CN85103513A - Across pitch moves back continuously adopts the sublevel open stoping caved stopes - Google Patents

Across pitch moves back continuously adopts the sublevel open stoping caved stopes Download PDF

Info

Publication number
CN85103513A
CN85103513A CN85103513.2A CN85103513A CN85103513A CN 85103513 A CN85103513 A CN 85103513A CN 85103513 A CN85103513 A CN 85103513A CN 85103513 A CN85103513 A CN 85103513A
Authority
CN
China
Prior art keywords
mining
ore
formula
meters
flood peak
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN85103513.2A
Other languages
Chinese (zh)
Other versions
CN1007532B (en
Inventor
王昌汉
彭氏辉
周骥
彭思君
张怀孝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Kaiyang Phosphate Mine Bureau
Central South University
Original Assignee
Guizhou Kaiyang Phosphate Mine Bureau
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Kaiyang Phosphate Mine Bureau, Central South University filed Critical Guizhou Kaiyang Phosphate Mine Bureau
Priority to CN86106887A priority Critical patent/CN1007532B/en
Publication of CN85103513A publication Critical patent/CN85103513A/en
Publication of CN1007532B publication Critical patent/CN1007532B/en
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/16Connecting or disconnecting pipe couplings or joints
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/24Guiding or centralising devices for drilling rods or pipes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T279/00Chucks or sockets
    • Y10T279/17Socket type
    • Y10T279/17666Radially reciprocating jaws
    • Y10T279/17692Moving-cam actuator
    • Y10T279/17717Rotary eccentric-cam sleeve

Abstract

" flood peak " formula mining codes belong to field of mining.It is in thick thin partially, it is slow partially to tilt, a kind of combined mining method that the uneasily mining orebody of little structure development provides.The long-pending excellent method of this method utilization creative engineering, it is few to combine the barnyard dilution, and avalanche method management ground presses the wall type method to form the advantage of barnyard.Its essence is and do not stay rib, the top-bottom pillar unification, across pitch moves back continuously and adopts, a step back production of ore drawing under the shielding ore pillar.Mining technology of the present invention is simple, and depletion loss is low, good economical benefit; Personnel do not advance barnyard, and technology is reliable, and safety is good.The present invention is suitable for ferrous metal, non-ferrous metal and nonmetal mining.

Description

Across pitch moves back continuously adopts the sublevel open stoping caved stopes
The invention belongs to field of mining.
In thick inclined orebody owing to be subjected to the restriction at orebody thickness and inclination angle, the back production difficulty is big, can not utilize the gravity ore drawing, also high efficiency mining equipment is used in inconvenience, labor productivity is low, safety condition is poor.Its exploitation method at home and abroad all is a research topic.
The sixties, Soviet Union Mil Gary nurse is matched plumbous zinc ore and was tested " room-and-pillar method that electricity is taken off ore removal ", in 1983, chemical mine design and research institute of China's chemical industry portion and chaste tree assist phosphorus ore mineral bureau to propose " forming the medium-length hole room-and-pillar method of barrier pillar synchronously " jointly, and they all are two step back production, and residual ore pillar is difficult to reclaim, adopt electricity to take off ore removal, labor productivity is low, and personnel need advance barnyard, poor stability.The seventies, Zambia Mu Fulila copper mine has been tested " waterfall " formula mining codes.These mining codes also are across pitch two step back production, employings in to time to fan shaped medium length hole, the ore owing to nearly 50% is to emit under rock cover, therefore, pure ore recovery ratio is low, and this method only to be suitable for vertical thickness be ore body more than 9 meters.
The objective of the invention is in thick thin partially, it is slow partially to tilt, the ore body of minor structure growth adopts a kind of technology simple, compliance is strong; Depletion loss is low, good economical benefit; Technology is reliable, the mining methods that safety is good.
This method promptly is " across pitch moves back the sublevel open stoping avalanche method of adopting continuously ".This method is the long-pending excellent method of utilization creative engineering, and the open-stope method dilution is few, and press on avalanche method management ground, and the advantage of wall type method formation barnyard organically combines and is integral.Its essence is and do not stay rib, the top-bottom pillar unification, across pitch moves back continuously and adopts, a step back production of ore drawing under the shielding ore pillar.Owing to move back the shape scape that presents in the process of adopting as the flash flood, so be " flood peak " formula mining codes." flood peak " formula mining codes are seen accompanying drawing.
Divide three segmentations in 40 meters scopes of level interval, the segmentation height is respectively 13 meters or 14 meters.Segmentation ore removal tunnel is tunneled in ore body along the ore body base plate, joins by segmentation connecting taxiway and exploiting field People's Bank of China and ore pass, forms independently transportation system of segmentation.The rock drilling gallery that undercuts is arranged along ore body base plate contact wire in vertical high 5 meters on slice drift top.Adorn ore deposit crosscuts by chassis one side every 8 meters diggings along segmentation ore removal gallery.
Every about 66-67 rice, tunnel the inclination angle on the ore body chassis and be 50~55 ° ore removal and People's Bank of China's combined shaft, tunnel segmentation ore removal connecting taxiway to ore body from courtyard every 13-14 rice, 5 meters cutting horizontal on the segmentation connecting taxiway, from the upraise rock drilling connecting taxiway that undercuts, stride 1.2 meters high chassis rock along the ore body chassis, pick undercuts, and the gallery (4) of rock drilling unification is dug segmentation ore removal gallery (1) and arrived the stope border in ore body along the ore body chassis.By lower wall one side, be about 5.5 meters crosscut, dress ore deposit (2), bucket neck (3) every 8 meters drivings.Tunnel in ore body along the chassis to cut sth. askew from the rock drilling gallery that undercuts on the stope border and cut courtyard (6), cutting groove is to form with the fan shaped medium length hole explosion.
Stope does not stay studding, and Liu Chuigao is 5 meters an inclination foundation.When following substoping, keeps 3 meters and tiltedly thickly isolate fore-set (5) as segmentation, fore-set generally not to reclaim, collapses sneaking into of segmentation barren rock as supporting barnyard in the exploitation process with stopping, and stope structure parameter sees Table.
From the horizontal Drilling medium-length hole of the rock drilling that undercuts, its hole packed plane with move towards into 80 ° of-85 ° of angles of cut, and 70 °-85 ° the inclination fanhole(s) of leaning forward is because hole packed plane can utilize quick-fried power to reduce the loss of base plate ore towards taking over a business direction.
At place, last segmentation dress crosscut, ore deposit, contrary mining direction is arranged single face inclination fanhole(s), the vertical ore body roof and floor of its row's face.On design and cutter, during medium-length hole, pay special attention to move towards the smooth and desired physical dimension of ore pillar, with the integrality of assurance curtain wall.
Ore caving work is carried out in two steps, begins across pitch ore caving by row from cutting groove, and the ore under collapsing falls into the moat ditch, and this part ore amount accounts for 65%; Secondly, when bottom ore caving work plane
Stope structure parameter table (unit: rice)
Figure 85103513_IMG1
After advancing about 8 meters, big gun hole in avalanche top utilizes quick-fried power that ore is thrown into the moat ditch immediately.This part ore amount accounts for 20%.
Broken ore is fallen the ore in the moat ditch, drops down onto dress crosscut, ore deposit by funnel, is transported into courtyard through the scraper shovel, selects for use suitable equipment to be transported to the face of land then.
Freshly distinguished and admirablely enter the slice drift and the rock drilling gallery that undercuts by courtyard, useless wind turns to vent (-escape) raise to discharge the face of land through mineral building from the top slice drift, and work plane remains and runs through distinguished and admirable, does not have the trouble of dirty wind polyphone.
" flood peak " formula mining codes key parameter is determined by following two design formulas:
The spacing of a, drawhole
l=B+ (2h)/(tgφ)
In the formula: the spacing of l-drawhole
The width of B-drawhole
H-measures the height dimension of level to the stope drift active workings base plate
φ-ore drawing angle of repose
The length of b, interim curtain wall
l′= (h)/(tgα) +e
In the formula: the length of l '-interim curtain wall
H-stope slant height
α-the angle of fall, equivalent shop
The e-lime stone pours in the length in the stope
" flood peak " formula mining codes adopt principle:
When the slanting angle of ore body 〉=40 °, and orebody thickness is 5.5~6.5 meters a little structure development, available such scheme, when the slanting angle of ore body<40 °, orebody thickness is 5.5~6.5 meters, and top board is more firm, then but across pitch is generally 16 meters distance layout courtyard, make full use of quick-fried power, height of lift is strengthened better effects if.
The present invention compares with " waterfall " formula mining codes, and it is thick thin partially to it is characterized in that being used for exploitation, and slow partially uneasily mining orebody tilts.In-vein preparatory work, permanent fore-set is stayed in top-bottom pillar unification, the single step back production, in the employing to fan shaped medium length hole.85% ± 10 ore is emitted pure ore recovery ratio height under the barnyard of isolating under the fore-set protection.
Embodiment: thick thin partially in the many genus of Chinese Kaiyang phosphorus ore, it is slow partially to tilt, and little structure development directly pushes up unsteady rich phosphorus deposit, and the exploitation difficulty is big.In design, construction and the production of recent two decades, carried out four larger ortho-tests with regard to eight kinds of mining methods once, effect is all very undesirable, and operation is dangerous, and accident is frequent; Ore dilution loss is big; It is unreliable to produce, and output fluctuation is big.From one nine eight O to eight in September, 3, this ore deposit adopts " flood peak " mining codes to obtain good benefit, and loss late reduces by 10.62%, and the rate of dilution reduces by 1.6%, for ore deposit grade 31.2%, adopts T 2Average 140 ton per days of production capacity of mining field (being up to 800 ton per days) direct cost now was 8.68 yuan/ton when G transported ore deposit equipment, had obtained 39.1 ten thousand yuan of direct economic benefits, and 48.8 ten thousand yuan of economic results in society add up to total economic benefit to reach 87.9 ten thousand yuan." flood peak " formula mining codes are used over nearly 5 years at the Kaiyang phosphorus ore major casualties are not taken place, and are subjected to workman's welcome and favorable comment deeply.
The suitable ferrous metal mining of the present invention, non-ferrous metal mining and nonmetal mining.

Claims (6)

1, a kind of mining codes belong to field of mining, be to adopt two step back production, being suitable for vertical thickness is ore body more than 9 meters, the invention is characterized in and to be applied to thickly in the exploitation thinly partially tilt to delay partially, the uneasily mining orebody of little structure development does not stay rib, the top-bottom pillar unification, across pitch moves back continuously and adopts, a step back production of ore drawing under the shielding ore pillar.
2, according to claim 1 described " flood peak " formula mining codes, it is characterized in that the distance computation formula of drawhole is: l=B+ (2h)/(tg φ).
3, according to claim 1 described " flood peak " formula mining codes, it is characterized in that the length computation formula of interim curtain wall is: l '=(h)/(tg α)+e
4, according to claim 1 described " flood peak " formula mining codes, it is characterized in that being applicable to the slanting angle of ore body more than or equal to 40 °, orebody thickness is 5.5~6.5 meters a little structure development.
5, according to claim 1 described " flood peak " formula mining codes, it is characterized in that its slanting angle of ore body less than 40 °, and orebody thickness is 5.5~6.5 meters, when top board is relatively more firm, then but across pitch is generally 16 meters distance layout incline raise, and height of lift is strengthened, and makes full use of quick-fried power.
6,, it is characterized in that the suitable ferrous metal mining of the present invention, non-ferrous metal mining and nonmetal mining according to claim 1 described " flood peak " formula mining codes.
CN86106887A 1985-04-30 1985-04-30 Continuous retreating sectional open stope caving mining along the run of ore vein Expired CN1007532B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN86106887A CN1007532B (en) 1985-04-30 1985-04-30 Continuous retreating sectional open stope caving mining along the run of ore vein

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN86106887A CN1007532B (en) 1985-04-30 1985-04-30 Continuous retreating sectional open stope caving mining along the run of ore vein

Publications (2)

Publication Number Publication Date
CN85103513A true CN85103513A (en) 1986-10-29
CN1007532B CN1007532B (en) 1990-04-11

Family

ID=4793245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN86106887A Expired CN1007532B (en) 1985-04-30 1985-04-30 Continuous retreating sectional open stope caving mining along the run of ore vein

Country Status (1)

Country Link
CN (1) CN1007532B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967973B (en) * 2009-07-28 2012-10-31 鞍钢集团矿业公司 Open stope-caving combined mining method
CN106437716A (en) * 2016-09-23 2017-02-22 北京矿冶研究总院 Underground broken phosphorus ore body mining method
CN108104869A (en) * 2017-12-08 2018-06-01 北京科技大学 A kind of continuous stoping method of mining by the way of filling of gently inclined medium thick orebody
CN109139015A (en) * 2018-10-16 2019-01-04 长沙矿山研究院有限责任公司 Cut type openstope method is drawn in slitting

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967973B (en) * 2009-07-28 2012-10-31 鞍钢集团矿业公司 Open stope-caving combined mining method
CN106437716A (en) * 2016-09-23 2017-02-22 北京矿冶研究总院 Underground broken phosphorus ore body mining method
CN108104869A (en) * 2017-12-08 2018-06-01 北京科技大学 A kind of continuous stoping method of mining by the way of filling of gently inclined medium thick orebody
CN108104869B (en) * 2017-12-08 2019-05-07 北京科技大学 A kind of continuous stoping method of mining by the way of filling of gently inclined medium thick orebody
CN109139015A (en) * 2018-10-16 2019-01-04 长沙矿山研究院有限责任公司 Cut type openstope method is drawn in slitting
CN109139015B (en) * 2018-10-16 2020-06-23 长沙矿山研究院有限责任公司 Strip cutting type open stoping method

Also Published As

Publication number Publication date
CN1007532B (en) 1990-04-11

Similar Documents

Publication Publication Date Title
CN101725352B (en) Method for filling solid and fully mechanizing and recovering room type coal pillar
CN103590831B (en) A kind of gentle dip is thin-the novel mining methods of middle thickness orebody
CN1260461C (en) Continuous mining method of stepped sectional extruding and ore caving followed by filling
CN101915101B (en) Method of mining coal from heavy pitch thick coal seam
CN100554642C (en) A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining
CN105019904B (en) Mining- machine-based slowly inclined thin ore vein mechanized continuous mining method
CN108561135A (en) A kind of mechanization stoping method of the suitable unstable middle thickness orebody of low-angle dip country rock
CN101509377B (en) High-dipping ore block house column mining method
CN102635356A (en) Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN111550244B (en) Mining method for layered strips of gently inclined ore body
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN106499396B (en) Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method
CN104100270A (en) Trackless mining method for gently inclined ore vein
CN1963147A (en) Mining method
CN111042817B (en) Partition cemented prop wall-cutting filling mining method
CN106194188A (en) The quick-fried power of scraper collaborative carrying puppet tilts room and pillar stoping
CN104453900A (en) Filling mining method of near-horizontal ore body
CN201474347U (en) Sublevel mining room
CN106640080A (en) Deep part high-stress environment self-stabilizing arched stope arrangement mining method
CN113756812A (en) Method for recovering end slope pressing coal of strip mine for partition mining
CN1858401A (en) Coal mining process including prop type mining and prop recovery
CN85103513A (en) Across pitch moves back continuously adopts the sublevel open stoping caved stopes
CN106988745A (en) A kind of sublevel open stoping mining methods of narrow dipping vein
CN1008463B (en) Strip caving open stopping method and plant
CN111520142A (en) Mining method for continuous mining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C13 Decision
GR02 Examined patent application
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee