CN2758480Y - Pelt storage device of synchronous conveyer - Google Patents
Pelt storage device of synchronous conveyer Download PDFInfo
- Publication number
- CN2758480Y CN2758480Y CN 200420114141 CN200420114141U CN2758480Y CN 2758480 Y CN2758480 Y CN 2758480Y CN 200420114141 CN200420114141 CN 200420114141 CN 200420114141 U CN200420114141 U CN 200420114141U CN 2758480 Y CN2758480 Y CN 2758480Y
- Authority
- CN
- China
- Prior art keywords
- dolly
- storage apparatus
- cylinder
- carrying roller
- wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model relates to a belt storage device of a synchronous conveyer, which mainly solves the technical problem of increasing the work efficiency of tunnel driving, etc. The utility model has the technical scheme that a bogie frame of the belt storage device is fixedly connected with a barn frame in which a roller supporting trolley, a sliding trolley and a tension device are arranged. A conveying belt extends into the belt storage device from the head section and winds around a roller set of the bogie frame and the sliding trolley by a plurality of layers. The output end of the belt is connected to the machine tail. The roller supporting trolley is arranged between the bogie frame and the sliding trolley, and the rollers of the roller supporting trolley respectively support each layer of the conveying belt. A steel cable of the tension device is connected with the sliding trolley. The utility model is suitable for synchronous conveyers which can extend and bend.
Description
Technical field:
The utility model relates to a kind of equipment that tunnels the tunnel, particularly a kind of equipment of removing or transporting excavated material.
Background technology:
In existing tunnel (or underworkings) tunneling process, the material earth of its generation or spoil etc. are transported to ground from the tunnel, be to adopt the batch (-type) means of transportation, tunnel as subway tunnel, adopt shield excavation machine, with material earth or spoil extruding or broken, by the conveying worm that is provided with in the shield excavation machine, material is extruded into the redoiming conveyor that the shield excavation machine rear side is provided with, is loaded in the body feed tank, be transported to the tunnel well head by electric locomotive (locomotive battery or stringing) traction then, by elevator material is transported to ground again, be discharged to interim windrow field boundary, electric locomotive returns back to the shield excavation machine place along track simultaneously, remakes conveying next time; Be transported in the process of material field from shield excavation machine at above-mentioned material; because material is output in time; shield excavation machine has to stop excavation operation; and the ineffective time of formation operation; reduce excavation operation efficient; the time that above-mentioned electric locomotive comes and goes in the tunnel; along with the distance of shield excavation machine and well head increases and prolongs, in tunneling process, this may reach km to thousands of rice apart from major part; and the gait of march of electric locomotive normally 8 kms/hour; obviously be very long the downtime of shield excavation machine, therefore, will have a strong impact on drivage efficiency; its loss economically is very big, and brings negative social effect simultaneously.How above-mentioned discontinuous means of transportation being changed into continuous means of transportation, improve tunnel piercing efficient, is the technical problem that the dealer needs to be resolved hurrily.
The utility model content:
Technical problem to be solved in the utility model is, a kind of belt storage apparatus for synchronous conveyor is provided, it can make the conveyer belt of synchronous conveyor, prolong synchronously along with the prolongation of the driving process of shield excavation machine, the material that excavation operation produces can be delivered to well head from shield excavation machine continuously, improves excavation operation efficient.
The technical scheme in the invention for solving the above technical problem is: belt storage apparatus includes bogie, the storehouse frame, the carrying roller dolly, dolly and tensioning apparatus move about, bogie is connected with the storehouse frame, be provided with the carrying roller dolly in the frame of storehouse, dolly and tensioning apparatus move about, the conveyer belt of synchronous conveyor stretches into belt storage apparatus from head, conveyer belt in belt storage apparatus is the multilayer pitch of the laps in the cylinder group of bogie and the cylinder group of the dolly that moves about, conveyer belt is connected in tail at the end that goes out of belt storage apparatus, at bogie with move about and be provided with the carrying roller dolly between the dolly, the carrying roller of carrying roller dolly supports each layer conveyer belt respectively, and the cable wire of tensioning dress is connected with the dolly that moves about.Conveyer belt goes out end at belt storage apparatus and is drawn by tail through fuselage, when the shield excavation machine drive tail that advances, tail traction conveyer belt extends thereupon synchronously, simultaneously, utilize tensioning apparatus winch pull line, make that the dolly that moves about moves, tensioning and change the length of the conveyer belt of multilayer folding.
The structure of the multilayer folding conveyer belt that each cylinder group of the utility model mat belt storage apparatus forms, the conveyer belt of storage preseting length, and with its change belt length feature, can keep the synchronous transport function to extend synchronously with shield excavation machine driving progress, thereby the material earth that driving is produced, spoil etc., be delivered to well head from shield excavation machine continuously, fundamentally overcome the defective of tradition with electric locomotive intermittent delivery material, tunnel piercing speed can be increased to 17~18 meters of average every days by 7~8 meters of former average every days, improve drivage efficiency greatly, have remarkable economic efficiency and social benefit.
Description of drawings:
Fig. 1 is the continuous convey materials equipment combination of a tunnel piercing schematic diagram.
Fig. 2 is that the utility model belt storage apparatus for synchronous conveyor is laid schematic diagram.
Fig. 3 is a bogie schematic diagram among Fig. 2.
Fig. 4 is Fig. 2 middle idler roller dolly schematic diagram.
Fig. 5 is the side direction view of Fig. 4.
Fig. 6 is move about among Fig. 2 dolly and storehouse frame schematic diagram.
Fig. 7 is the dolly schematic diagram that moves about among Fig. 2.
Fig. 8 is tensioning apparatus and a storehouse frame schematic diagram among Fig. 2.
Fig. 9 be among Fig. 8 A to the view enlarged diagram.
The specific embodiment:
With reference to Fig. 1, the equipment of the continuous convey materials of tunnel piercing includes elevator 91, synchronous conveyor 92 and shield excavation machine unit 93, elevator 91 is an existing equipment, material can be promoted to the interim windrow field boundary on ground from the tunnel well head, shield excavation machine unit 93 also is an existing equipment, and extruding of its shield excavation machine or broken material are extruded into by conveying worm and reprint and changed course is passed on machine (belt conveying) and delivered to synchronous conveyor 92;
With reference to Fig. 2, belt storage apparatus for synchronous conveyor includes bogie 1, storehouse frame 2, carrying roller dolly 3, dolly 4 and tensioning apparatus 5 move about.
Bogie 1, as Fig. 2, shown in 3, its support body 11 is a steel structure frame, the front end 111 of support body 11 is connected in the frame of head 921, the rear end 112 of support body 11 is connected with the storehouse support body 21 of storehouse frame 2, the inside of support body 11 is provided with a series cylinder 12,12 ', 12 " quantity; cylinder 12; 12 '; 12 " can be 1 to 4, (present embodiment is an example with 3, as follows), cylinder 12,12 ', 12 " and supporting construction be known technology; each supporting is installed in the support body 11 and establishes on the stiffening girder; each cylinder 12; 12 '; 12 " laying in support body 11 is, on, down, before, the back dislocation, to keep conveyer belt layering winding equably, the loading condiction of support body 11 also can be improved, simultaneously at each cylinder 12,12 ', 12 " the suitable proximity in rear; be respectively arranged with guide wheel 13; 13 '; 13 ", on can reducing, distance between the conveying belt of lower floor 925, to reduce the height of support body 11, be provided with a guide wheel 14 below support body 11 front ends, in order to keep the belt distance evenly, support body 11 is to be fixedly supported upon on the support on well head ground, tunnel.
The dolly 4 that moves about shown in Fig. 6,7, includes car body 40, cylinder 41,41 ', 41 ", guide wheel 42,42 ', 42 " and wheel 43;
During the synchronous conveyor operation, with reference to Fig. 1,3,4, maximum layer on the belt storage apparatus bogie 1 (illustrating 5 layers) conveyer belt 925 is connected in tail 924, in shield excavation machine 93 excavation operations, the tail 924 that sets firmly on its frame moves towards tunneling direction under shield excavation machine 93 drives, tail 924 towing conveyer belts 925 extend thereupon, the tractive force of the conveyer belt 925 in the extension, in belt storage apparatus, a by conveyer belt 925, b, c, d, the acting in conjunction of each layer of e, the dolly 4 that will move about spurs to head 921 directions, bogie 1 and the distance of moving about between the dolly 4 shorten thereupon, therefore and make a of storage, b, c, d, each layer of e band emitted respective length, this length and tail 924 equate with the distance that development machine 93 moves, thereby realize that conveyer belt 925 corresponding shield excavation machines 93 extend synchronously, simultaneously, in the dolly 4 heads 921 direction moving process that move about, under the control of tensioning apparatus 5 winches 53 of belt storage apparatus and oil cylinder 54, the cable wire 50 that system is connected to the dolly 4 that moves about always is in tension, and make 925 tensionings of whole piece conveyer belt, conveyer belt 925 can be carried the thing section of development machine 93 outputs continuously reposefully under the power drum of head 921 drives; The total stocks of each layer of belt storage apparatus band, quantity with cylinder 12,41 increases, the utility model embodiment is 3 roller frames, rice surplus its storage band amount can reach 200, the operating type that this storage strip length can keep shield excavation machine continuous operation a couple of days a couple of days to ten and tradition to utilize electric locomotive to transport material compares, as to improve 1~2 times of average driving speed every day, not only its economic benefit is considerable, and quickens the social benefit of whole construction of tunnel progress, is significant especially.
Claims (8)
1, a kind of belt storage apparatus for synchronous conveyor, it is characterized in that: belt storage apparatus includes bogie (1), storehouse frame (2), carrying roller dolly (3), dolly (4) and tensioning apparatus (5) move about, bogie (1) is connected with storehouse frame (2), be provided with carrying roller dolly (3) in the storehouse frame (2), dolly (4) and tensioning apparatus (5) move about, the conveyer belt of synchronous conveyor (925) stretches into belt storage apparatus from head (921), conveyer belt in belt storage apparatus (925) is the cylinder group (12 of multilayer pitch of the laps at bogie (1), 12 ', 12 ") and the cylinder group of the dolly that moves about (4) (41; 41 '; 41 "), conveyer belt (925) is connected in tail (924) at the end that goes out of belt storage apparatus, between bogie (1) and the dolly that moves about (4), be provided with carrying roller dolly (3), the carrying roller (32) of carrying roller dolly (3) supports each layer conveyer belt (925) respectively, and the cable wire (50) of tensioning apparatus (5) is connected with the dolly that moves about (4).
2, belt storage apparatus for synchronous conveyor according to claim 1, support body (11) front end that it is characterized in that bogie (1) is connected with the storehouse support body (21) that head (921) rear end is connected with storehouse frame (2), be installed with a series cylinder (12,12 ', 12 ") on the support body (11); the quantity of cylinder (12,12 ', 12 ") is 1 to 4, each cylinder (12,12 ', 12 ") layering is installed on the support body (11).
3, belt storage apparatus for synchronous conveyor according to claim 1 and 2 is characterized in that each cylinder (12,12 ', 12 ") rear proximity of bogie (1) is respectively arranged with guide wheel (13), and bogie (1) front end below is provided with a guide wheel (14).
4, belt storage apparatus for synchronous conveyor according to claim 1, it is characterized in that storehouse frame (2) is constituted by segmentation storehouse support body (21), the top is provided with the deck (22) that longeron is installed, and the bottom is provided with can be for the guide rail (23) of carrying roller dolly (3) and the dolly that moves about (4) walking.
5, belt storage apparatus for synchronous conveyor according to claim 1, it is characterized in that carrying roller dolly (3) includes vehicle body (31), carrying roller group (32) and road wheel (33), the position of corresponding each layer of conveyer belt (925) of each carrying roller of carrying roller group (32) is separately positioned on the vehicle body (31), the quantity of carrying roller and conveyer belt (925) number of plies correspondence in belt storage apparatus, vehicle body (31) below is provided with road wheel (33), and the guide rail (23) in road wheel (33) and the storehouse frame (2) touches.
6, belt storage apparatus for synchronous conveyor according to claim 1, the dolly (4) that it is characterized in that moving about includes car body (40), cylinder (41,41 ', 41 "); guide wheel (42; 42 '; 42 ") and wheel (43), cylinder (41,41 ', 41 " position that quantity) and layering are installed in car body (40) is all corresponding identical with the cylinder of bogie (1) (12; 12 '; 12 "), each cylinder (41,41 ', 41 ") the place ahead proximity is respectively arranged with guide wheel (42; 42 '; 42 "), car body (40) below is provided with wheel (43), guide rail (23) in wheel (43) and the storehouse frame (2) touches, and the dolly that moves about (4) car body (40) afterbody is installed with joint (44).
7, belt storage apparatus for synchronous conveyor according to claim 1, it is characterized in that tensioning apparatus (5) includes cable wire (50), front wheel (51), rear wheel (52), winch (53), oil cylinder (54), oil cylinder pulley (55), cable wire (50) front end is connected with the joint (44) of the dolly that moves about (4), cable wire (50) encloses backward around oil cylinder pulley (55), that continues encloses forward around front wheel (51) and rear wheel (52), the rear end of cable wire (50) is connected in the reel (530) of winch (53), oil cylinder pulley (55) is arranged at the plunger end of oil cylinder (54), and winch (53) and oil cylinder (54) are fixedly arranged on the storehouse support body (21) of storehouse frame (2).
8, according to claim 1 or 7 described belt storage apparatus for synchronous conveyor, it is characterized in that the forward and backward pulley (51,52) of tensioning apparatus (5) is a multi-groove structure, the groove number is 2 to 4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420114141 CN2758480Y (en) | 2004-12-14 | 2004-12-14 | Pelt storage device of synchronous conveyer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420114141 CN2758480Y (en) | 2004-12-14 | 2004-12-14 | Pelt storage device of synchronous conveyer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2758480Y true CN2758480Y (en) | 2006-02-15 |
Family
ID=36078622
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420114141 Expired - Lifetime CN2758480Y (en) | 2004-12-14 | 2004-12-14 | Pelt storage device of synchronous conveyer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2758480Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110905824A (en) * | 2019-11-25 | 2020-03-24 | 中铁十六局集团北京轨道交通工程建设有限公司 | Tunnel slag discharging device, system and method |
CN110985013A (en) * | 2019-12-10 | 2020-04-10 | 中铁十四局集团隧道工程有限公司 | Shield construction system |
-
2004
- 2004-12-14 CN CN 200420114141 patent/CN2758480Y/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110905824A (en) * | 2019-11-25 | 2020-03-24 | 中铁十六局集团北京轨道交通工程建设有限公司 | Tunnel slag discharging device, system and method |
CN110985013A (en) * | 2019-12-10 | 2020-04-10 | 中铁十四局集团隧道工程有限公司 | Shield construction system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111285009A (en) | Continuous-mining and continuous-transporting cooperative conveying system | |
CN203430564U (en) | Self-moving belt conveyor tail | |
CN103410561A (en) | Self-moving belt conveyor tail | |
US4896764A (en) | Monorail advanced system for conveyors in a mining apparatus | |
CN110239894A (en) | Electrodeless Che Zulian multi-points driving for belt conveyor and chain tensioning method | |
CN114013942A (en) | High-efficient tunnelling belt conveyor with high capacity level stores up belting | |
CN2758480Y (en) | Pelt storage device of synchronous conveyer | |
CN1789663A (en) | Belt storage apparatus for synchronous conveyor | |
CN111689130A (en) | Synchronous self-moving transshipment transportation system | |
CN203740486U (en) | Bridge equipment of slag discharge belt for underground mine transportation | |
CN2523732Y (en) | Telescopic belt conveyer | |
CN212049164U (en) | Crawler belt walking type telescopic rubber belt conveyor | |
CN211168548U (en) | Single-track transverse belt conveyor | |
CN1128836A (en) | Continuous conveyor system | |
CN202743922U (en) | Self-moving device of loader | |
CN1796724A (en) | Method for feeding materiel continuously through tunnel | |
CN205150967U (en) | A rotatory conveyer that displaces of freely unloading for tailing discharges | |
CN209554383U (en) | A kind of mining machinery with collapsible band transportation system | |
CN111285008A (en) | Continuous mining and continuous transporting cooperative conveying multi-joint transfer system | |
CN219905705U (en) | Traveling car alignment device of telescopic belt conveyor | |
CN209974153U (en) | Lining building block hoist and mount conveyor | |
CN2250934Y (en) | expansible rubber coated draper | |
CN210392531U (en) | Mine is with half fixed scalable belt conveyor | |
CN207121141U (en) | A kind of band continuous vertical conveyor of bucket type | |
CN220164873U (en) | Transmission system for TBM belt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CX01 | Expiry of patent term |
Expiration termination date: 20141214 Granted publication date: 20060215 |