CN2894921Y - Upper beam pipe welding clamp - Google Patents

Upper beam pipe welding clamp Download PDF

Info

Publication number
CN2894921Y
CN2894921Y CN 200620068969 CN200620068969U CN2894921Y CN 2894921 Y CN2894921 Y CN 2894921Y CN 200620068969 CN200620068969 CN 200620068969 CN 200620068969 U CN200620068969 U CN 200620068969U CN 2894921 Y CN2894921 Y CN 2894921Y
Authority
CN
China
Prior art keywords
pipe
fixed support
workpiece
bed hedgehopping
substrate
Prior art date
Application number
CN 200620068969
Other languages
Chinese (zh)
Inventor
丁雷敏
卢国荣
孙罕俊
Original Assignee
庄添财
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 庄添财 filed Critical 庄添财
Priority to CN 200620068969 priority Critical patent/CN2894921Y/en
Application granted granted Critical
Publication of CN2894921Y publication Critical patent/CN2894921Y/en

Links

Abstract

The utility model relates to a welding clamp of upper beam tube, which comprises a baseplate, a first fixing bracket and a second fixing bracket fixed and connected on the baseplate, and a support mould fastened and connected on the baseplate and between the two brackets. The support mould supports an upper beam tube processed. A push rod threads the first bracket with one end of the rod fixed on a fixing block. One side of the fixing block is fixed and connected with a clamping mold, which anastomoses with one end surface of the upper beam tube. After the upper beam tube goes across a first worktable and second worktable with workpieces placed at least. The other end surface of the upper beam tube anastomoses with and leans against a positioning mold installed on the second fixing bracket. The upper beam tube and the workpiece welded are settled respectively and allocated mutually, and the one-off welding of the upper beam tube and the workpiece welded can be done to improve welding efficiency and quality.

Description

Put the beams in place and manage weld jig

Technical field

The utility model relates to a kind of upper beam pipe weld jig, clamping and location when being applicable to the pipe of putting the beams in place with other workpiece welding.

Background technology

In the prior art, such as comprise the pipe of putting the beams in place on the vehicle frame of motorcycle, bicycle, when making the vehicle frame of motorcycle, bicycle, need be with some other workpiece be welded on the upper beam pipe, and, making upper beam pipe and welded part to locate owing to there is not the instrument of clamping and location upper beam pipe and welded part, the upper beam pipe described in the welding process can rotate often, thereby in welding process, need constantly to adjust the position of workpiece, influenced the quality and the operating efficiency of welding greatly.

Summary of the invention

The utility model purpose provides a kind of upper beam pipe weld jig, can position respectively put the beams in place pipe and soldered workpiece, improves the quality and the efficient of welding.

The technical solution of the utility model is: a kind of upper beam pipe weld jig, it comprises substrate, first fixed support and second fixed support that are fixedly connected on the described substrate and are provided with at intervals, between described first fixed support and second fixed support and be fixedly connected on the described substrate at least one holder mould, described holder die shoe processed upper beam pipe, and the external peripheral surface of the upper surface of described holder mould and upper beam pipe matches, passed push rod on described first fixed support, one end of described push rod is fixedly connected on the fixed block, one side of described fixed block is fixedly connected with clamping die, one end face kissing of described clamping die and processed upper beam pipe merges and pushes against mutually, after described upper beam pipe was provided with first work stage or second work stage of workpiece through at least one, the other end of described upper beam pipe pushed against mutually with the positioning module kissing merging that is arranged on second fixed support.

Described first work stage comprise be fixedly connected on the described substrate and along the first bed hedgehopping piece that extends perpendicular to the horizontal plane direction, be arranged at the withstanding tight block on the described first bed hedgehopping piece, be provided with the stage clip that is positioned at the first bed hedgehopping piece between described withstanding tight block and the described substrate, the upper surface of described withstanding tight block has held out against first workpiece, and described first workpiece withstands on the described upper beam pipe.

Described second work stage comprises and being fixedly connected on the described substrate and along the second bed hedgehopping piece that extends perpendicular to the horizontal plane direction, the second bed hedgehopping piece head lamp brush guard pivot is connected with pressing plate, be provided with torsion spring between described second bed hedgehopping piece and the described pressing plate, described pressing plate compresses second workpiece that is positioned at the described second bed hedgehopping piece upper end, and described second workpiece is pressed in the upper surface of upper beam pipe.

One end of described push rod is arranged at the cylinder that is positioned at first fixed support outside slidably.

Be connected with an end of dog link on the described fixed block, the other end of described dog link is fixedly connected on first fixed support.

The utility model compared with prior art has following advantage: because in welding process, described upper beam pipe is clamped between clamping die and the positioning module, and make that under the effect of first work stage and second work stage described first workpiece and second workpiece are pressed in respectively on the upper beam pipe, be described upper beam pipe and soldered first workpiece, second workpiece be fixed respectively and mutually the location, thereby shortened the time of welding, improved the quality and the efficient of welding greatly.

Description of drawings

Accompanying drawing 1 is a stereogram of the present utility model;

Accompanying drawing 2 is the cross-sectional schematic of the first bed hedgehopping piece of the present utility model;

Wherein: 1, substrate, 2, push rod, 3, fixed block, 4, clamping die, 5, the pipe of putting the beams in place, 6, positioning module, 7, first workpiece, 8, second workpiece, 9, holder mould, 10, withstanding tight block, 11, the first bed hedgehopping piece, 12, the second bed hedgehopping piece, 13, first fixed support, 14, second fixed support, 15, dog link, 16, stage clip, 17, alignment pin, 18, pressing plate, 19, torsion spring, 20, cylinder valve, 21, cylinder, 22, first work stage, 23, second work stage

The specific embodiment

Referring to accompanying drawing 1 to accompanying drawing 2, a kind of upper beam pipe weld jig, comprise substrate 1, first fixed support 13 and second fixed support 14 that are fixedly connected on the described substrate 1 and are provided with at intervals, between described first fixed support 13 and second fixed support 14 and be fixedly connected on the described substrate 1 at least one the holder mould 9, described holder mould 9 is holding in the palm processed upper beam pipe 5, and the upper surface of described holder mould 5 matches with the external peripheral surface of the pipe 5 of putting the beams in place, passed push rod 2 on described first fixed support 13, one end of described push rod 2 is arranged at the cylinder 21 that is positioned at first fixed support, 13 outsides slidably, one end of described push rod 2 is fixedly connected on the fixed block 3, one side of described fixed block 3 is fixedly connected with clamping die 4, one end face kissing of described clamping die 4 and processed upper beam pipe 5 merges and pushes against mutually, after described upper beam pipe 5 was provided with first work stage 22 or second work stage 23 of workpiece through at least one, the other end of described upper beam pipe 5 pushed against mutually with the positioning module 6 kissings merging that is arranged on second fixed support 14.

Described first work stage 22 comprise be fixedly connected on the described substrate 1 and along the first bed hedgehopping piece 11 that extends perpendicular to the horizontal plane direction, be arranged at the withstanding tight block 10 on the described first bed hedgehopping piece 11, be provided with the stage clip 16 that is positioned at the first bed hedgehopping piece 11 between described withstanding tight block 10 and the described substrate 1, the upper surface of described withstanding tight block 10 has held out against first workpiece 7, and described first workpiece 7 withstands on the described upper beam pipe 5.

Described second work stage 23 comprises and being fixedly connected on the described substrate 1 and along the second bed hedgehopping piece 12 that extends perpendicular to the horizontal plane direction, the second bed hedgehopping piece, 12 head lamp brush guard pivots are connected with pressing plate 18, be provided with torsion spring 19 between described second bed hedgehopping piece 12 and the described pressing plate 18, described pressing plate 18 compresses second workpiece 8 that is positioned at the described second bed hedgehopping piece 12 upper ends, and described second workpiece 8 is pressed in the upper surface of the pipe 5 of putting the beams in place.

Be connected with an end of dog link 15 on the described fixed block 3, the other end of described dog link 15 is fixedly connected on first fixed support 13.

The first soldered workpiece 7 is placed on the described withstanding tight block 10, and first workpiece 7 and described withstanding tight block 10 is located with alignment pin 17; Processed upper beam pipe 5 is placed on the described holder mould 9, adjusts described upper beam pipe 5 outer surface of one end and described positioning module 6 is fitted; Described upper beam pipe 5 compresses and is positioned at first workpiece 7 that is positioned on the withstanding tight block 10, and the stage clip 16 that is arranged between described withstanding tight block 10 and the substrate 1 is compressed; Cocked described pressing plate 18 is placed on described second workpiece 8 in the locating slot of the described second bed hedgehopping piece 12, puts down described pressing plate 18, makes pressing plate 18 compress described second workpiece 8; Pull cylinder valve 20, described cylinder 21 drives described push rods 2 and inwardly moves with clamping die 4 that described push rod 2 is fixed together, the outer surface of described clamping die 4 contacts with the end face of processed upper beam pipe 5 and pushes against gradually, thereby make described upper beam pipe 5 and soldered first workpiece 7, second workpiece, 8 clamped and mutual location, can weld.Welding finishes, and turns back cylinder valve 20, and described cylinder 21 drives push rods 2 and outwards move, and the clamping die 4 that is fixedly connected with described push rod 2 leaves the end face of the pipe 5 of putting the beams in place, and cocked described pressing plate 18 can take off welding upper beam pipe well.

Claims (5)

1, a kind of upper beam pipe weld jig, it is characterized in that: it comprises substrate (1), be fixedly connected on first fixed support (13) and second fixed support (14) that described substrate (1) is gone up and is provided with at intervals, be positioned between described first fixed support (13) and second fixed support (14) and be fixedly connected on the described substrate (1) at least one the holder mould (9), described holder mould (9) is holding in the palm processed upper beam pipe (5), and the upper surface of described holder mould (9) matches with the external peripheral surface of the pipe (5) of putting the beams in place, passed push rod (2) on described first fixed support (13), one end of described push rod (2) is fixedly connected on the fixed block (3), one side of described fixed block (3) is fixedly connected with clamping die (4), one end face kissing of described clamping die (4) and processed upper beam pipe (5) merges and pushes against mutually, after described upper beam pipe (5) was provided with first work stage (22) or second work stage (23) of workpiece through at least one, the other end of described upper beam pipe (5) pushed against mutually with positioning module (6) the kissing merging that is arranged on second fixed support (14).
2, upper beam pipe weld jig according to claim 1, it is characterized in that: described first work stage (22) comprises that being fixedly connected on described substrate (1) goes up also along the first bed hedgehopping piece (11) that extends perpendicular to the horizontal plane direction, be arranged at the withstanding tight block (10) on the described first bed hedgehopping piece (11), be provided with the stage clip (16) that is positioned at the first bed hedgehopping piece (11) between described withstanding tight block (10) and the described substrate (1), the upper surface of described withstanding tight block (10) has held out against first workpiece (7), and described first workpiece (7) withstands on the described upper beam pipe (5).
3, upper beam pipe weld jig according to claim 1, it is characterized in that: described second work stage (23) comprises that being fixedly connected on described substrate (1) goes up also along the second bed hedgehopping piece (12) that extends perpendicular to the horizontal plane direction, second bed hedgehopping piece (12) head lamp brush guard pivot is connected with pressing plate (18), be provided with torsion spring (19) between described second bed hedgehopping piece (12) and the described pressing plate (18), described pressing plate (18) compresses second workpiece (8) that is positioned at described second bed hedgehopping piece (12) upper end, and described second workpiece (8) is pressed in the upper surface of the pipe (5) of putting the beams in place.
4, upper beam pipe weld jig according to claim 1 is characterized in that: an end of described push rod (2) is arranged at the cylinder (21) that is positioned at first fixed support (13) outside slidably.
5, upper beam pipe weld jig according to claim 1 is characterized in that: be connected with an end of dog link (15) on the described fixed block (3), the other end of described dog link (15) is fixedly connected on first fixed support (13).
CN 200620068969 2006-01-24 2006-01-24 Upper beam pipe welding clamp CN2894921Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620068969 CN2894921Y (en) 2006-01-24 2006-01-24 Upper beam pipe welding clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620068969 CN2894921Y (en) 2006-01-24 2006-01-24 Upper beam pipe welding clamp

Publications (1)

Publication Number Publication Date
CN2894921Y true CN2894921Y (en) 2007-05-02

Family

ID=38064500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620068969 CN2894921Y (en) 2006-01-24 2006-01-24 Upper beam pipe welding clamp

Country Status (1)

Country Link
CN (1) CN2894921Y (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101934456A (en) * 2010-09-20 2011-01-05 浙江师范大学 Welding clamping device for front tripod of bicycle
CN102049647A (en) * 2010-12-30 2011-05-11 浙江工业职业技术学院 Welding fixture for girder of truss
CN102366871A (en) * 2011-09-29 2012-03-07 合肥常青机械制造有限责任公司 Second cross beam pie welding clamp
CN102689122A (en) * 2012-06-11 2012-09-26 珠海市新维焊接器材有限公司 Large-diameter pipeline welding device
CN102814584A (en) * 2012-08-14 2012-12-12 温州天基机器人自动化有限公司 Push rod clamp
CN103056571A (en) * 2011-10-21 2013-04-24 北汽福田汽车股份有限公司 Welding method for plate spring mounting casing pipe and positioning tool
CN103286513A (en) * 2013-05-31 2013-09-11 昆山宝锦激光拼焊有限公司 Laser welding worktable applicable to tubular welding parts
CN103302428A (en) * 2013-07-05 2013-09-18 江苏华阳金属管件有限公司 Locking device of straight aluminum pipe welding machine
CN103317273A (en) * 2013-07-05 2013-09-25 江苏华阳金属管件有限公司 Locking device for aluminum straight pipe welding machine
CN103639640A (en) * 2013-11-27 2014-03-19 芜湖通和汽车管路系统有限公司 Welding and positioning tooling for automobile pipeline
CN103639944A (en) * 2013-11-30 2014-03-19 芜湖通和汽车管路系统有限公司 Clamping device for assembly of automobile pipeline support
CN104827237A (en) * 2015-05-31 2015-08-12 资兴市粤兴汽车零部件制造有限公司 Pipe end hoop welding and fixing device for automobile pipe
CN105312830A (en) * 2015-11-24 2016-02-10 希姆斯电梯(中国)有限公司 Round pipe and round rod welding positioning tool
CN105618997A (en) * 2016-02-23 2016-06-01 河南平高电气股份有限公司 Contact tube positioning tool and contact tube machining method
CN105965195A (en) * 2016-07-25 2016-09-28 开封全盛汽车配件有限公司 Fixing device for pipe fitting welding
CN108555483A (en) * 2016-12-26 2018-09-21 黄红梅 A kind of aluminum welding machine for capableing of multi-panel welding
CN110560974A (en) * 2019-09-12 2019-12-13 浙江金麦特自动化系统有限公司 Automatic welding system for automobile silencer

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101934456A (en) * 2010-09-20 2011-01-05 浙江师范大学 Welding clamping device for front tripod of bicycle
CN101934456B (en) * 2010-09-20 2013-01-16 浙江师范大学 Welding clamping device for front tripod of bicycle
CN102049647A (en) * 2010-12-30 2011-05-11 浙江工业职业技术学院 Welding fixture for girder of truss
CN102366871B (en) * 2011-09-29 2014-05-07 合肥常青机械股份有限公司 Second cross beam pie welding clamp
CN102366871A (en) * 2011-09-29 2012-03-07 合肥常青机械制造有限责任公司 Second cross beam pie welding clamp
CN103056571B (en) * 2011-10-21 2015-05-20 北汽福田汽车股份有限公司 Welding method for plate spring mounting casing pipe and positioning tool
CN103056571A (en) * 2011-10-21 2013-04-24 北汽福田汽车股份有限公司 Welding method for plate spring mounting casing pipe and positioning tool
CN102689122A (en) * 2012-06-11 2012-09-26 珠海市新维焊接器材有限公司 Large-diameter pipeline welding device
CN102689122B (en) * 2012-06-11 2015-04-15 珠海市新维焊接器材有限公司 Large-diameter pipeline welding device
CN102814584A (en) * 2012-08-14 2012-12-12 温州天基机器人自动化有限公司 Push rod clamp
CN103286513A (en) * 2013-05-31 2013-09-11 昆山宝锦激光拼焊有限公司 Laser welding worktable applicable to tubular welding parts
CN103302428A (en) * 2013-07-05 2013-09-18 江苏华阳金属管件有限公司 Locking device of straight aluminum pipe welding machine
CN103317273A (en) * 2013-07-05 2013-09-25 江苏华阳金属管件有限公司 Locking device for aluminum straight pipe welding machine
CN103639640B (en) * 2013-11-27 2016-02-24 芜湖通和汽车管路系统股份有限公司 A kind of automobile pipeline welding positioning tool
CN103639640A (en) * 2013-11-27 2014-03-19 芜湖通和汽车管路系统有限公司 Welding and positioning tooling for automobile pipeline
CN103639944B (en) * 2013-11-30 2015-10-14 芜湖通和汽车管路系统股份有限公司 A kind of automobile pipeline support assembling clamping device
CN103639944A (en) * 2013-11-30 2014-03-19 芜湖通和汽车管路系统有限公司 Clamping device for assembly of automobile pipeline support
CN104827237A (en) * 2015-05-31 2015-08-12 资兴市粤兴汽车零部件制造有限公司 Pipe end hoop welding and fixing device for automobile pipe
CN105312830A (en) * 2015-11-24 2016-02-10 希姆斯电梯(中国)有限公司 Round pipe and round rod welding positioning tool
CN105618997A (en) * 2016-02-23 2016-06-01 河南平高电气股份有限公司 Contact tube positioning tool and contact tube machining method
CN105965195A (en) * 2016-07-25 2016-09-28 开封全盛汽车配件有限公司 Fixing device for pipe fitting welding
CN108555483A (en) * 2016-12-26 2018-09-21 黄红梅 A kind of aluminum welding machine for capableing of multi-panel welding
CN110560974A (en) * 2019-09-12 2019-12-13 浙江金麦特自动化系统有限公司 Automatic welding system for automobile silencer

Similar Documents

Publication Publication Date Title
CN201889657U (en) Work piece compression device with sawing machine
CN101791644B (en) Tube bender
JP4085072B2 (en) Double-sided milling machine
CN2806034Y (en) Translation welding type ultrasonic welding unit
CN201394726Y (en) Press mounting and riveting device for oil cylinder and housing of diverter
CN103538086A (en) Cutting machine for rubber hoses with fiber woven layers
CN102398181B (en) Exhaust manifold milling large fixture
CN2860720Y (en) Spot welding clamper of motorcycle frame assembly
CN201940830U (en) Fixture for automatic shifting transmission case shell
CN2843719Y (en) Structural-section assembled welding integrating equipment
CN205290219U (en) Door sash assembly welder dress
CN106077939B (en) Tab welding device
CN2747131Y (en) Means for installing positioning fittings for automobile wind screen
CN205684949U (en) A kind of automobile pair acoustic filter weld jig and welding tooling
CN204639999U (en) Car limit fixture automation equipment
CN200977606Y (en) Clamping device for machine tool
CN204621456U (en) Automobile exhaust pipe straight seam welding work bench with adjustable holder
CN104723085A (en) Aluminum alloy joint connector assembling machine
CN202224878U (en) Welding fixture for motorcycle frame assemblies
CN202317513U (en) Automobile armchair welding tool
CN203495616U (en) Clamping device for linear cutting of thin wall cylinder workpiece
CN205129272U (en) Be used for blast pipe welded workstation
CN200970604Y (en) Correcting clamp for whole vehicle frame
CN206169538U (en) Backrest welding jig assembly
CN201807639U (en) Tube bending machine of jumper tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070502

Termination date: 20110124