CN223646167U - Tool for replacing main transformer cooler - Google Patents

Tool for replacing main transformer cooler

Info

Publication number
CN223646167U
CN223646167U CN202520312380.6U CN202520312380U CN223646167U CN 223646167 U CN223646167 U CN 223646167U CN 202520312380 U CN202520312380 U CN 202520312380U CN 223646167 U CN223646167 U CN 223646167U
Authority
CN
China
Prior art keywords
cooler
clamp
main transformer
hoop
replacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202520312380.6U
Other languages
Chinese (zh)
Inventor
李加贤
王举超
雷云
杨猛
管毅
单祖兴
黄吉
雷素刚
蔡福龙
王忠伟
韩双平
王保鑫
罗忠亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Dianneng Huize Niulanjiang Hydropower Development Co ltd
Original Assignee
Yunnan Dianneng Huize Niulanjiang Hydropower Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Dianneng Huize Niulanjiang Hydropower Development Co ltd filed Critical Yunnan Dianneng Huize Niulanjiang Hydropower Development Co ltd
Priority to CN202520312380.6U priority Critical patent/CN223646167U/en
Application granted granted Critical
Publication of CN223646167U publication Critical patent/CN223646167U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

本实用新型公开了一种用于主变冷却器更换工装,涉及变电站设备更换工装技术领域。其结构包括龙门架,龙门架包括横梁和固定连接在横梁两端的支腿,支腿连接在轨道上的轨道滑板上,在横梁上装配有两个滑轮车,两个滑轮车上分别悬挂有一个手拉葫芦;其中一个手拉葫芦的下方挂钩上挂载有第一夹具;另一个手拉葫芦的下方挂钩上挂载有第二夹具。本实用新型通过在冷却器的上端和下端分别安装第一夹具和第二夹具,并利用两个手拉葫芦进行提升,显著降低了对龙门架高度的要求;这种设计使得在高度有限的发电室内也能够方便地进行操作;通过使用两个手拉葫芦分别悬挂在滑轮车上,并且结合侧拉组件的使用,本方案能够灵活调整冷却器的位置和角度。

This utility model discloses a tooling for replacing a main transformer cooler, relating to the field of substation equipment replacement tooling technology. Its structure includes a gantry frame, comprising a crossbeam and legs fixedly connected to both ends of the crossbeam. The legs are connected to a track slide on a rail. Two pulley carts are mounted on the crossbeam, each suspending a hand-operated hoist. A first clamp is attached to the lower hook of one hand-operated hoist, and a second clamp is attached to the lower hook of the other hand-operated hoist. This utility model significantly reduces the height requirement of the gantry frame by installing the first and second clamps at the upper and lower ends of the cooler respectively, and using two hand-operated hoists for lifting. This design allows for convenient operation even in generator rooms with limited height. By using two hand-operated hoists suspended on the pulley carts and in conjunction with the use of a side-pull assembly, this solution allows for flexible adjustment of the cooler's position and angle.

Description

Tool for replacing main transformer cooler
Technical Field
The utility model belongs to the technical field of transformer substation equipment replacement tools, and particularly relates to a replacement tool for a main transformer cooler.
Background
Because the indoor equipment of the main transformer is installed, the indoor environment of the main transformer is complex, partial equipment in the hoisting area is blocked, the side close to the main transformer is the cobble ground, and the conventional hoisting support cannot enter the equipment area for operation. At present, the main transformer cooler needs to be replaced by smashing the wall surface of the main transformer room to a sufficient width, and the hanging belt is lifted by using the overhead working truck to penetrate through the hanging point at the top of the main transformer room, so that the main transformer cooler is easy to collide with adjacent equipment, the equipment is damaged, and the operation difficulty is high. The existing cooler replacement tool generally comprises a portal frame, a chain block and other components, and lifting and moving of the cooler are achieved through cooperation of the portal frame and the chain block. However, these conventional tools suffer from some significant drawbacks during use. The existing main transformer cooler replacing tool often needs a higher portal frame to adapt to the height of the cooler, but the main transformer cooler replacing tool is particularly difficult in a power generation room with limited space, so that the cooler cannot be effectively replaced. The main transformer cooler replacing tool is simple in structure, convenient to operate and small in occupied space, so that working efficiency and safety are improved, and the requirement of modern power system maintenance is met. Therefore, the development of a novel main transformer cooler replacement tool is particularly important,
Disclosure of utility model
The utility model aims to provide a tool for replacing a main transformer cooler, which solves the problems that a first clamp and a second clamp are respectively arranged at the upper end and the lower end of the cooler, and two chain blocks are utilized for lifting, so that the requirement on the height of a gantry frame is obviously reduced.
In order to solve the technical problems, the utility model is realized by the following technical scheme:
The utility model discloses a tool for replacing a main transformer cooler, which comprises a portal frame, wherein the portal frame comprises a cross beam and supporting legs fixedly connected to two ends of the cross beam, the supporting legs are connected to rail sliding plates on rails, two pulley carts are assembled on the cross beam, two chain blocks are respectively hung on the two pulley carts, a first clamp is hung on a lower hook of one chain block, a second clamp is hung on a lower hook of the other chain block, the first clamp is installed on the outer wall of the upper end of the cooler in a clamping mode, and the second clamp is installed on the outer wall of the lower end of the cooler in a clamping mode.
As a preferable technical scheme of the utility model, the portal frame and the two trolley are provided with two side pull assemblies.
As an optimized technical scheme, the side pulling assembly comprises an iron chain, reversing wheels and iron hooks fixed on the side surfaces of the supporting legs, wherein the two reversing wheels are respectively arranged on the top surfaces of two end parts of the cross beam, one end of the iron chain is fixed on the top surface of the trolley, and the iron chain is hung on the iron hooks on the same side after bypassing the reversing wheels on the same side.
According to the optimal technical scheme, the first clamp comprises a first hoop arranged on the outer wall of the upper end of the cooler, a portal frame is fixed on two wing plates on the same hoop plate of the first hoop, and a first hanging ring is fixed in the middle of the top surface of the portal frame.
As an optimal technical scheme, the second clamp comprises a second hoop arranged on the outer wall of the lower end of the cooler, and two second hanging rings are axially symmetrically fixed on the outer walls of two hoop plates of the second hoop.
As a preferable technical scheme of the utility model, rubber pads are arranged between the first anchor ear and the cooler and between the second anchor ear and the cooler.
The utility model has the following beneficial effects:
According to the utility model, the first clamp and the second clamp are respectively arranged at the upper end and the lower end of the cooler, and the two chain blocks are utilized for lifting, so that the requirement on the height of the gantry is obviously reduced. This design allows for easy operation also in highly confined power generation chambers.
According to the utility model, the two chain blocks are respectively hung on the trolley, and the position and the angle of the cooler can be flexibly adjusted by combining the use of the side pull assembly. The cooler assembly and disassembly device not only improves the convenience of operation, but also ensures that the cooler assembly and disassembly work can be smoothly completed under different space conditions.
The operation steps of the utility model are relatively simple and clear, the clamp is firstly installed, then lifted, and finally the cooler is horizontally moved out. The whole process can be completed by a small number of people without complex equipment or tools, and the operation difficulty and the labor cost are reduced.
Of course, it is not necessary for any one product to practice the utility model to achieve all of the advantages set forth above at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a structural schematic diagram of a portal frame installation state of a main transformer cooler replacement tool.
Fig. 2 is a schematic structural view of a cooler with a first clamp installed by vertically lifting a single chain block of the main transformer cooler replacement tool.
Fig. 3 is a schematic structural diagram of a cooler with a first clamp and a second clamp mounted by transversely lifting two chain blocks of a main transformer cooler replacement tool.
Fig. 4 is a schematic structural view of the first jig, the second jig, and the cooler.
In the drawings, the list of components represented by the various numbers is as follows:
1-cross beam, 2-supporting leg, 3-track, 4-track slide plate, 5-pulley vehicle, 6-chain block, 7-first clamp, 8-second clamp, 9-cooler, 10-side pull assembly, the device comprises a 101-iron chain, a 102-reversing wheel, a 103-iron hook, a 71-first anchor ear, a 72-portal, a 73-first hanging ring, a 81-second anchor ear and a 82-second hanging ring.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
First embodiment:
Referring to fig. 1-4, the utility model discloses a tool for replacing a main transformer cooler, which comprises a portal frame, wherein the portal frame comprises a beam 1 and supporting legs 2 fixedly connected to two ends of the beam 1, the supporting legs 2 are connected to rail sliding plates 4 on rails 3, two pulley carriages 5 are assembled on the beam 1, and a chain block 6 is respectively hung on the two pulley carriages 5. A first clamp 7 is hung on the hook below one of the chain blocks 6. A second clamp 8 is hung on the hook below the other chain block 6. The first clamp 7 is installed to clamp the outer wall of the upper end portion of the cooler 9. The second clamp 8 clamps the outer wall of the lower end of the cooler 9.
Wherein the first clamp 7 comprises a first anchor ear 71 mounted on the outer wall of the upper end of the cooler 9, as shown in fig. 4. A portal 72 is fixed on the first hoop 71 and two wing plates on the same hoop plate. A first hanging ring 73 is fixed in the middle of the top surface of the portal 72. The second clamp 8 comprises a second anchor ear 81 mounted on the outer wall of the lower end of the cooler 9. Two second hanging rings 82 are axisymmetrically fixed on the outer walls of the two hoop plates of the second hoop 81.
The process of disassembling the main transformer cooler 9 is as shown in fig. 1-3, firstly, paving the track 3 on the cobble ground, then, installing the first clamp 7 on the outer wall of the upper end part of the cooler 9, moving the portal frame to the upper part of the cooler 9, vertically lifting the cooler 9 on the first lifting ring 73 by using the hook of the first chain block 6, then installing the second clamp 8 on the outer wall of the lower end part of the cooler 9, pulling up the lower end of the cooler 9 on the second lifting ring 82 by using the hook of the other chain block 6, and lifting the cooler 9 horizontally upwards by using the two chain blocks 6. The cooler 9 can be moved out horizontally, so that the requirement on the height of the gantry is reduced, and the operation in a power generation chamber with limited height is facilitated. The disassembled main transformer cooler 9 is dropped to the ground, and the process of replacing the new cooler 9 is not repeated.
Rubber pads are arranged between the first anchor ear 71 and the cooler 9 and between the second anchor ear 81 and the cooler 9. Damage to the cooler 9 by the clamp is avoided. These designs enhance the stability and safety of the overall system, reducing operational risks.
Wherein, two side pull assemblies 10 are arranged on the portal frame and the two pulley carts 5. The side pull assembly 10 comprises an iron chain 101, a reversing wheel 102 and an iron hook 103 fixed on the side of the support leg 2. Two reversing wheels 102 are respectively arranged on the top surfaces of two end parts of the beam 1. One end of the iron chain 101 is fixed on the top surface of the trolley 5, and the iron chain 101 is hung on the iron hook 103 on the same side after bypassing the reversing wheel 102 on the same side.
The relative distance between the two pulley carts 5 on the cross beam 1 can be adjusted by the two side pull assemblies 10, the distance can be the distance between the hanging points of the first anchor ear 71 and the second clamp 8, the horizontal hanging of the cooler 9 is guaranteed, and secondly, the position of the two pulley carts 5 relative to one end of the cross beam 1 can be adjusted to avoid the too high part of the whole generator set.
In the description of the present specification, the descriptions of the terms "one embodiment," "example," "specific example," and the like, mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present utility model. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the utility model disclosed above are intended only to assist in the explanation of the utility model. The preferred embodiments are not exhaustive or to limit the utility model to the precise form disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, to thereby enable others skilled in the art to best understand and utilize the utility model. The utility model is limited only by the claims and the full scope and equivalents thereof.

Claims (6)

1. The utility model provides a be used for main cooler to change frock, includes the portal frame, the portal frame includes crossbeam (1) and fixed connection landing leg (2) at crossbeam (1) both ends, landing leg (2) are connected on track slide (4) on track (3), its characterized in that:
Two pulley carts (5) are assembled on the cross beam (1), and a chain block (6) is respectively hung on the two pulley carts (5);
A first clamp (7) is hung on the lower hook of one of the chain blocks (6);
A second clamp (8) is hung on the hook below the other chain block (6);
the first clamp (7) is installed on the outer wall of the upper end part of the cooler (9) in a clamping mode, and the second clamp (8) is installed on the outer wall of the lower end part of the cooler (9) in a clamping mode.
2. The tooling for replacing a main transformer cooler according to claim 1, wherein two side pull assemblies (10) are mounted on the portal frame and the two pulley carts (5).
3. The tool for replacing the main transformer cooler according to claim 2, wherein the side pulling assembly (10) comprises an iron chain (101), reversing wheels (102) and iron hooks (103) fixed on the side surfaces of the supporting legs (2), the two reversing wheels (102) are respectively arranged on the top surfaces of two end portions of the cross beam (1), one end of the iron chain (101) is fixed on the top surface of the pulley car (5), and the iron chain (101) is hung on the iron hooks (103) on the same side after bypassing the reversing wheels (102) on the same side.
4. The tool for replacing the main transformer cooler according to claim 1, wherein the first clamp (7) comprises a first hoop (71) arranged on the outer wall of the upper end of the cooler (9), a portal frame (72) is fixed on two wing plates on the same hoop plate of the first hoop (71), and a first hanging ring (73) is fixed in the middle of the top surface of the portal frame (72).
5. The tool for replacing the main transformer cooler according to claim 4, wherein the second clamp (8) comprises a second hoop (81) arranged on the outer wall of the lower end of the cooler (9), and two second hanging rings (82) are axially symmetrically fixed on the outer walls of two hoop plates of the second hoop (81).
6. The tooling for replacing a main transformer cooler according to claim 5, wherein rubber pads are arranged between the first anchor ear (71) and the cooler (9) and between the second anchor ear (81) and the cooler (9).
CN202520312380.6U 2025-02-26 2025-02-26 Tool for replacing main transformer cooler Active CN223646167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202520312380.6U CN223646167U (en) 2025-02-26 2025-02-26 Tool for replacing main transformer cooler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202520312380.6U CN223646167U (en) 2025-02-26 2025-02-26 Tool for replacing main transformer cooler

Publications (1)

Publication Number Publication Date
CN223646167U true CN223646167U (en) 2025-12-09

Family

ID=97906806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202520312380.6U Active CN223646167U (en) 2025-02-26 2025-02-26 Tool for replacing main transformer cooler

Country Status (1)

Country Link
CN (1) CN223646167U (en)

Similar Documents

Publication Publication Date Title
CN210528272U (en) Hoisting equipment for prefabricated parts
CN202785364U (en) Movable dual-door-type mast hoisting device
CN110127530A (en) For hanging apparatus and its application method in restricted clearance workshop
CN216625079U (en) A 10kV mid-mounted switchgear circuit breaker multifunctional maintenance test device
CN212671145U (en) Small-size slide rail formula portable hanging flower basket
CN207829430U (en) Lifting type operation platform for suspension operation
CN110654977A (en) Flexible-straight converter valve submodule replacing tool and method
CN212050215U (en) Integral disassembly and assembly device of GIS current transformer
CN216190533U (en) Lifting appliance device for overhauling converter station
CN220596831U (en) Dismounting tool for hydraulic generator brake air brake
CN208327184U (en) A kind of construction of hydro project trash rack lifting mounting device
CN204873435U (en) Rail vehicle floor hoist
CN210767897U (en) A unitized curtain wall plate construction machine
CN218290134U (en) Frame jack-up hoist
CN213445775U (en) Frock is transported to chassis wire casing
CN217498484U (en) Small-size diversified portable portal frame
CN221521907U (en) Pump lifting device
CN218261666U (en) A door frame device for hoisting large equipment
CN223133945U (en) Manually adjustable lifting device
CN220300141U (en) Pipeline hoist device
CN218261771U (en) Trolley for mounting and dismounting
CN220519916U (en) Device for installing and overhauling roller motor and shaft coupling
CN223936107U (en) Replacement device for track hanging festoon
CN221140977U (en) Equipment hoist and mount driving in dustproof canopy is aerifyd to portable
CN221587875U (en) Wind-powered electricity generation flange loading hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant