CN2625494Y - Connector - Google Patents

Connector Download PDF

Info

Publication number
CN2625494Y
CN2625494Y CN 03246179 CN03246179U CN2625494Y CN 2625494 Y CN2625494 Y CN 2625494Y CN 03246179 CN03246179 CN 03246179 CN 03246179 U CN03246179 U CN 03246179U CN 2625494 Y CN2625494 Y CN 2625494Y
Authority
CN
China
Prior art keywords
scaffold
joint
steel pipe
arc junction
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03246179
Other languages
Chinese (zh)
Inventor
耿永田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03246179 priority Critical patent/CN2625494Y/en
Application granted granted Critical
Publication of CN2625494Y publication Critical patent/CN2625494Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a joint used for connecting a steel tube when erecting a steel pipe scaffold, comprising a cube, a lune connecting panel, a stiffening plate, a straight connecting panel and a cross scissors plate. The joint can be simultaneously connected with a steel tube with six directions, wherein, one joint can be connected with at best nine steel tubes comprising two upright stanchions, three rails and four inclined struts, and which can save more than by ten percent usage amounts of the steel tubes, and the usage amount of the joint is two fifth of the usage amount of a fastener of a fastener type scaffold. The transmission of the force is a shearing force which causes the transmission to be more reasonable. The steel tube can be made into a standardized length so as to standardize the scaffold bar member and enable the scaffold erect orderly, beautifully and conveniently and be convenient for management and examination, and the erection of scaffold which is not based on the requirement must be stopped. The stack and transportation of the steel tube are more convenient and easier and the installation is simple, safe and flexible, various scaffolds can be erected, more particularly an indoor scaffold cam be erected conveniently.

Description

Joint
Technical field
The utility model relates to a kind of connector that steel pipe scaffold is used of setting up, and the steel pipe that can finish six direction with a connector connects, and specifically is a kind of joint.
Background technology
Used scaffold in the construction of structure, great majority are to adopt fastener type steel pipe scaffold.The connection of steel pipe is finished by fastener, vertical rod in the scaffold connected with being connected by cruciform fastening for falsework of leger, little cross bar is on leger, also connect by cruciform fastening for falsework, the butt joint of the butt joint of vertical rod and vertical rod, leger and leger is connected with word deduction, also will use rotary buckle when setting up the scissors support.Vertical rod does not directly contact with cross bar when vertical rod is connected with cross bar, and the load that acts on during construction on the cross bar is delivered in the vertical rod by cruciform fastening for falsework, and the transmission of its power is that the frictional force that produces when holding cross bar and vertical rod with a firm grip by fastener is finished.The length of steel pipe because steel pipe is longer, is unfit to do inner scaffold generally at 6 meters (except little cross bars).When scaffold was installed, the vertical transport of steel pipe was very inconvenient, can not be with hanging scaffold or cage transportation, and great majority are vertical transport of finishing steel pipe by installation personnel with the pulling of rope, installation rate is slower.The butt joint of vertical rod is the comparison difficulty, also be dangerous, installation personnel stands on the steel pipe in high-altitude, about under the situation having no backing, can not move steel pipes long with 6 meters, 23 kiloponds vertically lift, finish the butt joint of steel pipe, this work is to general constructor, do not say on the shelf that stands in the high-altitude, be exactly on ground, can vertically lift by steel pipes long with 6 meters, 23 kiloponds, be not easy very much, be on the high-level shelf still more, its difficulty and danger are well imagined.So the scaffolder belongs to special work post, the personnel that scaffold is installed must pass through the professional technique training, could be on duty behind the certificate that qualifies.No matter be the connection between vertical rod, leger, little cross bar, the scissors support, all be to lean on the bond stress of fastener to realize, the position of fastener card pipe is also uncertain, all can change the position at every turn, and during each fastener card pipe, can on pipe, leave a trace damage pipe and deface paint, so neither attractive in appearance, shortened application life of steel pipe again.For guaranteeing to connect reliably, prevent scurrying out of steel pipe, the length of little cross bar is grown 60 centimetres to 70 centimetres than the horizontal spacing of vertical rod, and the leger in the scaffold end also will grow 30 centimetres to 40 centimetres, and is neither attractive in appearance, again waste material.
Summary of the invention
For the transfer mode that changes existing fastener power and the mounting method of scaffold, the utility model provides a kind of joint, and it is extremely convenient that this joint is connected with steel pipe, and the installation of scaffold is simple, speed is fast, power transmission reliably, safety.
The technical scheme in the invention for solving the technical problem is: a kind of joint that is used to connect steel pipe scaffold comprises by square, arc junction plate, stiffener, direct-connected fishplate bar, cross scissors plate and forming.Described arc junction plate and stiffener are supporting, a hole that is shaped on screw thread is arranged on arc junction plate, arc junction plate is responsible for connecting steel pipe and is transmitted horizontal force and vertical force, control simultaneously the displacement of steel pipe again with stiffener, and with the Load Transfer that produces on the cross bar to vertical rod, the transmission of its power is a shearing force.A hole is arranged on the described direct-connected fishplate bar, be connected with brace, be used for builder's jack by handle.On the described cross scissors plate four holes are arranged, be connected with bridging, be used for to be provided with the scaffold of bridging by handle.Respectively there is a hole the same side at described steel pipe two ends, when steel pipe socket after on the arc junction plate, bolt passed on hole on the steel pipe and the arc junction plate of precession be shaped in the hole of screw thread, steel pipe and joint are linked together, changed the transfer mode of power and the mounting method of scaffold.
The beneficial effects of the utility model are: change the transmission of power into shearing force by frictional force, the transmission of exerting all one's strength is more reasonable, and scaffolding structure is stable more, safety.Can be according to the requirement of safety operation, with vertical rod, leger, little cross bar, bridging, brace are made full-length, paint different colors, make the standardization of scaffold rod member.So both improved the Degree of Safety of scaffold, make again the scaffold of setting up neat, attractive in appearance, be convenient to management and check, stop to set up scaffold not according to operational procedure.The length of steel pipe has been lacked, and is in light weight, and the stacking of steel pipe, transportation, installation ratio are easier to, make things convenient for, simple, safety, do not need the special training scaffolder, and general constructor just can install.Can set up diversified scaffold (comprising inner scaffold).This joint can connect the steel pipe of 6 directions simultaneously, and the multipotency in tie point place connects 9 rod members, has reduced the use amount of steel pipe and joint, can save the use amount of steel pipe more than 10, and the joint usage quantity is 2/5ths of a fastener usage quantity.The scaffold standardization also can make the scaffold floor standardization, replaces the bamboo scaffold floor with Steel scaffold board, but scaffold floor application life increases the number of turnover of scaffold floor, can reduce the use cost of scaffold floor.
Description of drawings
Fig. 1 is the schematic diagram of the utility model ordinary couplings;
Fig. 2 is the A-A sectional drawing of Fig. 1;
Fig. 3 is the schematic diagram of the utility model brace joint;
Fig. 4 is the B-B sectional drawing of Fig. 3;
Fig. 5 is the schematic diagram of the utility model scissors joint;
Fig. 6 is the C-C sectional drawing of Fig. 5;
Fig. 7 is the schematic diagram of the utility model steel pipe;
Fig. 8 is the schematic diagram of the utility model bridging;
Fig. 9 is the D-D sectional drawing of Fig. 8;
Figure 10 is the schematic diagram that the utility model ordinary couplings is connected with steel pipe;
Figure 11 is the E-E sectional drawing of Figure 10;
Figure 12 is the schematic diagram that the utility model scissors joint is connected with steel pipe, bridging;
Figure 13 is the F-F sectional drawing of Figure 12;
Figure 14 is the 1-1 sectional drawing of Figure 13.
1. squares among the figure, 2. arc junction plate, 3. stiffener, 4. threaded shank hole, 5. direct-connected fishplate bar, 6. bolt penetration hole, 7. ten sub-scissors plates, 8. steel pipe, 9. bolt penetration hole, 10. bolt, 11. handle, 12. legers, 13. vertical rods, 14. little cross bars, 15. nuts.
The specific embodiment
Shown in Fig. 1-2, the joint of being made up of a square (1), four or six arc junction plates (2) and stiffener (3) is an ordinary couplings, is used to connect leger (12), vertical rod (13), little cross bar (14).When six arc junction plates (2) and stiffener (3), can connect two vertical rods (13), four cross bars are used for setting up of full hall scaffold; When five arc junction plates (2) and stiffener (3), can connect two legers (12), two vertical rods (13), a little cross bar (14), external scaffolding sets up in being used for; When four arc junction plates (2) and stiffener (3), be used for the setting up of bottom, top, end scaffold of scaffold.
As shown in Figure 3-4, the joint of being made up of a square (1), a direct-connected fishplate bar (5), five arc junction plates (2) and stiffener (3) is the brace joint, can connect two legers (12), two vertical rods (13), a little cross bar (14) and a brace, be used to set up outer outrigger scaffold.
Shown in Fig. 5-6, the joint of being made up of a square (1), ten sub-scissors plates (7), five arc junction plates (2) and a stiffener (3) is the scissors joint, can connect two legers (12), two vertical rods (13), a little cross bar (14) and four bridgings, be used for setting up of bridging scaffold need be set.
Shown in Fig. 7-9, the same side at the two ends of steel pipe (8) respectively is provided with a bolt penetration hole (9), the length of steel pipe can be made as 1 meter, 1.4 meters, 1.8 meters three kinds of length, purposes that can be different according to scaffold, the spacing of vertical rod (13) and the step Gao Junke of cross bar are made as 1 meter, 1.4 meters, 1.8 meters three kinds of sizes.As when setting up cast-in-situ concrete beam and use scaffold, cross bar is selected the steel pipe of 1 meter or 1.4 meters for use, and the spacing of its vertical rod (13) is 1 meter or 1.4 meters.As when setting up inner scaffold, the step height of cross bar can be selected the length of vertical rod (13) according to indoor height for use, to adapt to the needs of chamber height.Leger (12), vertical rod (13), little cross bar (14) all can be made as 1 meter, 1.4 meters, 1.8 meters three kinds of sizes.Brace and bridging are general, are made up of 1.8 meters long steel pipes (8) and two handles (11).
Shown in Figure 10-14, when steel pipe is connected with joint, need only steel pipe socket on the arc junction plate (2) of joint, tight a bolt (10) get final product.

Claims (6)

1. joint, comprise by square (1), several arc junction plates (2), several stiffeners (3), direct-connected fishplate bar (5), cross scissors plate (7), several bolts (10) constitute, it is characterized in that: described square (1) has six faces, is provided with direct-connected fishplate bar (5), cross scissors plate (7), several arc junction plates (2) and stiffener (3) on these six faces; Described arc junction plate (2) is provided with a threaded hole (4) that is used for twisting bolt (10), and a bolt penetration hole (6) of wearing bolt (10) is arranged on the direct-connected fishplate bar (5), and cross scissors plate (7) is provided with four bolt penetration hole (6) of wearing bolt (10).
2. joint according to claim 1 is characterized in that: described ordinary couplings is made up of a square (1), some arc junction plates (2) and stiffener (3).
3. joint according to claim 1 is characterized in that: described brace joint is made up of a square (1), a direct-connected fishplate bar (5), five arc junction plates (2) and stiffener (3).
4. joint according to claim 1 is characterized in that: described scissors joint is made up of a square (1), a cross scissors plate (7), five arc junction plates (2) and stiffener (3).
5. joint according to claim 1 is characterized in that: the same side at described steel pipe (8) two ends respectively is provided with a bolt penetration hole (9), and the length of steel pipe (8) is divided into three kinds of different full-lengths, can form the scaffold of asynchronous height and different spacing.
6. joint according to claim 1 is characterized in that: described brace and bridging can be general, are made up of steel pipe (8) and two handles (11), and steel pipe is connected with bolt (10) with handle (11).
CN 03246179 2003-07-18 2003-07-18 Connector Expired - Fee Related CN2625494Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03246179 CN2625494Y (en) 2003-07-18 2003-07-18 Connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03246179 CN2625494Y (en) 2003-07-18 2003-07-18 Connector

Publications (1)

Publication Number Publication Date
CN2625494Y true CN2625494Y (en) 2004-07-14

Family

ID=34251942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03246179 Expired - Fee Related CN2625494Y (en) 2003-07-18 2003-07-18 Connector

Country Status (1)

Country Link
CN (1) CN2625494Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101372864B (en) * 2007-08-22 2011-08-24 卢兴明 Multi-direction centralized connection type composed scaffold
CN102704669A (en) * 2012-06-24 2012-10-03 郑德春 Crossbar insert piece for bowl-locking scaffold and mounting method thereof
CN110242033A (en) * 2019-07-08 2019-09-17 陕西建工机械施工集团有限公司 A kind of connecting node of assembly flow shop platform
CN111236637A (en) * 2020-03-26 2020-06-05 张延年 Adjustable template scaffold

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101372864B (en) * 2007-08-22 2011-08-24 卢兴明 Multi-direction centralized connection type composed scaffold
CN102704669A (en) * 2012-06-24 2012-10-03 郑德春 Crossbar insert piece for bowl-locking scaffold and mounting method thereof
CN102704669B (en) * 2012-06-24 2015-09-30 郑德春 The total sub-semigroup mounting method of cross bar inserted sheet
CN110242033A (en) * 2019-07-08 2019-09-17 陕西建工机械施工集团有限公司 A kind of connecting node of assembly flow shop platform
CN111236637A (en) * 2020-03-26 2020-06-05 张延年 Adjustable template scaffold

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN100480481C (en) Quadrangular pyramid sphere net case falsework-free constructing and mounting method and hoisting machine tool
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN202209044U (en) Pull rod type cantilever frame of flower basket
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN213234203U (en) A buckled column ladder cage scaffold
CN103382768A (en) Multifunctional constructional engineering construction support assembly
CN111764623B (en) Hanging construction platform module and construction method of high altitude large cantilever steel roof frame
CN213868835U (en) Scaffold frame for interior decoration convenient to height-adjusting
CN205742956U (en) A kind of safe Hanging Basket for work high above the ground
CN201190413Y (en) Double-poling steel tube rectangular fastener
CN216810838U (en) Rectangular pipe frame structure scaffold system
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN207296361U (en) A kind of regularization assembled overhanging protection canopy
CN210767782U (en) Guide rail pole setting connecting piece that convenient concatenation was used
CN201053199Y (en) Large template pylon
CN208585976U (en) A kind of channel connecting Lou Tiyu tower crane
CN2832994Y (en) Dedicated protection frame for construction of main structure
CN201151628Y (en) Square cone spherical reticulated shell without scaffolding construction hoisting equipment
CN219080928U (en) Full hall scaffold with adjustable modulus
CN207131062U (en) A kind of job platform
CN224173688U (en) Pull-up flower basket overhanging scaffold
CN222524049U (en) Tower crane standard knot
CN220745193U (en) Tower body standard knot and tower crane
CN221143548U (en) Multifunctional beam clamp

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee