A steel curtain combined hoisting deviceInfo
- Publication number
- CN223813263U CN223813263U CN202520628691.3U CN202520628691U CN223813263U CN 223813263 U CN223813263 U CN 223813263U CN 202520628691 U CN202520628691 U CN 202520628691U CN 223813263 U CN223813263 U CN 223813263U
- Authority
- CN
- China
- Prior art keywords
- track
- rail
- cantilever
- lifting
- hoisting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a hoisting device for combining a steel curtain, which comprises a fixed frame, a track assembly and a hoisting assembly, wherein the fixed frame is provided with a fixed part and an overhanging part, the track assembly comprises a first track and a second track, the first track and the second track are arranged along the circumferential direction of the overhanging part, the first track is positioned on the outer layer of the second track, the hoisting assembly comprises a first hoisting tool and a second hoisting tool, the first hoisting tool is slidably arranged on the first track, the second hoisting tool is slidably arranged on the second track, the first hoisting tool is used for executing first hoisting operation, and the second hoisting tool is used for executing second hoisting operation. The lifting device forms the overhanging part for installing the first rail and the second rail through the fixed frame, the first lifting appliance and the second lifting appliance which are slidably arranged on the first rail and the second rail can lift the frame main body of the sightseeing elevator, the lifting of the tower crane and the automobile crane on the construction site is avoided, and the lifting efficiency can be remarkably improved.
Description
Technical Field
The utility model relates to the technical field of hoisting equipment, in particular to a hoisting device for combining steel curtains.
Background
The sightseeing ladder of the building protrudes out of the building main body, and forms a peripheral protection structure through the steel frame and the glass curtain wall.
In the building construction process, when steel frame and glass curtain wall hoist and mount, adopt hoisting equipment such as tower crane or automobile crane to carry out usually, tower crane can't hoist and mount other operations when using, influence the construction progress, and when adopting the automobile crane, be limited by davit length restriction, the hoisting ability is restricted under special environment such as high-rise.
Disclosure of utility model
The utility model mainly solves the technical problem of providing a hoisting device with a steel curtain combined, so as to avoid hoisting by adopting a tower crane or an automobile crane and improve hoisting efficiency.
The application provides a hoisting device for combining steel curtains, which comprises:
The fixing frame is provided with a fixing part and a cantilever part, the fixing part is used for being fixed on a cantilever frame at the top of a sightseeing elevator shaft, and the cantilever part extends out of the cantilever frame;
The track assembly comprises a first track and a second track, wherein the first track and the second track are arranged along the circumferential direction of the overhanging part, and the first track is positioned on the outer layer of the second track;
The lifting assembly comprises a first lifting appliance and a second lifting appliance, wherein the first lifting appliance is slidably arranged on the first track, the second lifting appliance is slidably arranged on the second track, the first lifting appliance is used for executing first lifting operation, and the second lifting appliance is used for executing second lifting operation.
As a further scheme of the steel curtain combined hoisting device, the steel curtain combined hoisting device further comprises a plurality of tensioning ropes, wherein the tensioning ropes are circumferentially arranged around the overhanging portion, one end of each tensioning rope is used for being connected with a top-layer platform of a building, and the other end of each tensioning rope is connected with one end, far away from the fixing portion, of the overhanging portion.
As a further scheme of the steel curtain combined hoisting device, the steel curtain combined hoisting device further comprises an upper support and a lower support, wherein the upper support is fixed on a top layer platform of a building and is used for being hinged with one end of a tensioning rope, the lower support is arranged on an overhanging part, and the lower support is used for being hinged with the other end of the tensioning rope.
As a further scheme of the steel curtain combined hoisting device, the tensioning rope is a steel wire rope with adjustable tightness.
As a further scheme of the steel curtain combined hoisting device, the fixing frame comprises a plurality of beam frames, a plurality of first fixing seats and a plurality of second fixing seats, the beam frames are fixed on the cantilever frames and partially extend out of the cantilever frames, the parts of the beam frames fixed on the cantilever frames are formed into fixing parts, the parts of the beam frames extending out of the cantilever frames are formed into cantilever parts, the first fixing seats are used for connecting the cantilever parts with the first tracks, and the second fixing seats are used for connecting the cantilever parts with the second tracks.
As a further proposal of the steel curtain combined hoisting device provided by the application,
The rail assembly further comprises a third rail, the third rail is fixed to the overhanging portion along the length direction of the overhanging frame, and the third rail is positioned on the outer layer of the first rail;
the lifting assembly further comprises a third lifting appliance, the third lifting appliance is slidably arranged on the third track, and the third track is used for executing glass curtain wall lifting operation.
The first track is provided with a first front end part and two first side parts, the two first side parts are connected with two sides of the first front end part and are in arc transition connection with the first front end part, the second track is provided with a second front end part and two second side parts, the two second side parts are connected with two sides of the second front end part and are in arc transition connection with the second front end part, the first front end part and the second front end part form a lifting area, the third track is arranged outside the first side part, and the third track is arranged outside the two first side parts.
As a further scheme of the steel curtain combined hoisting device, two third tracks are arranged on the outer side of the first side part side by side, and the third hoisting devices are slidably arranged on the third tracks.
According to the steel curtain combined hoisting device, the overhanging part for installing the first rail and the second rail is formed through the fixed frame, the first hoisting tool and the second hoisting tool which are slidably arranged on the first rail and the second rail can hoist the frame main body of the sightseeing elevator, the tower crane and the automobile crane on the construction site are prevented from being used for hoisting, and the hoisting efficiency can be remarkably improved.
Drawings
FIG. 1 is a perspective view of a steel curtain combined hoisting device provided by the application;
Fig. 2 is a top view of a hoisting device combined with a steel curtain provided by the application;
fig. 3 is a front view of the steel curtain combined hoisting device provided by the application.
Detailed Description
The utility model will be described in further detail below with reference to the drawings by means of specific embodiments. Wherein like elements in different embodiments are numbered alike in association. In the following embodiments, numerous specific details are set forth in order to provide a better understanding of the present utility model. However, one skilled in the art will readily recognize that some of the features may be omitted, or replaced by other elements, materials, or methods in different situations. In some instances, related operations of the present utility model have not been shown or described in the specification in order to avoid obscuring the core portions of the present utility model, and may be unnecessary to persons skilled in the art from a detailed description of the related operations, which may be presented in the description and general knowledge of one skilled in the art.
Furthermore, the described features, operations, or characteristics of the description may be combined in any suitable manner in various embodiments. Also, various steps or acts in the method descriptions may be interchanged or modified in a manner apparent to those of ordinary skill in the art. Thus, the various orders in the description and drawings are for clarity of description of only certain embodiments, and are not meant to be required orders unless otherwise indicated.
The numbering of the components itself, e.g. "first", "second", etc., is used herein merely to distinguish between the described objects and does not have any sequential or technical meaning. The term "coupled" as used herein includes both direct and indirect coupling (coupling), unless otherwise indicated.
The application provides a hoisting device with a combined steel curtain, which is applied to hoisting a frame main body of a sightseeing elevator protruding out of a building, avoids hoisting by adopting a tower crane and an automobile crane on a construction site, and can obviously improve hoisting efficiency. Referring to fig. 1 to 3, the steel curtain combined hoisting device provided by the application comprises a fixed frame 10, a track assembly 20 and a hoisting assembly 30.
The fixing frame 10 has a fixing portion 11 and an overhanging portion 12, the fixing portion 11 is used for being fixed on an overhanging frame 100 at the top of a hoistway of the sightseeing elevator, and the overhanging portion 12 extends out of the overhanging frame 100.
The rail assembly 20 includes a first rail 21 and a second rail 22, each of the first rail 21 and the second rail 22 being arranged along a circumferential direction of the overhanging portion 12, and the first rail 21 being located at an outer layer of the second rail 22.
Wherein, the cantilever frame 100 at the top of the sightseeing elevator shaft is formed in a shape similar to a runway type, and the cantilever portion 12 is formed in a shape similar to the cantilever frame 100, so that the first rail 21 and the second rail 22 are formed in a shape similar to the cantilever frame 100, thereby facilitating the lifting of materials.
The lifting assembly 30 includes a first lifting device 31 and a second lifting device 32, the first lifting device 31 is slidably disposed on the first track 21, the second lifting device 32 is slidably disposed on the second track 22, the first lifting device 31 and the second lifting device 32 may be electric hoists, the first lifting device 31 is used for performing a first lifting operation, for example, lifting a steel rod through the first lifting device 31, the second lifting device 32 is used for performing a second lifting operation, for example, lifting a single-truss partition and an operation platform through the second lifting device 32, and the steel rod and the single-truss partition form a frame structure surrounding the periphery of a sightseeing elevator well.
In order to further improve the safety of the fixed frame 10, the steel curtain combined hoisting device provided in this embodiment further includes a plurality of tensioning cables 40, the plurality of tensioning cables 40 are circumferentially arranged around the overhanging portion 12, one end of each tensioning cable 40 is used for connecting with the top-layer platform 200 of the building, and the other end of each tensioning cable 40 is connected with one end of the overhanging portion 12 far away from the fixed portion 11. Each tensioning rope 40 tightens the overhanging part 12 obliquely, so that an effective tightening effect is formed on the fixed frame 10, and the safety of the construction process is ensured.
The hoisting device that the steel curtain provided in this embodiment combines still includes upper bracket 41 and lower support 42, and upper bracket 41 is fixed in building top layer platform 200, and upper bracket 41 is used for being connected in articulated with the one end of taut cable 40, and lower support 42 is installed in overhanging portion 12, and lower support 42 is used for being connected in articulated with the other end of taut cable 40, through the setting of upper bracket 41 and lower support 42, can make things convenient for the equipment of taut cable 40.
In some embodiments, the tensioning cable 40 is an adjustable tension wire rope, and the tensioning effect on the fixed frame 10 can be improved by adjusting the degree of tightness.
The fixing frame 10 includes a plurality of beam frames 13 and a plurality of first fixing bases 14 and a plurality of second fixing bases 15, the plurality of beam frames 13 are fixed to the cantilever frame 100 and partially extend out of the cantilever frame 100, a portion of the beam frames 13 fixed to the cantilever frame 100 is formed as a fixing portion 11, and a portion of the beam frames 13 extending out of the cantilever frame 100 is formed as a cantilever portion 12. The first fixing seat 14 is used for connecting the overhanging portion 12 with the first rail 21, the second fixing seat 15 is used for connecting the overhanging portion 12 with the second rail 22, and the first rail 21 and the second rail 22 are firmly and fixedly connected with the overhanging portion 12 through the arrangement of the first fixing seat 14 and the second fixing seat 15.
Referring to fig. 1, the rail assembly 20 further includes a third rail 23, the third rail 23 is fixed to the cantilever portion 12 along the length direction of the cantilever frame 100, and the third rail 23 is located at an outer layer of the first rail 21. The lifting assembly 30 further comprises a third lifting device 33, the third lifting device 33 is slidably arranged on the third rail 23, and the third rail 33 is used for performing lifting operation of the glass curtain wall, so that the glass curtain wall can be mounted on the frame.
In this embodiment, the first track 21 has a first front end 211 and two first side portions 212, the two first side portions 212 connect two sides of the first front end 211, and the first side portions 212 are connected with the first front end 211 in a circular arc transition manner. The second rail 22 has a second front end 221 and two second side portions 222, the two second side portions 222 are connected to two sides of the second front end 221, and the second side portions 222 are connected to the second front end 221 in a circular arc transition manner. The first front end portion 211 and the second front end portion 221 are formed as a lifting area. The third rails 23 are provided outside the first side portions 212, and the third rails 23 are provided outside both the first side portions 212.
In some embodiments, two third rails 23 are disposed side by side on the outer side of the first side 212, and each third rail 23 is slidably provided with a third hanger 33 to facilitate the hanging of the glass curtain wall.
In summary, according to the hanging device with the combined hanging steel curtain, the hanging parts for installing the first rail and the second rail are formed through the fixed frames, the first hanging tool and the second hanging tool which are slidably arranged on the first rail and the second rail can be used for hanging the frame main body of the sightseeing elevator, the hanging of the tower crane and the automobile crane on the construction site is avoided, and the hanging efficiency can be remarkably improved.
The foregoing description of the utility model has been presented for purposes of illustration and description, and is not intended to be limiting. Several simple deductions, modifications or substitutions may also be made by a person skilled in the art to which the utility model pertains, based on the idea of the utility model.
Claims (8)
1. Hoist device that steel curtain combines, a serial communication port includes:
The fixing frame is provided with a fixing part and a cantilever part, the fixing part is used for being fixed on a cantilever frame at the top of a sightseeing elevator shaft, and the cantilever part extends out of the cantilever frame;
The track assembly comprises a first track and a second track, wherein the first track and the second track are arranged along the circumferential direction of the overhanging part, and the first track is positioned on the outer layer of the second track;
The lifting assembly comprises a first lifting appliance and a second lifting appliance, wherein the first lifting appliance is slidably arranged on the first track, the second lifting appliance is slidably arranged on the second track, the first lifting appliance is used for executing first lifting operation, and the second lifting appliance is used for executing second lifting operation.
2. The steel curtain combined hoisting device as recited in claim 1, further comprising a plurality of tension ropes, wherein the plurality of tension ropes are circumferentially arranged around the overhanging portion, one end of each tension rope is used for connecting a top-layer platform of a building, and the other end of each tension rope is connected with one end of the overhanging portion away from the fixing portion.
3. The steel curtain combined hoisting device as claimed in claim 2, further comprising an upper support and a lower support, wherein the upper support is fixed on a top platform of the building, the upper support is hinged to one end of the tensioning rope, the lower support is mounted on the overhanging portion, and the lower support is hinged to the other end of the tensioning rope.
4. A steel curtain combined hoisting device as claimed in claim 3, characterized in that the tightening rope is an adjustable tightness steel wire rope.
5. The steel curtain combined hoisting device according to claim 1, wherein the fixing frame comprises a plurality of beam frames, a plurality of first fixing seats and a plurality of second fixing seats, the beam frames are fixed on the cantilever frames and partially extend out of the cantilever frames, the parts of the beam frames fixed on the cantilever frames are formed into fixing parts, the parts of the beam frames extending out of the cantilever frames are formed into cantilever parts, the first fixing seats are used for connecting the cantilever parts with the first tracks, and the second fixing seats are used for connecting the cantilever parts with the second tracks.
6. A steel curtain combined hoisting device as claimed in claim 1, characterized in that,
The rail assembly further comprises a third rail, the third rail is fixed to the overhanging portion along the length direction of the overhanging frame, and the third rail is positioned on the outer layer of the first rail;
the lifting assembly further comprises a third lifting appliance, the third lifting appliance is slidably arranged on the third track, and the third track is used for executing glass curtain wall lifting operation.
7. The steel curtain combined hoisting device according to claim 6, wherein the first rail has a first front end portion and two first side portions, the two first side portions are connected to both sides of the first front end portion and arc transition is formed between the first side portions and the first front end portion, the second rail has a second front end portion and two second side portions, the two second side portions are connected to both sides of the second front end portion and arc transition is formed between the second side portions and the second front end portion, the first front end portion and the second front end portion are formed into a hoisting area, the third rail is disposed outside the first side portions, and the third rail is disposed outside the two first side portions.
8. The steel curtain combined hoisting device as recited in claim 7, wherein two third rails arranged side by side are arranged on the outer side of the first side portion, and each third rail is slidably provided with the third hoisting tool.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202520628691.3U CN223813263U (en) | 2025-04-03 | 2025-04-03 | A steel curtain combined hoisting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202520628691.3U CN223813263U (en) | 2025-04-03 | 2025-04-03 | A steel curtain combined hoisting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN223813263U true CN223813263U (en) | 2026-01-20 |
Family
ID=98427950
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202520628691.3U Active CN223813263U (en) | 2025-04-03 | 2025-04-03 | A steel curtain combined hoisting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN223813263U (en) |
-
2025
- 2025-04-03 CN CN202520628691.3U patent/CN223813263U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2007099515A (en) | Method for mounting support means of lift cage to lift cage and lift shaft | |
| EP4486678A1 (en) | An elevator construction arrangement and a method | |
| CN223813263U (en) | A steel curtain combined hoisting device | |
| US20240417220A1 (en) | Elevator construction arrangement and a method | |
| JP5350062B2 (en) | Elevator equipment | |
| JP7810814B2 (en) | Elevator construction equipment and method | |
| CN211974386U (en) | Curtain wall mounting system | |
| JP4841171B2 (en) | Rise-up elevator installation method | |
| CN112709450A (en) | Method for installing skirt building glass lighting roof of high-rise building | |
| CN223239553U (en) | A windproof and anti-falling limited hoisting guide rope mechanism | |
| JP2004331348A (en) | Elevator installation method | |
| JP4790941B2 (en) | Elevator main rope hanging method | |
| CN218520918U (en) | Real abdomen formula steel crane roof beam installation device | |
| CN217732601U (en) | Auxiliary equipment for installation of assembly type building elevator | |
| CN220351575U (en) | High-voltage insulator suspension machine | |
| JP2000118907A (en) | Safety device for elevator | |
| CN216687192U (en) | Curtain wall hoisting device | |
| JP2654409B2 (en) | Elevator main cable replacement method | |
| JP3297345B2 (en) | Governor rope extension method for construction elevators | |
| JP2939064B2 (en) | Elevator installation template | |
| JP2544949Y2 (en) | Elevator work floor equipment | |
| JP4058915B2 (en) | Lift equipment for elevator equipment | |
| JP2003246563A (en) | Hanging apparatus for device for elevator | |
| JP2002332175A (en) | Elevator device | |
| JPH0672663A (en) | Main rope hanging method for elevator |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |