CN2625494Y - Connector - Google Patents
Connector Download PDFInfo
- Publication number
- CN2625494Y CN2625494Y CN 03246179 CN03246179U CN2625494Y CN 2625494 Y CN2625494 Y CN 2625494Y CN 03246179 CN03246179 CN 03246179 CN 03246179 U CN03246179 U CN 03246179U CN 2625494 Y CN2625494 Y CN 2625494Y
- Authority
- CN
- China
- Prior art keywords
- scaffold
- joint
- steel pipe
- arc junction
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 49
- 239000010959 steel Substances 0.000 claims abstract description 49
- 239000003351 stiffener Substances 0.000 claims description 15
- 230000035515 penetration Effects 0.000 claims description 6
- 230000008878 coupling Effects 0.000 claims description 4
- 238000010168 coupling process Methods 0.000 claims description 4
- 238000005859 coupling reaction Methods 0.000 claims description 4
- 230000005540 biological transmission Effects 0.000 abstract description 7
- 238000009434 installation Methods 0.000 abstract description 6
- 238000010008 shearing Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 7
- 210000001503 joint Anatomy 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to a joint used for connecting a steel tube when erecting a steel pipe scaffold, comprising a cube, a lune connecting panel, a stiffening plate, a straight connecting panel and a cross scissors plate. The joint can be simultaneously connected with a steel tube with six directions, wherein, one joint can be connected with at best nine steel tubes comprising two upright stanchions, three rails and four inclined struts, and which can save more than by ten percent usage amounts of the steel tubes, and the usage amount of the joint is two fifth of the usage amount of a fastener of a fastener type scaffold. The transmission of the force is a shearing force which causes the transmission to be more reasonable. The steel tube can be made into a standardized length so as to standardize the scaffold bar member and enable the scaffold erect orderly, beautifully and conveniently and be convenient for management and examination, and the erection of scaffold which is not based on the requirement must be stopped. The stack and transportation of the steel tube are more convenient and easier and the installation is simple, safe and flexible, various scaffolds can be erected, more particularly an indoor scaffold cam be erected conveniently.
Description
Technical field
The utility model relates to a kind of connector that steel pipe scaffold is used of setting up, and the steel pipe that can finish six direction with a connector connects, and specifically is a kind of joint.
Background technology
Used scaffold in the construction of structure, great majority are to adopt fastener type steel pipe scaffold.The connection of steel pipe is finished by fastener, vertical rod in the scaffold connected with being connected by cruciform fastening for falsework of leger, little cross bar is on leger, also connect by cruciform fastening for falsework, the butt joint of the butt joint of vertical rod and vertical rod, leger and leger is connected with word deduction, also will use rotary buckle when setting up the scissors support.Vertical rod does not directly contact with cross bar when vertical rod is connected with cross bar, and the load that acts on during construction on the cross bar is delivered in the vertical rod by cruciform fastening for falsework, and the transmission of its power is that the frictional force that produces when holding cross bar and vertical rod with a firm grip by fastener is finished.The length of steel pipe because steel pipe is longer, is unfit to do inner scaffold generally at 6 meters (except little cross bars).When scaffold was installed, the vertical transport of steel pipe was very inconvenient, can not be with hanging scaffold or cage transportation, and great majority are vertical transport of finishing steel pipe by installation personnel with the pulling of rope, installation rate is slower.The butt joint of vertical rod is the comparison difficulty, also be dangerous, installation personnel stands on the steel pipe in high-altitude, about under the situation having no backing, can not move steel pipes long with 6 meters, 23 kiloponds vertically lift, finish the butt joint of steel pipe, this work is to general constructor, do not say on the shelf that stands in the high-altitude, be exactly on ground, can vertically lift by steel pipes long with 6 meters, 23 kiloponds, be not easy very much, be on the high-level shelf still more, its difficulty and danger are well imagined.So the scaffolder belongs to special work post, the personnel that scaffold is installed must pass through the professional technique training, could be on duty behind the certificate that qualifies.No matter be the connection between vertical rod, leger, little cross bar, the scissors support, all be to lean on the bond stress of fastener to realize, the position of fastener card pipe is also uncertain, all can change the position at every turn, and during each fastener card pipe, can on pipe, leave a trace damage pipe and deface paint, so neither attractive in appearance, shortened application life of steel pipe again.For guaranteeing to connect reliably, prevent scurrying out of steel pipe, the length of little cross bar is grown 60 centimetres to 70 centimetres than the horizontal spacing of vertical rod, and the leger in the scaffold end also will grow 30 centimetres to 40 centimetres, and is neither attractive in appearance, again waste material.
Summary of the invention
For the transfer mode that changes existing fastener power and the mounting method of scaffold, the utility model provides a kind of joint, and it is extremely convenient that this joint is connected with steel pipe, and the installation of scaffold is simple, speed is fast, power transmission reliably, safety.
The technical scheme in the invention for solving the technical problem is: a kind of joint that is used to connect steel pipe scaffold comprises by square, arc junction plate, stiffener, direct-connected fishplate bar, cross scissors plate and forming.Described arc junction plate and stiffener are supporting, a hole that is shaped on screw thread is arranged on arc junction plate, arc junction plate is responsible for connecting steel pipe and is transmitted horizontal force and vertical force, control simultaneously the displacement of steel pipe again with stiffener, and with the Load Transfer that produces on the cross bar to vertical rod, the transmission of its power is a shearing force.A hole is arranged on the described direct-connected fishplate bar, be connected with brace, be used for builder's jack by handle.On the described cross scissors plate four holes are arranged, be connected with bridging, be used for to be provided with the scaffold of bridging by handle.Respectively there is a hole the same side at described steel pipe two ends, when steel pipe socket after on the arc junction plate, bolt passed on hole on the steel pipe and the arc junction plate of precession be shaped in the hole of screw thread, steel pipe and joint are linked together, changed the transfer mode of power and the mounting method of scaffold.
The beneficial effects of the utility model are: change the transmission of power into shearing force by frictional force, the transmission of exerting all one's strength is more reasonable, and scaffolding structure is stable more, safety.Can be according to the requirement of safety operation, with vertical rod, leger, little cross bar, bridging, brace are made full-length, paint different colors, make the standardization of scaffold rod member.So both improved the Degree of Safety of scaffold, make again the scaffold of setting up neat, attractive in appearance, be convenient to management and check, stop to set up scaffold not according to operational procedure.The length of steel pipe has been lacked, and is in light weight, and the stacking of steel pipe, transportation, installation ratio are easier to, make things convenient for, simple, safety, do not need the special training scaffolder, and general constructor just can install.Can set up diversified scaffold (comprising inner scaffold).This joint can connect the steel pipe of 6 directions simultaneously, and the multipotency in tie point place connects 9 rod members, has reduced the use amount of steel pipe and joint, can save the use amount of steel pipe more than 10, and the joint usage quantity is 2/5ths of a fastener usage quantity.The scaffold standardization also can make the scaffold floor standardization, replaces the bamboo scaffold floor with Steel scaffold board, but scaffold floor application life increases the number of turnover of scaffold floor, can reduce the use cost of scaffold floor.
Description of drawings
Fig. 1 is the schematic diagram of the utility model ordinary couplings;
Fig. 2 is the A-A sectional drawing of Fig. 1;
Fig. 3 is the schematic diagram of the utility model brace joint;
Fig. 4 is the B-B sectional drawing of Fig. 3;
Fig. 5 is the schematic diagram of the utility model scissors joint;
Fig. 6 is the C-C sectional drawing of Fig. 5;
Fig. 7 is the schematic diagram of the utility model steel pipe;
Fig. 8 is the schematic diagram of the utility model bridging;
Fig. 9 is the D-D sectional drawing of Fig. 8;
Figure 10 is the schematic diagram that the utility model ordinary couplings is connected with steel pipe;
Figure 11 is the E-E sectional drawing of Figure 10;
Figure 12 is the schematic diagram that the utility model scissors joint is connected with steel pipe, bridging;
Figure 13 is the F-F sectional drawing of Figure 12;
Figure 14 is the 1-1 sectional drawing of Figure 13.
1. squares among the figure, 2. arc junction plate, 3. stiffener, 4. threaded shank hole, 5. direct-connected fishplate bar, 6. bolt penetration hole, 7. ten sub-scissors plates, 8. steel pipe, 9. bolt penetration hole, 10. bolt, 11. handle, 12. legers, 13. vertical rods, 14. little cross bars, 15. nuts.
The specific embodiment
Shown in Fig. 1-2, the joint of being made up of a square (1), four or six arc junction plates (2) and stiffener (3) is an ordinary couplings, is used to connect leger (12), vertical rod (13), little cross bar (14).When six arc junction plates (2) and stiffener (3), can connect two vertical rods (13), four cross bars are used for setting up of full hall scaffold; When five arc junction plates (2) and stiffener (3), can connect two legers (12), two vertical rods (13), a little cross bar (14), external scaffolding sets up in being used for; When four arc junction plates (2) and stiffener (3), be used for the setting up of bottom, top, end scaffold of scaffold.
As shown in Figure 3-4, the joint of being made up of a square (1), a direct-connected fishplate bar (5), five arc junction plates (2) and stiffener (3) is the brace joint, can connect two legers (12), two vertical rods (13), a little cross bar (14) and a brace, be used to set up outer outrigger scaffold.
Shown in Fig. 5-6, the joint of being made up of a square (1), ten sub-scissors plates (7), five arc junction plates (2) and a stiffener (3) is the scissors joint, can connect two legers (12), two vertical rods (13), a little cross bar (14) and four bridgings, be used for setting up of bridging scaffold need be set.
Shown in Fig. 7-9, the same side at the two ends of steel pipe (8) respectively is provided with a bolt penetration hole (9), the length of steel pipe can be made as 1 meter, 1.4 meters, 1.8 meters three kinds of length, purposes that can be different according to scaffold, the spacing of vertical rod (13) and the step Gao Junke of cross bar are made as 1 meter, 1.4 meters, 1.8 meters three kinds of sizes.As when setting up cast-in-situ concrete beam and use scaffold, cross bar is selected the steel pipe of 1 meter or 1.4 meters for use, and the spacing of its vertical rod (13) is 1 meter or 1.4 meters.As when setting up inner scaffold, the step height of cross bar can be selected the length of vertical rod (13) according to indoor height for use, to adapt to the needs of chamber height.Leger (12), vertical rod (13), little cross bar (14) all can be made as 1 meter, 1.4 meters, 1.8 meters three kinds of sizes.Brace and bridging are general, are made up of 1.8 meters long steel pipes (8) and two handles (11).
Shown in Figure 10-14, when steel pipe is connected with joint, need only steel pipe socket on the arc junction plate (2) of joint, tight a bolt (10) get final product.
Claims (6)
1. joint, comprise by square (1), several arc junction plates (2), several stiffeners (3), direct-connected fishplate bar (5), cross scissors plate (7), several bolts (10) constitute, it is characterized in that: described square (1) has six faces, is provided with direct-connected fishplate bar (5), cross scissors plate (7), several arc junction plates (2) and stiffener (3) on these six faces; Described arc junction plate (2) is provided with a threaded hole (4) that is used for twisting bolt (10), and a bolt penetration hole (6) of wearing bolt (10) is arranged on the direct-connected fishplate bar (5), and cross scissors plate (7) is provided with four bolt penetration hole (6) of wearing bolt (10).
2. joint according to claim 1 is characterized in that: described ordinary couplings is made up of a square (1), some arc junction plates (2) and stiffener (3).
3. joint according to claim 1 is characterized in that: described brace joint is made up of a square (1), a direct-connected fishplate bar (5), five arc junction plates (2) and stiffener (3).
4. joint according to claim 1 is characterized in that: described scissors joint is made up of a square (1), a cross scissors plate (7), five arc junction plates (2) and stiffener (3).
5. joint according to claim 1 is characterized in that: the same side at described steel pipe (8) two ends respectively is provided with a bolt penetration hole (9), and the length of steel pipe (8) is divided into three kinds of different full-lengths, can form the scaffold of asynchronous height and different spacing.
6. joint according to claim 1 is characterized in that: described brace and bridging can be general, are made up of steel pipe (8) and two handles (11), and steel pipe is connected with bolt (10) with handle (11).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 03246179 CN2625494Y (en) | 2003-07-18 | 2003-07-18 | Connector |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 03246179 CN2625494Y (en) | 2003-07-18 | 2003-07-18 | Connector |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2625494Y true CN2625494Y (en) | 2004-07-14 |
Family
ID=34251942
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 03246179 Expired - Fee Related CN2625494Y (en) | 2003-07-18 | 2003-07-18 | Connector |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2625494Y (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101372864B (en) * | 2007-08-22 | 2011-08-24 | 卢兴明 | Multi-direction centralized connection type composed scaffold |
| CN102704669A (en) * | 2012-06-24 | 2012-10-03 | 郑德春 | Crossbar insert piece for bowl-locking scaffold and mounting method thereof |
| CN110242033A (en) * | 2019-07-08 | 2019-09-17 | 陕西建工机械施工集团有限公司 | A kind of connecting node of assembly flow shop platform |
| CN111236637A (en) * | 2020-03-26 | 2020-06-05 | 张延年 | Adjustable template scaffold |
-
2003
- 2003-07-18 CN CN 03246179 patent/CN2625494Y/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101372864B (en) * | 2007-08-22 | 2011-08-24 | 卢兴明 | Multi-direction centralized connection type composed scaffold |
| CN102704669A (en) * | 2012-06-24 | 2012-10-03 | 郑德春 | Crossbar insert piece for bowl-locking scaffold and mounting method thereof |
| CN102704669B (en) * | 2012-06-24 | 2015-09-30 | 郑德春 | The total sub-semigroup mounting method of cross bar inserted sheet |
| CN110242033A (en) * | 2019-07-08 | 2019-09-17 | 陕西建工机械施工集团有限公司 | A kind of connecting node of assembly flow shop platform |
| CN111236637A (en) * | 2020-03-26 | 2020-06-05 | 张延年 | Adjustable template scaffold |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201826525U (en) | Climbing shuttering system device for buildings | |
| CN100480481C (en) | Quadrangular pyramid sphere net case falsework-free constructing and mounting method and hoisting machine tool | |
| CN202370253U (en) | Assembly type single-row vertical rod machining shed for building construction site | |
| CN202209044U (en) | Pull rod type cantilever frame of flower basket | |
| CN108331335A (en) | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support | |
| CN213234203U (en) | A buckled column ladder cage scaffold | |
| CN103382768A (en) | Multifunctional constructional engineering construction support assembly | |
| CN111764623B (en) | Hanging construction platform module and construction method of high altitude large cantilever steel roof frame | |
| CN213868835U (en) | Scaffold frame for interior decoration convenient to height-adjusting | |
| CN205742956U (en) | A kind of safe Hanging Basket for work high above the ground | |
| CN201190413Y (en) | Double-poling steel tube rectangular fastener | |
| CN216810838U (en) | Rectangular pipe frame structure scaffold system | |
| CN205617772U (en) | Gallows structure under lifting foot hand rack special use | |
| CN207296361U (en) | A kind of regularization assembled overhanging protection canopy | |
| CN210767782U (en) | Guide rail pole setting connecting piece that convenient concatenation was used | |
| CN201053199Y (en) | Large template pylon | |
| CN208585976U (en) | A kind of channel connecting Lou Tiyu tower crane | |
| CN2832994Y (en) | Dedicated protection frame for construction of main structure | |
| CN201151628Y (en) | Square cone spherical reticulated shell without scaffolding construction hoisting equipment | |
| CN219080928U (en) | Full hall scaffold with adjustable modulus | |
| CN207131062U (en) | A kind of job platform | |
| CN224173688U (en) | Pull-up flower basket overhanging scaffold | |
| CN222524049U (en) | Tower crane standard knot | |
| CN220745193U (en) | Tower body standard knot and tower crane | |
| CN221143548U (en) | Multifunctional beam clamp |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |