CN2652991Y - Plum blossom hole water guide tube special for road bed - Google Patents
Plum blossom hole water guide tube special for road bed Download PDFInfo
- Publication number
- CN2652991Y CN2652991Y CN 200320115419 CN200320115419U CN2652991Y CN 2652991 Y CN2652991 Y CN 2652991Y CN 200320115419 CN200320115419 CN 200320115419 CN 200320115419 U CN200320115419 U CN 200320115419U CN 2652991 Y CN2652991 Y CN 2652991Y
- Authority
- CN
- China
- Prior art keywords
- plum blossom
- aqueduct
- hole
- blossom hole
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a plum blossom hole aqueduct specially used for the roadbeds, which is combined together by a soft layer (5), a firm layer (6) and a hard layer (7). The aqueduct is provided with a plum blossom hole (3) or a Chinese character <zhi> shape hole (4) which is communicated with an opening (2) of the aqueduct, can transmit the water and cooperate with the construction of the railway and the road, is laid on a yellow sand layer (9) under a road layer (8). Groundwater (13) in the roadbed can permeate into the plum blossom hole (3) or the <zhi> shape hole (4), and flows out through the opening (2) of the aqueduct so that the roadbeds of the railway and the road are protected from being soaked by the up returning groundwater.
Description
Affiliated field
The utility model relates to the aqueduct that is adopted in railway, the highway subgrade flood Prevention Technique, especially by the synthetic special aqueduct with plum blossom hole for road base of the outer soft three layer construction of interior hard backbone.
Background technology
The technology of controlling of returning to stations on known railway, the highway underground water to be adopted and adds elevated formation level, deep-cuts gutter, buries the way of thick pipe of cement or metal tube underground, alleviate or prevent and treat on the underground water and return with this, wherein pipe of cement that is adopted or metal tube, single, thick, can only solve on the water conservancy diversion of a large amount of rainwater and the local paroxysmal underground water and return problem, for returning problem on the long-term property of low-lying region underground water, never have the technical scheme of radical cure.
Summary of the invention
The purpose of this utility model provides a kind of special aqueduct with plum blossom hole for road base of preventing and treating railway, highway water damage, when cooperating railway, highway construction, be layed under the supercrust, in the sandstone on the base course, the plum blossom hole that can be effectively gathers by aqueduct or the word hole, with on the underground water water conservancy diversion that returns in the roadbed gutter.
For achieving the above object, roadbed special aqueduct with plum blossom hole of the present utility model is by interior hard formation (as duroplasts), backbone layer (as aluminium alloys or stainless steel), outer soft formation (as flexible plastic or rubber) be combined into; The aqueduct body be provided with the preface plum blossom hole or the word hole, plum blossom hole or the word hole all communicate with conduit mouth; Special aqueduct with plum blossom hole for road base with equidistantly be layed under the supercrust, in the sandstone on the base course, can with the underground water that returns in the roadbed through gathering plum blossom hole or word hole water conservancy diversion in gutter.
Adopt such technical pattern, in railway, highway construction, can effect a radical cure effectively on the roadbed underground water and return problem, can prolong the application life of railway, highway, reduce the construction cost of railway, highway.
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Description of drawings
1. aqueducts among the figure, 2. conduit mouth, 3. plum blossom hole, word hole 4., 5. soft formation, 6. hard layer, 7. hard formation, 8. supercrust, 9. yellow sand layer, 10. macadam, 11. block stone layers, 12. soil matrix layers, 13. underground water.
Fig. 1 is the vertical face figure of the profile of first specific embodiment of the utility model special aqueduct with plum blossom hole for road base;
Fig. 2 is the plum blossom hole longitudinal section of second specific embodiment of the utility model special aqueduct with plum blossom hole for road base:
Fig. 3 be the 3rd specific embodiment of the utility model special aqueduct with plum blossom hole for road base word hole longitudinal section;
Fig. 4 is the cross-sectional configurations figure of the 4th specific embodiment of the utility model special aqueduct with plum blossom hole for road base;
Fig. 5 is the sectional drawing in the highway subgrade of being embedded in of the 5th specific embodiment of the utility model special aqueduct with plum blossom hole for road base.
Embodiment
Special aqueduct with plum blossom hole for road base shown in Figure 1 is formed oval tubulose by aqueduct 1 and two conduit mouth 2, and is smooth unimpeded in the tube chamber.
Special aqueduct with plum blossom hole for road base shown in Figure 2 is established plum blossom hole 3 by aqueduct 1, and plum blossom hole 3 communicates with conduit mouth 2.
The word hole 4 that special aqueduct with plum blossom hole for road base shown in Figure 3 is established by aqueduct 1, word hole 4 communicate with conduit mouth 2.
Special aqueduct with plum blossom hole for road base cross section shown in Figure 4 is by outer soft formation 5, backbone layer 6, interior hard formation 7 be combined intos, but conduit mouth 2 water flowings.
Special aqueduct with plum blossom hole for road base shown in Figure 5 is embedded in the yellow sand layer 9, yellow sand layer 9 upper strata are that supercrust 8, lower floor are macadam 10, block stone layer 11 and soil matrix layer 12, and contained underground water 13 infiltrates plum blossom hole 3, flows out from conduit mouth 2 through tube chamber through yellow sand layer 9 in the roadbed.
During use, can be according to returning situation on railway, the highway section underground water, the unrestrained or close special aqueduct with plum blossom hole for road base of putting; During making, its materials, thickness, the density in hole and size can conversion to put into practice role, and these conversion all drop within the protection domain of the present utility model.
Claims (2)
1, a kind of special aqueduct with plum blossom hole for road base of preventing and treating railway, highway subgrade water damage.Special aqueduct with plum blossom hole for road base is tubular, smooth unimpeded in the tube chamber, it is characterized in that: aqueduct (1) body is synthesized by soft formation (5), hard layer (6), hard formation (7), aqueduct (1) body establish plum blossom hole (3) or word hole (4), plum blossom hole (3) or word hole (4) communicate with conduit mouth (2).
2, special aqueduct with plum blossom hole for road base according to claim 1 is characterized in that: plum blossom hole (3) or size, the arranging density in word hole (4) convertible, aqueduct (1) thickness, length are convertible.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200320115419 CN2652991Y (en) | 2003-10-10 | 2003-10-10 | Plum blossom hole water guide tube special for road bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200320115419 CN2652991Y (en) | 2003-10-10 | 2003-10-10 | Plum blossom hole water guide tube special for road bed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2652991Y true CN2652991Y (en) | 2004-11-03 |
Family
ID=34345870
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200320115419 Expired - Fee Related CN2652991Y (en) | 2003-10-10 | 2003-10-10 | Plum blossom hole water guide tube special for road bed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2652991Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102373675A (en) * | 2011-11-21 | 2012-03-14 | 余跃建 | Fabricated culvert member and construction method thereof |
CN105756062A (en) * | 2016-04-22 | 2016-07-13 | 北京思创佳德桩工机械制造有限公司 | Method for governing highway middle green belt water accumulation through screw pile |
-
2003
- 2003-10-10 CN CN 200320115419 patent/CN2652991Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102373675A (en) * | 2011-11-21 | 2012-03-14 | 余跃建 | Fabricated culvert member and construction method thereof |
CN102373675B (en) * | 2011-11-21 | 2013-09-04 | 余跃建 | Fabricated culvert member and construction method thereof |
CN105756062A (en) * | 2016-04-22 | 2016-07-13 | 北京思创佳德桩工机械制造有限公司 | Method for governing highway middle green belt water accumulation through screw pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202298405U (en) | Road pavement dewatering structure system | |
CN103132485A (en) | External water interception and purification type urban river multi-element ecological embankment physical structural system | |
CN107237388A (en) | Waterproof ground rainwater leads the system of oozing | |
CN105297872A (en) | LID type city rainwater closed conduit with functions of water permeating, storing, purifying and draining | |
CN200999325Y (en) | Highway pipe road surface drainage arrangement | |
CN108532406A (en) | Can rapid construction high-bearing capacity pervious surface and laying method | |
CN205224230U (en) | LID type urban rainwater oozes and holds clean drainage closed conduit | |
CN110700038A (en) | Underground pipe gallery sponge city municipal road surface with load resistance and drainage function | |
CN202450483U (en) | Three-dimensional composite box culvert structure for urban rivers | |
CN201695293U (en) | Curbstones and road including same | |
CN2652991Y (en) | Plum blossom hole water guide tube special for road bed | |
CN201151862Y (en) | Roadbed dedicated plum blossom hole aqueduct | |
CN201495526U (en) | High-speed water flow hydraulic structure movement joint structure | |
CN208748462U (en) | Can rapid construction high-bearing capacity pervious surface | |
CN207699962U (en) | A kind of road engineering roadbed | |
CN206267162U (en) | A kind of roadbed side slope safeguard structure | |
CN205529776U (en) | Infiltration structure of waterproof road in road surface | |
CN104631279A (en) | Space utilization road surface unit | |
CN114892502A (en) | Environment-friendly road and bridge structure and construction method thereof | |
CN107288007A (en) | A kind of asphalt paving structure with safeguard measure | |
CN211368283U (en) | Asphalt concrete road structure | |
CN202285515U (en) | Saline and alkaline land and coastal road surface paving and desalting system | |
CN206512743U (en) | River course soil-baffling structure | |
CN208486142U (en) | A kind of novel porous runoff porous pavement | |
CN210013083U (en) | Permeable terrace structure coated with water-based finishing agent |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |