CN2923144Y - Pipe argon-arc welding argon filler - Google Patents

Pipe argon-arc welding argon filler Download PDF

Info

Publication number
CN2923144Y
CN2923144Y CN 200620021290 CN200620021290U CN2923144Y CN 2923144 Y CN2923144 Y CN 2923144Y CN 200620021290 CN200620021290 CN 200620021290 CN 200620021290 U CN200620021290 U CN 200620021290U CN 2923144 Y CN2923144 Y CN 2923144Y
Authority
CN
China
Prior art keywords
screwed
baffle
external screw
hole
argon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620021290
Other languages
Chinese (zh)
Inventor
陈卫国
赵永新
郝兴才
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Heavy Industries Co Ltd
Original Assignee
China First Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Heavy Industries Co Ltd filed Critical China First Heavy Industries Co Ltd
Priority to CN 200620021290 priority Critical patent/CN2923144Y/en
Application granted granted Critical
Publication of CN2923144Y publication Critical patent/CN2923144Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to an argon filling device for a pipe argon arc welder in the filed of gas shield welding technique consisting of a welded pipe, a plug, a grip nut, a baffle, a sealing strip, an internal screw sleeve, a hole, a duct and an external screw coupler. One end of the duct has an external screw thread screwed by a grip nut, inserted by a baffle, a sealing strip and again a baffle. The internal screw sleeve with holes is screwed into the external screw thread of the duct tightly against the baffle, the external screw coupler is screwed into the other end of the internal screw sleeve, inserted by a baffle, a sealing strip and again a baffle fastened by the grip nut. The plug is screwed into an internal hole on one end of the external external screw coupler, the hole is inflated after being in alignment with the crater, the gas comes out from the hole directly into the crater with litter scattering, thereby protecting the crater and reducing the inflating space. The workpieces is easy in alignment and the utility model is applicable for mass rotary welding of pipes with various apertures and lengths while saving gas and tool material.

Description

Tube Argon Arc Welding Argon-filling Device
Affiliated technical field
The utility model relates to a kind of Tube Argon Arc Welding Argon-filling Device, carries out argon-filled protection to managing inside specifically in the pipe gas shielded arc welding, belongs to the gas shielded arc welding technical field.
Background technology
At present; known gas shielded arc welding is to carry out gas protection welding on the welded part surface; all carry out applying argon gas in the commute oxidation tube during pipe welding; the protection effect is undesirable; the argon gas waste is serious, and especially to big caliber welding and welding in batches, not only the argon gas waste is serious; and the frock making complexity, be difficult to guarantee welding quality.
Summary of the invention
In order to overcome above-mentioned technical deficiency, the utility model provides a kind of Tube Argon Arc Welding Argon-filling Device, and this Tube Argon Arc Welding Argon-filling Device can not only weld on general plumber's part, can also be in caliber welding and welding, rotating welding greatly in batches.
The technical scheme that its technical problem that solves the utility model adopts is: it is by welded pipe, plug, binding nut, catch, diaphragm seal, the internal thread sleeve pipe, the hole, conduit, male connector is formed, one end of conduit is shaped on external screw thread, on external screw thread, be screwed into binding nut, be inserted in catch, diaphragm seal, catch, be drilled with the hole on the internal thread sleeve pipe, the internal thread sleeve pipe is screwed on the external screw thread of conduit and is close to catch, male connector is screwed into the other end of internal thread sleeve pipe, be inserted in catch successively, diaphragm seal, catch, fastening by binding nut, plug is screwed into the endoporus of male connector one end; Insert in the welded pipe combination back, after the hole aligns weld bond, and inflation, gas is gone out direct protection weld bond by the hole.
The beneficial effects of the utility model are: reduced plenum space, made gas directly arrive weld bond, gas dissipation is few, protects effectively, and workpiece aligns easily, is fit in batches, rotating welding, saves gas, frock material, is applicable to the pipe welding of various apertures, length.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the Tube Argon Arc Welding Argon-filling Device structure chart.
Among the figure 1, welded pipe, 2, plug, 3, binding nut, 4, catch, 5, diaphragm seal, 6, catch, 7, the internal thread sleeve pipe, 8, the hole, 9, conduit, 10, welded pipe, 11, binding nut, 12, catch, 13, diaphragm seal, 14, catch, 15, male connector.
The specific embodiment
In the embodiment shown in fig. 1, one end of conduit (9) is shaped on external screw thread, on external screw thread, be screwed into binding nut (11), be inserted in catch (12), diaphragm seal (13), catch (14), be drilled with hole (8) on the internal thread sleeve pipe (7), internal thread sleeve pipe (7) is screwed on the external screw thread of conduit (9) and is close to catch (14), male connector (15) is screwed into the other end of internal thread sleeve pipe (7), be inserted in catch (6), diaphragm seal (5), catch (4) successively, fastening by binding nut (3), plug (2) is screwed into the endoporus of male connector (15) one ends; Insert in welded pipe (1), (10) the combination back, and hole (8) align weld bond.

Claims (1)

1, a kind of Tube Argon Arc Welding Argon-filling Device, it is by welded pipe, plug, binding nut, catch, diaphragm seal, the internal thread sleeve pipe, the hole, conduit, male connector is formed, it is characterized in that, one end of conduit (9) is shaped on external screw thread, on external screw thread, be screwed into binding nut (11), be inserted in catch (12), diaphragm seal (13), catch (14), be drilled with hole (8) on the internal thread sleeve pipe (7), internal thread sleeve pipe (7) is screwed on the external screw thread of conduit (9) and is close to catch (14), male connector (15) is screwed into the other end of internal thread sleeve pipe (7), be inserted in catch (6) successively, diaphragm seal (5), catch (4), fastening by binding nut (3), plug (2) is screwed into the endoporus of male connector (15) one ends; Insert in welded pipe (1), (10) the combination back, and hole (8) align weld bond.
CN 200620021290 2006-07-21 2006-07-21 Pipe argon-arc welding argon filler Expired - Fee Related CN2923144Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620021290 CN2923144Y (en) 2006-07-21 2006-07-21 Pipe argon-arc welding argon filler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620021290 CN2923144Y (en) 2006-07-21 2006-07-21 Pipe argon-arc welding argon filler

Publications (1)

Publication Number Publication Date
CN2923144Y true CN2923144Y (en) 2007-07-18

Family

ID=38259568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620021290 Expired - Fee Related CN2923144Y (en) 2006-07-21 2006-07-21 Pipe argon-arc welding argon filler

Country Status (1)

Country Link
CN (1) CN2923144Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102310249A (en) * 2011-06-22 2012-01-11 中国海洋石油总公司 Welding method of composite hose stainless steel joint
CN102513657A (en) * 2011-11-30 2012-06-27 广新海事重工股份有限公司 Argon arc welding method for pipe welding and auxiliary device used in method
CN102513744A (en) * 2011-12-02 2012-06-27 武汉一冶钢结构有限责任公司 Pipe sheet test piece welding gas back protection method and device
CN103170768A (en) * 2011-12-21 2013-06-26 哈电集团(秦皇岛)重型装备有限公司 Small-caliber straight pipe butt welding device
CN103862144A (en) * 2014-03-31 2014-06-18 成都振中电气有限公司 Core rod structure for argon arc welding
CN104708186A (en) * 2015-01-22 2015-06-17 中国神华能源股份有限公司 Gas storage device for pipeline welding and pipeline welding method
CN104708169A (en) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 Automatic pipe plate welder
CN105618901A (en) * 2016-03-02 2016-06-01 平高集团有限公司 Left baffle for pipeline welding and gas protection device and welding tool
CN106112231A (en) * 2016-07-12 2016-11-16 中国五冶集团有限公司 Argon-filled protection device is used in a kind of long-distance pipe welding

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102310249A (en) * 2011-06-22 2012-01-11 中国海洋石油总公司 Welding method of composite hose stainless steel joint
CN102513657A (en) * 2011-11-30 2012-06-27 广新海事重工股份有限公司 Argon arc welding method for pipe welding and auxiliary device used in method
CN102513744A (en) * 2011-12-02 2012-06-27 武汉一冶钢结构有限责任公司 Pipe sheet test piece welding gas back protection method and device
CN103170768A (en) * 2011-12-21 2013-06-26 哈电集团(秦皇岛)重型装备有限公司 Small-caliber straight pipe butt welding device
CN103170768B (en) * 2011-12-21 2015-12-02 哈电集团(秦皇岛)重型装备有限公司 Straight pipe with small diameter Butt welding device
CN104708169A (en) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 Automatic pipe plate welder
CN104708169B (en) * 2013-12-12 2017-11-21 中国核工业第五建设有限公司 Automatic Tubesheet welding machine
CN103862144A (en) * 2014-03-31 2014-06-18 成都振中电气有限公司 Core rod structure for argon arc welding
CN103862144B (en) * 2014-03-31 2015-12-16 成都振中电气有限公司 A kind of argon arc welding mandrel structure
CN104708186A (en) * 2015-01-22 2015-06-17 中国神华能源股份有限公司 Gas storage device for pipeline welding and pipeline welding method
CN105618901A (en) * 2016-03-02 2016-06-01 平高集团有限公司 Left baffle for pipeline welding and gas protection device and welding tool
CN106112231A (en) * 2016-07-12 2016-11-16 中国五冶集团有限公司 Argon-filled protection device is used in a kind of long-distance pipe welding

Similar Documents

Publication Publication Date Title
CN2923144Y (en) Pipe argon-arc welding argon filler
CN201702498U (en) Board-stopping device used for gas shielded welding of large-caliber pipeline and long pipeline
CN201102129Y (en) Argon-in tube protection energy conservation equipment
CN201677114U (en) Cooling coil pipe and tube sheet inner hole welding device for nitric acid absorber
CN103302386A (en) Argon shield device for local welding
CN201427218Y (en) Multifunctional electric conduction device
CN204201367U (en) A kind of small-bore pipeline on-line production send blocking device
CN206066341U (en) A kind of finished product bushing press-mounting instrument
CN202984947U (en) Protection gas lock device for girth welding of metallic conduit
CN201815791U (en) Hanging spot welding positioning device
CN207757060U (en) One kind protecting tool for small-bore high alloy steel pipe internal argon-filling
JP2002005352A (en) Connecting device for piping
CN207171180U (en) Argon arc welding argon filling instrument
CN206988644U (en) The new Joining Structure of soldering pliers water pipe connector
CN202461785U (en) Flat gas hood welding tip of all-position pipeline automatic welder
CN218926533U (en) Welding gun joint with good air tightness
CN200975573Y (en) Brake hose assembly metal welding lining core joint
CN212616856U (en) Wheel oiling moves back and unloads frock
CN202180300U (en) Detachable welding ventilation device
CN206973955U (en) A kind of reservoir input and output pipe mounting structure
CN205465036U (en) Welded structure that submerged arc welding steel pipe sealed
CN207394181U (en) It is a kind of can be with the band liner pipe connector of adjustment length
CN205271116U (en) A argon filling frock for pipe argon arc weld
CN206478353U (en) A kind of Fluorine-lined delivery pipe quick connector
CN205689265U (en) A kind of reaming type inserts oil gauge pipe assembly soon

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China No.1 Heavy Machinery Group Corporation Dalian Hydrogenation Reactor Manufa

Assignor: China No.1 Heavy-Duty Machinery Group Co.

Contract fulfillment period: 2008.7.14 to 2016.6.9

Contract record no.: 2008230000001

Denomination of utility model: Pipe argon-arc welding argon filler

Granted publication date: 20070718

License type: Exclusive license

Record date: 20080922

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.7.14 TO 2016.6.9; CHANGE OF CONTRACT

Name of requester: CHINA FIRST HEAVY MACHINERY GROUP DALIAN HYDROGENA

Effective date: 20080922

ASS Succession or assignment of patent right

Owner name: CHINA FIRST HEACY MACHINE STOCK CO., LTD.

Free format text: FORMER OWNER: CHINESE NO.1 HEAVY MECHANICAL GROUP CO.

Effective date: 20091023

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20091023

Address after: No. 9, front office, ruby office, Fulaerji District, Heilongjiang, Qigihar, China: 161042

Patentee after: China First Heavy Industries Co., Ltd.

Address before: The 9 Road, Tiexi factory, Fulaerji District, Heilongjiang, Qigihar Province, 161042

Patentee before: China No.1 Heavy-Duty Machinery Group Co.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070718

Termination date: 20130721