CN87102572A CN87102572.8A CN87102572A CN87102572A CN 87102572 A CN87102572 A CN 87102572A CN 87102572 A CN87102572 A CN 87102572A CN 87102572 A CN87102572 A CN 87102572A
Authority
CN
China
Prior art keywords
bed
fluidized
little
clinker
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN87102572.8A
Other languages
Chinese (zh)
Other versions
CN1015422B (en
Inventor
馆林恂
高田友昭
林公隆
熊谷亲德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Motors Ltd
Original Assignee
Kawasaki Jukogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=27301714&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN87102572(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Priority claimed from JP61075131A external-priority patent/JPS62230657A/en
Priority claimed from JP20430286A external-priority patent/JPH0676239B2/en
Priority claimed from JP61279468A external-priority patent/JPS63134540A/en
Application filed by Kawasaki Jukogyo KK filed Critical Kawasaki Jukogyo KK
Publication of CN87102572A publication Critical patent/CN87102572A/en
Publication of CN1015422B publication Critical patent/CN1015422B/en
Expired legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B7/00Hydraulic cements
    • C04B7/36Manufacture of hydraulic cements in general
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B15/00Fluidised-bed furnaces; Other furnaces using or treating finely-divided materials in dispersion
    • F27B15/003Cyclones or chain of cyclones
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B7/00Hydraulic cements
    • C04B7/36Manufacture of hydraulic cements in general
    • C04B7/43Heat treatment, e.g. precalcining, burning, melting; Cooling
    • C04B7/434Preheating with addition of fuel, e.g. calcining
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B7/00Hydraulic cements
    • C04B7/36Manufacture of hydraulic cements in general
    • C04B7/43Heat treatment, e.g. precalcining, burning, melting; Cooling
    • C04B7/44Burning; Melting
    • C04B7/45Burning; Melting in fluidised beds, e.g. spouted beds

Abstract

Apparatus for manufacturing cements clinker is made of following part: the suspended solid preheater of preheating cement material powder; Granulated preheated cement material powder's spray bed furnace; The fluidized bed type stove of sintered granulated powder raw material for cement; The cooling system of cooling granulation products of combustion; Some burners are placed on the bottom of spray bed furnace, burner opposite one another, and the end is inclined upwardly, and forms the local hot spots in the spouted bed; The preheated material charge chute loads the preheating material powder that suspended solid preheater is supplied with a little more than local hot spots to spray bed furnace; Local hot spots one side is provided with the granulated materials drain tank.

Description

Apparatus for manufacturing cements clinker
The present invention is relevant with apparatus for manufacturing cements clinker.
In relevant skill field, make in the typical conventional plant or equipment of cement clinker, the fluidized bed type sintering oven is arranged, cooling system, air preheater, heat exchange swirler, the combination of dust collector.This legacy equipment must use particulate grog (nuclide clinker).The particulate grog is typically the fine particle of grog, circulates in particulate grog circulation line.But the shortcoming of this equipment, just like because of the circulation of particulate grog big thermal losses being arranged, the organic efficiency of the sensible heat of burning grog is low, causes low efficiency, and makes the reduction difficulty of fuel consumption.
For overcoming these problems in the prior art field, the inventor etc. proposed, a kind of shown in No. the 13738/1985th, Japanese patent laid-open publication gazette need be with the apparatus for manufacturing cements clinker of particulate grog.This equipment has a suspended solid preheater, comprising some swirlers, and a spouted bed granulation stove; a fluidized bed type sintering oven; with cooling apparatus or the like, the bottom of its spouted bed type granulation stove and the top of fluidized bed type sintering oven, interconnection by a waste pipe.Particularly; the characteristics of this equipment are: the preheated material that the suspended substance preheating oven is sent; infeed the conduit that between cooling system and ejection-type granulation stove, connects; the hot cooling air that makes material and extract out from cooling system mixes; do both heat exchanges, then mixture is infeeded spouted bed type granulation stove.Use this equipment, can eliminate the material melts composition and on the conduit internal surface that is connected between cooling system and the granulation stove, adhere to and accumulate, thus the problem that on this internal surface, covers.In addition, also can effectively utilize the heat of from the cement clinker cooling system, collecting.
During the equipment operation that in No. the 13738/1985th, Japanese patent laid-open publication gazette, discloses,, keep the liquid temperature that produces, generally in 1250~1350 ℃ of scopes with the atmosphere in the spouted bed type granulation stove.Part is because the burner of the spouted bed type granulation stove of this device; be located on the straight barrel-shaped wall of granulation stove; part is owing to the calcined materials for the treatment of that will introduce with air suspends; cover near the zone of internal surface, granulation furnace wall; burn the fuel that burner is supplied with, formation temperature is not than the high a lot of local hot spots in peripheral region.Therefore, in spouted bed, realize the basic uniform distribution of heat.The basic uniform distribution of temperature does not promptly have local hot spots, the amount of the liquid that forms in the time of must reducing the cement material powder fusing.As a result, the particle that forms in the granulation stove has trended towards too small and uneven size, so only there is the granulation of low speed to take place.The temperature that improves spouted bed just can increase liquid generation.But in this known equipment, the temperature of spouted bed evenly increases, and owing to (particle) agglomeration in the spouted bed, trends towards damaging the stability of spouted bed.
Therefore, one object of the present invention is to propose a kind of equipment, can produce the cement clinker of even macrobead size rapidly and stably.
For this reason, one aspect of the present invention proposes a kind of apparatus for manufacturing cements clinker, comprising: the suspended solid preheater of a preheating cement material powder; Spray bed furnace with preheating cement material powder granulation; One with granulating cement raw material agglomerating fluidized bed type stove; The cooling system of a cooling granulation products of combustion; Be placed on the some burners in spray bed furnace bottom, opposite one another, their end be inclined upwardly, thereby form a local hot spots in the spouted bed; A preheated material feed chute is placed a little more than local hot spots, is used for the preheating material powder with suspended solid preheater, the spray bed furnace of packing into; Side in local hot spots is provided with the granulated material drain tank.
Adopt this arrangement, because in the spouted bed of spouted bed type granulation stove, form a local hot spots, thereby can stablize and produce the cement clinker that size is generally 2 to 3mm big single-size effectively.In addition, also can reduce the power consumption of grinding grog.And because the particle size of cement clinker is even, the heat recovery efficiency of cooling system significantly improves, and the fuel consumption of equipment has substantial degradation.
Another aspect of the present invention has proposed a kind of producing apparatus of cement clinker, comprising: the suspended substance preheating oven of a preheating cement material powder; Spray bed furnace with preheating cement material powder granulation; One with granulation cement material powder agglomerating fluidized bed type stove; The cooling system of a cooling granulation products of combustion; A blast tube is placed in the spouted bed of spray bed furnace, makes between blast tube and the spray bed furnace bottom and forms a gap; Burner apparatus be placed on blast tube below, in order to cooperating, actively form a local hot spots in the blast tube with blast tube, particle is sent into blast tube by the gap; A preheated material charge chute is placed a little more than local hot spots, is used for the preheating material powder with suspended solid preheater, the spray bed furnace of packing into; Side in local hot spots is provided with the granulated materials drain tank.
According to this arrangement, will enter the own combustion gas body of spray bed furnace, introduce the top of stove by blast tube.Burnt gas is followed by fuel fluidized particles and cement material powder, and fuel is burnt in blast tube, form local hot spots, thereby cement material powder sticks on the fluidized particles surface, promotes the granulating of cement material powder.Simultaneously, the outer fluidized particles of blast tube is by cement material, the particle of swirler recirculation, and thermal radiation cooling.In addition, burnt gas never flows to the conical bottom of spray bed furnace, so the particle of furnace bottom is not heated.This has reduced the clinging power between the particle again, just can suppress any reunion tendency and the deposition of particle on the wall table in the stove circular cone bottom.
According to a third aspect of the present invention, a kind of apparatus for manufacturing cements clinker has been proposed, comprising: a suspended substance preheating oven with the cement material powder preheating; One with preheating water mud material powder particleization and sintering, at the granulation sintering oven of spouted bed; Some burners that are placed on this spray bed furnace bottom are used for forming a local hot spots at spouted bed; A feed chute is placed a little more than local hot spots, is used for the preheating material powder of suspended solid preheater is loaded (going into spray bed furnace); A discharge groove is arranged in a side of local hot spots, is used to discharge the cement raw material of granulation at least.
Owing to cancelled the fluidized bed type stove, this arrangement can reduce the cost of cement clinker production unit.
Above-mentioned advantage with other of the present invention, just can clearly be understood with reference to the narration of accompanying drawing do about desirable embodiment from hereinafter.Yet should be noted that the form and the arrangement method of each building block in the above-mentioned embodiment, for illustrative purposes only, except that mentioning especially, and the intention of the unrestricted scope of the invention.
Fig. 1 is the local section side-looking of apparatus for manufacturing cements clinker first embodiment of the present invention;
Fig. 2 is the amplification profile side-looking of spouted bed type granulation stove one example of Fig. 1 embodiment employing;
Fig. 3 is analysing and observe along III among Fig. 2-III line;
Fig. 4 A is the cement clinker production unit second embodiment local section side-looking of the present invention;
Fig. 4 B is the amplification profile side-looking of a kind of modified version of the second embodiment fluidized calcining stove;
Fig. 5 is cement clinker production unit the 3rd embodiment local section side-looking of the present invention;
Fig. 6 is the spouted bed type granulation stove amplification profile side-looking that embodiment shown in Figure 5 adopts, and shows the arrangement around the granulation stove;
Fig. 7,8 and 10 is in the 3rd embodiment, the amplification profile side-view of spouted bed type granulation stove and peripheral part modified version thereof;
Fig. 9 is analysing and observe along IX among Fig. 8-IX line;
Figure 11 is cement clinker production unit the 4th of the present invention and the 5th embodiment local section side-looking, and the 4th embodiment is represented with solid line among the figure, the 5th embodiment be added in part on the 4th embodiment, represent with long and short dash line;
Figure 12 is the amplification profile side-looking of a kind of modified version of cement clinker production unit the 6th embodiment of the present invention;
Figure 13 is used for cement clinker production unit the 7th embodiment of the present invention, the amplification profile side-looking of spray bed furnace peripheral part;
Figure 14 is analysing and observe along X IX-X IX line among Figure 13;
Figure 15 is the amplification profile side-looking of a kind of modified version of embodiment shown in Figure 13;
Figure 16 is analysing and observe along X VI-X VI line among Figure 15;
Figure 17 and 18 is respectively explanation and crosses signal and the graphic representation that the bed height degree of a body and pressure concern between falling.
First embodiment;
Referring to Fig. 1 to 3, cement material powder is having swirler 6a, and 6b is in the suspended solid preheater 6 of 6c and 6d, with the heating by the exhaust gases in spouted bed type granulation stove 2 and the fluidized bed type sintering oven 4.Cement material powder passes through successive swirler 6d, 6c, and 6b and 6a carry successively, by a dual-active door speed reduction unit 8, infeed granulation in stove 2 to spouted bed type granulation stove 2.In these figure, the number of marking on a map 10 expression valve speed reduction units, number 12 indication suction fans.
The cement material powder that does not have granulation in spray bed furnace 2, by swirler 6a, to 2 recirculation of spouted bed type granulation stove.Rest on the particle in the spouted bed type granulation stove; after in stove, increasing; by a L shaped gas-tight seal device (hereinafter being called the L valve); drain in the fluidized bed type sintering oven 4; the L valve utilizes particulate material to make material seal (material seal); thereby in the latter, under the temperature between 1400 ℃ to 1500 ℃, burn.Such incendiary cement clinker is discharged, for example discharge, put into the cooling system such as the fluidized bed type water cooler, make it cooling, make the finished product then and take out by L valve 16.
On the other hand, send into cooling air in the cooling system and the grog after the burning carries out heat exchange,, make combustion air and supply with fluid bed furnace 4 by grog heating with forced draft machine 22.Excess air in the cooling system 18 is passed through particle collector not shown in the figures and is discharged.
Burnt gas in the fluidized bed type sintering oven 4 is used for fuel combustion, and fuel is supplied with by a burner that is placed in spouted bed type granulation stove 2 bottoms, and the gas that burning produces is discharged from the top of spouted bed type granulation stove 2 as waste gas.With the continuous cyclone device 6a of this waste gas from suspended solid preheater 6,6b passes through among 6c and the 6d, makes the cement material powder preheating, discharges to atmosphere by (figure does not show) particle collector with vacuum fan 12 then.The bottom of the top of fluidized bed type sintering oven 4 and spouted bed type granulation stove connects by waste gas duct 24.
From Fig. 2 and 3 as seen, spouted bed type granulation stove 2 has a straight barrel-shaped part 26 and a tapered segment 28, is provided with waste gas and discharges conduit 30 on its top end part, and there is trunnion portion 32 its bottom.Trunnion portion 32 is connected with waste gas duct 24.Some burners are arranged, for example have two in the embodiment of giving an example, opposed in the joint near zone of the conical end 28 of spouted bed type granulation stove 2 and trunnion portion 32, the sloped-end that makes two burners upwards.Under this arrangement, can be in spouted bed 36, on the position of burner 34 tops, form a local hot spots 38, the temperature of local hot spots 38 is generally high approximately 100 to 150 ℃ than the zone around the spouted bed.Preheated material inlet channel 40, a little more than the joint of tapered segment 28 and straight barrel section 26, particle drain tank 42 is a little less than the joint location of conus portion 28 and straight bucket portion 26.
Under this arranges, suitably select the speed of gas in the trunnion portion, the bed temperature of spouted bed 36 is just reducible to be reached between 1300 ℃ 1400 ℃, and the high temperature that causes in local hot spots 38 is between 1400 ℃-1550 ℃.When in this local hot spots that preheating cement powdered material is packed into, powdered material melts rapidly, suspends when stagnating, by burning from granulation in spouted bed 36.Be appreciated that and in spouted bed 36, supply with any particulate grog and carry out granulation.Can also remove fluidized bed type sintering oven 4 from, as the situation in the 4th embodiment that hereinafter will explain orally.
The cement material particle that forms is like this discharged by particle drain tank 42, infeed fluidized bed type sintering oven 4.
Second embodiment:
Fig. 4 is second embodiment of cement clinker production unit of the present invention.As seen, the fluidized-bed 44 in the fluidized bed type sintering oven 4 is partitioned into a little fluidized-bed 48 and a big fluidized-bed 50 with dividing plate 46 from this figure.Fenestra case 52 in this stove is also separated with a dividing plate 54, and this partition position and aforementioned barriers 46 align.
During running, particle under 1400-1500 ℃ temperature of combustion, becomes cement clinker in the big fluidized-bed 50 of fluidized bed sintering stove 4.Flow through from dividing plate 46 through the cement clinker grog that burns like this, enter little fluidized-bed 48.
Little fluidized-bed cavity temperature keeps below the sintering temperature (bed temperature) of big fluidized-bed 50.So little fluidized-bed temperature is for example between 1200-1000 ℃.As a result, incendiary cement clinker in big fluidized-bed 50, the instant is cooled to the bed temperature of little fluidized-bed 48.Therefore, be cooled to about 1200 ℃ from about 1350 ℃ rapidly, become high-quality cement clinker through the incendiary grog.Rapid refrigerative cement clinker by keeping cement clinker and the isolated L valve 16 of ambient air, enters cooling system 18 in little fluidized-bed 48.So cement clinker is further cooling in cooling system.
Do not increase fuel consumption for cooling off cement clinker rapidly, preferably increase a kind of arrangement.This arranges shown in Fig. 4 B 55, two differential pressure gauge 56A of an arithmetical unit are arranged, 56B, and the pressure of measuring respectively by little fluidized-bed 48 and big fluidized-bed 50 falls, and an air pulse syringe is arranged, and for example valve 57, injection air pulse in L valve 16.Arithmetical unit 55 is connected with differential pressure gauge 56a and 56b.Arithmetical unit 55 also is connected with air pulse syringe 57, handles L valve 16.Syringe 57 injection air pulses blow out the cement clinker in the L valve 16, make the cement clinker discharge of 48 li of little fluidized-beds.According to this arrangement, air pulse syringe 57 falls the pressure by little fluidized-bed 48 according to the signal injection air pulse of arithmetical unit 55, forever falls less than the pressure by big fluidized-bed 50.Therefore, cement clinker can cool off rapidly and not increase fuel consumption.
High-quality stable for guaranteeing cement clinker, preferably increase another kind of the arrangement.This arranges also shown in the 4B 58, one thermometers 59 of an arithmetical unit are arranged, the motor 61 that is connected with arithmetical unit 59, and the aperture of regulating speed reduction unit 63 has a fuel valve 65 to regulate the fuel of supplying with little fluidized-bed 48.In the gas circuit between forced air supply machine 22 and sintering oven 4 speed reduction unit 63 is set.When the temperature of little fluidized-bed 48 was higher than preset temperature, motor 61 was open with speed reduction unit 63, increases the fluidization air from forced air supply machine 22.On the contrary, when the temperature of little fluidized-bed 48 is lower than pre-timing, motor 61 reduces the aperture of speed reduction unit 63, and/or increase the aperture of fuel valves 65 by arithmetical unit 58.According to this arrangement, the cooling situation of little fluidized-bed 48 becomes constant, thereby the quality of cement clinker can be stablized.
If not to the fluidized-bed fueling, the bed temperature of little fluidized-bed 48 be decided by heat the burning cement clinker feed speed and supply with the speed of fluidization airs to little fluidized-bed 48.Therefore, because when the output of the cement clinker that must reduce the unit time was disturbed in running, the bed temperature of little fluidized-bed 48 descended, gas flow rate is reduced, thereby the flowability of little fluidized-bed 48 is weakened, the cooling of cement clinker as a result and hindered to the conveying of L valve 16.For avoiding occurring this situation, be advisable to supply with burning in a small amount to little fluidized-bed 48, keep the height of little fluidized-bed 48 temperature, be enough to make gas flow rate can make little fluidized-bed 48 have enough fluidizations to get final product.Therefore, to little fluidized-bed 48 fuelings, but the high quality of the steady running of assurance device and cement clinker.
The 3rd embodiment:
Referring to Fig. 5 and 6; the blast tube 62 that a form is arranged is short pipe fitting is placed in the spouted bed 36 of spouted bed type granulation stove 2; the upper end of blast tube 62 is slightly to the projection of the top of spouted bed 36; between the conus portion 28 on blast tube 62 lower ends and spouted bed type granulation stove 2 bottoms, there is a little gap 64 to form.Blast tube 62 must not reach the top of spouted bed 36 upper surfaces, and can cancel at all.There is a burner 34 to be arranged near the trunnion portion 28, below blast tube 62, forms a local hot spots reliably.Preferably burner apparatus 34 is made up of some burners, they opposite one another, the end is inclined upwardly.
Cement material is by a charge chute 66 and/or 68, in the spouted bed type of packing into the granulation stove.Arrangement is: when using charge chute 66, charging is fallen near the zone, blast tube 62 upper ends.This arrangement effectively reduces fritting particulate temperature, eliminates any deposition of particulate.
Fig. 7 shows a kind of modification, and its blast tube 62 usefulness supporting members 70 and 72 are fixed.
Fig. 8 and 9 shows another modification, and its cooling air is introduced near the zone, blast tube 62 upper ends.Particularly, in this modification, conduit 74 is also made supporting member usefulness, is connected with the upper end of blast tube 62, has a cooling air pipe 76 to be connected with these conduits 74, supplies with cooling air or ambient air that water cooler is discharged.
Figure 10 shows another kind of modification, by supplying water or air near the chuck 78 2 times conus portions of spouted bed type granulation stove 28, realizes cooling indirectly.Suitable combination has been done in arrangement among Fig. 5 to 10, constituted device by the 3rd embodiment of the present invention.
The running of third party's case is as follows.With the burnt gas in the fluidized bed type sintering oven 4, under high speed,, introduce spouted bed type granulation stove 2 by the trunnion 32 on spouted bed type granulation stove 2 lower ends, at a high speed so-called, for example between 30 to 50 meters/per second.Then gas is passed through blast tube 62, introduce in the upper space in the stove 2.Gas and fuel, fluidized particles and cement material powder are introduced by the import of blast tube 62 jointly.Fuel burns in blast tube 62 as a result, form local hot spots, and cement material powder adheres on the surface of fluidized particles, promotes the granulation of cement clinker.Simultaneously, the particle that blast tube is outer is by the particle and the thermal radiation cooling of cement material, swirler recirculation.These particulate can overheatedly not be because burnt gas never enters conus portion 28.As a result, what act between particle is loss of adhesion, takes a step forward than above-mentioned first embodiment, guarantees to eliminate the agglomeration in the conus portion 28.Simultaneously, based on same reason, eliminated particle adhering at the wall table.
The 4th embodiment:
Can understand from Figure 11, the 4th embodiment of the present invention has been cancelled the fluidized bed type sintering oven 4 in first embodiment shown in Figure 1.Particularly; referring to Figure 11; in spray bed furnace 80, stagnate the also granulation products of combustion of granulation; owing to utilize the effect of the L valve 14 of granulation products of combustion constituent material sealing; discharge by drain tank 82, drain tank 82 is connected on the conus portion 28 and barrel-shaped 26 joint position slightly on the lower side of spray bed furnace 80.Then product is delivered in the cooling system 84 such as fluidized bed cooler or pulldown bed (moving bed) water cooler, inside cooling.
The 5th embodiment:
The 5th embodiment of the present invention has a cement material feed chute 86 as shown in figure 11, is connected with the top of spray bed furnace 80, is used for loading at least a part of cement material powder.The method of attachment of cement material feed chute 86 is that the preheating cement material powder among the swirler 6b is feeded by groove.The cement material powder that loads by groove 86 can effectively reduce fritting particulate temperature, thereby prevents that particle from adhering on the inwall table on spray bed furnace 80 tops.In addition because the decarburization in the space on spray bed furnace 80 of preheating cement material powder, even with cement material powder by preheated material feed chute 40 local hot spots 38 of packing into, still may keep the high temperature that requires in the local hot spots 38.As a result, just may obtain high granulation and sintering velocity, and guarantee the uniform-dimension of granulation and products of combustion.
The 6th embodiment:
The 6th embodiment is basic identical with the 4th embodiment, difference have following some.Referring to Figure 12, the 4th embodiment has a chuck 88, around the upper inlet of granulation products of combustion drain tank 82.Some holes 90 are arranged, form on groove 82 parts in chuck 88, chuck 88 is connected with cooling air inlet tube 92, thereby cooling air is sent into groove 82 by hole 90.Cooling air inlet tube 92 is established speed reduction unit 94, is driven under computer 98 controls by motor 96.Computer 98 accepts to detect the signal of cooled cement clinker thermometer 100.Computer 98 is with this signal reaction, control motor 96, thereby the flow velocity of speed reduction unit 94 controlled chilling air make the cement clinker after the burning be cooled to 1200 ℃ from 1350 ℃ rapidly, with the high quality of assurance product, and guarantee that the temperature of cooled cement clinker is no more than 1200 ℃.Cooling air inlet tube 92 can be from the export pipeline upper bifurcation of forced air supply machine 22, as shown in figure 11.
The 7th embodiment:
The 7th embodiment of the present invention is the improvement of spray bed furnace conus portion in above-mentioned first to six embodiment basically.
Referring to Figure 13 and 14, the bottom of spray bed furnace 102, bifurcated becomes some circular cones, three circular cone 28a for example, 28b and 28c respectively have a maximum value footpath less than the stove footpath, that is less than barrel-shaped 26 diameter.Establish some burners 34 on the bottom of each circular cone.In the illustrated example, two burners 34 are established in every taper.The preheating material powder of swirler 6a, by feed chute 104a separately, 104b and 104c, circular cone 28a, 28b and 28c pack into.
Figure 15 and 16 shows an example, realizes by the spray bed furnace tapered segment that the 7th embodiment is applied in grog device the 3rd embodiment of the present invention.The installation of the short pipe fitting form blast tube 62 in this example and fixing makes the corresponding circular cone 28a of its lower end and spouted bed type granulation stove 102 bottoms, between 28b and the 28c, and gapped formation.There is burner 34 to be arranged on the bottom of each blast tube 62.
Generally speaking, the diameter that spouted bed type granulation stove diameter D(is barrel-shaped 26) increase is whenever arranged, the height " h " of bed body shown in Figure 17 is also increased.The furnace pressure loss, just the pressure by the bed body falls and the height " h " of bed is directly proportional.Therefore, when stove footpath D increased, the pressure that crosses siege that shows among Figure 18 fell P and also increases.The increase that P falls in pressure causes the increase of power consumption, therefore, preferably should avoid.In this respect, the 7th embodiment can be noticed,, but, the tendency that increases of pressure loss can be suppressed because the maximum value of conus portion directly reduces even when spray bed furnace is very big.In addition and common arrangement relatively because the total height of spouted bed type granulation stove lowers, the total cost of equipment reduces.

Claims (22)

1, the equipment of manufacturing cement clinker has characteristics as follows:
A suspended solid preheater preheating cement material powder;
Granulation and agglomerating plant are provided with spouted bed, with preheating cement material powder granulation and sintering;
A kind of burner forms local hot spots in spouted bed;
A charge chute is placed a little more than local hot spots, is used to load the preheating cement material powder that suspended solid preheater is supplied with;
A discharge groove is arranged in a side of local hot spots, is used to discharge the cement raw material of granulation at least.
2, the equipment of manufacturing cement clinker has characteristics as follows:
A suspended solid preheater preheating cement material powder;
A spray bed furnace is with preheating cement material powder granulation;
A fluidized bed type stove is with granulation cement material powder sintering;
A cooling system cooling granulation products of combustion;
The some burners that are placed on the spray bed furnace bottom opposite one another, and the end is inclined upwardly, and forms the local hot spots of spraying in the stove;
A preheated material charge chute is arranged a little more than local hot spots, is used for the preheating material powder with the suspended solid preheater supply, infeeds spray bed furnace;
A granulated materials drain tank is arranged on a side of local hot spots.
3, as the apparatus for manufacturing cements clinker of claim 2, it is characterized by the bottom of spray bed furnace, bifurcated is some circular cones.
4, as the apparatus for manufacturing cements clinker in the claim 2, it is characterized by the bottom of spray bed furnace, be branched into some circular cones, in the bottom of each circular cone burner is set.
5, as the apparatus for manufacturing cements clinker in the claim 2, it is characterized by the fluidized bed type stove has a dividing plate, and fluidized-bed is divided into a little fluidized-bed and a big fluidized-bed, and the cement material after the burning is crossed dividing plate, enters little fluidized-bed.
6, as the apparatus for manufacturing cements clinker in the claim 5, it is characterized by the fluidized bed type stove and also have device, keep the differential pressure of little fluidized-bed 48 to be lower than differential pressure in the big fluidized-bed.
7, as the apparatus for manufacturing cements clinker in the claim 5, it is characterized by the fluidized bed type stove and also have device, fuel is done controllable supply to little fluidized-bed.
8, as the apparatus for manufacturing cements clinker in the claim 5, it is characterized by the fluidized bed type stove device is also arranged in addition, when the temperature of little fluidized-bed is higher than the preset temperature of little fluidized-bed, the fluidization air that increase is supplied with to little fluidized-bed, when the temperature of little fluidized-bed is lower than preset temperature, the fluidization air that minimizing is supplied with to little fluidized-bed, and/or increase the fuel quantity of supplying with to little fluidized-bed.
9, a kind of equipment of making cement clinker, it has feature as follows:
A suspended solid preheater preheating cement material powder;
Spray bed furnace is with the cement material powder granulation of preheating;
Fluidized bed type stove is with the cement material powder sintering of granulation;
A cooling system cools off the product after granulation and the burning;
A blast tube is placed in the spouted bed of spray bed furnace, makes between blast tube and the spray bed furnace bottom and forms a gap;
Combustion unit be placed on blast tube below and blast tube cooperate a local hot spots that forms reliably in the blast tube, particle is sent into blast tube by the gap;
A preheated material charge chute arranges that a little more than local hot spots the preheating material powder with suspended solid preheater is supplied with infeeds spray bed furnace;
A granulated materials drain tank is arranged on a side of local hot spots.
10, as the apparatus for manufacturing cements clinker in the claim 9, it is characterized by the bottom of spray bed furnace, be branched into some circular cones.
11, as the apparatus for manufacturing cements clinker in the claim 9, it is characterized by the bottom of spray bed furnace, be branched into some circular cones, in the bottom of each circular cone burner is set.
12, as the apparatus for manufacturing cements clinker in the claim 9, it is characterized by has a dividing plate in the fluidized bed type stove, a fluidized-bed is divided into a little fluidized-bed and a big fluidized-bed, and the cement material after the burning is crossed dividing plate, enters little fluidized-bed.
13, as the apparatus for manufacturing cements clinker in the claim 12, it is characterized by also has device in addition in the fluidized bed type stove, keep the differential pressure of little fluidized-bed 48, is lower than the differential pressure of big fluidized-bed.
14, as the apparatus for manufacturing cements clinker in the claim 12, it is characterized by the fluidized bed type stove also has device in addition, does controllable fuel feed to little fluidized-bed.
15, as the apparatus for manufacturing cements clinker in the claim 12, it is characterized by the fluidized bed type stove device is also arranged in addition, when the temperature of little fluidized-bed is higher than the preset temperature of little fluidized-bed, the fluidization air that increase is supplied with to little fluidized-bed, when the temperature of little fluidized-bed is lower than the preset temperature of little fluidized-bed, the fluidization air that minimizing is supplied with to little fluidized-bed, and/or increase the fuel quantity of supplying with to little fluidized-bed.
16, the equipment of manufacturing cement clinker has feature as follows:
The suspended solid preheater of a preheating cement material powder;
A spray bed furnace that is connected with suspended solid preheater is with preheating cement material powder granulation and sintering;
The cooling system of a cooling granulation and the after product that burns;
Some burners that are placed on the spray bed furnace bottom form the local hot spots in the spray bed furnace spouted bed;
Preheated material charge chute a little more than the local hot spots placement, the preheating material powder that suspended solid preheater is supplied with infeeds to spray bed furnace;
A drain tank is arranged on a side of local hot spots, the product after discharging granulation and burning.
17, as the apparatus for manufacturing cements clinker in the claim 16, it is characterized by has a cement material charge chute in addition, is connected with the top of spray bed furnace, is used for supplying with a part of cement material powder to spray bed furnace at least.
18, as the apparatus for manufacturing cements clinker in the claim 16, it is characterized by has a cooling air inlet tube in addition, and a near part with drain tank is connected.
19, as the apparatus for manufacturing cements clinker in the claim 18, it is characterized by the cooling air inlet tube and introduce cooling air, gas velocity is controlled, keeps cooled cement clinker temperature to be lower than predetermined temperature level.
20, as the apparatus for manufacturing cements clinker in the claim 16; it is characterized by a blast tube is arranged in addition; be placed in the spouted bed of spray bed furnace; make between the bottom of the lower end of blast tube and spouted bed type granulation stove and form a gap; in blast tube, form a local hot spots reliably, and simultaneously particle is sent into blast tube by the gap.
21, as the apparatus for manufacturing cements clinker in the claim 16, it is characterized by the bottom of spray bed furnace, be branched into some circular cones.
22, as the apparatus for manufacturing cements clinker in the claim 16, it is characterized by the bottom of spraying pool furnace, be branched into some circular cones, burner is arranged on the bottom of each circular cone.
CN87102572A 1986-04-01 1987-03-31 Apparatus for manufacturing cements clinker Expired CN1015422B (en)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
JP61075131A JPS62230657A (en) 1986-04-01 1986-04-01 Plant for manufacturing cement clinker
JP75131/86 1986-04-01
JP204302/86 1986-08-29
JP20430286A JPH0676239B2 (en) 1986-08-29 1986-08-29 Granulation method with spouted bed
JP61279468A JPS63134540A (en) 1986-11-21 1986-11-21 Facilities for manufacturing cement clinker
JP279468/86 1986-11-21

Publications (2)

Publication Number Publication Date
CN87102572A true CN87102572A (en) 1987-10-14
CN1015422B CN1015422B (en) 1992-02-12

Family

ID=27301714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN87102572A Expired CN1015422B (en) 1986-04-01 1987-03-31 Apparatus for manufacturing cements clinker

Country Status (10)

Country Link
US (1) US4877397A (en)
EP (1) EP0240304B2 (en)
KR (1) KR900000364B1 (en)
CN (1) CN1015422B (en)
BR (1) BR8701464A (en)
CA (1) CA1285761C (en)
DE (1) DE3771247D1 (en)
DK (1) DK169781B1 (en)
ES (1) ES2022338T5 (en)
IN (1) IN166844B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2227301A (en) * 1989-01-18 1990-07-25 Smidth & Co As F L Method and apparatus for producing cement clinker
DE4219697A1 (en) * 1992-06-16 1993-12-23 Krupp Polysius Ag Process for the production of cement clinker
DE69330940T2 (en) * 1992-12-28 2002-06-20 Kawasaki Heavy Ind Ltd Apparatus for the production of cement clinker
US5944513A (en) * 1992-12-28 1999-08-31 Kawasaki Jukogyo Kabushiki Kaisha Apparatus for manufacturing cement clinker
TW332857B (en) * 1993-02-26 1998-06-01 Kawasaki Heavy Ind Ltd Cement clinker
US5325797A (en) * 1993-08-18 1994-07-05 The United States Of America As Represented By The United States Department Of Energy Staged fluidized-bed combustion and filter system
US5788482A (en) * 1994-09-08 1998-08-04 Kawasaki Jukogyo Kabushiki Kaisha Sintering method of cement clinkers and sintering apparatus of the same
JP2618836B2 (en) * 1994-09-08 1997-06-11 川崎重工業株式会社 Method and apparatus for firing cement clinker
SE9403268L (en) * 1994-09-29 1996-03-30 Abb Carbon Ab Method and apparatus for feeding fuel to a fluidized bed
CH689633A5 (en) * 1995-01-10 1999-07-30 Von Roll Umwelttechnik Ag Process for cooling and cleaning of flue gases.
DK173203B1 (en) * 1996-02-02 2000-03-13 Smidth & Co As F L Method and apparatus for continuous processing of particulate matter
DE102009041089C5 (en) * 2009-09-10 2013-06-27 Khd Humboldt Wedag Gmbh Process and plant for the production of cement with reduced CO2 emission
EP3081889B1 (en) * 2009-11-16 2018-09-26 Mitsubishi Materials Corporation Mixing calciner
JP6393981B2 (en) * 2012-12-26 2018-09-26 三菱マテリアル株式会社 Fluid calciner
US10654009B1 (en) 2018-02-27 2020-05-19 Mainstream Engineering Corporation Spouted bed with venturi draft tube and method for improved gas-solid contacting
CN117795279A (en) * 2021-08-16 2024-03-29 Fl史密斯公司 Apparatus and method for providing reduced cementitious material

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB852573A (en) * 1956-11-08 1960-10-26 Robert Pyzel Improvements in cement manufacture
US3397657A (en) * 1965-11-01 1968-08-20 Tada Mitsuru Apparatus for continuously burning wastes
US3731398A (en) * 1971-05-10 1973-05-08 L Niems Apparatus for cooling particles
DD104720A1 (en) * 1972-10-03 1974-03-20
DE2533010A1 (en) * 1974-07-26 1976-02-05 Commw Scient Ind Res Org REACTOR WITH A SPOUT BED OR SPOUT BED FLUIDATE BED
US3970011A (en) * 1975-02-04 1976-07-20 Fluidfire Development Limited Combustion with fluidizable bed
GB1577717A (en) * 1976-03-12 1980-10-29 Mitchell D A Thermal reactors incorporating fluidised beds
US4177742A (en) * 1978-04-05 1979-12-11 Babcock-Hitachi Kabushiki Kaisha Incinerator for burning waste and a method of utilizing same
JPS6119307Y2 (en) * 1978-05-12 1986-06-11
ZA801294B (en) * 1979-03-14 1981-10-28 British Petroleum Co Fluidised bed combustor
SE437722B (en) * 1980-10-22 1985-03-11 Stal Laval Turbin Ab VIRVELBEDDSBRENNKAMMARE
JPS57156349A (en) * 1981-03-17 1982-09-27 Kawasaki Heavy Ind Ltd Burning method and device for cement clinker or like
US4480392A (en) * 1982-01-18 1984-11-06 Ingersoll-Rand Company Conduction dryer for flaked or fluffed material
CA1225292A (en) * 1982-03-15 1987-08-11 Lars A. Stromberg Fast fluidized bed boiler and a method of controlling such a boiler
US4506608A (en) * 1983-01-07 1985-03-26 Electrodyne Research Corp. Unfired drying and sorting apparatus for preparation of solid fuel and other solid material
JPS60637A (en) * 1983-06-16 1985-01-05 Hitachi Ltd Optomagnetic recording medium
JPS60636A (en) * 1983-06-16 1985-01-05 Victor Co Of Japan Ltd Recording medium
JPS601548A (en) * 1983-06-17 1985-01-07 Toshiba Corp Ion selective electrode
FI79403C (en) * 1984-06-01 1989-12-11 Ahlstroem Oy FOERBRAENNINGSMETOD.
JPS60264350A (en) * 1984-06-11 1985-12-27 秩父セメント株式会社 Manufacture and facilities for white cement clinker
FR2567234B1 (en) * 1984-07-04 1986-12-12 Charbonnages De France VALVE FOR PNEUMATIC DISTRIBUTION OF FLUIDIZABLE MATERIAL
US4693682A (en) * 1986-05-12 1987-09-15 Institute Of Gas Technology Treatment of solids in fluidized bed burner
JPH0613738A (en) * 1992-06-24 1994-01-21 Nippondenso Co Ltd Printed-circuit board

Also Published As

Publication number Publication date
US4877397A (en) 1989-10-31
EP0240304A3 (en) 1988-11-30
BR8701464A (en) 1988-01-19
ES2022338T5 (en) 1999-04-01
KR880006141A (en) 1988-07-21
DK169781B1 (en) 1995-02-27
KR900000364B1 (en) 1990-01-25
EP0240304B2 (en) 1999-01-07
EP0240304B1 (en) 1991-07-10
ES2022338B3 (en) 1991-12-01
IN166844B (en) 1990-07-28
CA1285761C (en) 1991-07-09
DK162787D0 (en) 1987-03-31
DE3771247D1 (en) 1991-08-14
DK162787A (en) 1987-10-02
CN1015422B (en) 1992-02-12
EP0240304A2 (en) 1987-10-07

Similar Documents

Publication Publication Date Title
CN1015422B (en) Apparatus for manufacturing cements clinker
CN103304157B (en) Energy-conservation and emission-reduction type active lime calcination method and apparatus
US3869248A (en) Apparatus for burning materials of cement and the like
US4266931A (en) Apparatus and method of heating particulate material
US3926651A (en) Method and apparatus for use in firing raw material for cement
CN102336510B (en) Flue gas latent energy recovery method in glass smelting kiln
US3940241A (en) Rotary kiln plant
CN100414234C (en) Method for incineration of material contg. carbon
JPS5813827B2 (en) Kanetsu Sochi
CN1049298A (en) The method and apparatus of heating and processing granular materials
US4265710A (en) Process for calcining coke
KR930011376B1 (en) Apparatus for preheating granular material
CN105330179B (en) Box burner shaft furnace
CN87102197A (en) The novel process of fechnology for direct conversion of blast furnace melting slag into cement clinker
CN1017082B (en) Novel vertical kiln
US4340359A (en) Apparatus and method of heating particulate material
RU2165985C1 (en) Apparatus for charging of recovery iron-ore fines directly into melting gasificator
JP3280256B2 (en) Artificial aggregate manufacturing equipment
CN1073212A (en) Entirely flow continuous steelmaking and iron-smelting method and equipment
CN210906057U (en) Environmental protection and energy saving recarburizer granulation system
JPH031256B2 (en)
SU968564A1 (en) Unit for roasting polydispersed materials
JPH01121617A (en) Incinerator for industrial wastes
KR930001006B1 (en) Fluidized bed furnace for powder ore
CN110639430A (en) Recarburizer granulating system for comprehensively utilizing fine powder of calcined coal furnace

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C13 Decision
C14 Grant of patent or utility model
C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
C19 Lapse of patent right due to non-payment of the annual fee