CN223509490U - Precast beam overhead hoist for bridge construction - Google Patents

Precast beam overhead hoist for bridge construction

Info

Publication number
CN223509490U
CN223509490U CN202423034903.XU CN202423034903U CN223509490U CN 223509490 U CN223509490 U CN 223509490U CN 202423034903 U CN202423034903 U CN 202423034903U CN 223509490 U CN223509490 U CN 223509490U
Authority
CN
China
Prior art keywords
lifting
bridge construction
hanging
precast beam
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202423034903.XU
Other languages
Chinese (zh)
Inventor
周成云
唐志鹏
杨溧
罗建军
夏天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bijie Highway Administration Bureau Of Guizhou Province
Original Assignee
Bijie Highway Administration Bureau Of Guizhou Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bijie Highway Administration Bureau Of Guizhou Province filed Critical Bijie Highway Administration Bureau Of Guizhou Province
Priority to CN202423034903.XU priority Critical patent/CN223509490U/en
Application granted granted Critical
Publication of CN223509490U publication Critical patent/CN223509490U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型涉及桥梁施工技术领域,特别涉及一种桥梁施工用预制梁吊运装置,包括吊梁、连接杆、下吊索、吊钩及上吊索。两个所述吊梁水平且相互平行设置;连接杆设置于两个所述吊梁之间,用于连接两个所述连接梁;所述下吊索包括设置于所述吊梁底部的第一下吊索及设置于所述吊梁两端的第二下吊索,所述第一下吊索及第二下吊索的上端与所述吊梁连接;所述吊钩与所述第一下吊索或第二下吊索的下端连接,且所述吊钩钩设于预制梁四周;所述上吊索设置于所述吊梁的顶部,用于连接吊车。吊索不与预制梁直接接触,而是通过吊钩与预制梁连接,从而避免了吊索与预制梁之间摩擦导致吊索磨损,并且在预制梁的四周均钩设有吊钩,从而稳定的将预制梁吊起。

This utility model relates to the field of bridge construction technology, and in particular to a precast beam hoisting device for bridge construction, comprising a lifting beam, a connecting rod, a lower lifting cable, a hook, and an upper lifting cable. Two lifting beams are horizontally and parallel to each other; the connecting rod is positioned between the two lifting beams to connect them; the lower lifting cable includes a first lower lifting cable at the bottom of the lifting beam and a second lower lifting cable at both ends of the lifting beam, with the upper ends of the first and second lower lifting cables connected to the lifting beam; the hook is connected to the lower end of the first or second lower lifting cable and is hooked around the precast beam; the upper lifting cable is positioned at the top of the lifting beam and is used to connect to a crane. The lifting cables do not directly contact the precast beam, but are connected to it through the hook, thus avoiding friction between the cables and the precast beam that could cause cable wear. Furthermore, hooks are provided around the precast beam to stably lift it.

Description

Precast beam overhead hoist for bridge construction
Technical Field
The utility model relates to the technical field of bridge construction, in particular to a precast beam lifting device for bridge construction.
Background
In bridge construction, the prefabricated box girder of a reinforced concrete structure is widely applied, the prefabricated box girder is required to be hoisted to a designated position for installation through a steel wire rope in the installation process, the traditional hoisting operation of the prefabricated box girder is to directly pocket the bottom of the suspended girder by adopting a steel wire rope, the steel wire rope is easy to damage the precast box girder bottom plate and the edge concrete of a flange plate in the hoisting process, the quality of the box girder is influenced, the steel wire rope is easy to wear during hoisting due to the fact that the corner edge of the prefabricated box girder is too sharp, potential safety hazards are brought due to the repeated use of the hoisting steel wire rope, and the hoisting structure is unstable.
Disclosure of utility model
The utility model aims to overcome the defects of the prior art and provides a precast beam lifting device for bridge construction, which can solve the problems.
A precast beam lifting device for bridge construction comprises a lifting beam, a connecting rod, a lower sling, a lifting hook and an upper sling. The two hanging beams are horizontally arranged in parallel, a connecting rod is arranged between the two hanging beams and used for connecting the two hanging beams, the lower slings comprise a first lower sling arranged at the bottom of the hanging beams and a second lower sling arranged at two ends of the hanging beams, the upper ends of the first lower sling and the second lower sling are connected with the hanging beams, the lifting hooks are connected with the lower ends of the first lower sling or the second lower sling, the lifting hooks are hooked around the prefabricated beams, and the upper slings are arranged at the top of the hanging beams and used for connecting cranes.
Further, the lifting hook comprises an upper suspension arm, a lower suspension arm and a connecting arm, wherein the upper suspension arm and the lower suspension arm are horizontally arranged, the connecting arm is connected with the connecting arm, the lower suspension arm is longer than the upper suspension arm, one ends of the upper suspension arm and one ends of the lower suspension arm are longitudinally aligned, the connecting arm is fixed at one end of the upper suspension arm, which is aligned with the lower suspension arm, lifting holes are horizontally formed in two ends of the precast beam to be connected, and the lifting hook is clamped on the edge of the top plate of the precast beam or the lower suspension arm of the lifting hook is inserted in the lifting holes.
Further, the lifting device further comprises a lifting plate, wherein the lifting plate is arranged above the lifting beam, the lifting plate is connected with the lifting beam through connecting cables, a plurality of connecting cables are connected to the upper end face of the lifting beam at equal intervals, the upper sling is connected to four corners of the upper end face of the lifting plate, and the upper end of the upper sling is connected with a main sling.
Further, the connecting rod comprises a first sleeve, a screw rod and an adjusting nut, wherein the adjusting nut is rotationally connected to one end of the first sleeve, one end of the screw rod is in threaded connection with the adjusting nut and is inserted into the first sleeve, and one ends, far away from each other, of the first sleeve and the screw rod are respectively fixedly connected with the two hanging beams.
Further, the inner diameter of the adjusting nut is smaller than that of the first sleeve, and a first limiting plate is fixed at one end of the screw inserted into the first sleeve.
Further, a guide rod is further arranged between the two hanging beams, the guide rod comprises a second sleeve and a slide rod, one end of the slide rod is slidably inserted into the second sleeve, and one ends, far away from each other, of the second sleeve and the slide rod are respectively fixedly connected with the two hanging beams.
Further, a travelling car is arranged at the bottom of the hanging beam, and the upper end of the first lower sling is connected with the travelling car.
Furthermore, the vertical section of the hanging beam is in an I-shaped structure.
Further, telescopic rods are arranged at two ends of the hanging beam, fixed ends of the telescopic rods are fixedly connected with the hanging beam, and extending ends of the telescopic rods are connected with the upper ends of the second lower slings.
Further, the telescopic rod is an electrohydraulic push rod.
Compared with the prior art, the utility model has the beneficial effects that:
According to the precast beam lifting device for bridge construction, the two lifting beams are arranged, the bottom and two ends of the lifting beams are respectively connected with the first lower sling and the second lower sling, the lower ends of the first lower sling and the second lower sling are respectively connected with the lifting hooks, the lifting hooks are hooked around the precast beam, so that the precast beam is lifted, the lifting slings are not in direct contact with the precast beam, but are connected with the precast beam through the lifting hooks, the sling wear caused by friction between the lifting slings and the precast beam is avoided, and the lifting hooks are hooked around the precast beam, so that the precast beam is stably lifted.
According to the precast beam lifting device for bridge construction, the connecting rod between the two lifting beams adopts the structure with the adjustable length, so that the distance between the two lifting beams can be adjusted, and the precast beam lifting device can adapt to precast beams with different widths to a certain extent. The travelling car is established to the hanging beam bottom, and first sling and travelling car are connected to can adjust the position of the lifting hook on the first sling, hanging beam both ends installation telescopic link, the second sling is connected with the extension end of telescopic link down, thereby can adjust the position of the lifting hook on the second sling down, further adapt to precast beam's width and length.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
fig. 1 is a schematic view of a use state of a precast beam hoist for bridge construction in an embodiment of the present utility model.
Fig. 2 is a schematic view showing a use state of another view angle of the precast beam hoist for bridge construction according to an embodiment of the present utility model.
Fig. 3 is a schematic view of the overall structure of a precast beam hoist for bridge construction in an embodiment of the present utility model.
Fig. 4 is a schematic structural view of a traveling carriage in an embodiment of the present utility model.
Fig. 5 is a schematic view showing the structure of a hook in an embodiment of the present utility model.
In the figure, 1, a hanging beam, 2, a first lower sling, 3, a second lower sling, 4, a lifting hook, 401, an upper boom, 402, a lower boom, 403, a connecting arm, 5, an upper sling, 6, a hanging plate, 7, a connecting rope, 8, a main hanging ring, 9, a first sleeve, 10, a screw rod, 11, an adjusting nut, 12, a second sleeve, 13, a sliding rod, 14, a moving trolley, 1401, a frame, 1402, a driving wheel, 1403, a driven wheel, 1404, a motor, 1405, a first gear, 1406, a rotating shaft, 1407, a second gear, 15 and a telescopic rod are arranged.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
As shown in fig. 1, 2 and 3, the precast beam lifting device for bridge construction in this embodiment includes a main lifting ring 8, an upper lifting rope 5, a lifting plate 6, a connecting rope 7, a lifting beam 1, a connecting rod, a lower lifting rope and a lifting hook 4 which are sequentially arranged from top to bottom.
In this embodiment, the hanger plate 6 is rectangular, four corners of the upper surface of the hanger plate 6 are connected with upper slings 5, and the upper ends of the four upper slings 5 are connected with a main hanging ring 8, where the main hanging ring 8 is used for connecting with external hanging equipment, such as a crane. The two hanging beams 1 are horizontally and mutually parallel arranged below the hanging plate 6, the hanging beams 1 are parallel to the length direction of the hanging plate 6, the hanging plate 6 is connected with the hanging beams 1 through connecting cables 7, and a plurality of connecting cables 7 are connected to the upper end face of the hanging beam 1 at equal intervals. The connecting rod is arranged between the two hanging beams 1 and connects the two hanging beams 1.
Specifically, the connecting rod includes first sleeve 9, screw rod 10 and adjusting nut 11, and adjusting nut 11 rotates to be connected in the one end of first sleeve 9, and the one end of screw rod 10 and adjusting nut 11 threaded connection just insert in the first sleeve 9 to through the length that rotates adjusting nut 11 adjusting screw rod 10 stretches into in the first sleeve 9, adjust the holistic length of connecting rod, and then adjust the distance between two hanging beam 1, with the precast beam of adaptation different width, the one end that first sleeve 9 and screw rod 10 kept away from each other is respectively with two hanging beam 1 fixed connection. The inner diameter of the adjusting nut 11 is smaller than that of the first sleeve 9, a first limiting plate is fixed at one end of the screw 10 inserted into the first sleeve 9, and the outer diameter of the first limiting plate is larger than that of the screw 10, so that the screw 10 is prevented from falling out of the first sleeve 9.
In this embodiment, a guide bar is also provided between the two lifting beams 1. The connecting rod sets up in hanging beam 1 middle part, and two guide bars set up in the both sides of connecting rod respectively. Specifically, the guide rod comprises a second sleeve 12 and a slide rod 13, one end of the slide rod 13 is slidably inserted into the second sleeve 12, and one end, far away from each other, of the second sleeve 12 and the slide rod 13 is fixedly connected with the two hanging beams 1 respectively. Preferably, the inner diameter of the second sleeve 12 is larger than the outer diameter of the slide bar 13, a baffle ring is fixed at one end of the second sleeve 12 close to the slide bar 13, the inner diameter of the baffle ring is smaller than the inner diameter of the second sleeve 12, a second limiting plate is fixed at one end of the slide bar 13 extending into the second sleeve 12, and the outer diameter of the second limiting plate is larger than the inner diameter of the baffle ring, so that the slide bar 13 is prevented from falling out of the second sleeve 12. By arranging the guide rod, the guide rod stretches and shortens while the connecting rod stretches and shortens, and the adjustment of the distance between the two hanging beams 1 is not affected while the connecting strength between the two hanging beams 1 is enhanced.
In this embodiment, the vertical section of the hanging beam 1 is in an i-shaped structure, and is specifically made of i-steel. The bottom of the hanging beam 1 is provided with a travelling car 14 which can move back and forth on the hanging beam 1, the two ends of the hanging beam 1 are provided with telescopic rods 15, and the fixed ends of the telescopic rods 15 are fixedly connected with the hanging beam 1. The lower sling comprises a first lower sling 2 and a second lower sling 3, the lower ends of the first lower sling 2 and the second lower sling 3 are connected with a lifting hook 4, the upper end of the first lower sling 2 is connected with a travelling car 14, and the upper end of the second lower sling 3 is connected with the extending end of a telescopic rod 15.
Specifically, as shown in fig. 4, the travelling car 14 includes a frame 1401, a driving wheel 1402, a driven wheel 1403, a motor 1404, a first gear 1405 and a rotation shaft 1406, the frame 1401 is wholly u-shaped and semi-enclosed in the lower portion of the hanging beam 1, the driving wheel 1402 and the driven wheel 1403 are installed on the inner side of the frame 1401 in pairs, and the driving wheel 1402 and the driven wheel 1403 are in rotational friction connection with the hanging beam 1. The motor 1404 is fixed in the frame 1401 outside, and the output shaft of motor 1404 is fixedly connected with axis of rotation 1406, and axis of rotation 1406 is connected with the frame 1401 rotation and both ends are fixed with first gear 1405, and the one side that the drive wheel 1402 is close to frame 1401 is fixed with the second gear 1407 that meshes with first gear 1405, and the frame 1401 bottom surface is fixed with down rings, and the upper end of first down hoist cable 2 is connected with travelling car 14 through lower rings.
The telescopic rod 15 is specifically an electrohydraulic push rod or an electric telescopic rod 15.
In this embodiment, a plurality of lifting hooks 4 hook around the precast beam, and specifically, the lifting hook 4 hook of the lower extreme of first lower hoist cable 2 locates precast beam roof edge, and the lifting hook 4 hook of the lower extreme of second lower hoist cable 3 locates precast beam and waits to connect both ends to form stable connection structure, hoist and mount precast beam. As shown in fig. 5, the hook 4 in this embodiment includes an upper boom 401, a lower boom 402, and a connecting arm 403 connecting the upper boom 401 and the lower boom 402, the lower boom 402 is longer than the upper boom 401, and one ends of the two are aligned longitudinally, the connecting arm 403 is fixed at one end of the upper boom 401 aligned with the lower boom 402, two ends of the precast beam to be connected are horizontally provided with a hanging hole, the upper boom 401 and the lower boom 402 of the lower end hook 4 of the first lower sling 2 are clamped on the upper and lower surfaces of the precast beam top plate edge, the upper boom 401 of the lower end hook 4 of the second lower sling 3 is clamped on the upper surface of the precast beam, the lower boom 402 is inserted in the hanging hole, so that the hook 4 is hooked around the precast beam, and the lower ends of the first lower sling 2 and the second lower sling 3 are connected with one end of the upper boom 401 far from the connecting arm 403, so as to form a stable connecting structure.
In this embodiment, the upper sling 5, the connecting rope 7, the first lower sling 2 and the second lower sling 3 are all steel wires.
The working principle of the precast beam lifting device for bridge construction in the embodiment is as follows:
Through setting up two hanging beam 1 to connect first hoist cable 2 and second hoist cable 3 respectively in the bottom and the both ends of hanging beam 1, the lower extreme of hoist cable 2 and second hoist cable 3 all is connected with lifting hook 4 down, and lifting hook 4 hooks around the precast beam, thereby lifts up the precast beam, and the hoist cable is not with precast beam direct contact, but is connected with the precast beam through lifting hook 4, thereby has avoided the friction to lead to the hoist cable wearing and tearing between hoist cable and the precast beam, and all hooks are equipped with lifting hook 4 around the precast beam, thereby stable with precast beam lift up. The connecting rod between the two hanging beams 1 adopts a structure with adjustable length, so that the distance between the two hanging beams 1 can be adjusted, and the prefabricated beams with different widths can be adapted to a certain extent. The travelling car 14 is established to hoist beam 1 bottom, and the first hoist cable 2 is connected with travelling car 14 to can adjust the position of lifting hook 4 on the first hoist cable 2, hoist beam 1 both ends installation telescopic link 15, the second hoist cable 3 is connected with the end that stretches out of telescopic link 15, thereby can adjust the position of lifting hook 4 on the second hoist cable 3, further adapt to precast beam's width and length.
It should be noted that the above-mentioned embodiments are merely preferred embodiments of the present utility model, and the present utility model is not limited thereto, but may be modified or substituted for some of the technical features thereof by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (10)

1. Precast beam overhead hoist is used in bridge construction, its characterized in that includes:
the hanging beams (1) are horizontally arranged and mutually parallel;
the connecting rod is arranged between the two hanging beams (1) and is used for connecting the two hanging beams (1);
The lower sling comprises a first lower sling (2) arranged at the bottom of the hanging beam (1) and a second lower sling (3) arranged at two ends of the hanging beam (1), and the upper ends of the first lower sling (2) and the second lower sling (3) are connected with the hanging beam (1);
A lifting hook (4), wherein the lifting hook (4) is connected with the lower end of the first lower sling (2) or the second lower sling (3), the lifting hook (4) is hooked around the precast beam, and
And the upper sling (5) is arranged at the top of the hanging beam (1) and used for being connected with a crane.
2. The girder lifting device for bridge construction according to claim 1, wherein the lifting hook (4) comprises an upper lifting arm (401), a lower lifting arm (402) and a connecting arm (403) for connecting the upper lifting arm (401) and the lower lifting arm (402), the lower lifting arm (402) is longer than the upper lifting arm (401) and one end of the lower lifting arm is longitudinally aligned, the connecting arm (403) is fixed at one end of the upper lifting arm (401) aligned with the lower lifting arm (402), lifting holes are horizontally arranged at two ends of the girder to be connected, and the lifting hook (4) is clamped at the edge of a top plate of the girder or the lower lifting arm (402) of the lifting hook (4) is inserted into the lifting holes.
3. The precast beam lifting device for bridge construction according to claim 2, further comprising a lifting plate (6), wherein the lifting plate (6) is arranged above the lifting beam (1), the lifting plate (6) is connected with the lifting beam (1) through connecting ropes (7), a plurality of connecting ropes (7) are connected to the upper end face of the lifting beam (1) at equal intervals, the lifting ropes (5) are connected to four corners of the upper end face of the lifting plate (6), and a main lifting ring (8) is connected to the upper end of the lifting ropes (5).
4. The precast beam lifting device for bridge construction according to claim 3, wherein the connecting rod comprises a first sleeve (9), a screw rod (10) and an adjusting nut (11), the adjusting nut (11) is rotatably connected to one end of the first sleeve (9), one end of the screw rod (10) is in threaded connection with the adjusting nut (11) and is inserted into the first sleeve (9), and one ends, far away from each other, of the first sleeve (9) and the screw rod (10) are fixedly connected with the two hanging beams (1) respectively.
5. The girder lifting device for bridge construction according to claim 4, wherein the inner diameter of the adjusting nut (11) is smaller than the inner diameter of the first sleeve (9), and a first limiting plate is fixed at one end of the screw (10) inserted into the first sleeve (9).
6. The precast beam lifting device for bridge construction according to claim 5, wherein a guide rod is further arranged between the two hanging beams (1), the guide rod comprises a second sleeve (12) and a sliding rod (13), one end of the sliding rod (13) is slidably inserted into the second sleeve (12), and one end, far away from each other, of the second sleeve (12) and the sliding rod (13) is fixedly connected with the two hanging beams (1) respectively.
7. The precast beam lifting device for bridge construction according to claim 1, wherein a travelling car (14) is arranged at the bottom of the lifting beam (1), and the upper end of the first lower sling (2) is connected with the travelling car (14).
8. The precast beam hoist for bridge construction according to claim 7, characterized in that the vertical section of the hanging beam (1) is in an i-shaped structure.
9. The precast beam lifting device for bridge construction according to claim 1, wherein telescopic rods (15) are arranged at two ends of the lifting beam (1), fixed ends of the telescopic rods (15) are fixedly connected with the lifting beam (1), and protruding ends of the telescopic rods (15) are connected with upper ends of the second lower lifting ropes (3).
10. The bridge construction precast beam hoist according to claim 9, characterized in that the telescopic rod (15) is an electrohydraulic push rod.
CN202423034903.XU 2024-12-10 2024-12-10 Precast beam overhead hoist for bridge construction Active CN223509490U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202423034903.XU CN223509490U (en) 2024-12-10 2024-12-10 Precast beam overhead hoist for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202423034903.XU CN223509490U (en) 2024-12-10 2024-12-10 Precast beam overhead hoist for bridge construction

Publications (1)

Publication Number Publication Date
CN223509490U true CN223509490U (en) 2025-11-04

Family

ID=97516682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202423034903.XU Active CN223509490U (en) 2024-12-10 2024-12-10 Precast beam overhead hoist for bridge construction

Country Status (1)

Country Link
CN (1) CN223509490U (en)

Similar Documents

Publication Publication Date Title
CN103848360B (en) A kind of group tower tower crane being provided with packaged type balance weight system
CN205953370U (en) Perpendicular transport means of unitized curtain wall
CN118723818B (en) A split type cable-mounted crane and a cable-mounted hoisting device
CN216512495U (en) Special bridge crane for steel mill metallurgy
CN207748760U (en) A kind of bridge crane of hoisting large-size drainpipe
CN211496659U (en) Prefabricated assembled floor hoisting machine
CN111776940A (en) An adjustable arch rib installation and lifting device
CN108408667A (en) Broken line type girder truss rod piece Quick overturning device and its method for turning
CN111453630B (en) Bridge crane and its use method
CN212222219U (en) Adjustable arch rib installation hoisting device
CN203474321U (en) Tower crane used for constructing and erecting electric transmission line iron towers
CN210457238U (en) Special crane for tubular pile
CN216663844U (en) Bridge floor transverse prestress tensioning auxiliary device
CN201634333U (en) Super-altitude gantry crane
CN220300239U (en) Shipbuilding gantry crane
CN210117190U (en) Small material hoister
CN217376980U (en) double-T-beam self-balancing hoisting sling
CN218174415U (en) Cable manufacture handling device
CN115354575A (en) Multifunctional bridge floor crane for middle cable plane cable-stayed bridge
CN206783147U (en) A kind of power wire protection device for bridge crane
CN111252683A (en) Bridge deck crane and application method thereof applied to bridge dismantling
CN212687392U (en) Cable crane hoisting device for bridge erection
CN203143924U (en) Sling for hoisting steel crane girder
CN214401419U (en) Tower top hanging bracket for mounting stay cable tower end
CN201648524U (en) Bridge-type self-propelled trolley device for round steel strand pickling line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant