CN2627063Y - Vegetation retaining wall for earthworker's grid chamber - Google Patents

Vegetation retaining wall for earthworker's grid chamber Download PDF

Info

Publication number
CN2627063Y
CN2627063Y CN 03219002 CN03219002U CN2627063Y CN 2627063 Y CN2627063 Y CN 2627063Y CN 03219002 CN03219002 CN 03219002 CN 03219002 U CN03219002 U CN 03219002U CN 2627063 Y CN2627063 Y CN 2627063Y
Authority
CN
China
Prior art keywords
geotechnical grid
lattices
earth
separating wall
vegetation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03219002
Other languages
Chinese (zh)
Inventor
谢永利
杨晓华
冯瑞玲
俞永华
杨惠林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN 03219002 priority Critical patent/CN2627063Y/en
Application granted granted Critical
Publication of CN2627063Y publication Critical patent/CN2627063Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

A vegetation separating wall with earth lattices is provided. A strengthening rib filled with filling material inside is provided on the road foundation, earth lattices filled with soil is provided at the lateral side of the road foundation and above and below the strengthening rib, and one layer of earth lattices is anchored with the adjacent upper and lower layers of earth lattices. Compared with the existing separating wall of road foundation, the separating wall in the utility model belongs to flexible separation structure, has both characteristics of concrete or stone work separating wall and reinforced soil separating wall, can well harmonize the stress and deformation of the wall; meanwhile, the wall can effectively disperse the stress of the road foundation, so as to reduce settlement. The vegetation separating wall with earth lattices has the advantages of light weight, standard specification, and easy construction. Under the prerequisite of stability, flower and grass can be planted in the earth lattices to green the sloping surface and beautify environment. The utility model can be widely used in road foundation separating wall, water reservoir dike dam and riverbank.

Description

Geotechnical grid vegetation barricade
Technical field
The utility model belongs to the retaining wall technical field, is specifically related to retaining wall or protecting wall.
Background technology
Propping up the retaining structure is engineering measure commonly used in the civil engineering, and main purpose is to carry out the stability that roadbed props up retaining, protection and guarantees roadbed.But the metope of existing retaining structure all is to be formed by concrete or stone-laying body, causes very big difficulty for the recovery of ecological environment, and is very inharmonious with surrounding environment, influenced geomorphologic landscape, and environment protecting is unsatisfactory.
Geotechnical grid is a kind of novel geosynthetics of developing the eighties in 20th century, and it is the material of the 3-D solid structure system that formed through ultrasonic bonding by the high density polyethylene (HDPE) of several reinforcements or polypropylene broadband.Geotechnical grid vegetation barricade is according to the architectural characteristic of geotechnical grid, utilizes the frictional force of lattice chamber and filler and lattice chamber self to the lateral restriction of filler and big, the anticorrosive ageing-resistant deck of bulk strength height, rigidity that forms.
Summary of the invention
Technical problem underlying to be solved in the utility model is to overcome the shortcoming of above-mentioned roadbed barricade, provide that a kind of structure is light-duty, specification standards, easy construction, applicability are wide, can coordinate preferably body of wall stressed with distortion, and the geotechnical grid vegetation barricade that can on barricade, plant flowers and plants.
Solving the problems of the technologies described above the technical scheme that is adopted is: establish on roadbed and fill Packed reinforcing rib within it, be filled with native geotechnical grid in its lattice being located at up and down of the side of roadbed reinforcing rib, one deck geotechnical grid connects with holdfast with neighbouring one deck geotechnical grid.
Geotechnical grid of the present utility model is 3 D stereo net structure or three-dimensional honeycomb structure.
The height of geotechnical grid of the present utility model is 15~25cm.
The cross section of geotechnical grid of the present utility model is prismatic or the regular hexagon that area equates, the volume of each lattice of geotechnical grid is 0.024~0.04m 3
The filler of filling in the reinforcing rib of the present utility model is gravel or rubble.
The utility model is compared with existing highway subgrade barricade, and barricade of the present utility model belongs to flexible retaining structure, has the characteristics of concrete or stone-laying barricade and reinforced earth bulkhead concurrently, can coordinate the stressed of body of wall and distortion preferably, simultaneously, can disperse base stress effectively, sedimentation is less.The geotechnical grid vegetation wall-retaining structure that it adopts has advantages such as in light weight, specification standards, easy construction, is guaranteeing can to plant flowers and plants under the stable prerequisite in geotechnical grid, and it is domatic to reach greening, beautifies the environment.Can on roadbed barricade and reservoir dam and river levee, extensively promote the use of.
Description of drawings
Fig. 1 is the structural representation of an embodiment of the utility model.
Fig. 2 is the connection schematic diagram of geotechnical grid 1 among Fig. 1.
Fig. 3 is the schematic diagram that connects of one deck geotechnical grid 1 and neighbouring one deck geotechnical grid 1 among Fig. 1.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further described, but the utility model is not limited to these embodiment.
Embodiment 1
In Fig. 1,2,3, the geotechnical grid vegetation barricade of present embodiment is to be connected by geotechnical grid 1, reinforcing rib 2, gravel 4, connection ear 5, attachment pegs 6, holdfast 7 to constitute.
Differing heights in highway subgrade 3 is provided with reinforcing rib 2 at a certain distance, be filled with gravel 4 in the reinforcing rib 2, two-berth at highway subgrade 3 side reinforcing ribs 2 is provided with geotechnical grid 1, last layer reinforcing rib 2 and exposed parts and geotechnical grid 1 usefulness attachment pegs 6 link, another part of geotechnical grid 1 and reinforcing rib 2 is embedded in the highway subgrade 3, reinforcing rib 2 not only plays and blocks water and drainage, and plays the effect of increase barricade resistance to overturning.The both sides of each piece geotechnical grid 1 have been connected as a single entity with geotechnical grid 1 and have connected ear 5, geotechnical grid 1 with connect ear 5 and also can weld and be connected as a single entity, a geotechnical grid 1 adopts attachment pegs 6 to connect with an adjacent geotechnical grid 1 at the position that connects ear 5, the thick soil of 30~35cm is housed in each lattice of geotechnical grid 1, during construction soil used the road roller compacting, on the geotechnical grid 1 that compacting is good, re-lay one deck geotechnical grid 1 again, load soil compacting again, in layer lay until the road surface, one deck geotechnical grid 1 and neighbouring one deck geotechnical grid 1 usefulness holdfast 7 are followed closely in geotechnical grid 1 lattice on the soil layer of compacting, one deck geotechnical grid 1 and neighbouring one deck geotechnical grid 1 are linked up, strengthened globality.Be manufactured with the spilled water hole a of marshalling on the wooden partition of each piece geotechnical grid 1, spilled water hole a is used for draining.
The geotechnical grid 1 of present embodiment be shaped as the 3 D stereo net structure, adopt ultrasonic bonding to make with polyethylene or polypropylene material flitch, the height of each piece geotechnical grid 1 is 20cm, each lattice of geotechnical grid 1 are isopyknic net structure, the cross section of geotechnical grid 1 each lattice is the prismatic that area equates, the volume of each lattice of geotechnical grid 1 is 0.032m 3Can plant flowers and plants on the soil layer in surface portion geotechnical grid 1 lattice that expose outside, overcome the drawback that the exterior wall that built up by concrete or stone-laying body can not be planted flowers and plants, beautify environment.
Embodiment 2
In the present embodiment, the height of geotechnical grid 1 is 15cm, and the volume of each lattice of geotechnical grid 1 is 0.024m 3The connecting relation of other component and component is identical with embodiment 1.
Embodiment 3
In the present embodiment, the height of geotechnical grid 1 is 25cm.The volume of each lattice of geotechnical grid 1 is 0.04m 3The connecting relation of other component and component is identical with embodiment 1.
Embodiment 4
In above embodiment 1~3, geotechnical grid 1 is to be made of the identical honeycomb structure that is connected as a single entity of volume, and the height of geotechnical grid 1 and the volume of each lattice are identical with respective embodiments.The connecting relation of other component and component is identical with embodiment 1.

Claims (6)

1, a kind of geotechnical grid vegetation barricade, it is characterized in that: on highway subgrade [3], establish and fill Packed reinforcing rib [2] within it, being located at up and down of side reinforcing rib [2] in highway subgrade [3] is filled with native geotechnical grid [1] in its lattice, one deck geotechnical grid [1] connects with holdfast [7] with neighbouring one deck geotechnical grid [1].
2, according to the described geotechnical grid vegetation of claim 1 barricade, it is characterized in that: said geotechnical grid [1] is 3 D stereo net structure or three-dimensional honeycomb structure.
3, according to claim 1 or 2 described geotechnical grid vegetation barricades, it is characterized in that: the height of said geotechnical grid [1] is 15~25cm.
4, according to claim 1 or 2 described geotechnical grid vegetation barricades, it is characterized in that: the cross section of said geotechnical grid [1] is prismatic or the regular hexagon that area equates, the volume of each lattice of geotechnical grid [1] is 0.024~0.04m 3
5, according to the described geotechnical grid vegetation of claim 3 barricade, it is characterized in that: the cross section of said geotechnical grid [1] is prismatic or the regular hexagon that area equates, the volume of each lattice of geotechnical grid [1] is 0.024~0.04m 3
6, according to the described geotechnical grid vegetation of claim 1 barricade, it is characterized in that: the filler of filling in the said reinforcing rib [2] is gravel [4] or rubble.
CN 03219002 2003-05-30 2003-05-30 Vegetation retaining wall for earthworker's grid chamber Expired - Fee Related CN2627063Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03219002 CN2627063Y (en) 2003-05-30 2003-05-30 Vegetation retaining wall for earthworker's grid chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03219002 CN2627063Y (en) 2003-05-30 2003-05-30 Vegetation retaining wall for earthworker's grid chamber

Publications (1)

Publication Number Publication Date
CN2627063Y true CN2627063Y (en) 2004-07-21

Family

ID=34244138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03219002 Expired - Fee Related CN2627063Y (en) 2003-05-30 2003-05-30 Vegetation retaining wall for earthworker's grid chamber

Country Status (1)

Country Link
CN (1) CN2627063Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100464034C (en) * 2005-06-17 2009-02-25 长沙理工大学 Flexible reinforced retaining structure and construction method therefor
CN101892675A (en) * 2010-06-29 2010-11-24 长安大学 Flexible retaining wall with rigid support
CN103572777A (en) * 2013-10-18 2014-02-12 中国航空港建设第九工程总队 Earthwork standard room retaining wall and construction method thereof
CN108517882A (en) * 2018-05-04 2018-09-11 长安大学 A kind of geotechnical grid reinforcement high gradient slope and its construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100464034C (en) * 2005-06-17 2009-02-25 长沙理工大学 Flexible reinforced retaining structure and construction method therefor
CN101892675A (en) * 2010-06-29 2010-11-24 长安大学 Flexible retaining wall with rigid support
CN103572777A (en) * 2013-10-18 2014-02-12 中国航空港建设第九工程总队 Earthwork standard room retaining wall and construction method thereof
CN103572777B (en) * 2013-10-18 2016-04-20 中国航空港建设第九工程总队 A kind of geotechnical grid retaining wall and construction method thereof
CN108517882A (en) * 2018-05-04 2018-09-11 长安大学 A kind of geotechnical grid reinforcement high gradient slope and its construction method
CN108517882B (en) * 2018-05-04 2019-02-19 长安大学 A kind of geotechnical grid reinforcement high gradient slope and its construction method

Similar Documents

Publication Publication Date Title
CN106368238B (en) A kind of honeycomb geotechnical grid retaining wall and its construction method with ecological recovery function
CN104594287B (en) Ecological and economic bank protection structure
CN110644430A (en) Composite ecological revetment structure and construction method thereof
CN105002916B (en) A kind of construction method of immerseable embankment high slope interlocking ecological brick flexible protective structure
CN201027311Y (en) Water discharge type anchor stock frame beam for reinforcing side slope
CN102369326A (en) Windproof and sand-blocking dam with net cage sand barriers constructed by machine and constructing method thereof
CN104234061A (en) Reinforced ecological concrete revetment and construction method thereof
CN109356090B (en) Triangular modularized ecological sea wall
CN103362135B (en) Fang Beng hilllock, protect water and soil net grass bank protection
CN205259198U (en) Flexible bank protection device
CN210031857U (en) Ecological embankment side slope structure
CN213805480U (en) Gabion retaining wall
CN2627063Y (en) Vegetation retaining wall for earthworker's grid chamber
CN111622244A (en) Three-dimensional netted reinforced band flexible retaining structure that can assemble
CN1685791A (en) Green grass protection frame grid board and its application
CN210013240U (en) Interlocking type ecological retaining wall building block
CN208363109U (en) A kind of slope protection equipment of roadbed
CN212452702U (en) Three-dimensional netted reinforced band flexible retaining structure that can assemble
CN106609510A (en) A flexible slope protection device
CN111321700B (en) Overflowing energy dissipation type ecological bank protection method for anti-scouring and anti-landslide barrier plugs
CN101892675B (en) Flexible retaining wall with rigid support
CN213571767U (en) Ecological reinforced structure of river course shore protection
CN204959774U (en) Ecological brick flexible protection structure of immerseable embankment high slope interlocking formula
CN208379542U (en) A kind of low water level building blocks for bank protection construction structure
CN207062983U (en) A kind of prefabricated frame posture retaining wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee