CN2263711Y - Roofbolter - Google Patents
Roofbolter Download PDFInfo
- Publication number
- CN2263711Y CN2263711Y CN 96227005 CN96227005U CN2263711Y CN 2263711 Y CN2263711 Y CN 2263711Y CN 96227005 CN96227005 CN 96227005 CN 96227005 U CN96227005 U CN 96227005U CN 2263711 Y CN2263711 Y CN 2263711Y
- Authority
- CN
- China
- Prior art keywords
- frame
- creep
- chassis
- leading truck
- guide pillars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 claims abstract description 13
- 239000010720 hydraulic oil Substances 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 5
- 239000003638 chemical reducing agent Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005183 dynamical system Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a technical scheme that is used for light-duty roofbolter of mine, traffic and building engineering. The said scheme features that the speed varying motor is used to drive the gear box to provide drilling power to the drill rod, the hydraulic system for the hydraulic oil cylinder to provide the drilling frame with lifting power, and the horizontal lifting unit of the drilling frame can regulate the drilling position conveniently.
Description
The utility model relates to the rig that mine, construction work are used, deep pit support retaining in particular for engineerings such as mine, traffic, civilian construction, on the ground, underground engineering support, edge improvement is waited on prevention landslide, and all kinds of engineering the drilling lightweight jumbolter of constructing.
At present, still do not have this type of light rig abroad, what its dynamical system of the jumbolter of domestic use adopted all is single machine driving or single hydraulic drive, so exist structure complicated, application life is short, inconvenient operation in construction, the big and low problem of efficient of labour intensity.
The purpose of this utility model provides a kind of simple in structure at the existing in prior technology problem exactly, at the scene the low technical scheme of being convenient to the jumbolter operated again of labour intensity in the construction.
This programme is realized by following technical measures.Jumbolter mainly be on the chassis, be equipped with control cabinet with creep into the adjusting support bar that frame is connected and regulate oil cylinder, motor is housed on the frame connects the drilling rod pass leading truck by gearbox creeping into, the characteristics of this programme are near leading truck one side a horizontal lifting gear to be housed also creeping between frame and the chassis; Described leading truck then be by with creep into guiding lower carriage that frame is connected and practice by strand and connect a guiding upper bracket, axis at least three rollers parallel with drill rod axis are housed on two stands.
In this programme, because the drilling system of drilling rod is the mechanical system that adopts motor, gearbox, and the lifting and the angle adjustment of creeping into frame are the hydraulic systems that adopts, and therefore, its junction structure is simple, uses reliable.In addition, increased the horizontal lifting gear that creeps into frame, made can adjust easily in construction and creep into the frame height, the variation that drill height adapts to the position, hole is adjusted thereby saved by manpower finishing place in the mating holes position exactly, has significantly reduced labour intensity.Also having leading truck is to be made of upper and lower two supports and roller, and this can promptly will change leading truck because of drill pipe diameter changes, and leading truck does not have serious wearing and tearing yet.This shows, the utility model compared with prior art, its effect is conspicuous.
Description of drawings:
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the schematic top plan view of Fig. 1;
Fig. 3 is the structural representation of leading truck among the utility model embodiment;
Fig. 4 looks the part cross-sectional schematic for the left side of Fig. 3;
Fig. 5 is for creeping into the structural representation of the horizontal lifting gear of frame among the utility model embodiment.
Below by a specific embodiment and in conjunction with its accompanying drawing, this programme is described in further detail.Jumbolter mainly be on chassis 7, be equipped with control cabinet 10 with creep into the adjusting support bar 9 that frame 1 is connected and regulate oil cylinder 8, motor 2 is housed creeping on the frame 1, this motor 2 is the reducing motors that planet cycloid pinwheel deceleration device is housed, and is the XWD type speed reducer that adapts to generalization, the standardization needs adopt typing to produce.The shaft of this reducer connects gearbox 3, and gearbox 3 connects the drilling rod 5 that passes leading truck 4, transmits to drilling rod 5 and creeps into power.Described leading truck 4 then be by with creep into guiding lower carriage 13 that frame 1 is connected and practice by strand and connect a guiding upper bracket 11, it is parallel with drilling rod 5 axis that axis is housed on two stands, and along equally distributed four rollers, 12 formations of leading truck 4 endoporus circumference.In addition, a horizontal lifting gear 6 also is housed creeping between frame 1 and the chassis 7 near leading truck 4 one sides.This horizontal lifting gear 6 is that two guide pillars 14 that axis is parallel are installed on chassis 7, and there are a hoisting cross beam 15 and two guide pillars 14 to be slidingly connected 14 of two guide pillars, there is a hoist cylinder 16 middle part between two guide pillars 14, the bottom of hoist cylinder 16 is connected with chassis 7, the top is connected with hoisting cross beam 15, and hoisting cross beam 15 with creep into frame 1 and connect and compose described horizontal lifting gear 6.Hoist cylinder 16 in the horizontal lifting gear 6 and regulate oil cylinder 8 and cooperatively interact and just can adjust the angle of creeping into frame 1 bore angle can be changed between-10 to 90 degree can adapt to the needs that various angles are holed.
Claims (3)
- A jumbolter mainly be on chassis (7), be equipped with control cabinet (10) with creep into the adjusting support bar (9) that frame (1) is connected and regulate oil cylinder (8), motor (2) is housed on the frame (1) connects the drilling rod (5) pass leading truck (4) by gearbox (3) creeping into, feature of the present utility model is to creep between frame (1) and chassis (7), and a side of close leading truck (4) also is equipped with a horizontal lifting gear (6); Described leading truck (4) then be by with creep into guiding lower carriage (13) that frame (1) is connected and practice by strand and connect a guiding upper bracket (11), axis at least three rollers (12) parallel with drilling rod (5) axis are housed on two stands.
- 2. jumbolter according to claim 1, it is characterized in that described horizontal lifting gear (6) is that two guide pillars (14) that axis is parallel are installed on chassis (7), and between two guide pillars (14), there are a hoisting cross beam (15) and two guide pillars (14) to be slidingly connected, there is a hoist cylinder (16) middle part between two guide pillars (14), its bottom is connected with chassis (7), the top is connected with hoisting cross beam (15), and hoisting cross beam (15) with creep into frame (1) and connect and compose.
- 3. jumbolter according to claim 1 and 2 is characterized in that described motor (2) is a reducing motor that planet cycloid pinwheel deceleration device is housed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96227005 CN2263711Y (en) | 1996-01-03 | 1996-01-03 | Roofbolter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96227005 CN2263711Y (en) | 1996-01-03 | 1996-01-03 | Roofbolter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2263711Y true CN2263711Y (en) | 1997-10-01 |
Family
ID=33905224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 96227005 Expired - Fee Related CN2263711Y (en) | 1996-01-03 | 1996-01-03 | Roofbolter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2263711Y (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100420822C (en) * | 2006-07-18 | 2008-09-24 | 徐鸿祥 | Drilling machine with supporting frame |
CN103277123A (en) * | 2013-06-05 | 2013-09-04 | 北方重工集团有限公司 | Movable sliding seat mechanism for mounting onboard drilling machines |
CN103924994A (en) * | 2014-03-19 | 2014-07-16 | 山西潞安环保能源开发股份有限公司漳村煤矿 | Self-advancing roof bolter platform |
CN106639920A (en) * | 2017-01-09 | 2017-05-10 | 中煤科工集团西安研究院有限公司 | Manual holder with double-layer righting devices and for tunnel drilling machine and holding method |
CN107829686A (en) * | 2017-11-18 | 2018-03-23 | 东台市巨力机械制造有限公司 | A kind of efficient non-excavation pipe-laying drilling rig |
CN110410004A (en) * | 2019-06-05 | 2019-11-05 | 深圳市华建工程项目管理有限公司 | A kind of construction grouting rock bolt drilling apparatus |
CN111074887A (en) * | 2019-12-31 | 2020-04-28 | 中铁二十二局集团第五工程有限公司 | Portable soil nail mounting plate |
CN111810204A (en) * | 2020-06-18 | 2020-10-23 | 中铁十六局集团地铁工程有限公司 | Fine adjustment anchorage device and method capable of compensating prestress loss of water-rich sand layer |
-
1996
- 1996-01-03 CN CN 96227005 patent/CN2263711Y/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100420822C (en) * | 2006-07-18 | 2008-09-24 | 徐鸿祥 | Drilling machine with supporting frame |
CN103277123A (en) * | 2013-06-05 | 2013-09-04 | 北方重工集团有限公司 | Movable sliding seat mechanism for mounting onboard drilling machines |
CN103924994A (en) * | 2014-03-19 | 2014-07-16 | 山西潞安环保能源开发股份有限公司漳村煤矿 | Self-advancing roof bolter platform |
CN103924994B (en) * | 2014-03-19 | 2016-01-27 | 山西潞安环保能源开发股份有限公司漳村煤矿 | Automatic moving type jumbolter platform |
CN106639920A (en) * | 2017-01-09 | 2017-05-10 | 中煤科工集团西安研究院有限公司 | Manual holder with double-layer righting devices and for tunnel drilling machine and holding method |
CN107829686A (en) * | 2017-11-18 | 2018-03-23 | 东台市巨力机械制造有限公司 | A kind of efficient non-excavation pipe-laying drilling rig |
CN110410004A (en) * | 2019-06-05 | 2019-11-05 | 深圳市华建工程项目管理有限公司 | A kind of construction grouting rock bolt drilling apparatus |
CN110410004B (en) * | 2019-06-05 | 2022-02-15 | 深圳市华建工程项目管理有限公司 | Mortar anchor rod drilling device for building construction |
CN111074887A (en) * | 2019-12-31 | 2020-04-28 | 中铁二十二局集团第五工程有限公司 | Portable soil nail mounting plate |
CN111810204A (en) * | 2020-06-18 | 2020-10-23 | 中铁十六局集团地铁工程有限公司 | Fine adjustment anchorage device and method capable of compensating prestress loss of water-rich sand layer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201526271U (en) | Crawler-type all-hydraulic tunnel drilling machine | |
CN2890312Y (en) | Attached electric short auger drilling machine | |
CN201326382Y (en) | Hydraulic outburst prevention drilling machine for coal seam gas drainage | |
CN111021355B (en) | Hoisting type cast-in-place pile head cutting device | |
CN2263711Y (en) | Roofbolter | |
CN201206465Y (en) | Lifting and rotating coal cutting machine | |
CN110107221B (en) | Ultra-large aperture pore-forming working device and method suitable for complex geological conditions | |
CN201694778U (en) | Downhole hydraulic support assembling and disassembling crane | |
CN201902199U (en) | Power combined type oil pumping machine with ultra long stroke for a plurality of wells | |
CN2816349Y (en) | One-machine multi-well reciprocating oil pumping machine | |
CN209291872U (en) | A kind of coal mine jumbo lifting device | |
CN202265845U (en) | Mine crawler loader | |
CN108757026B (en) | Convenient-to-adjust drainage device in groove of underground winch base | |
CN2931753Y (en) | Minisize well borer | |
CN211898379U (en) | Pile head rotary cutting mechanism of cast-in-place pile | |
CN213150243U (en) | Warning device is used in construction engineering construction | |
CN200964809Y (en) | Blowout prevention device mounting device | |
CN220226736U (en) | Gantry three-arm drilling and anchoring system | |
CN106120933B (en) | A kind of pot hole drilling and digging machine | |
CN221386228U (en) | Variable construction width's chain structure | |
CN2721363Y (en) | Diamond rope saw | |
CN2212037Y (en) | Mulitfunction high speed wellhead by hydraulic lift | |
CN201396133Y (en) | Workover rig dragged by industrial electric network-driven frequency-conversion speed-controlling rare-earth permanent magnet synchronous motor | |
CN220101181U (en) | Integrated drilling and hoisting roof bolter | |
CN2630461Y (en) | Special thin percussion grooving apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |