CN2378452Y - Steel fiber concrete water collecting well - Google Patents
Steel fiber concrete water collecting well Download PDFInfo
- Publication number
- CN2378452Y CN2378452Y CN 99214380 CN99214380U CN2378452Y CN 2378452 Y CN2378452 Y CN 2378452Y CN 99214380 CN99214380 CN 99214380 CN 99214380 U CN99214380 U CN 99214380U CN 2378452 Y CN2378452 Y CN 2378452Y
- Authority
- CN
- China
- Prior art keywords
- well
- water transport
- transport port
- fibrous concrete
- steel fibrous
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 27
- 239000004567 concrete Substances 0.000 title claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 21
- 239000010959 steel Substances 0.000 title claims abstract description 21
- 239000000835 fiber Substances 0.000 title abstract description 4
- 210000001503 joint Anatomy 0.000 claims description 11
- 239000004568 cement Substances 0.000 claims description 5
- 230000001427 coherent effect Effects 0.000 claims description 3
- 239000000853 adhesive Substances 0.000 claims description 2
- 230000001070 adhesive effect Effects 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 239000003292 glue Substances 0.000 claims description 2
- 238000007789 sealing Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 9
- 238000012423 maintenance Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 4
- 239000010865 sewage Substances 0.000 description 4
- 239000011449 brick Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000010257 thawing Methods 0.000 description 2
- 241001669679 Eleotris Species 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 238000013019 agitation Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 210000001520 comb Anatomy 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000011505 plaster Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- -1 sandstone Substances 0.000 description 1
- LENZDBCJOHFCAS-UHFFFAOYSA-N tris Chemical compound OCC(N)(CO)CO LENZDBCJOHFCAS-UHFFFAOYSA-N 0.000 description 1
- 235000020681 well water Nutrition 0.000 description 1
- 239000002349 well water Substances 0.000 description 1
Images
Landscapes
- Revetment (AREA)
Abstract
A steel fiber concrete water collecting well comprises a lower base, an upper base, a middle section and an upper edge which are sequentially bonded together. The lower base and the upper base are buckled into a water delivery port, the water delivery port can extend to form a branch pipe hole, and the water delivery port is circular or square. Use the utility model discloses make and receive well prefab and construction, it is not high with the downcomer mouth linking requirement, the commonality is strong, and construction cycle is short, and maintenance work volume is few, receives the well and does not leak, and is sturdy and durable.
Description
The utility model relates to a kind of steel fibrous concrete and receives well.
Steel fibre is made steel fibrous concrete with materials such as sandstone, additives, have many-sided advantages such as intensity height, corrosion-resistant, the height of anti-flexural compressive strength the, tensile property be good, this complex coagulation soil material, be particularly suitable for replacing brick to make various thin-wall members, can make products such as well lid, sleeper, threaded joint, network frame plate, cement wall plate in building trade, but Shang Weijian is used to receive the manufacturing of well.The urban construction downcomer line must be furnished with the receipts well, so that unnecessary sewage in ground or rainwater are imported sewer pipe, it is except bearing weights such as vehicle roll, itself also is subjected to the extruding of underground soil layer, very unbalanced again during this being extruded with, particularly after sewage, rainwater infiltrate the stratum, bigger to receiving the well influence.Under the disadvantageous condition of many-side, in succession water-supply-pipe is non-leakage mutually with it still to keep receiving well, and the face of land does not subside, and receives the well engineering and must satisfy strict technical requirements.It all is brick that the used flat comb formula of existing municipal administration is received well well body, and well body volume is big, uses material many, long construction period, and well body bearing capacity is low, well inwall cement sand plaster freeze thawing resistance ability, use very easily comes off through a period of time, causes Jing Tiloushui.
The utility model provides a kind of have upper bed-plate, lower bottom base, middle joint and upper edge structure for the weak point of avoiding prior art to exist, receives well with the steel fibrous concrete of flatly combing, downcomer line matches.
The purpose of this utility model can reach with following method, and described steel fibrous concrete is received well, includes the well body, receives the mouth of a river, water transport port.Be the well chamber of hollow structure in the well body, suitable for reading the shaft bottom is sealed in order to receive the mouth of a river, and the side has water transport port.The well body is made of the mutual coherent lower bottom base of order, upper bed-plate, middle joint and upper edge, and lower bottom base and upper bed-plate side are buckled into water transport port.
Scheme reached below the utility model was also available, and when the mutual coherent lower bottom base of order, upper bed-plate, middle joint and upper edge were bonded into the well body, adhesive therefor used the plain glue of cement.
The water transport port of well body is made circle or rectangle, and water transport port can be 1~4.
The tap of water transport port for stretching out to the external side of well, tap has the shoulder structure.
Middle joint in the well body can be made into different-thickness.
There is following advantage compared to existing technology in the utility model: 1, this receipts well member is lower bottom base, upper bed-plate, middle joint, upper edge, rational in infrastructure, can match with existing flat comb, sewer pipe, lotus cuts and can reach 105~170KN after testing, and passed through actual use examination, can satisfy the requirement of urban sewage engineering.2, make thin-walled with steel fibrous concrete and receive the well preform, save material therefor and man-hour, receive water well drilling cycle weak point.Line up is less demanding when 3, being connected with downcomer line, highly versatile.4, the receipts well is sturdy and durable, is difficult for leaking, and maintenance load is little, and the life-span is long.
The drawing of accompanying drawing is described as follows:
Fig. 1 is the whole well schematic diagram of receiving of the utility model, and it is square receiving the mouth of a river, and a circular water transport port is arranged;
Fig. 2 is the whole well split structural representation of receiving of the utility model, and it is square receiving the mouth of a river, and two square water transport ports are arranged;
Fig. 3 lower bottom base structure chart;
Fig. 4 upper bed-plate structure chart;
Fig. 5 upper edge structure chart.
Below in conjunction with accompanying drawing embodiment is explained, steel fibrous concrete is a kind of composite material, and it is that steel with the short fiber shape is scattered in the concrete, strengthens performances such as concrete anticracking, tension, bending resistance, freeze thawing resistance, is particularly useful for making thin-wall member.Technical requirements with the receipts well is a foundation, produces steel fibrous concrete and receives the well prefabricated component, and lower bottom base 6, upper bed-plate 7, middle joint 8 and upper edge 9 are made in split.The prefabricated component order sticks together mutually and forms well body 1.The top of well body 1 is to receive the mouth of a river 2, and the middle part is the well chamber 5 of hollow structure, the shaft bottom sealing, and the side is buckled into water transport port 3 by lower bottom base 6 and upper bed-plate 7, sees Fig. 1,2.
In downcomer line construction, it is unobstructed in collection and delivering rainwater, sewage process to require to receive the well facility, and structure is wanted resistance to compression, and not fragile, ground is smooth, and is water-tight, is connected good with downcomer line.The structure of Fig. 1 and Fig. 2 all can satisfy these requirements.Receive the well well head for adapting to existing flat comb requirement, be designed to square; For adapting to sewer pipe degree of lip-rounding shape, water transport port 3 is designed to square or circular.
Because of underground downcomer line apart from ground height difference, the middle joint 8 of receiving the mouth of a river 2 well bodies, 1 design should have different-thickness, and is simple in structure because of it in order to regulate the whole height of receiving well, only is square frame shape, do not show with accompanying drawing.Upper edge 9 frames are pressed well comb size design, see Fig. 5, and its neighboring is a bit larger tham lower bottom base 6, upper bed-plate 7 housing sizes along size.
The receipts well that the utility model adopts steel fibrous concrete to make can be before guaranteeing premium properties under the topic, and the attenuate product size alleviates overall weight, and can make preform in advance, forms the various fixed product, has also accelerated speed of application, has shortened construction period.
Steel fibrous concrete is produced the receipts well need make preform earlier, adds coarse aggregate in the assembling die of receiving well, and steel fibrous concrete under agitation is dosed in the assembling die by prescription, and vibration is made firm by ramming, the finally demould moulding.Prefabricated component is pressed design drawing receive well, between each precast member and receive well and comb and being connected of walling crib, all adopt gluing the connecing of cement element of using on the common buildings engineering with flat at the bonding one-tenth of the existing field boundary of construction.
Concrete municipal construction operation is, in the qualified groove hole of the system of digging, entirely in groove, put into earlier lower bottom base 6 and the upper bed-plate 7 of choosing specification in advance, the sewer pipe mouth is placed the tap 4 that fastens formation, the sewer pipe port is leaned against on the shoulder 10, add full space and floating with cement mortar, regulate buried depth with the middle joint 8 of suitable depth then, place upper edges 9 above the middle joint 8, placing walling crib peace on upper edge 9 combs or well lid, carry out work such as backfill after above-mentioned receipts well compacting is wipeed off, this preform is piled up mode than brick method short construction period, and quality is good.
Claims (6)
1, a kind of steel fibrous concrete is received well, include well body (1), receive the mouth of a river (2), water transport port (3), it in the well body (1) the well chamber (5) of hollow structure, suitable for reading for receiving the mouth of a river (2), the shaft bottom sealing, the side has water transport port (3), it is characterized in that well body (1) by order mutual coherent lower bottom base (6), upper bed-plate (7), middle joint (8) and upper edge (9) formation, and lower bottom base (6) and upper bed-plate (7) side are buckled into water transport port (3).
2, steel fibrous concrete is according to claim 1 received well, it is characterized in that bonding adhesive therefor uses the plain glue of cement.
3, steel fibrous concrete is according to claim 1 received well, it is characterized in that water transport port (3) is circle or rectangle.
4, receive well as the steel fibrous concrete as described in claim 1 or 3, it is characterized in that water transport port (3) is 1~4.
5, steel fibrous concrete is according to claim 1 received well, it is characterized in that the tap (4) of water transport port (3) for stretching out to well body (1) outside, and tap (4) has shoulder (10) structure.
6, steel fibrous concrete is according to claim 1 received well, it is characterized in that middle joint (8) can be made into different-thickness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99214380 CN2378452Y (en) | 1999-06-25 | 1999-06-25 | Steel fiber concrete water collecting well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99214380 CN2378452Y (en) | 1999-06-25 | 1999-06-25 | Steel fiber concrete water collecting well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2378452Y true CN2378452Y (en) | 2000-05-17 |
Family
ID=34006569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 99214380 Expired - Lifetime CN2378452Y (en) | 1999-06-25 | 1999-06-25 | Steel fiber concrete water collecting well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2378452Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165254A (en) * | 2017-06-28 | 2017-09-15 | 广州市第三市政工程有限公司 | A kind of inlet for stom water mould |
CN107268755A (en) * | 2017-06-28 | 2017-10-20 | 广州市第三市政工程有限公司 | A kind of construction method of inlet for stom water |
CN107299673A (en) * | 2017-06-28 | 2017-10-27 | 广州市第三市政工程有限公司 | A kind of inlet for stom water |
CN112431292A (en) * | 2020-11-28 | 2021-03-02 | 中实翊(福建)建设工程有限公司 | Municipal road drainage structure and construction method |
-
1999
- 1999-06-25 CN CN 99214380 patent/CN2378452Y/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165254A (en) * | 2017-06-28 | 2017-09-15 | 广州市第三市政工程有限公司 | A kind of inlet for stom water mould |
CN107268755A (en) * | 2017-06-28 | 2017-10-20 | 广州市第三市政工程有限公司 | A kind of construction method of inlet for stom water |
CN107299673A (en) * | 2017-06-28 | 2017-10-27 | 广州市第三市政工程有限公司 | A kind of inlet for stom water |
CN112431292A (en) * | 2020-11-28 | 2021-03-02 | 中实翊(福建)建设工程有限公司 | Municipal road drainage structure and construction method |
CN112431292B (en) * | 2020-11-28 | 2022-03-22 | 中实翊(福建)建设工程有限公司 | Municipal road drainage structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947709A (en) | Pre-assembled single-compartment municipal tunnel and construction method thereof | |
CN204690783U (en) | A kind of prefabricated assembled single cabin municipal administration synthesis pipe gallery | |
CN104859036A (en) | Concrete solid square pile mold | |
CN111175477B (en) | Saturated fine sand layer induced grouting experimental model and experimental method | |
CN2378452Y (en) | Steel fiber concrete water collecting well | |
CN100513708C (en) | Method for transversal reinforcement and grouting underpinning of ready construction foundation | |
CN215211002U (en) | A kind of foundation composite pile | |
CN1332296A (en) | Construction process of retaining wall with inner anchoring wall | |
CN214301846U (en) | Upper and lower block-divided open-cut tunnel prefabricated lining prestress connecting structure | |
CN2635736Y (en) | Shaping mould for manhole | |
CN210117712U (en) | A basic structure of a stirring tank plug-in prefabricated combination box | |
CN219011303U (en) | Large-scale rain sewage inspection shaft of circular UHPC of assembled | |
CN218990551U (en) | Rubble wall | |
CN216331152U (en) | Plastic stone rockery formed by splicing cement rock slices | |
CN114575354B (en) | Unloading assembled pile anchor multistage supporting structure and construction method | |
CN101713189A (en) | Construction process of floral tube dry filling piles | |
CN213813065U (en) | Sample for mechanical test of contact surface of frozen soil and concrete, preparation cutting ring and sample box | |
CN211229151U (en) | Concrete masonry module | |
CN203924896U (en) | A kind of iron skill enclosure wall | |
CN107471424A (en) | A kind of water channel engineering system and construction method | |
CN207891894U (en) | Recoverable flexible compound supporting construction for coral reef foundation pit | |
CN112012243A (en) | Prefabricated integrated reinforced concrete inspection well and construction method thereof | |
CN216739570U (en) | Be used for corrugated steel pipe wedge position slip casting constructional device | |
CN2465022Y (en) | Permeation-proof underground high-pressure water pipe made of double-layer concrete and steel sheet | |
CN211137595U (en) | Concrete prefabricated part filling production equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: XUSHUI COUNTY HUAGUANG MANUCIPAL CONSTRUCTION MATE Free format text: FORMER NAME OR ADDRESS: HEBEI PROVINCE XUSHUI COUNTY HUAGUANG FINE STRUCTURE FIBER CEMENT FACTORY |
|
CP01 | Change in the name or title of a patent holder |
Patentee after: Xushui County Huaguang Municipal Construction Materials Co., Ltd. Patentee before: Xushui Hebei Huaguang fibre cement fine structure factory |
|
C17 | Cessation of patent right | ||
CX01 | Expiry of patent term |