CN223936175U - Novel hanging basket equipment for counterweight hoisting-free - Google Patents

Novel hanging basket equipment for counterweight hoisting-free

Info

Publication number
CN223936175U
CN223936175U CN202520460963.3U CN202520460963U CN223936175U CN 223936175 U CN223936175 U CN 223936175U CN 202520460963 U CN202520460963 U CN 202520460963U CN 223936175 U CN223936175 U CN 223936175U
Authority
CN
China
Prior art keywords
counterweight
support
hanging basket
suspension rope
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202520460963.3U
Other languages
Chinese (zh)
Inventor
赵孝辉
张琦
袁越
张淋勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Bureau Fifth Construction Co ltd
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Bureau Fifth Construction Co ltd
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Bureau Fifth Construction Co ltd, China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Bureau Fifth Construction Co ltd
Priority to CN202520460963.3U priority Critical patent/CN223936175U/en
Application granted granted Critical
Publication of CN223936175U publication Critical patent/CN223936175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a hanging basket for house reconstruction. The novel hanging basket device is simple in structure, light, convenient and high in adaptability, and the counterweight is free from being lifted. The utility model relates to novel hanging basket equipment with a counterweight free of hoisting, which comprises a suspension assembly, a counterweight assembly and a lifting assembly, wherein the suspension assembly comprises a bracket, the bracket is erected on a roof of a building, the counterweight assembly comprises a counterweight block, the counterweight block is fixedly arranged on the ground on one side of the building, the lifting assembly comprises a hanging rope, a hanging basket and a lifter, the hanging basket is arranged on the ground on the other side of the building opposite to the counterweight block, the hanging rope is supported by the bracket, one end of the hanging rope is connected to the counterweight block, the other end of the hanging rope is connected to the hanging basket, the lifter is arranged in the hanging basket and connected with the hanging rope, and the hanging basket is driven to move up and down by stretching the hanging rope through the lifter.

Description

Novel hanging basket equipment for counterweight hoisting-free
Technical Field
The utility model relates to hanging basket equipment, in particular to novel hanging basket equipment for lifting-free counterweights for house reconstruction.
Background
In the construction elevation reconstruction engineering, the hanging basket is used as a working platform for constructors, the electric hanging basket for high-altitude operation is low in price, simple to operate and convenient to install, and has no bearing requirement on the wall surface compared with a wall-attached scaffold, the hanging basket (counterweight bracket) has no need of repairing the wall surface after being detached, so that the construction quality is improved, the hanging operation platform can flexibly move up and down with a certain load of materials, and can work in places where the scaffold cannot be erected and the personnel cannot be accessed, the construction operation is convenient, the construction progress is accelerated, and the hanging basket is widely applied to the decoration construction of the outer wall of a building.
However, in the engineering of reforming old communities, conventional standard mounting baskets are limited due to narrow terrain, and the hanging mechanisms and configurations of the baskets cannot be mounted by using hoisting machinery. In addition, the roof precast slabs of old communities often lose repair over time, the roof bearing capacity cannot meet the requirement, and the roof structure can be damaged after the counterweight is mounted on the roof. Therefore, research and application of a novel hanging basket equipment installation technology are imperative.
Disclosure of utility model
The utility model provides novel hanging basket equipment with a simple structure, portability and strong adaptability, which is free of counterweight lifting and solves the technical problems.
The utility model discloses novel hanging basket equipment with a counterweight free of hoisting, which comprises a suspension assembly, a counterweight assembly and a lifting assembly, wherein the suspension assembly comprises a bracket, the bracket is erected on a building roof, the counterweight assembly comprises a counterweight block, the counterweight block is fixedly arranged on the ground on one side of the building, the lifting assembly comprises a hanging rope, a hanging basket and a lifter, the hanging basket is arranged on the ground on the other side of the building opposite to the counterweight block, the hanging rope is supported by the bracket, one end of the hanging rope is connected to the counterweight block, the other end of the hanging rope is connected to the hanging basket, the lifter is arranged in the hanging basket and is connected with the hanging rope, and the hanging basket is driven to move in a lifting manner by stretching the hanging rope through the lifter.
The utility model relates to novel hanging basket equipment with a counterweight free of hoisting, wherein the hanging rope comprises a first hanging rope and a second hanging rope, the two hanging ropes are arranged on a support, the two hanging ropes are supported by the first support, one end of each hanging rope is connected with one hanging basket, the other end of each hanging rope is supported by the second support, one end of each second hanging rope is connected with the other hanging basket, and the other end of each second hanging rope is connected with the other hanging basket.
The utility model relates to novel hanging basket equipment free of counterweight lifting, wherein a first bracket comprises a front arm, a middle arm and a rear arm, the front arm and the rear arm are supported on a building roof, the middle arm is connected to the front arm and the rear arm, a fixing rod is further connected between the front arm and the rear arm, and the second bracket structure is identical to the first bracket.
The utility model relates to novel hanging basket equipment free of counterweight lifting, wherein a first support and a second support are respectively provided with a first supporting point, a second supporting point, a third supporting point and a fourth supporting point, the first supporting point is arranged on a front arm, the second supporting point is arranged on a rear arm, the third supporting point and the fourth supporting point are arranged on a middle arm, and a lifting rope is supported on the first supporting point, the second supporting point, the third supporting point and the fourth supporting point.
The utility model relates to novel hanging basket equipment with a counterweight free of hoisting, wherein each supporting point of a first bracket and a second bracket for supporting a hanging rope is provided with an anti-skid wheel.
The utility model relates to novel hanging basket equipment free of counterweight lifting, wherein contact ends of a front arm and a rear arm with the top surface of a building are respectively set to be triangular supports, and anti-skid plates are arranged below the triangular supports.
The utility model relates to novel hanging basket equipment with a counterweight free of hoisting, wherein the counterweight assembly further comprises a ground steel plate, the counterweight block is fixed on the ground steel plate, and the ground steel plate is fixed on the ground through foundation bolts.
The utility model is characterized in that the heavy weight component is transferred to the ground, the heavy weight steel plate and the counterweight are fixed on one side of a building through the foundation bolts to form a fixed stress point, the first bracket and the second bracket with lighter weight are fixed on the top surface of the building to form another stress point, the hanging basket on the opposite side of the heavy weight component is a third stress point, the three stress points are sequentially connected by two hanging ropes to form a supporting framework, the lifting movement of the hanging basket is realized by stretching the hanging ropes by a lifter, and the front arm, the middle arm and the rear arm of the first bracket and the second bracket are assembled structures which can be flexibly disassembled and assembled, so that the hanging basket is convenient to move and carry, and the hanging basket is also suitable for old and old communities with some narrow roads and compact structures.
The novel hanging basket equipment free of counterweight lifting at least comprises the following beneficial effects:
the hanging basket device solves the technical problems that the hanging basket device cannot be lifted due to narrow topography, the roof bearing capacity cannot meet the requirements, and the like, and has simple construction technology, economy, environmental protection, strong operability, low requirement on construction district buildings, strong adaptability, capability of ensuring engineering quality and accelerating construction progress during construction, obvious economic benefit and social benefit, and wide popularization prospect.
The utility model is further described below with reference to the accompanying drawings.
Drawings
FIG. 1 is a schematic diagram of a perspective structure of a novel hanging basket device with a counterweight free from hoisting, which is arranged on a building;
FIG. 2 is a schematic diagram showing a perspective structure of a novel hanging basket device with a counterweight free from hoisting, which is arranged on a building;
FIG. 3 is a schematic perspective view of a novel hanging basket device with counterweight free of hoisting;
FIG. 4 is an enlarged view of a portion of the utility model at A in FIG. 3;
Fig. 5 is a schematic perspective view of a basket according to the present utility model.
Reference numerals:
01-suspension assembly, 10-bracket, 11-first bracket, 12-second bracket, 111-front arm, 112-middle arm, 113-rear arm, 13-fixed rod, 14-anti-skid wheel, 15-triangular support, 16-anti-skid plate, 02-counterweight assembly, 21-counterweight block, 22-ground steel plate, 03-lifting assembly, 31-lifting rope, 311-first lifting rope, 312-second lifting rope, 32-hanging basket, 33-lifting machine and 04-building.
Detailed Description
As shown in figure 1, the novel hanging basket equipment capable of avoiding lifting the counterweight comprises a suspension assembly 01, a counterweight assembly 02 and a lifting assembly 03, wherein the suspension assembly 01 comprises a support 10, the support 10 is erected on a roof of a building 04, the counterweight assembly 02 comprises a counterweight 21, the counterweight 21 is fixedly arranged on the ground on one side of the building 04, the lifting assembly 03 comprises a hanging rope 31, a hanging basket 32 and a lifting machine 33, the hanging basket 32 is arranged on the ground on the other side of the building 04 opposite to the counterweight 21, the hanging rope 31 is supported by the support 10, one end of the hanging rope 31 is connected to the counterweight 21, the other end of the hanging rope is connected to the hanging basket 32, the lifting machine 33 is arranged in the hanging basket 32 and is connected with the hanging rope 31, and the hanging rope 31 is stretched by the lifting machine 33 to drive the hanging basket 32 to move in a lifting mode.
The hanging basket 32 is generally in a cuboid shape and has a certain length and is used for bearing workers or construction tools and materials, the bracket 10 is erected on a roof of a building 04 to form a stress point for bearing, the balancing weight 21 is fixed on the ground to form a stress point on the ground, the ground balancing weight omits a balancing lifting procedure on one hand, roof load is reduced, the balancing weight is convenient to move subsequently, and when a plurality of old communities are constructed on the other hand, the bearing capacity is reduced due to too long time of the building 04, and the ground balancing weight can avoid the problems that the building 04 collapses or the top structure is damaged and the like.
As shown in fig. 3, the hanging rope 31 includes a first hanging rope 311 and a second hanging rope 312, the support 10 includes a first support 11 and a second support 12, the two weight blocks 21 are provided, the first hanging rope 311 is supported by the first support 11, one end of the first hanging rope 311 is connected with one weight block 21, the other end of the first hanging rope 311 is connected with one end of the hanging basket 32, the second hanging rope 312 is supported by the second support 12, one end of the second hanging rope 312 is connected with the other weight block 21, and the other end of the second hanging rope 312 is connected with the other end of the hanging basket 32.
One or more balancing weights 21 are connected to each lifting rope 31, so that the firmness of connection of the lifting ropes 31 is ensured. The first bracket 11 and the second bracket 12 are spaced apart by a distance, and the two weights 21 are also spaced apart by the same distance as the two brackets, which is the same as the length of the basket 32, and of course, a certain deviation is allowed, and the deviation is not particularly limited here. The first lifting rope 311 and the second lifting rope 312 are respectively erected on the first bracket 11 and the second bracket 12, one end of each lifting rope 31 is fixedly connected with the balancing weight 21 on the same side through bolts or locking pins, the other end of each lifting rope 31 is respectively fixed at the left end and the right end of the hanging basket 32, the arrangement is that the first bracket 11, one balancing weight 21 on the same side and one end of the hanging basket 32 are positioned on the same straight line, the second bracket 12, the other balancing weight 21 on the same side and the other end of the hanging basket 32 are also positioned on the same straight line, when the hanging basket 32 is lifted, the left end and the right end of each hanging basket 32 are stressed to lead the hanging ropes 31 to be straightened, the two hanging ropes 31 are ensured to only bear the force in the length direction, on one hand, the stability of the novel hanging basket 32 structure and the lifting stability are ensured, and on the other hand, faults such as breakage of the hanging ropes 31 or side turning over of the hanging basket 10 caused by deflection force of the hanging ropes 31 are avoided, and safety accidents such as falling of workers in the hanging basket 32 caused by the faults are avoided.
As shown in fig. 5, one or two lifters 33 may be provided according to a specific situation, if one lifter 33 is provided, the lifters may be fixed on the left side or the right side in the basket 32 by bolts, if two lifters 33 are provided, the lifters 33 are respectively fixed on the left side and the right side in the basket 32 by bolts, friction wheels or reels are provided in the lifters 33, the lifting ropes 31 are connected to the friction wheels or reels, the first bracket 11 and the second bracket 12 are fixed on the roof of the building 04 during construction, the distance between the two brackets 10 is set according to the length of the basket 32, the two counterweights 21 are fixed on one side of the building 04, the distance between the two counterweights is set, then the two lifting ropes 31 are respectively erected on the two brackets 10, and are respectively connected to the two counterweights 21, the other ends are fixed on the basket 32 and are connected to the lifters 33, and finally, the lifting motor is electrified, at this time, the novel basket 32 is installed.
When the hanging basket 32 needs to be lifted, a switch of the lifting machine 33 is turned on, the lifting button of the panel is controlled by the lifting machine 33 to be operated, the lifting machine 33 rotates clockwise or anticlockwise, the friction wheel or the winding drum rotates along with the lifting button to pull the hanging rope 31, the hanging basket 32 ascends under the driving of the lifting machine 33, and similarly, when the hanging basket 32 needs to be lowered, the descending button of the panel of the lifting machine 33 is controlled, the lifting machine 33 rotates anticlockwise or clockwise, the friction wheel or the winding drum rotates along with the lifting button and pulls the hanging rope 31, and the hanging basket 32 descends under the driving of the lifting machine 33.
In the lifting process of the hanging basket 32, the balancing weight 21 is always fixed on the ground, and the hanging basket 32 and all the gravity in the hanging basket 32 are borne by the balancing weight 21 on the ground and the two supports 10 on the roof, so that the pressure on the roof of the building 04 is relieved, and the damage caused by overweight stress is avoided.
As shown in fig. 1 and 3, the first bracket 11 includes a front arm 111, a middle arm 112 and a rear arm 113, the front arm 111 and the rear arm 113 are supported on the roof of the building 04, the middle arm 112 is connected to the front arm 111 and the rear arm 113, a fixing rod 13 is further connected between the front arm 111 and the rear arm 113, and the second bracket 12 has the same structure as the first bracket 11.
The first bracket 11 and the second bracket 12 comprise a front arm 111, a middle arm 112 and a rear arm 113, the front arm 111 and the rear arm 113 are identical in structure, are both supported on a roof of the building 04 and can be vertically supported or slightly inclined, when bearing, the gravity of the novel hanging basket 32 is ensured to be supported by the two brackets 10, the front arm 111 and the rear arm 113 are connected through the middle arm 112 to form a supporting framework, and light high-strength steel is adopted, wherein the middle arm 112 is firmly connected with the front arm 111 and the rear arm 113 through bolts or locking pins, and the detachable structure is convenient to transport, saves space and has strong adaptability.
In order to enhance the bearing capacity and stability of the first bracket 11 and the second bracket 12, two or more fixing rods 13 are connected between the front arm 111 and the rear arm 113 by bolts, and the fixing rods 13 are installed to cross each other to reinforce the front and rear arms 113.
As shown in fig. 1 and 3, the first bracket 11 and the second bracket 12 are provided with a first supporting point, a second supporting point, a third supporting point and a fourth supporting point, the first supporting point is arranged on the front arm 111, the second supporting point is arranged on the rear arm 113, the third supporting point and the fourth supporting point are arranged on the middle arm 112, and the lifting rope 31 is supported on the first supporting point, the second supporting point, the third supporting point and the fourth supporting point.
The first bracket 11 and the second bracket 12 formed by the front arm 111, the middle arm 112 and the rear arm 113 form four stress points, namely a first supporting point, a second supporting point, a third supporting point and a fourth supporting point, the first lifting rope 311 and the second lifting rope 312 are respectively erected on the four supporting points of the first bracket 11 and the second bracket 12, the trend of the lifting rope 31 is changed through the four supporting points, so that functions of traction and the like of the hanging basket 32 are realized, on one hand, the four supporting points can disperse stress of the lifting rope 31 and the bracket 10, so that the lifting rope 31 cannot be broken due to stress concentration, the bracket 10 cannot deform or roll over due to stress concentration, on the other hand, the longer middle arm 112 enables the third supporting point and the fourth supporting point to exceed the building 04, so that friction is not generated between the lifting rope 31 and the building 04, a certain space is ensured, and a stable connection between the lifting rope 32 and the hanging basket 32 and the building 04 is also not generated, on the other hand, the four supporting points are positioned on a straight line, the lifting rope 31 cannot be stressed, so that the lateral stability of the lifting rope 31 is not prolonged, and the stability of the lifting rope 10 is further ensured.
As shown in fig. 4, each of the first bracket 11 and the second bracket 12 is provided with an anti-skid wheel 14 at a supporting point for supporting the hoist rope 31.
The four supporting points on the two brackets 10 are provided with the anti-skid wheel 14, the anti-skid wheel 14 is provided with the groove for placing the lifting rope 31, the lifting rope 31 is placed in the groove of the anti-skid wheel 14, the friction force between the lifting rope 31 and the brackets 10 is reduced through the anti-skid wheel 14, and the lifting rope 31 is placed in the groove of the anti-skid wheel 14, so that the position of the lifting rope 31 on the pulley is more stable, and the service life of the lifting rope 31 is prolonged.
As shown in fig. 2, the contact ends of the front arm 111 and the rear arm 113 with the top surface of the building 04 are respectively provided with a triangular support 15, and a antiskid plate 16 is arranged under the triangular support 15.
Because the hanging basket 32 has certain weight, during the use, the staff works in the hanging basket 32, in order to ensure the safety of workers and the stability of the hanging basket 32, the lower ends of the front arm 111 and the rear arm 113 (namely the contact ends of the front arm 111 and the rear arm 113 with the top surface of the building 04 respectively) of the first bracket 11 and the second bracket 12 are arranged to be in a triangular support 15 structure, so that the contact area between the bracket 10 and the roof of the building 04 is increased on the one hand, and on the other hand, when the bracket 10 bears load, the stability of the triangular support 15 structure is utilized, so that the bracket 10 is stably supported in the left-right direction, and the condition of shaking left-right or even rollover can not occur. Each of the front arm 111 and the rear arm 113 is provided with a cleat 16 below, the material of the cleat 16 is not limited, steel or other materials may be used, the roof of the building 04 may be complex, and may be too smooth, so that the support 10 may be stably supported on the roof of the building 04 through the cleat 16, and on the other hand, the waterproof layer of the roof of the building 04 may not be broken due to the overlarge stress of the support 10, thereby ensuring the stability and safety of the novel basket 32.
As shown in fig. 2, the counterweight assembly 02 further includes a ground steel plate 22, the counterweight 21 is fixed to the ground steel plate 22 by bolts or locking pins, and the ground steel plate 22 is fixed to the ground by anchor bolts.
During operation, because the weight of the hanging basket 32 and workers in the hanging basket 32 is large, the stress at two ends of the hanging rope 31 is difficult to balance (namely, the connecting end of the hanging basket 32 and the connecting end of the hanging basket 21) by means of the weight of the balancing weight 21 alone, in order to firmly fix the hanging rope 31 on the ground, the novel hanging basket 32 is provided with two ground steel plates 22, the balancing weights 21 connected on the two hanging ropes 31 are respectively pressed on the two ground steel plates 22 and are fixed together through bolts, locking pins or steel wires and the like, then the ground steel plates 22 are firmly fixed on the ground through foundation bolts, and during construction, the weight of the hanging basket 32 and workers is balanced through the ground steel plates 22 and the balancing weights 21 fixed on the ground, so that the durable and stable operation of the novel hanging basket 32 is ensured.
It should be noted that, the positional or positional relationship indicated by the terms such as "center", "upper", "lower", "front", "rear", "left", "right", "middle", etc. are based on the positional or positional relationship shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or element referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
In the description of the present utility model, unless explicitly stated and limited otherwise, the terms "connected" and "connected" are to be construed broadly, and for example, they may be fixedly connected, detachably connected, or integrally connected, mechanically connected, electrically connected, or indirectly connected through an intermediate medium. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
The above examples are only illustrative of the preferred embodiments of the present utility model and are not intended to limit the scope of the present utility model, and various modifications and improvements made by those skilled in the art to the technical solution of the present utility model should fall within the scope of protection defined by the claims of the present utility model without departing from the spirit of the present utility model.

Claims (7)

1.一种配重免吊装的新型吊篮设备,其特征在于:包括悬架组件、配重组件和升降组件,所述悬架组件包括支架,所述支架架设在建筑物屋顶上;所述配重组件包括配重块,所述配重块固定设置在建筑物一侧地面上;所述升降组件包括吊绳、吊篮和升降机,所述吊篮设置在建筑物相对配重块另一侧地面上,所述吊绳通过支架支撑,所述吊绳一端连接在配重块上,另一端连接在吊篮上,所述升降机设置在吊篮内与吊绳连接,经升降机拉伸吊绳驱动吊篮升降运动。1. A novel suspended platform device with counterweight-free installation, characterized in that: it includes a suspension assembly, a counterweight assembly, and a lifting assembly; the suspension assembly includes a bracket erected on the roof of a building; the counterweight assembly includes a counterweight block fixedly installed on the ground on one side of the building; the lifting assembly includes a suspension rope, a suspended platform, and a lift; the suspended platform is installed on the ground on the opposite side of the building from the counterweight block; the suspension rope is supported by the bracket, one end of the suspension rope is connected to the counterweight block, and the other end is connected to the suspended platform; the lift is installed inside the suspended platform and connected to the suspension rope, and the lift drives the suspended platform to move up and down by stretching the suspension rope. 2.根据权利要求1所述的一种配重免吊装的新型吊篮设备,其特征在于:所述吊绳包括第一吊绳和第二吊绳,所述支架包括第一支架和第二支架,所述配重块设有两个,所述第一吊绳经第一支架支撑,第一吊绳一端与一个配重块连接,第一吊绳另一端连接在吊篮一端,所述第二吊绳经第二支架支撑,第二吊绳一端与另一个配重块连接,第二吊绳另一端连接在吊篮另一端。2. A novel suspended platform device with counterweight-free installation according to claim 1, characterized in that: the suspension rope includes a first suspension rope and a second suspension rope, the support includes a first support and a second support, two counterweights are provided, the first suspension rope is supported by the first support, one end of the first suspension rope is connected to one counterweight, and the other end of the first suspension rope is connected to one end of the suspended platform, the second suspension rope is supported by the second support, one end of the second suspension rope is connected to another counterweight, and the other end of the second suspension rope is connected to the other end of the suspended platform. 3.根据权利要求2所述的一种配重免吊装的新型吊篮设备,其特征在于:所述第一支架包括前臂、中臂和后臂,所述前臂与后臂支撑在建筑物屋顶上,所述中臂连接在前臂和后臂上,所述前臂与后臂之间还连接有固定杆,所述第二支架结构与第一支架相同。3. A novel suspended platform equipment with counterweight-free installation according to claim 2, characterized in that: the first support includes a front arm, a middle arm and a rear arm, the front arm and the rear arm are supported on the roof of the building, the middle arm is connected to the front arm and the rear arm, and a fixing rod is also connected between the front arm and the rear arm, and the structure of the second support is the same as that of the first support. 4.根据权利要求3所述的一种配重免吊装的新型吊篮设备,其特征在于:所述第一支架和第二支架均设置有第一支撑点、第二支撑点、第三支撑点和第四支撑点,所述第一支撑点设置在前臂上,所述第二支撑点设置在后臂上,所述第三支撑点和第四支撑点设置在中臂上,所述吊绳支撑在第一支撑点、第二支撑点、第三支撑点和第四支撑点上。4. A novel suspended platform device with counterweight-free installation according to claim 3, characterized in that: both the first support and the second support are provided with a first support point, a second support point, a third support point and a fourth support point, the first support point is provided on the forearm, the second support point is provided on the rear arm, the third support point and the fourth support point are provided on the middle arm, and the suspension rope is supported on the first support point, the second support point, the third support point and the fourth support point. 5.根据权利要求4所述的一种配重免吊装的新型吊篮设备,其特征在于:所述第一支架和第二支架的每个用于支撑吊绳的支撑点上均设置有防滑轮。5. A novel suspended platform device with counterweight and no hoisting required according to claim 4, characterized in that: each support point of the first bracket and the second bracket for supporting the suspension rope is provided with an anti-slip wheel. 6.根据权利要求5所述的一种配重免吊装的新型吊篮设备,其特征在于:所述前臂和后臂各自与建筑物顶面接触端均设置为三角支座,所述三角支座下设有防滑板。6. A novel suspended platform equipment with counterweight-free installation according to claim 5, characterized in that: the contact ends of the forearm and the rear arm with the top surface of the building are each provided with a triangular support, and an anti-slip plate is provided under the triangular support. 7.根据权利要求6所述的一种配重免吊装的新型吊篮设备,其特征在于:所述配重组件还包括地面钢板,所述配重块固定在地面钢板上,所述地面钢板经地脚螺栓固定在地面上。7. A novel suspended platform equipment with counterweight that does not require hoisting, as described in claim 6, characterized in that: the counterweight assembly further includes a ground steel plate, the counterweight block is fixed on the ground steel plate, and the ground steel plate is fixed to the ground by anchor bolts.
CN202520460963.3U 2025-03-17 2025-03-17 Novel hanging basket equipment for counterweight hoisting-free Active CN223936175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202520460963.3U CN223936175U (en) 2025-03-17 2025-03-17 Novel hanging basket equipment for counterweight hoisting-free

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202520460963.3U CN223936175U (en) 2025-03-17 2025-03-17 Novel hanging basket equipment for counterweight hoisting-free

Publications (1)

Publication Number Publication Date
CN223936175U true CN223936175U (en) 2026-02-24

Family

ID=98818066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202520460963.3U Active CN223936175U (en) 2025-03-17 2025-03-17 Novel hanging basket equipment for counterweight hoisting-free

Country Status (1)

Country Link
CN (1) CN223936175U (en)

Similar Documents

Publication Publication Date Title
CN111847267B (en) A cantilever crane
CN214935378U (en) A steel structure hoisting device
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN117886229B (en) Multifunctional integrated rail type lifting mechanism
CN220907002U (en) Hanging box shifting equipment
CN220317191U (en) Jig frame standard knot dismounting device
CN216711434U (en) High-lift hoister
CN219906654U (en) Curtain wall glass erects device
CN2154250Y (en) Mini-tower hoist
CN214114710U (en) Building engineering hoist device
CN116119532A (en) Maintenance device for vertical heavy hammer tensioning roller of belt conveyor and use method
CN213085125U (en) Elevator shaft traction rotary telescopic construction hoist
JPH04358698A (en) Carriage type crane
CN107344698A (en) A special high-altitude crane
CN116374798A (en) Lifters for the superstructure of aluminum electrolytic cells
CN2057658U (en) Self-lifting type crane
JP5458385B2 (en) crane
CN111302201A (en) Self-walking mechanical equipment lifting frame
CN215160421U (en) A high security hoisting machine constructs for electromechanical device installation
CN217297081U (en) Attached cross beam and upright post hoop device of tower crane
CN212769442U (en) Building material vertical hoisting device
CN220078360U (en) Concrete prefabricated section transfer device
CN217264459U (en) Pulley block hoisting equipment
CN212668966U (en) Lifting appliance structure for lifting high-altitude heavy object

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant