefahren, wodurch der Strebförderer baugestells ein hydraulischer Druckzylinder 16 vor- 50 Cl in Richtung auf die neu freigelegte Abbaufront gesehen, der in Verbindung mit den Kappenkonstruk- vorgeschoben wird. Dann werden die Stempel 10 und tionen 11 und 14 die jeweilige Lage der beiden Teil- 13 der Ausbaugestelle eingefahren, um sie aus ihrer elemente des Ausbaugestells gegeneinander einstellt. Verspannung zwischen Hangendem und LiegendemSince the mineral recovered between the foot part 9 of the face side and over the longwall sub-element and the foot part 12 of the rear conveyor Cl conveyed away. Then the Sub-element no direct connection provided expansion racks provided hydraulic return, is extended between the two sub-elements of the extension cylinder 19, whereby the face conveyor construction frame a hydraulic pressure cylinder 16 in front of 50 Cl in the direction of the newly exposed mining front seen, which is advanced in connection with the Kappen Konstruk-. Then the punches 10 and functions 11 and 14 retracted the respective position of the two parts 13 of the support racks to get them out of their elements of the extension frame adjusts against each other. Tension between hanging and lying
Weiterhin ist am abbaustoßseitigen Teilelement zu lösen. Dabei werden die Stempel 13 so betätigt,Furthermore, the partial element on the working face has to be solved. The punches 13 are operated in such a way that
ein doppeltwirkender Rückzylinder 19 befestigt, der 55 daß ihr Fußteil 12 vom Liegenden abhebt und dena double-acting rear cylinder 19 is attached, the 55 that her foot part 12 lifts from the lying person and the
zum Vorrücken des Strebförderers C1 dient, wenn Teil der Matte 4 freigibt, auf dem es gestanden hat.serves to advance the face conveyor C1 when part of the mat 4 is released on which it has stood.
er ausgefahren wird, und der zum Nachrücken des Dies geschieht entweder dadurch, daß der in F i g. 2it is extended, and the one to move up this is done either by the fact that the one shown in FIG. 2
Ausbaugestells gegen den bereits vorgerückten Streb- dargestellte hydraulische Druckzylinder 16 den ein-Expansion frame against the already advanced longwall - illustrated hydraulic pressure cylinder 16 the one
förderer dient, wenn er eingefahren wird. Zu diesem gefahrenen Stempel 13 stützt oder, wie in F i g. 3 dar-conveyor is used when it is retracted. Supports this driven punch 13 or, as in FIG. 3 dar-
Zweck ist die Kolbenstange des hydraulischen Rück- 60 gestellt, dadurch, daß die am Stempel 13 vorgesehenePurpose is the piston rod of the hydraulic return 60, in that the provided on the punch 13
Zylinders 19 am Strebförderer C1 bei 20 zug- und Manschette 21a sich an dem Träger 21 abstützt,Cylinder 19 on the face conveyor C1 at 20 pulling and sleeve 21a is supported on the carrier 21,
druckfest befestigt. wenn der doppeltwirkende Stempel 13 so weit ein-fastened pressure-tight. when the double-acting punch 13 is so far
An der Rückseite des rückwärtigen Teilelements gefahren ist, daß die Manschette 21a am Träger 21On the back of the rear sub-element, the cuff 21a on the carrier 21
sind Schilde 17 und 18 vorgesehen, die an der anliegt.shields 17 and 18 are provided, which rests against the.
Kappenkonstruktion 14 bzw. dem Fußteil 12 be- 65 Anschließend werden die Rückzylinder 19 eingefestigt sind und ein Eindringen von Bruchmaterial in fahren, um die zugehörigen Ausbaugestelle gegen den den offengehaltenen Strebraum verhindern sollen. vorgeschobenen Strebförderer C1 nachzuziehen. Wäh-Zwischen dem abbaustoßseitigen Teilelement und rend des Rückvorgangs wird das im Raum zwischen65 Then the rear cylinders 19 are fastened in place are and a penetration of broken material in drive to the associated support frames against the to prevent the longwall space being kept open. to pull the forward face conveyor C1. Choose between the partial element on the side of the mine face and the end of the reverse process will be in the space between
den Teilelementen der Ausbaugestelle bereit gehaltene, gegebenenfalls aufgerollte Material für die Matte 4 durch die Austrittsöffnung 5 nach rückwärts, d.h. auf den Versatz- oder Bruchraum zu herausgezogen, wie bei 4 α dargestellt ist.optionally rolled up material for the mat 4 held ready for the sub-elements of the support racks through the outlet opening 5 backwards, ie pulled out towards the offset or fracture space, as shown at 4 α .
Nach Abschluß des Rückvorgangs werden die Stempel 10 und 13 des vorgerückten Ausbaugestells wieder zwischen Hangendem und Liegendem der Oberbank 51 verspannt.After the return process is completed, the punches 10 and 13 of the advanced support frame again tensioned between the hanging and lying of the upper bench 51.
Der hydraulische Druckzylinder 16 kann so ausgebildet und angeordnet werden, daß er im Zusammenwirken mit der Kappenkonstruktion 14 und dem Fußteil 12 den Stempel 13 anhebt, so daß er mit seinem Fußteil 12 vom Liegenden frei kommt, wenn die Matte 4 unter dem Fußteil 12 herausgezogen werden soll. In diesem Falle braucht der Stempel 13 nicht unbedingt doppeltwirkend ausgeführt zu sein. Die Matte 4 erstreckt sich am Liegenden der Oberbank 51 von den Ausbaugestellen 1 her in den Bruchoder Versatzraum hinein und dient im Zusammenwirken mit den Ausbaugestellen 2 und 3 als Dachabstützung bzw. Verzug in den nachfolgenden Streben in den Bänken 52, 53 und 54. Die wandernden Ausbaugestelle 2 und 3 in den nachfolgenden Streben sind im Prinzip wie herkömmliche wandernde Ausbauböcke ausgebildet. Ihre rückwärtige Kappenkonstruktion 2 a wird zweckmäßig, ähnlich wie beim bekannten Schildausbau, nach hinten in einer Wölbung abfallend ausgeführt, um, wie bei 7 dargestellt, eine gleichmäßige Überleitung der Matte 4 vom Niveau 6 auf das Niveau 8 zu ermöglichen, ohne daß die Matte dabei geknickt oder anderweitig beschädigt wird.The hydraulic pressure cylinder 16 can be designed and arranged in such a way that, in cooperation with the cap structure 14 and the foot part 12, it lifts the plunger 13 so that it comes free with its foot part 12 when the mat 4 is pulled out from under the foot part 12 target. In this case, the punch 13 does not necessarily have to be designed to be double-acting. The mat 4 extends on the lying of the upper bench 51 from the extension racks 1 into the breakage or offset space and, in cooperation with the extension racks 2 and 3, serves as a roof support or warpage in the subsequent struts in the banks 52, 53 and 54 Support racks 2 and 3 in the following struts are basically designed like conventional traveling support frames. Your rear cap construction 2 a is expediently, similar to the known shield construction, designed sloping backwards in a curvature, in order, as shown at 7, to enable an even transition of the mat 4 from level 6 to level 8 without the mat thereby kinked or damaged in any other way.
Beim Vorrücken der Strebe können die in Reihe angeordneten Ausbaugestelle alle gemeinsam oder aber auch einzeln nacheinander oder in Gruppen nacheinander vorgerückt werden, nachdem der Strebförderer in bekannter Weise gegen die Abbaufront vorgerückt worden ist. Beim Vorrücken der Ausbaugestelle in Gruppen oder einzeln nacheinander wird eine gewisse Flexibilität des Mattenmaterials vorausgesetzt. When the strut is advanced, the support racks arranged in a row can all be together or but can also be advanced individually one after the other or in groups one after the other after the face conveyor has been advanced in a known manner against the dismantling front. When advancing the support frames In groups or individually one after the other, a certain flexibility of the mat material is required.
Die Ausbaugestelle 1 können aber auch so ausgebildet sein, daß beim Vorrücken zunächst das vordere Teilelement vorgerückt wird und wieder verspannt wird, um anschließend beim Nachrücken des rückwärtigen Teilelements als Widerlager für den Rückzylinder zu dienen. In diesem Falle werden zweckmäßig die abbaustoßseitigen Teilelemente einzeln nacheinander oder in einzelnen Gruppen vorgerückt, um in bekannter Weise den unzerlegten Strebförderer abschnittsweise vorrücken zu können. Sämtliche rückwärtigen Teilelemente verbleiben in diesem Falle in ihrer Verspannung zwischen Hangendem und Liegendem, bis alle abbaustoßseitigen Teilelemente vorgerückt sind. Anschließend werden sämtliche rückwärtigen Teilelemente aus ihrer Verspannung gelöst und gleichzeitig vorgerückt. Hierdurch wird vermieden, daß das Mattenmaterial unnötig auf Biegung beansprucht wird.The support frames 1 can also be designed so that when moving forward, the first front sub-element is advanced and tensioned again to then move up the rear sub-element to serve as an abutment for the rear cylinder. In this case it will be expediently, the partial elements on the side of the mine face are advanced individually one after the other or in individual groups, in order to be able to advance the undisassembled face conveyor in sections in a known manner. All rear sub-elements remain in this case in their bracing between the hanging wall and Lying until all sub-elements on the working face side are advanced. Then all rear sub-elements released from their tension and advanced at the same time. This will avoided that the mat material is unnecessarily stressed on bending.
Die Schilde 17 und 18 an den rückwärtigen Teilelementen sind so breit ausgeführt, daß sie auch den Raum zwischen den einzelnen Ausbaugestellen zum Versatzraum hin abschirmen. Auf diese Weise bilden sie eine lückenlose Wand an der Rückseite des Strebes.The shields 17 and 18 on the rear sub-elements are made so wide that they also Shield the space between the individual extension racks from the offset space. Form this way they have a gapless wall at the back of the strut.
Der hydraulische Druckzylinder 16 dient nicht allein dazu, den Abstand zwischen dem abbaustoßseitigen und dem rückwärtigen Teilelement zu halten, sondern auch dazu, die Kappenkonstruktion 14 zu tragen, solange der Stempel 13 während des Rückvorgangs eingefahren ist.The hydraulic pressure cylinder 16 is not only used to reduce the distance between the working face side and to hold the rear sub-element, but also to hold the cap structure 14 wear as long as the ram 13 is retracted during the reverse process.
Mehr ins einzelne gehend ist die Konstruktion der Ausbaugestelle 1 in den F i g. 4, 5 und 6 dargestellt. Die in diesen Figuren angegebenen Bezugszeichen stimmen mit den in F i g. 3 angegebenen Bezugszeichen überein. In diesen Figuren ist noch ein hydraulischer Druckzylinder 22 dargestellt, der zwischen zwei rückwärtigen Stempeln 13 angeordnet werden kann, die in senkrechter Richtung an dem Träger 21 verschiebbar sind. Dieser zusätzliche Druckzylinder ist schwenkbar an dem Träger 21 befestigt und unterstützt mit dem freien Ende seiner Kolbenstange die Kappenkonstruktion 14.The construction of the support frames 1 in FIGS. 4, 5 and 6 shown. The reference symbols given in these figures agree with those in FIG. 3 indicated reference numerals match. In these figures there is another hydraulic one Printing cylinder 22 is shown, which is arranged between two rear punches 13 can, which are displaceable on the carrier 21 in the vertical direction. This additional pressure cylinder is pivotably attached to the carrier 21 and supported with the free end of its piston rod the cap construction 14.
Dieser zusätzliche Druckzylinder 22 dient dazu, die Kappenkonstruktion 14 zusammen mit den Stempeln und dem Fußteil 12 anzuheben, wenn die Stempel aus ihrer Verspannung gelöst sind und das Mattenmaterial unter dem Fußteil 12 herausgezogen werden soll. In diesem Falle brauchen die Stempel 13 nicht doppeltwirkend ausgebildet zu werden. Der Druckzylinder 21 kann einfachwirkend ausgebildet sein, wenn er nur zum Anheben des Fußteiles 12 verwendet werden soll. Für den Fall, daß er auch das Absenken der Kappenkonstruktion beeinflussen soll, muß er doppeltwirkend ausgeführt sein.This additional pressure cylinder 22 serves to hold the cap structure 14 together with the stamps and to lift the foot part 12 when the stamps are released from their tension and the mat material is to be pulled out from under the foot part 12. In this case, the punches 13 do not need to be trained double-acting. The pressure cylinder 21 can be designed to be single-acting, if it is only to be used to lift the foot section 12. In case he does that too If lowering is to affect the canopy construction, it must be double-acting.
Claims (15)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB4186867A GB1219908A (en) | 1967-09-13 | 1967-09-13 | Improvements in or relating to advancing mine roof supports |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1758939B1 true DE1758939B1 (en) | 1970-12-17 |
Family
ID=10421723
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19681758939 Pending DE1758939B1 (en) | 1967-09-13 | 1968-09-05 | Moving hydraulic support frame for underground mine gear |
Country Status (4)
Country | Link |
---|---|
JP (1) | JPS4810284B1 (en) |
DE (1) | DE1758939B1 (en) |
FR (1) | FR1578449A (en) |
GB (1) | GB1219908A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4024250A1 (en) * | 1990-07-31 | 1992-02-06 | Linsingen Heintzmann Von | ARRANGEMENT FOR RECOVERING MINERALS DEPOSED AS FLOE, IN PARTICULAR COAL |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1986007107A1 (en) * | 1985-05-28 | 1986-12-04 | Hans Richter | Method and device for post-setting a liquid impervious layer in extended dumping grounds and contaminated areas in order to protect ground waters |
DE3530469A1 (en) * | 1985-08-27 | 1987-03-05 | Niederberg Chemie | Nocturnal landfill seals with mining mining |
CN106761753B (en) * | 2017-03-15 | 2018-08-14 | 河南理工大学 | A kind of thick seam slicing system lower leaf face layout of actual mining roadway method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1156036B (en) * | 1958-01-16 | 1963-10-24 | Gewerk Eisenhuette Westfalia | Process for the fully mechanical extraction of powerful storage areas in disk construction |
-
1967
- 1967-09-13 GB GB4186867A patent/GB1219908A/en not_active Expired
-
1968
- 1968-04-22 JP JP43026668A patent/JPS4810284B1/ja active Pending
- 1968-08-20 FR FR1578449D patent/FR1578449A/fr not_active Expired
- 1968-09-05 DE DE19681758939 patent/DE1758939B1/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1156036B (en) * | 1958-01-16 | 1963-10-24 | Gewerk Eisenhuette Westfalia | Process for the fully mechanical extraction of powerful storage areas in disk construction |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4024250A1 (en) * | 1990-07-31 | 1992-02-06 | Linsingen Heintzmann Von | ARRANGEMENT FOR RECOVERING MINERALS DEPOSED AS FLOE, IN PARTICULAR COAL |
DE4024250C3 (en) * | 1990-07-31 | 1999-09-09 | Linsingen Heintzmann | Arrangement for extracting minerals deposited as seam, in particular coal |
Also Published As
Publication number | Publication date |
---|---|
FR1578449A (en) | 1969-08-14 |
GB1219908A (en) | 1971-01-20 |
JPS4810284B1 (en) | 1973-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1219892B (en) | Control of a coal plow | |
DE2310077A1 (en) | STEPPING EXTENSION SYSTEM FOR MINING | |
AT504265A1 (en) | SUPPORT DEVICE FOR AN OPERATOR OR MACHINE | |
DE2815898A1 (en) | DEVICE FOR POSITIONING CEILING SUPPORT IN A TUNNEL | |
DE970540C (en) | Framework for progressive expansion in brown coal longwall mining | |
DE2540048B1 (en) | DEVICE WITH A REAR CYLINDER FOR A STRUCTURAL STRUCTURE MOVING WITH A STRUT CONVEYOR, IN PARTICULAR SHIELD REMOVAL FRAME AND WITH A DURING THE BACK, THE LYING SLEEVE ON THE LYING SLIDE PISTON | |
DE1758939B1 (en) | Moving hydraulic support frame for underground mine gear | |
CH644933A5 (en) | SCREWING UNIT ARRANGEMENT FOR A DRIVING MACHINE FOR ROUTES IN MINING AND FOR TUNNELS AND DRIVING MACHINE. | |
DE2416617C3 (en) | Device for aligning walking hydraulic jacks when hovering | |
DE2646496C3 (en) | Facility for the continuous expansion of a line with a door frame expansion | |
DE1075518B (en) | Migrating metallic lining for mining operations in mines | |
DE2250296C3 (en) | Knife shield propulsion device for propelling underground cavities, such as in particular tunnels, tunnels and the like | |
DE2323811B2 (en) | ||
DE1758939C (en) | Moving hydraulic support frame for underground mining operations | |
DE1583039B1 (en) | Longwall equipment with mining machine for a short longwall | |
DE2704222C3 (en) | Procedure and multi-purpose platform for the expansion of sections of mining and tunneling that were excavated by blasting | |
DE2617141B2 (en) | Cap and break shield construction for a shield support frame | |
DE1817054A1 (en) | Face device for struts in underground mining | |
DE1257721C2 (en) | HYDRAULIC STAMP REMOVAL UNDER LOAD | |
DE3041929A1 (en) | MINING NICHE SCREW CONSTRUCTION | |
DE973605C (en) | Mine support | |
DE2346853B2 (en) | Machine for bringing in a route extension consisting of door frames | |
AT294729B (en) | HIKING STRUCTURAL EQUIPMENT FOR DISPLACEMENT STRUT | |
DE1458679C3 (en) | Wandering expansion for underground mining | |
AT313833B (en) | Expansion frame |