CN223922599U - An unconventional cantilever scaffold - Google Patents
An unconventional cantilever scaffoldInfo
- Publication number
- CN223922599U CN223922599U CN202520542256.9U CN202520542256U CN223922599U CN 223922599 U CN223922599 U CN 223922599U CN 202520542256 U CN202520542256 U CN 202520542256U CN 223922599 U CN223922599 U CN 223922599U
- Authority
- CN
- China
- Prior art keywords
- main beam
- cantilever
- floor slab
- unconventional
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model relates to the technical field of constructional engineering and discloses an unconventional cantilever scaffold which is erected on a floor slab and a side beam of a building structure body and comprises a cantilever mechanism and a plurality of embedded anchoring mechanisms, wherein the cantilever mechanism comprises a main beam rod, a short vertical rod and inclined strut struts which are fixedly connected together, the main beam rod is arranged on the top surface of the floor slab, one end of the main beam rod extends out of the floor slab to form a cantilever end, the short vertical rod is positioned on the bottom surface of the cantilever end of the main beam rod, the short vertical rod is used for propping against the side beam, the inclined strut is positioned between one side of the short vertical rod, which is far away from the side beam, and the bottom surface of the cantilever end of the main beam rod, and the embedded anchoring mechanisms are arranged on the floor slab.
Description
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to an unconventional overhanging scaffold.
Background
In recent years, with the rapid development of civil buildings, the building height is continuously increased, and particularly under the condition of the shortage of the land used for the current building, the development of the civil buildings is mostly high-rise houses, but due to the large input amount of disposable steel pipes and fasteners of the floor type scaffold, the floor type scaffold cannot meet the construction requirements along with the increase of structural layers.
At present, the cantilever scaffold is the most commonly applied scaffold in high-rise building engineering, but when the cantilever outer scaffold forms an irregular cantilever scaffold with an ultra-long cantilever end due to special construction requirements, the far end of the horizontal cantilever steel beam is controlled by increasing the section of the cantilever steel beam or adding a diagonal structure due to overlarge deflection, so that the construction is complex, and the common diagonal steel wire rope is used, and is easy to stretch after being stressed, so that the safety risk of the cantilever scaffold is increased.
Disclosure of utility model
The utility model aims to provide an unconventional overhanging scaffold, which aims to solve or improve at least one of the technical problems.
In order to achieve the above purpose, the utility model provides a non-conventional overhanging scaffold which is erected on a floor slab and a side beam of a building structure body and comprises the following steps:
The cantilever mechanism comprises a main beam rod, a short vertical rod and an inclined strut rod which are fixedly connected together, wherein the main beam rod is arranged on the top surface of the floor slab, one end of the main beam rod extends out of the floor slab to form a cantilever end, the short vertical rod is positioned on the bottom surface of the cantilever end of the main beam rod, the short vertical rod is used for propping against the side beam, and the inclined strut rod is positioned between one side, far away from the side beam, of the short vertical rod and the bottom surface of the cantilever end of the main beam rod;
the embedded anchoring mechanisms are arranged on the floor slab and detachably connected with the main beam rod.
Optionally, the pre-buried anchoring mechanism includes:
The U-shaped bolt anchor ring is arranged on the floor slab, and the main beam rod is positioned in the inner ring of the U-shaped bolt anchor ring;
the angle steel is arranged on the top surface of the main beam rod and is detachably connected with the U-shaped bolt anchor ring through a nut.
Optionally, the system further comprises a plurality of first steel bars arranged in the floor slab, wherein the first steel bars are used for fixing the positions of the anchor rings of the U-shaped bolts.
Optionally, a wooden wedge is arranged between the two sides of the main beam and the U-shaped bolt anchor ring.
Optionally, a wood board is disposed between the floor slab and the main beam.
Optionally, the cantilever end top surface of main beam pole is provided with many second reinforcing bars, the second reinforcing bar is used for installing inside and outside scaffold steel pipe.
Optionally, the main beam is formed steel.
Optionally, the short vertical rod and the inclined strut are channel steel.
Optionally, the number of the pre-buried anchoring mechanisms is three, and the interval between the two pre-buried anchoring mechanisms far away from the cantilever end of the main beam rod is 200mm.
The utility model discloses the following technical effects:
Through set up a plurality of pre-buried anchor that can be connected with main beam pole detachably on the floor to and set up fixed connection's main beam pole, short montant and bracing branch together in advance, short montant is used for replacing the curb girder buried part, can directly place on the floor when being under construction, has reduced the construction degree of difficulty, compares with the conventional overhanging scaffold frame that adopts wire rope to draw to one side, and the construction degree of difficulty reduces, and construction speed is fast, and the security is high, can retrieve and use with the turnover repeatedly, does not produce the waste material, satisfies green construction requirement.
The short vertical rods are propped against the side beams, the short vertical rods, the inclined strut and the main beam are in a right-angle triangle shape, the inclined strut can provide an upward supporting force for the main beam, the bending moment born by the main beam can be greatly reduced, the settlement of the outer end part of the main beam is greatly reduced, the horizontal component force transmitted by the inclined strut is directly born by the concrete frame beam, the bending moment effect is not generated on the short vertical rod upper support, the vertical component force transmitted by the inclined strut is born by the short vertical rod upper support, and the vertical component force is smaller than the axial force of the inclined strut, so that the deflection problem of the large cantilever steel beam can be solved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this specification, illustrate embodiments of the application and together with the description serve to explain the application. In the drawings:
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
Fig. 2 is a schematic structural view of an embedded anchoring mechanism of the present utility model.
In the figure, 1, a main beam rod, 2, angle steel, 3, a U-shaped bolt anchor ring, 4, a nut, 5, a first steel bar, 6, a floor slab, 7, a wood board, 8, a wood wedge, 9, a side beam, 10, an inner scaffold steel pipe, 12, a short vertical rod, 13, a diagonal bracing strut, 14 and a second steel bar.
Detailed Description
The overhanging scaffold is a simple facility used in a building, and is mainly used for main body or decoration engineering operation and safety protection requirements in high-rise or super high-rise building construction. The load of the scaffold is fully or partially transferred to the building structure through the cantilever beam or the cantilever truss and other supporting structures, so that the dependence of the traditional scaffold on ground support is eliminated.
The inner and outer scaffold steel pipes are steel pipes for building the scaffold, and are mainly used in building construction operation. According to the different positions and actions of the scaffold steel pipes, the scaffold steel pipes can be divided into inner scaffold steel pipes and outer scaffold steel pipes.
The inner scaffold steel pipe is erected inside a building and is mainly used for building inner and outer walls and indoor decoration construction. The device is characterized by less material consumption, but frequent assembly and disassembly, thus being light and flexible, and convenient for assembly and disassembly. The inner scaffold steel pipe has various structural forms, including folding, support, portal frame, etc.
The outer scaffold steel pipe is a scaffold erected on the periphery of a building and is mainly used for outer wall masonry, outer elevation decoration and reinforced concrete engineering. The outer scaffold steel pipe has wide application range, including floor outer scaffold, hanging scaffold, picking scaffold, hanging scaffold, etc.
The section shapes of the section steel are various, including simple section steel (such as square steel, round steel, flat steel, angle steel and the like) and complex section steel (such as I-steel, channel steel, window frame steel and the like), the stress characteristics of the steel are different according to the types, the simple section steel is usually used for non-bearing structures, and the complex section steel (such as I-steel and channel steel) is used for bearing structures.
The section of the channel steel is U-shaped, the two flanges are parallel and the web plate extends up and down, and the steel has higher bending resistance and shear strength and is suitable for being used as a main stress member.
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In order that the above-recited objects, features and advantages of the present utility model will become more readily apparent, a more particular description of the utility model will be rendered by reference to the appended drawings and appended detailed description.
Referring to fig. 1-2, the present utility model provides an unconventional cantilever scaffold erected on a floor slab 6 and a side sill 9 of a building structure, comprising:
The cantilever mechanism comprises a main beam rod 1, a short vertical rod 12 and an inclined strut 13 which are fixedly connected together, wherein the main beam rod 1 is arranged on the top surface of a floor slab 6, one end of the main beam rod 1 extends out of the floor slab 6 to form a cantilever end, the short vertical rod 12 is positioned on the bottom surface of the cantilever end of the main beam rod 1, the short vertical rod 12 is used for propping against a side beam 9, and the inclined strut 13 is positioned between one side of the short vertical rod 12 far away from the side beam 9 and the bottom surface of the cantilever end of the main beam rod 1;
The embedded anchoring mechanisms are arranged on the floor slab 6 and are detachably connected with the main beam rod 1.
Through set up a plurality of pre-buried anchor that can be connected with girder pole 1 detachably on floor 6 to and set up fixed connection's main beam pole 1, short montant 12 and bracing branch 13 together in advance, short montant 12 is used for substituting curb girder 9 buried part, can directly place on the floor when being under construction, has reduced the construction degree of difficulty, compares with the conventional cantilever scaffold frame that adopts wire rope to draw to one side, and the construction degree of difficulty reduces, and construction speed is fast, and the security is high, can retrieve and use repeatedly, does not produce the waste material, satisfies green construction requirement.
The short vertical rods 12 are propped against the side beams 9, the short vertical rods 12, the inclined strut 13 and the main beam 1 form a right-angle triangle shape, the inclined strut 13 can provide an upward supporting force for the main beam 1, the bending moment born by the main beam 1 can be greatly reduced, the settlement of the outer side end part of the main beam 1 is greatly reduced, the horizontal component force transmitted by the inclined strut 13 is directly born by a concrete frame beam, the bending moment effect is not generated on the upper support of the short vertical rods 12, and the vertical component force transmitted by the upper support of the short vertical rods 12 to the inclined strut 13 is smaller than the axial force of the inclined strut 13, so that the deflection problem of the large cantilever steel beam can be solved.
In one embodiment of the present utility model, the pre-buried anchoring mechanism comprises:
The U-shaped bolt anchor ring 3 is arranged on the floor slab 6, and the main beam rod 1 is positioned in the inner ring of the U-shaped bolt anchor ring 3;
The angle steel 2 is arranged on the top surface of the main beam rod 1, and the angle steel 2 is detachably connected with the U-shaped bolt anchor ring 3 through a nut 4.
The main beam 1 is fixed on the floor slab 6 by forming a fixed structure by nuts 4 and angle steel 2 and U-shaped bolt anchor rings 3.
The U-shaped bolt anchor ring 3 is processed into a U-shaped anchor ring by adopting phi 20mm round steel, the U-shaped bolt anchor ring 3 is embedded in the concrete of the floor slab 6, and the U-shaped bolt anchor ring 3 is installed after the binding of the steel bars of the side beams 9 of the floor slab 6 is completed.
Further, the length of the upper port threading of the U-shaped bolt anchor ring 3 is 200mm, and the upper port is rounded.
In one embodiment of the utility model, the system further comprises a plurality of first steel bars 5 arranged in the floor slab 6, wherein the first steel bars 5 are used for fixing the positions of the U-shaped bolt anchor rings 3.
The first steel bars 5 are two, the first steel bars 5 are 1.5m long phi 18HRB335 steel bars, and the floor slab 6 or the side beam 9 concrete is poured after the U-shaped bolt anchor ring 3 is fixed.
In one embodiment of the utility model, a wooden wedge 8 is arranged between the two sides of the main beam 1 and the U-shaped bolt anchor ring 3, so that the main beam 1 is fixed.
In one embodiment of the utility model, a wood board 7 is arranged between the floor slab and the main beam rod for adjusting the flatness so as to uniformly stress the floor slab 6 or the side beam 9 concrete.
In one embodiment of the present utility model, the top surface of the cantilever end of the main beam 1 is provided with a plurality of second reinforcing bars 14, and the second reinforcing bars 14 are used for installing the inner and outer scaffolding steel pipes 10.
In one embodiment of the utility model, the main beam 1 is a section steel.
In one embodiment of the utility model, the short vertical bars 12 and the diagonal struts 13 are channel bars.
In one embodiment of the utility model, the number of the plurality of embedded anchoring mechanisms is three, and the distance between the two embedded anchoring mechanisms far away from the cantilever end of the main beam rod 1 is 200mm.
The utility model also provides an erection method of the unconventional overhanging scaffold, which comprises the following steps:
embedding a plurality of embedded anchoring mechanisms on the floor slab 6, specifically embedding the U-shaped bolt anchor ring 3 on the floor slab 6 or the side beam 9 before pouring concrete, embedding 2 first reinforcing steel bars 5 for fixing the U-shaped bolt anchor ring 3, and pouring the concrete of the floor slab 6 or the side beam 9;
The method comprises the steps of erecting a main beam rod 1 on a floor slab 6, enabling a short vertical rod 12 to prop against a side beam 9, connecting a pre-buried anchoring mechanism with the main beam rod 1, specifically, after the floor slab 6 or the side beam 9 reaches the design strength, installing a cantilever mechanism, installing angle steel 2 and nuts 4 for jacking, a timber block 7 between the main beam rod 1 and the floor slab 6, installing an inner scaffold steel pipe and an outer scaffold steel pipe 10 on the cantilever end of the main beam rod 1 as a cantilever scaffold, and after the main beam rod 1 is installed in place, checking the gaps between the bottom of the short vertical rod 12 and the side beam 9 one by one. If gaps are found, the wedge-shaped steel plates can be used for filling and compacting, and spot welding is used for fixing.
Further, before the cantilever mechanism is installed, the main beam rod 1, the short vertical rod 12 and the inclined strut support rod 13 are welded in advance, the short vertical rod 12 and the inclined strut support rod 13 are also welded and connected, and the second steel bars 14 are welded at the positions of the inner scaffold steel tube 10 and the outer scaffold steel tube 10 at the cantilever end of the main beam rod 1 so as to prevent the inner scaffold steel tube 10 from sliding.
The construction process comprises the steps of early construction preparation (the floor slab 6 or the side beam 9 fills the hall frame, the formwork support and the reinforcement are completed), U-shaped bolt anchor ring 3 installation, floor slab 6 or the side beam 9 concrete pouring, cantilever mechanism installation, pre-buried anchor mechanism installation, cantilever scaffold erection, cantilever scaffold dismantling, cantilever mechanism dismantling and pre-buried anchor mechanism dismantling.
In the description of the present utility model, it should be understood that the terms "longitudinal," "transverse," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate or are based on the orientation or positional relationship shown in the drawings, merely to facilitate description of the present utility model, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present utility model.
The above embodiments are only illustrative of the preferred embodiments of the present utility model and are not intended to limit the scope of the present utility model, and various modifications and improvements made by those skilled in the art to the technical solutions of the present utility model should fall within the protection scope defined by the claims of the present utility model without departing from the design spirit of the present utility model.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202520542256.9U CN223922599U (en) | 2025-03-26 | 2025-03-26 | An unconventional cantilever scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202520542256.9U CN223922599U (en) | 2025-03-26 | 2025-03-26 | An unconventional cantilever scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN223922599U true CN223922599U (en) | 2026-02-17 |
Family
ID=98762192
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202520542256.9U Active CN223922599U (en) | 2025-03-26 | 2025-03-26 | An unconventional cantilever scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN223922599U (en) |
-
2025
- 2025-03-26 CN CN202520542256.9U patent/CN223922599U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101886466B (en) | Construction method for support structure of coal tower template for tamping type coke oven | |
| CN103452311B (en) | A kind of erection method of shaped steel suspended structural support frame | |
| CN105649360A (en) | Integral assembling type building system and installing method | |
| CN112878535B (en) | Precast concrete wallboard connecting structure and construction method thereof | |
| CN216239741U (en) | Formwork system of high-rise cantilevered concrete structures | |
| CN107476470A (en) | Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method | |
| CN110106978A (en) | Half prefabricated reinforced concrete column node unit of one kind and its application | |
| CN110409624B (en) | Reverse calculation and construction method for large equipment installation and main body structure | |
| CN102080384B (en) | Construction Method of Installing Lift on the Roof of Underground Garage | |
| CN115748961A (en) | Improved Steel Tube Constrained Precast Concrete Column Connection Structure and Construction Method | |
| CN106121087A (en) | A kind of steel building and wall construction method, beam column steel beam column | |
| CN111593874B (en) | Support system and construction method for super-high-rise residential transfer layer super-heavy cantilevered components | |
| CN115573513A (en) | A bolt connection structure and construction method of prefabricated beams and prefabricated columns | |
| CN115749258A (en) | High-altitude overhanging roof formwork supporting system | |
| CN212897482U (en) | A construction platform for cantilevered structural layers of high-rise buildings | |
| CN221481494U (en) | A suspended exterior wall formwork system | |
| CN216664766U (en) | Assembled parapet that cornices | |
| CN116657875B (en) | Cantilever steel structure construction platform with formwork system and construction method | |
| CN220686735U (en) | Large-span concrete beam slab template supporting system | |
| CN208763309U (en) | The prefabrication and assembly construction beam column built from concrete connection structure of steel concrete supporting | |
| CN108951643B (en) | Super high-rise deep foundation pit basement core tube large-span large-area support changing construction method | |
| CN118564058A (en) | A construction method for a prefabricated structural formwork support system based on double-groove joists | |
| CN119981414A (en) | An unconventional cantilever scaffold and its erection method | |
| CN112359860B (en) | Construction method for non-support type open caisson capping | |
| CN114439219A (en) | Telescopic floor slab supporting truss |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |