CN223737534U CN202520155884.1U CN202520155884U CN223737534U CN 223737534 U CN223737534 U CN 223737534U CN 202520155884 U CN202520155884 U CN 202520155884U CN 223737534 U CN223737534 U CN 223737534U
Authority
CN
China
Prior art keywords
steel
steel plate
lifting
hoop
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202520155884.1U
Other languages
Chinese (zh)
Inventor
何基诚
陈苏闽
张乾
张骥鹏
郑俊清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN202520155884.1U priority Critical patent/CN223737534U/en
Application granted granted Critical
Publication of CN223737534U publication Critical patent/CN223737534U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及建筑施工相关技术领域,尤其涉及一种钢结构提升设备吊点固定装置,包括抱箍钢板,所述抱箍钢板的下表面两侧焊接有加腋钢板,所述加腋钢板的一侧焊接有第一抱箍侧钢板,所述抱箍钢板的表面一侧开设有吊孔,所述抱箍钢板上方表面固定安装有支撑机构,所述抱箍钢板的下表面一侧设置有调节机构,所述加腋钢板的一侧贯穿有对拉螺栓。该钢结构提升设备吊点固定装置,通过减少安装步骤和所需部件数量,提高安装效率,结构强度高,采用高强度钢材和合理结构设计,确保固定装置能够承受大型钢结构的重量和拉力,稳定性好,通过增加固定装置与结构之间的接触面积和减小间隙,提高固定装置的稳定性,确保钢结构在提升过程中的稳定性。

This utility model relates to the technical field of building construction, and in particular to a lifting point fixing device for steel structure lifting equipment. It includes a clamping steel plate, with armhole steel plates welded to both sides of the lower surface of the clamping steel plate. A first clamping side steel plate is welded to one side of the armhole steel plate. A lifting hole is provided on one side of the surface of the clamping steel plate. A support mechanism is fixedly installed on the upper surface of the clamping steel plate, and an adjustment mechanism is provided on one side of the lower surface of the clamping steel plate. A tie bolt passes through one side of the armhole steel plate. This lifting point fixing device for steel structure lifting equipment improves installation efficiency by reducing installation steps and the number of required components. It has high structural strength, using high-strength steel and a reasonable structural design to ensure that the fixing device can withstand the weight and tension of large steel structures. It has good stability, and by increasing the contact area between the fixing device and the structure and reducing the gap, the stability of the fixing device is improved, ensuring the stability of the steel structure during the lifting process.

Description

Lifting point fixing device of steel structure lifting equipment
Technical Field
The utility model relates to the technical field related to building construction, in particular to a lifting point fixing device of steel structure lifting equipment.
Background
In the current construction and industrial fields, steel structures are widely applied due to the advantages of high strength, light weight, short construction period and the like, however, in the construction and installation processes of the steel structures, the fixing device of the lifting points of lifting equipment is particularly important, and the traditional fixing device of the lifting points of the steel structure lifting equipment often has the problems of complex installation, low structural strength, poor stability and the like, so that the construction efficiency is influenced, and the threat to construction safety is possibly formed.
The traditional steel construction lifting device hoisting point fixing device needs the equipment of a plurality of parts in the installation, not only consuming time and labor, and is easy to make mistakes, and partial hoisting point fixing device is unreasonable in design or improper in material use, so that the structural strength is low, the lifting requirement of a large-scale steel structure can not be met, and in the lifting process, the steel structure is easy to shake or incline due to the fact that the connection between the hoisting point fixing device and the structure is unstable or gaps exist, so that the safety accident is caused.
Disclosure of utility model
The utility model aims to provide a lifting point fixing device for steel structure lifting equipment, which solves the problems that the prior lifting point fixing device for steel structure lifting equipment provided in the background art is complex in installation, low in structural strength and poor in stability, needs multiple parts to be combined during installation, is time-consuming and labor-consuming, and is easy to cause installation errors.
In order to achieve the purpose, the steel structure lifting equipment lifting point fixing device comprises a hoop steel plate, wherein armpit steel plates are welded on two sides of the lower surface of the hoop steel plate, a first hoop side steel plate is welded on one side of the armpit steel plate, a lifting hole is formed in one side of the surface of the hoop steel plate, a supporting mechanism is fixedly arranged on the surface above the hoop steel plate, an adjusting mechanism is arranged on one side of the lower surface of the hoop steel plate, and a split bolt penetrates through one side of the armpit steel plate.
Preferably, the supporting mechanism comprises a base, a fixing hole, a fixing bolt, a fixing nut, a connecting rod, a fixing block, a lantern ring, a connecting shaft and a guide wheel, wherein the base is fixedly arranged on two sides of the upper surface of the hoop steel plate, the fixing hole is formed in one side surface of the base, one end of the fixing hole penetrates through the fixing bolt, one end of the fixing bolt is connected with the fixing nut, one end of the fixing bolt penetrates through the connecting rod, one end of the connecting rod is rotatably connected with the fixing block, the fixing block is welded on two sides of the lantern ring, one end of the lantern ring is connected with the connecting shaft in a bearing manner, and one end of the connecting shaft is sleeved with the guide wheel.
Preferably, the fixing holes are distributed at equal intervals on one side of the base, and the base is distributed on two sides of the hanging hole.
Preferably, the adjustment mechanism includes spout, slider, second staple bolt side steel sheet, first connecting block, backup pad and second connecting block, the spout has been seted up to the lower surface both sides of staple bolt steel sheet, the one end sliding connection of spout has the slider, one side welding of slider has second staple bolt side steel sheet, one side surface welding of second staple bolt side steel sheet has first connecting block, the one end swivelling joint of first connecting block has the backup pad, the one end swivelling joint of backup pad has the second connecting block.
Preferably, one side of the second connecting block is welded with the hoop steel plate, and the second hoop side steel plate and the first hoop side steel plate are symmetrically distributed.
Preferably, the second hoop side steel plates and the first hoop side steel plates are distributed on two sides of the structural beam, and one side of the second hoop side steel plates penetrates through the split bolts.
Preferably, one end of the structural beam is fixedly connected with a structural column, one side of the structural column is provided with a steel structure frame body, and one end of the steel structure frame body is connected with a lifting steel rope through a hook.
Compared with the prior art, the steel structure lifting equipment lifting point fixing device has the beneficial effects that the steel structure lifting equipment lifting point fixing device is provided with a lifting point fixing device;
1. the installation is simple and convenient, the installation steps and the number of required parts are reduced through the optimal design, and the installation efficiency is improved;
2. the structure strength is high, and the fixing device can bear the weight and the tensile force of a large steel structure by adopting high-strength steel and reasonable structural design;
3. the stability is good, through increasing the area of contact between fixing device and the structure and reducing the clearance, improves fixing device's stability, ensures the stability of steel construction in the promotion in-process.
Drawings
FIG. 1 is a schematic view of the overall appearance structure of the present utility model;
FIG. 2 is a schematic view of the structure of the supporting mechanism of the present utility model;
FIG. 3 is a schematic view of the structure of the adjusting mechanism of the present utility model;
FIG. 4 is a schematic structural diagram of a use mode of the present utility model.
In the figure, the steel plate of the anchor ear comprises a steel plate of the anchor ear 1, a steel plate of the haunched arm 2, a steel plate of the anchor ear 3, a steel plate of the first anchor ear side, a hanging hole 4, a supporting mechanism 5, a supporting mechanism 501, a base 502, a fixing hole 503, a fixing bolt 504, a fixing nut 505, a connecting rod 506, a fixing block 507, a lantern ring 508, a connecting shaft 509, a guide wheel 6, an adjusting mechanism 601, a sliding chute 602, a sliding block 603, a steel plate of the second anchor ear side 604, a first connecting block 605, a supporting plate 606, a second connecting block 7, a split bolt 8, a structural beam 9, a structural column 10, a steel structure frame body 11 and a lifting steel rope.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the utility model provides a technical scheme that a lifting point fixing device of steel structure lifting equipment comprises a hoop steel plate 1, wherein armpit steel plates 2 are welded on two sides of the lower surface of the hoop steel plate 1, a first hoop side steel plate 3 is welded on one side of each armpit steel plate 2, a lifting hole 4 is formed in one side of the surface of the hoop steel plate 1, a supporting mechanism 5 is fixedly arranged on the surface above the hoop steel plate 1, an adjusting mechanism 6 is arranged on one side of the lower surface of the hoop steel plate 1, and a split bolt 7 penetrates through one side of each armpit steel plate 2.
Further, the supporting mechanism 5 includes base 501, fixed orifices 502, fixing bolt 503, fixation nut 504, connecting rod 505, fixed block 506, lantern ring 507, connecting axle 508 and guide pulley 509, the base 501 is fixedly installed on the upper surface both sides of staple bolt steel sheet 1, fixed orifices 502 have been seted up on one side surface of base 501, fixing bolt 503 has been run through to one end of fixed orifices 502, the one end of fixing bolt 503 is connected with fixation nut 504, one end of fixing bolt 503 has connecting rod 505, one end swivelling joint of connecting rod 505 has fixed block 506, the fixed block 506 welds in the both sides of lantern ring 507, the one end bearing of lantern ring 507 is connected with connecting axle 508, one end cover of connecting axle 508 is equipped with and is fixed with guide pulley 509, through base 501, fixed orifices 502, fixing bolt 503, fixing nut 504, connecting rod 505, the lantern ring 507, the setting of connecting axle 508 and guide pulley 509, when the lifting rope or cable passes from the one end of hanging hole 4, can rotate at the surface of 509, and guide pulley 509 can pass through the one end of connecting axle 508, simultaneously can pass through the connecting axle 505 of connecting rod both sides of lantern ring 507 and can take place the position adjustment through fixing bolt 503 and fixing bolt 509, can not take place with the position adjustment of the guide pulley 509 through the position of the connecting rod 505 at one side of fixing hole 502 or the hanging hole 509, can not take place at the same time, friction with the guide pulley 4.
Further, the fixing holes 502 are distributed at equal intervals on one side of the base 501, and the base 501 is distributed on two sides of the hanging hole 4.
Further, adjustment mechanism 6 includes spout 601, slider 602, second staple bolt side steel sheet 603, first connecting block 604, backup pad 605 and second connecting block 606, spout 601 has been seted up to staple bolt steel sheet 1's lower surface both sides, the one end sliding connection of spout 601 has slider 602, one side welding of slider 602 has second staple bolt side steel sheet 603, one side surface welding of second staple bolt side steel sheet 603 has first connecting block 604, the one end swivelling joint of first connecting block 604 has backup pad 605, the one end swivelling joint of backup pad 605 has second connecting block 606, through spout 601, slider 602, second staple bolt side steel sheet 603, first connecting block 604, backup pad 605 and second connecting block 606's setting, when using, second staple bolt side steel sheet 603 can be removed in the one end of spout 601, conveniently cooperate first staple bolt side steel sheet 3 centre gripping in the both sides of structural beam 8, closely laminate with structural beam 8, locking through split bolt 7, one side holding power of staple bolt steel sheet 1 can be increased to backup pad 605 simultaneously.
Further, one side of the second connection block 606 is welded to the hoop steel plate 1, and the second hoop steel plate 603 and the first hoop steel plate 3 are symmetrically distributed.
Further, the second hoop-side steel plate 603 and the first hoop-side steel plate 3 are distributed on two sides of the structural beam 8, and one side of the second hoop-side steel plate 603 penetrates through the split bolt 7.
Further, one end fixedly connected with structure post 9 of structure roof beam 8, steel construction framework 10 has been placed to one side of structure post 9, and the one end of steel construction framework 10 is connected with the promotion cable wire 11 through the couple.
The steel plate for the steel structure frame 10 comprises the working principle that firstly, a hoop steel plate 1 is placed above a structural beam 8, then a second hoop side steel plate 603 is pushed to be attached to the surface of the structural beam 8 through a sliding block 602 at one end of a sliding groove 601, then a split bolt 7 penetrates through one side of a first hoop side steel plate 3, meanwhile, the split bolt 7 penetrates through the second hoop side steel plate 603, the first hoop side steel plate 3 and the second hoop side steel plate 603 are locked through the split bolt 7, then a lifting rope or a steel rope is lapped on a guide wheel 509 and penetrates through the lifting hole 4, then the position of a connecting rod 505 is adjusted at one side of a base 501 according to the position of a fixing hole 502, meanwhile, the position of the connecting rod 505 matched with the fixing hole 502 is rotated at a fixing block 506, and the height of a lantern ring 507 at the side of the fixing block 506 is adjusted, so that the height and the position of an outer ring guide wheel 509 of the connecting shaft 508 can be adjusted while the lifting rope or the steel rope penetrates through the lifting hole 4, and the lifting rope is not contacted with the hole 4, and the lifting of the steel structure frame 10 is completed.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a steel construction lifting means hoisting point fixing device, includes staple bolt steel sheet (1), its characterized in that, the lower surface both sides welding of staple bolt steel sheet (1) have haunching steel sheet (2), one side welding of haunching steel sheet (2) has first staple bolt side steel sheet (3), hanging hole (4) have been seted up on one side of the surface of staple bolt steel sheet (1), staple bolt steel sheet (1) top surface fixed mounting has supporting mechanism (5), lower surface one side of staple bolt steel sheet (1) is provided with adjustment mechanism (6), one side of haunching steel sheet (2) is run through has split bolt (7).
2. The steel construction lifting equipment hoisting point fixing device of claim 1, wherein the supporting mechanism (5) comprises a base (501), a fixing hole (502), a fixing bolt (503), a fixing nut (504), a connecting rod (505), a fixing block (506), a lantern ring (507), a connecting shaft (508) and guide wheels (509), the base (501) is fixedly installed on two sides of the upper surface of the hoop steel plate (1), the fixing hole (502) is formed in one side surface of the base (501), one end of the fixing hole (502) penetrates through the fixing bolt (503), one end of the fixing bolt (503) is connected with the fixing nut (504), one end of the fixing bolt (503) penetrates through the connecting rod (505), one end of the connecting rod (505) is rotatably connected with the fixing block (506), the fixing block (506) is welded on two sides of the lantern ring (507), one end bearing of the lantern ring (507) is connected with the connecting shaft (508), and one end of the connecting shaft (508) is sleeved with the guide wheels (509).
3. The lifting point fixing device for the steel structure lifting equipment according to claim 2, wherein the fixing holes (502) are distributed at equal intervals on one side of the base (501), and the base (501) is distributed on two sides of the lifting hole (4).
4. The steel construction lifting device of claim 1, wherein the adjusting mechanism (6) comprises a sliding groove (601), a sliding block (602), a second hoop side steel plate (603), a first connecting block (604), a supporting plate (605) and a second connecting block (606), wherein the sliding groove (601) is formed in two sides of the lower surface of the hoop steel plate (1), one end of the sliding groove (601) is connected with the sliding block (602) in a sliding mode, the second hoop side steel plate (603) is welded on one side of the sliding block (602), a first connecting block (604) is welded on one side surface of the second hoop side steel plate (603), one end of the first connecting block (604) is rotatably connected with the supporting plate (605), and one end of the supporting plate (605) is rotatably connected with the second connecting block (606).
5. The lifting point fixing device of the steel structure lifting equipment according to claim 4, wherein one side of the second connecting block (606) is welded with the hoop steel plate (1), and the second hoop side steel plate (603) and the first hoop side steel plate (3) are symmetrically distributed.
6. The lifting point fixing device for the steel structure lifting equipment is characterized in that the second hoop side steel plates (603) and the first hoop side steel plates (3) are distributed on two sides of the structural beam (8), and one side of the second hoop side steel plates (603) penetrates through the split bolt (7).
7. The lifting point fixing device for steel structure lifting equipment according to claim 6, wherein one end of the structural beam (8) is fixedly connected with a structural column (9), one side of the structural column (9) is provided with a steel structure frame body (10), and one end of the steel structure frame body (10) is connected with a lifting steel rope (11) through a hook.
CN202520155884.1U 2025-01-23 2025-01-23 A steel structure lifting equipment hoisting point fixing device Active CN223737534U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202520155884.1U CN223737534U (en) 2025-01-23 2025-01-23 A steel structure lifting equipment hoisting point fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202520155884.1U CN223737534U (en) 2025-01-23 2025-01-23 A steel structure lifting equipment hoisting point fixing device

Publications (1)

Publication Number Publication Date
CN223737534U true CN223737534U (en) 2025-12-30

Family

ID=98161858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202520155884.1U Active CN223737534U (en) 2025-01-23 2025-01-23 A steel structure lifting equipment hoisting point fixing device

Country Status (1)

Country Link
CN (1) CN223737534U (en)

Similar Documents

Publication Publication Date Title
CN201580914U (en) Monospar trackless combination gantry crane
CN217417929U (en) Overturning fixture for liquid rocket engine
CN223737534U (en) A steel structure lifting equipment hoisting point fixing device
CN113120775A (en) Double-rail hoisting system for curtain wall
CN2923644Y (en) Superhigh super-large high-tonnage walking derricktype lifting machine
CN215055468U (en) A kind of ALC wall panel installation and lifting device for building decoration engineering
CN114221260A (en) Insulator maintenance frame of electric power pylon
CN209758978U (en) Elevated straddle type rail working vehicle with crane and power device
CN219710948U (en) Push-pull platform device for wall attachment position of climbing tower crane
CN217947394U (en) Movable hanging bracket for wet joint bottom template of bridge box girder
CN215926943U (en) Transmission line steel pipe tower ring-shaped steel rib horizontal installation adjusting device
CN116335410A (en) A construction method for truss diagonal members on the refuge floor of a super high-rise building
CN203401253U (en) Cage-type welding rotatable tire of tower crane cargo boom frame
CN221295843U (en) Large-span steel truss hoisting device
CN214144122U (en) Easily install C shaped steel bearing frame structure
CN219786916U (en) Automatic welding device for circular seam of large-sized pressure steel pipe
CN223543252U (en) A vertical hanging clamp device for automatic spraying of wing panels
CN219170002U (en) Wind power tower section of thick bamboo anchor plate welding frock
CN223054939U (en) Safety belt suspension device for underbeam construction
CN206539037U (en) A kind of air transport device in Steel Structure Installation
CN211545738U (en) Building materials hoist device for building site
CN223963080U (en) Turning device for steel member
CN213834248U (en) An adjustable steel beam connecting plate mounting frame
CN213326591U (en) Welding platform for butt weld of deformed steel column
CN216551569U (en) Auxiliary tool truss for installing bottom maintenance track of high-altitude bridge floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant