CN2707818Y - Bored pile post-pressure-grouting grouting device used for soft ground - Google Patents
Bored pile post-pressure-grouting grouting device used for soft ground Download PDFInfo
- Publication number
- CN2707818Y CN2707818Y CN 200420019930 CN200420019930U CN2707818Y CN 2707818 Y CN2707818 Y CN 2707818Y CN 200420019930 CN200420019930 CN 200420019930 CN 200420019930 U CN200420019930 U CN 200420019930U CN 2707818 Y CN2707818 Y CN 2707818Y
- Authority
- CN
- China
- Prior art keywords
- grouting
- casting machine
- slurry casting
- pipe
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 24
- 229910052742 iron Inorganic materials 0.000 claims abstract description 12
- 239000002002 slurry Substances 0.000 claims abstract description 8
- 238000007789 sealing Methods 0.000 claims abstract description 7
- 238000007582 slurry-cast process Methods 0.000 claims description 41
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 239000004927 clay Substances 0.000 claims description 6
- 238000007569 slipcasting Methods 0.000 claims description 6
- 238000000034 method Methods 0.000 abstract description 7
- 239000002689 soil Substances 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract description 2
- 229910001037 White iron Inorganic materials 0.000 abstract 2
- 238000005553 drilling Methods 0.000 abstract 1
- 230000010412 perfusion Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 9
- 239000000843 powder Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 210000000988 bone and bone Anatomy 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000012945 sealing adhesive Substances 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The utility model provides a bored pile post-pressure-grouting grouting device used for the soft ground. A long cylinder column body is arranged in a pile bottom-soil body. A grouting inlet is connected with a grouting pipe which is arranged in the steel-reinforcement cage of the drilling pile. A grouting device body is composed of five black iron pipes, and each black iron pipe is orderly connected by a white iron casing. The cylindrical surface of each black iron pipe is provided with one group of small holes which are in the quincunx arrangement. The outside of the black iron pipes are sealed with the rubber sleeves. The bottom of the grouting device body is provided with a white iron sealing head. The utility model has the reliable sealability required of the later pressure grouting, and the one-way valve performance. The slurry is effectively prevented from entering the grouting pipe in the process of the placing and the embedding of the grouting material and the perfusion process of the underwater concrete. The utility model can be opened under the lower pressure in grouting to form a grouting channel, and has the definite ability of resisting the external damage.
Description
Technical field
The utility model relates to a kind of construction implement, especially a kind of slurry casting machine of the post-pressure grouting that is used to hole.
Background technology
At present, in the drilled pile construction, great majority adopt post grouting process to improve bearing capacity of pile, reduce the pile body settling amount, thereby can reduce a number, reduce cost and reduction of erection time.And drilled pile post grouting process key of success is a slurry casting machine.
The slurry casting machine that existing grouting behind shaft or drift lining is used is to make according to the actual conditions of each engineering, the simple and easy grouting valve of general employing, sealing is poor, in practice of construction, variety of issue can appear in slurry casting machine, especially severe be that earth and powder on pit bottom sand pour in Grouting Pipe easily, cause slurry casting machine to lose efficacy, thereby make the slurry casting machine cisco unity malfunction, success rate is extremely low, has prolonged construction period to a certain extent and has increased construction costs.
Summary of the invention
The utility model purpose is exactly to solve the problem that slurry casting machine exists in the construction of drilled pile grouting behind shaft or drift lining, provide a kind of the laying of injecting paste material, bury underground, can effectively stop mud to enter Grouting Pipe in the underwater concrete pouring process, and when slip casting, under lower pressure, can open again, form the slip casting passage, and possess the slurry casting machine of the outer damage capability of certain opposing.
For achieving the above object, the technical solution adopted in the utility model is as follows:
A kind of soft clay area boring post-pressure grouting slurry casting machine, oval barrel mast body places in the subsoil body, the slip casting input port joins with placing the Grouting Pipe in the drilled pile reinforcing cage, the slurry casting machine body is made up of five sections black pipes, connect successively with the galvanized iron overcoat between each section black pipe, have one group of aperture that is quincuncial arrangement on every section black pipe face of cylinder, the outside seals with rubber sleeve, and slurry casting machine body bottom envelope has the galvanized iron end socket.
Slurry casting machine length is 50cm, and inner hole section is long-pending to be 572mm
2, the slurry outlet gross area is 961mm
2, and be placed in and stretch out 40-50cm position at the bottom of the reinforcing cage.
One group of aperture that is quincuncial arrangement being opened on every section black pipe face of cylinder is five holes that diameter is 7mm.
The utlity model has the positiver sealing and the one way valve performance of back mud jacking indispensability, the slurry casting machine end opening adopts the galvanized iron end socket to shut and can shield to slurry casting machine, even slurry casting machine inserts soil, can not damage slurry casting machine yet, and can prevent that earth and powder on pit bottom blowout from going into Grouting Pipe, guarantee that slurry casting machine is down to the safety of hole end opening at the end; Adopt rubber sleeve that injected hole is sealed, do the time spent at certain defeated slurry pressure, rubber sleeve can be washed open, make slurries pass through injected hole and slowly inject the soil body, and the injected hole area is long-pending greater than the slurry casting machine inner hole section, can satisfy the construction process requirement of boring post-pressure grouting fully.In addition, slurry casting machine is placed in stretches out 50cm place at the bottom of the reinforcing bar bone cage, can avoid concrete that slurry casting machine is encased the grouting behind shaft or drift lining hole by the situation that blocks and can't rive, and guaranteeing under the long situation of stake, formed a loose slip casting district isolated, thereby can guarantee the successful implementation of back mud jacking construction technology with pile body.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is that the utility model is laid embedding schematic diagram.
The specific embodiment
The utility model will be further described below in conjunction with drawings and Examples.
As shown in Figure 1; soft clay area boring post-pressure grouting slurry casting machine; black pipe 1 by five sections Φ 33.5mm * 3.25mm is formed; use 2 fixed seal connections of galvanized iron overcoat between each black pipe 1 vertically; its bottom one section end opening is shut with galvanized iron end socket 5; can shield to slurry casting machine; even slurry casting machine inserts soil; can not damage yet, and can prevent that earth and powder on pit bottom blowout from going into Grouting Pipe, guarantee that slurry casting machine is down to the safety of hole end opening at the end slurry casting machine; the hole 4 that to have five diameters on every section black pipe 1 face of cylinder be 7mm; and being quincuncial arrangement, certain external force effect can be resisted with rubber sleeve 3 sealings in the outside; after embedding finishing; with certain defeated slurry pressure, rubber sleeve 3 is washed open, make slurries pass through injected hole 4 and slowly inject the soil body.
Slurry casting machine length after the connection is 50cm, and inner hole section is long-pending to be 572mm
2, the slurry outlet gross area is 961mm
2, the injected hole area is long-pending greater than the slurry casting machine inner hole section, can satisfy the construction process requirement of boring post-pressure grouting fully.
As shown in Figure 2,, slurry casting machine is stretched out 7 end of reinforcing cage 50cm laying when descending most joint reinforcing cage 7, slurry casting machine can be inserted cheat in the subsoil body 8, do not encased by concrete to guarantee slurry casting machine according to dark, the shallow characteristics in next door in the middle of behind the drilled pile pore-forming.Avoid concrete that slurry casting machine is encased the situation appearance that the grouting behind shaft or drift lining hole is blocked and can't rive fully, and guaranteeing to form a loose slip casting district isolated under the long situation of stake with pile body.
The slurry casting machine input port joins with placing the Grouting Pipe 6 usefulness galvanized iron overcoats 2 in the drilled pile reinforcing cage 7.Grouting Pipe 6 and reinforcing cage 7 main muscle firm fixation, and with reinforcing cage 7 integral body transfer (to reinforcing cage 7 not on earth the stake, then must increase the guiding reinforcing bar hangs together, to guarantee the stability and the verticality of Grouting Pipe 6), adopt the silk tooth to connect between the tube and tube, wrap up with the sealing adhesive tape at screw thread place, outside, and firmly tighten sealing, when every joint reinforcing cage 7 is transferred end, must in Grouting Pipe 6, inject clear water and check the sealing performance of pipeline, water filling in Grouting Pipe 6 can also reduce negative pressure in the Grouting Pipe 6, to prevent owing to the Grouting Pipe 6 external and internal pressures caulking gum 3 that makes slurry casting machine that differs greatly is damaged by pressure.When slurry casting machine during the end, adopts the little stroke of hoist engine to insert soil body 50cm near stake.
Claims (3)
1. soft clay area boring post-pressure grouting slurry casting machine, oval barrel mast body places in the subsoil body, the slip casting input port joins with placing the Grouting Pipe in the drilled pile reinforcing cage, it is characterized in that, described slurry casting machine body is made up of five sections black pipes (1), connects successively with galvanized iron overcoat (2) between each section black pipe (1), has one group of aperture (4) that is quincuncial arrangement on every section black pipe (1) face of cylinder, there is galvanized iron end socket (5) in the outside with rubber sleeve (3) sealing, slurry casting machine body bottom envelope.
2. soft clay area boring post-pressure grouting slurry casting machine according to claim 1 is characterized in that described slurry casting machine length is 50cm, and inner hole section is long-pending to be 572mm
2, the slurry outlet gross area is 961mm
2, and be placed in and stretch out 40-50cm position at the bottom of the reinforcing cage.
3. soft clay area boring post-pressure grouting slurry casting machine according to claim 1 is characterized in that having one group of aperture (4) that is quincuncial arrangement on described every section black pipe (1) face of cylinder is five holes that diameter is 7mm.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200420019930 CN2707818Y (en) | 2004-12-28 | 2004-12-28 | Bored pile post-pressure-grouting grouting device used for soft ground |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200420019930 CN2707818Y (en) | 2004-12-28 | 2004-12-28 | Bored pile post-pressure-grouting grouting device used for soft ground |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2707818Y true CN2707818Y (en) | 2005-07-06 |
Family
ID=34849023
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200420019930 Expired - Fee Related CN2707818Y (en) | 2004-12-28 | 2004-12-28 | Bored pile post-pressure-grouting grouting device used for soft ground |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2707818Y (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102071691A (en) * | 2010-12-18 | 2011-05-25 | 中铁十七局集团第五工程有限公司 | Bored concrete pile underwater concrete perfusion pipe pressure type dredging device and method |
| CN102296617A (en) * | 2010-11-11 | 2011-12-28 | 东南大学 | Post-grouting reinforcement construction method of flexible joints of diaphragm walls |
| CN102425309A (en) * | 2011-10-24 | 2012-04-25 | 上海市第二市政工程有限公司 | Sleeve pressure grouting construction device for steel bar connection |
| CN102677677A (en) * | 2012-04-28 | 2012-09-19 | 邢台路桥建设总公司 | Composite injection pipe for injection-molded soil and stone composite pile foundation |
| CN103184737A (en) * | 2011-12-28 | 2013-07-03 | 上海市基础工程有限公司 | Grouting machine for post grouting under embedded rock geological condition |
| CN105156017B (en) * | 2015-08-12 | 2017-10-10 | 中铁三局集团有限公司 | A kind of impacting with high pressure whitewashing rig for applying to collapse hole stratum and construction method |
| CN114575884A (en) * | 2022-02-19 | 2022-06-03 | 中建铁投轨道交通建设有限公司 | Segmented intermittent karst grouting construction method |
-
2004
- 2004-12-28 CN CN 200420019930 patent/CN2707818Y/en not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102296617A (en) * | 2010-11-11 | 2011-12-28 | 东南大学 | Post-grouting reinforcement construction method of flexible joints of diaphragm walls |
| CN102071691A (en) * | 2010-12-18 | 2011-05-25 | 中铁十七局集团第五工程有限公司 | Bored concrete pile underwater concrete perfusion pipe pressure type dredging device and method |
| CN102425309A (en) * | 2011-10-24 | 2012-04-25 | 上海市第二市政工程有限公司 | Sleeve pressure grouting construction device for steel bar connection |
| CN102425309B (en) * | 2011-10-24 | 2014-07-02 | 上海城建市政工程(集团)有限公司 | Sleeve pressure type grouting construction device for connection of steel bars |
| CN103184737A (en) * | 2011-12-28 | 2013-07-03 | 上海市基础工程有限公司 | Grouting machine for post grouting under embedded rock geological condition |
| CN102677677A (en) * | 2012-04-28 | 2012-09-19 | 邢台路桥建设总公司 | Composite injection pipe for injection-molded soil and stone composite pile foundation |
| CN105156017B (en) * | 2015-08-12 | 2017-10-10 | 中铁三局集团有限公司 | A kind of impacting with high pressure whitewashing rig for applying to collapse hole stratum and construction method |
| CN114575884A (en) * | 2022-02-19 | 2022-06-03 | 中建铁投轨道交通建设有限公司 | Segmented intermittent karst grouting construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104727319B (en) | A kind of side slope is from drainage anchor rod and construction method | |
| CN201172828Y (en) | Well-covering device for dewatering well | |
| CN110388223B (en) | A segmented grouting hollow grouting anchor cable and using method | |
| CN108999195B (en) | It is a kind of block the larger water burst of deep-foundation side wall stratum in the safe grouting construction process of step heap weir formula | |
| CN2707818Y (en) | Bored pile post-pressure-grouting grouting device used for soft ground | |
| CN201883435U (en) | Preburied pipe pile grouting device | |
| CN108868827A (en) | Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing | |
| CN108130903A (en) | A post-grouting construction technology for cast-in-place piles | |
| CN102168419A (en) | Method for compounding anchor rod by geotextile reinforcing | |
| CN110453673B (en) | A pier-type foundation reinforcement structure and method | |
| CN201649099U (en) | Grout injector metal casting | |
| CN2911011Y (en) | Prestressed anchor arm device | |
| CN111852556A (en) | Forward and reverse drainage method in downward through-layer drilling | |
| CN208219660U (en) | A kind of drilling post-pressure grouting slurry casting machine | |
| CN103114576A (en) | Post grouting construction method for cast-in-place concrete pile | |
| CN206530337U (en) | A kind of jacking pipe joints replacement grouting borehole jack part | |
| CN218116517U (en) | Bag type series connection plugging device | |
| CN112301995A (en) | Prefabricated composite reinforcement structure serving as precipitation grouting channel and construction method | |
| CN100398782C (en) | Vertical pipe vacuum pre pressing bidirectional slip casting method and sealed slip casting system thereof | |
| CN208023598U (en) | A kind of base pit dewatering pipe well | |
| CN213805307U (en) | A prefabricated composite reinforced solid structure that doubles as a precipitation grouting channel | |
| CN113279729B (en) | Gas extraction method for leaking stoppage and concentration | |
| CN205475198U (en) | Karst area solution cavity coats soil layer slip casting reinforcing apparatus | |
| CN213928311U (en) | High-efficiency operation aggregate device | |
| CN211256953U (en) | Reinforcing pile structure for improving foundation stress |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |