CN224063291U - Bridge construction hanging basket - Google Patents

Bridge construction hanging basket

Info

Publication number
CN224063291U
CN224063291U CN202520834983.2U CN202520834983U CN224063291U CN 224063291 U CN224063291 U CN 224063291U CN 202520834983 U CN202520834983 U CN 202520834983U CN 224063291 U CN224063291 U CN 224063291U
Authority
CN
China
Prior art keywords
side plate
pedals
bridge construction
connecting rod
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202520834983.2U
Other languages
Chinese (zh)
Inventor
杨柏轩
秦慧
莫庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Zhongxiang Lutong Engineering Co ltd
Original Assignee
Hunan Zhongxiang Lutong Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Zhongxiang Lutong Engineering Co ltd filed Critical Hunan Zhongxiang Lutong Engineering Co ltd
Priority to CN202520834983.2U priority Critical patent/CN224063291U/en
Application granted granted Critical
Publication of CN224063291U publication Critical patent/CN224063291U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge construction hanging basket, which comprises a first side plate, a second side plate, a plurality of pedals, wherein two adjacent pedals are rotationally connected through two parallel connecting arms, the pedals on two sides are respectively and fixedly connected with the first side plate and the second side plate, an adjustable connecting rod is connected between the first side plate and the pedals, a second hanging ring connected with a hanging rope is arranged at the top of the second side plate, a third hanging ring is arranged on the side wall of the second side plate, and a first hanging ring connected with another hanging rope is arranged on the first side plate. The adjustable bridge has the beneficial effects that the adjustable bridge can adapt to angles of different bridge sides after the adjustable bridge is adjusted by the device, so that constructors can stand stably, the constructors can perform larger-area construction operation after the lifting equipment is adjusted in height, the constructors can stand stably, and the construction safety is improved.

Description

Bridge construction hanging basket
Technical Field
The utility model relates to the field of bridge construction, in particular to a bridge construction hanging basket.
Background
In bridge construction, the hanging basket is important high-altitude operation equipment and is commonly used for the installation, maintenance and cleaning work of bridges. Through the hanging flower basket, the workman can carry out accurate operation in the eminence of bridge, ensures efficiency of construction and security. The hanging basket is supported by the steel frame structure and the lifting system, can move between different working surfaces, provides convenience for operations such as lifting, welding and coating, and is widely applied to bridge construction and daily maintenance.
The bottom surface of the prior art devices is typically a relatively large flat plate structure, which has a relatively large disadvantage when facing the sides of the concave bridge. Because the slab structure can not flexibly adapt to different angles of the side edge of the bridge, particularly when the side edge extends towards the inner side of the bottom, constructors can not perform construction operation in a part of areas in the hanging basket of the slab structure, and therefore the condition of limited construction surface is caused.
Disclosure of utility model
The present utility model aims to provide a bridge construction nacelle for solving the above problems, as will be explained in detail below.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a bridge construction hanging basket, which comprises a first side plate, a second side plate, a plurality of pedals, wherein two adjacent pedals are rotationally connected through two parallel connecting arms, the pedals on two sides are respectively and fixedly connected with the first side plate and the second side plate, an adjustable connecting rod is connected between the first side plate and the pedals, a second hanging ring connected with a hanging rope is arranged at the top of the second side plate, a third hanging ring is arranged on the side wall of the second side plate, a first hanging ring connected with another hanging rope is arranged on the first side plate, and the hanging rope penetrates out of the third hanging ring and extends upwards.
Further, the number of the pedals is not less than three.
Further, the connecting rods are located above the pedals, the number of the connecting rods located on one side of the first side plate is not smaller than two, and the connecting rods are distributed along the height direction of the first side plate and the second side plate.
The connecting rod is characterized in that two guide sleeves are sleeved outside the connecting rod in a sliding mode, the guide sleeves are connected with the first side plate and the second side plate in a rotating mode, locking bolts used for locking the guide sleeves are arranged on the first side plate and the second side plate, and fixing bolts used for fixing the connecting rod are connected with the outer sides of the guide sleeves in a threaded mode.
Further stated, the movable end of the connecting rod is provided with a limiting block.
Further stated, the connecting rod is provided with a jack corresponding to the inner end of the fixing bolt.
Further stated, a protective net is arranged between the first side plate and the second side plate.
Further stated, the surface of the pedal is provided with anti-skid patterns.
The beneficial effects are that:
Through adjustable connecting rod and footboard, after the device is adjusted, can be adapted to the angle of different bridge sides, ensure that constructor stands steadily, after lifting device carries out altitude mixture control, constructor can carry out the construction operation of bigger area, ensures that constructor stands steadily, promotes the construction security.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a front view of the present utility model;
Fig. 2 is a front view of the present utility model at the time of construction.
The reference numerals are explained as follows:
1. The device comprises a first side plate, 101, a first hanging ring, 2, a second side plate, 201, a second hanging ring, 202, a third hanging ring, 3, a connecting rod, 301, a guide sleeve, 4, a pedal, 401, a connecting arm and 5, a protective net.
Detailed Description
In order to make the objects, technical solutions and advantages of the present utility model more apparent, the technical solutions of the present utility model will be described in detail below. It will be apparent that the described embodiments are only some, but not all, embodiments of the utility model. All other embodiments, based on the examples herein, which are within the scope of the utility model as defined by the claims, will be within the scope of the utility model as defined by the claims.
First embodiment:
Referring to fig. 1-2, the utility model provides a bridge construction hanging basket, which comprises a first side plate 1 and a second side plate 2, wherein the first side plate 1 and the second side plate 2 are of a vertical plate-shaped structure, the high end of the first side plate 1 is lower than the height of the second side plate 2, the bridge construction hanging basket further comprises a plurality of pedals 4, two adjacent pedals 4 are rotationally connected through two connecting arms 401 which are arranged in parallel, after the connecting arms 401 rotate, the connecting arms 401 can push the two pedals 4 to move so as to realize the position adjustment of the pedals 4, in addition, the position adjustment of the pedals 4 can be kept, the pedals 4 positioned at two sides are fixedly connected with the first side plate 1 and the second side plate 2 respectively, an adjustable connecting rod 3 is connected between the first side plate 1 and the pedals 4, the top of the second side plate 2 is provided with a second hanging ring 201 which is connected with a hanging rope, the side wall of the second side plate 2 is provided with a third hanging ring 202, and the first side plate 1 is provided with a first hanging ring 101 which is connected with another hanging rope, and extends upwards from the third hanging ring 202;
When the device is used, one lifting rope and the first lifting ring 101 are fixed, extend upwards after penetrating through the third lifting ring 202 and are connected with rolling equipment, the other lifting rope is connected with the second lifting ring 201, the movable end part extends upwards and is connected with the rolling equipment, the first lifting ring 101 and the second lifting ring 201 are pulled by utilizing the two rolling equipment, the device is fixed in an auxiliary mode, when the device is used, the device can be adjusted according to the actual conditions of the side edges of a bridge, the distance between a plurality of pedals 4 can be adjusted, namely the device can be suitable for the angles of concave side walls of the side edges of various bridge, a user stands on the pedals 4 to construct the side edges of the bridge, and after the lifting equipment performs position adjustment once, the user can perform construction operation with a larger area by trampling different pedals 4.
The surface of the pedal 4 is provided with anti-skid patterns, so that the stability of the use of a user is improved.
Further, the number of the pedals 4 is not less than three, and the plurality of pedals 4 are used for supporting a user to perform construction.
The second embodiment is different from the first embodiment in that:
The connecting rods 3 are positioned above the pedal 4, the number of the connecting rods 3 positioned at one side of the first side plate 1 is not less than two, the connecting rods 3 are distributed along the height direction of the first side plate 1 and the second side plate 2, in the structure of the device, the connecting rods 3 are positioned at two sides of the first side plate 1 and the second side plate 2, when a user stands on the pedal 4 to perform construction operation, the protection of the sides is formed by the connecting rods 3, in the specific structure of the connecting rods 3, two guide sleeves 301 are sleeved on the outer sides of the connecting rods 3 in a sliding manner, the guide sleeves 301 are rotatably connected with the first side plate 1 and the second side plate 2, locking bolts used for locking the guide sleeves 301 are arranged on the first side plate 1 and the second side plate 2, the fixing bolts used for fixing the connecting rod 3 are connected to the outer side of the guide sleeve 301 in a threaded manner, after the locking bolts are unscrewed, the connecting rod 3 can slide in the guide sleeve 301, after the connecting rod slides to a proper position, the fixing bolts are screwed, the connecting rod 3 is fixed by the fixing bolts, the locking bolts are screwed, and the rotating shaft on the guide sleeve 301 is fixed, so that the first side plate 1, the second side plate 2 and the connecting rod 3 form a stable quadrilateral structure, and the adjustment of a plurality of pedals 4 can be synchronously realized in the position adjustment process between the first side plate 1 and the second side plate 2;
Further, be equipped with the jack that corresponds with fixing bolt inner on the connecting rod 3, the jack is along the length direction evenly distributed of connecting rod 3, then fixing bolt is when locking connecting rod 3, and fixing bolt inner stretches into in the jack, realizes fixing connecting rod 3, and is fixed effectual.
In addition, the movable end of the connecting rod 3 is provided with a limiting block, so that the connecting rod 3 can be prevented from falling out of the guide sleeve 301.
The third embodiment is different from the first embodiment in that:
Be equipped with protection network 5 between first curb plate 1 and the second curb plate 2, the face in opposite directions of first curb plate 1 and second curb plate 2 is equipped with the suspension hook, and protection network 5 and suspension hook fixed setting, protection network 5 are located footboard 4 below, utilize protection network 5 can protect when the user uses.
The foregoing is merely illustrative of the present utility model, and the present utility model is not limited thereto, and any person skilled in the art will readily recognize that variations or substitutions are within the scope of the present utility model. Therefore, the protection scope of the present utility model shall be subject to the protection scope of the claims.

Claims (8)

1.一种桥梁施工吊篮,包括第一侧板(1)和第二侧板(2),其特征在于:1. A bridge construction scaffold, comprising a first side plate (1) and a second side plate (2), characterized in that: 还包括多个踏板(4),相邻两个所述踏板(4)之间通过两个平行设置的连接臂(401)转动连接,位于两侧的踏板(4)分别与所述第一侧板(1)和所述第二侧板(2)固定连接,所述第一侧板(1)和所述踏板(4)之间连接有可调节的连接杆(3);It also includes multiple pedals (4), with two adjacent pedals (4) rotatably connected by two parallel connecting arms (401), and the pedals (4) on both sides are fixedly connected to the first side plate (1) and the second side plate (2) respectively. An adjustable connecting rod (3) is connected between the first side plate (1) and the pedals (4). 所述第二侧板(2)顶部设有连接吊绳的第二吊环(201),所述第二侧板(2)侧壁设有第三吊环(202),所述第一侧板(1)设有连接另一吊绳的第一吊环(101),该吊绳从第三吊环(202)穿出,且向上延伸。The second side plate (2) has a second lifting ring (201) for connecting the lifting rope at the top, and a third lifting ring (202) on the side wall of the second side plate (2). The first side plate (1) has a first lifting ring (101) for connecting another lifting rope, which passes through the third lifting ring (202) and extends upward. 2.根据权利要求1所述的一种桥梁施工吊篮,其特征在于:所述踏板(4)的数量不小于三个。2. The bridge construction scaffolding according to claim 1, characterized in that: the number of the treads (4) is not less than three. 3.根据权利要求1所述的一种桥梁施工吊篮,其特征在于:所述连接杆(3)位于所述踏板(4)上方,且位于所述第一侧板(1)一侧的所述连接杆(3)数量不小于两个,且沿所述第一侧板(1)和所述第二侧板(2)的高度方向分布。3. A bridge construction scaffold according to claim 1, characterized in that: the connecting rod (3) is located above the tread (4), and the number of the connecting rods (3) located on one side of the first side plate (1) is not less than two, and they are distributed along the height direction of the first side plate (1) and the second side plate (2). 4.根据权利要求3所述的一种桥梁施工吊篮,其特征在于:所述连接杆(3)外侧滑动套装有两个导向套(301),所述导向套(301)与所述第一侧板(1)和所述第二侧板(2)转动连接,所述第一侧板(1)和所述第二侧板(2)上设有用于对所述导向套(301)进行锁紧的锁紧螺栓,所述导向套(301)外侧螺纹连接有用于对所述连接杆(3)固定的固定螺栓。4. A bridge construction scaffold according to claim 3, characterized in that: two guide sleeves (301) are slidably fitted on the outer side of the connecting rod (3), the guide sleeves (301) are rotatably connected to the first side plate (1) and the second side plate (2), the first side plate (1) and the second side plate (2) are provided with locking bolts for locking the guide sleeves (301), and the outer side of the guide sleeves (301) is threaded with fixing bolts for fixing the connecting rod (3). 5.根据权利要求4所述的一种桥梁施工吊篮,其特征在于:所述连接杆(3)活动端部设有限位块。5. A bridge construction scaffold according to claim 4, characterized in that: a limiting block is provided at the movable end of the connecting rod (3). 6.根据权利要求4所述的一种桥梁施工吊篮,其特征在于:所述连接杆(3)上设有与所述固定螺栓内端对应的插孔。6. A bridge construction scaffold according to claim 4, characterized in that: the connecting rod (3) is provided with an insertion hole corresponding to the inner end of the fixing bolt. 7.根据权利要求1所述的一种桥梁施工吊篮,其特征在于:所述第一侧板(1)和所述第二侧板(2)之间设有防护网(5)。7. A bridge construction scaffold according to claim 1, characterized in that: a protective net (5) is provided between the first side plate (1) and the second side plate (2). 8.根据权利要求1所述的一种桥梁施工吊篮,其特征在于:所述踏板(4)表面设有防滑纹。8. A bridge construction scaffold according to claim 1, characterized in that: the surface of the tread (4) is provided with anti-slip texture.
CN202520834983.2U 2025-04-29 2025-04-29 Bridge construction hanging basket Active CN224063291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202520834983.2U CN224063291U (en) 2025-04-29 2025-04-29 Bridge construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202520834983.2U CN224063291U (en) 2025-04-29 2025-04-29 Bridge construction hanging basket

Publications (1)

Publication Number Publication Date
CN224063291U true CN224063291U (en) 2026-03-31

Family

ID=99198531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202520834983.2U Active CN224063291U (en) 2025-04-29 2025-04-29 Bridge construction hanging basket

Country Status (1)

Country Link
CN (1) CN224063291U (en)

Similar Documents

Publication Publication Date Title
CN110902579A (en) Hydraulic lifting device for construction
CN224063291U (en) Bridge construction hanging basket
CN205802864U (en) Novel architecture lowering or hoisting gear
CN107859475B (en) Height-adjustable anti-falling aerial working platform ladder
CN207240173U (en) Membrane pump outlet valve chamber opens and inspect device and the diaphragm pump of device is opened and inspect with valve chamber
CN104060939A (en) Ladder for maintaining large grab bucket
CN207672441U (en) An integrated steel truss beam bolt screwing work platform
CN210003199U (en) general type steelframe cat ladder climbing equipment
CN221119325U (en) Building jacking device
CN208899832U (en) A kind of scaffold that construction security performance is high
CN219691038U (en) Novel scaffold based on construction safety
CN209339555U (en) A kind of construction scaffold
CN207078935U (en) A kind of portable full circle swinging mast loop wheel machine anchor
CN217536662U (en) Guardrail flange plate construction moving trolley in bridge floor
CN205740254U (en) A kind of power transformation overhaul platform of many mounting means
CN223426496U (en) A universal auxiliary installation device for detecting the anti-slip coefficient of friction plates
CN216076199U (en) Scaffold for building engineering
CN221073402U (en) Building construction scaffold with safety protection function
CN206158136U (en) But decorate facade construction mobile scaffold
CN117145253B (en) A recyclable working-level planar opening protection device and its installation method
CN220100568U (en) Building construction frame
CN221919025U (en) Construction device for bridge anti-collision wall
CN213174711U (en) Movable building scaffold
CN206931906U (en) Electricity box install power assisting device
CN219840355U (en) Hanging basket device suitable for arc-shaped structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant