Building climbing frame convenient to assemble
Technical Field
The application belongs to the technical field of building climbing frames, and particularly relates to a building climbing frame convenient to assemble.
Background
The building climbing frame is a temporary supporting structure for building construction, and is mainly used for the construction and decoration of the outer wall of a high-rise building. It is usually composed of steel pipe, fastener, etc. and has good bearing capacity and stability. The design of climbing frame can be adjusted according to the height and the construction demand of building, can effectively improve the efficiency of construction, ensures construction safety. Compared with the traditional scaffold, the climbing frame can be lifted along with the height of a building in the use process, so that the time for constructing and disassembling is reduced, and the climbing frame is suitable for various complex construction environments.
The utility model discloses a scaffold is climbed to building convenient to equipment as disclosed in the application of publication number CN221972961U, relates to scaffold technical field with movable platform. This frame is climbed to building convenient to equipment, including first building frame subassembly, the lower surface of frame subassembly is climbed to first building is provided with the second building and climbs the frame subassembly, the lower surface of frame subassembly is climbed to first building and the upper surface of frame subassembly is climbed to second building, four recesses have all been seted up to the surface of frame subassembly is climbed to first building and second building, four nuts that frame subassembly corresponds are climbed to second building external force, make four nuts can stably restrict the position relation that frame subassembly and second building climbed to first building, when frame subassembly corresponds the nut and takes place the smooth silk phenomenon, external force is torn out smooth silk and is corresponded the recess, it changes to correspond the nut cover, the loosening groove has been changed, the recess resets the restriction thread bush, the equipment that frame subassembly and second building climbed to frame subassembly is influenced to the smooth silk phenomenon to the appearance of avoiding.
However, in this application, a single-side bolt fastening method is still used for installing each component, and the construction process is still complex in a plurality of combined scenes.
Disclosure of utility model
The application aims to solve the problem that the construction process is complex in a plurality of combined scenes by adopting a unilateral bolt fixing mode for installing all parts, and provides a building climbing frame convenient to assemble.
The technical scheme includes that the building climbing frame convenient to assemble comprises a vertical rod, wherein a horizontal truss connecting piece is movably connected to the outer surface of one side of the vertical rod, a horizontal truss is movably connected to the outer surface of the horizontal truss connecting piece, a screw is movably connected to the side surface of the horizontal truss corresponding to the horizontal truss, the screw penetrates through the horizontal truss connecting piece and is fixedly arranged on the horizontal truss, an insertion supporting rod is movably inserted into the outer surface of the horizontal truss connecting piece corresponding to the outer surface of the vertical rod, a long connecting rod is movably sleeved on the outer surface of the insertion supporting rod, a short connecting rod is movably sleeved on the outer surface of one end, far away from the insertion supporting rod, of the long connecting rod, a threaded rod is welded to the outer surface of the horizontal truss connecting piece, and a nut is movably connected to the outer surface of the threaded rod.
Through adopting above-mentioned technical scheme, the pole setting is as climbing frame main support spare part, for climbing the whole vertical support of frame and providing the assurance, and horizontal individual layer supports, then by each accessory connection provide each functional effect, horizontal truss is as providing personnel walking side protect function, the optimizing point lies in inserting the bracing piece, long connecting rod, the short connecting rod forms integratively through screw thread swivelling joint, form the individual layer and support the horizontal pole, form whole layer support through running through pole setting, horizontal truss connecting piece, and then the side is supplementary to be fixed and can only carry out once bolt fastening, need not every adjacent spare part and carry out unilateral bolt fastening, installation effectiveness has been increased.
In a preferred embodiment, the outer surface of one side of the horizontal truss connecting member is movably connected with a main clamping piece, the outer surface of the other side of the horizontal truss connecting member is movably connected with a secondary clamping piece, and the outer surface of the main clamping piece is welded with a reference block.
Through adopting above-mentioned technical scheme, the hole of vice clamping piece is gone into to the one end benchmark piece card of main clamping piece, and the hole correspondence of diagonal angle lets the individual layer that inserts bracing piece, long connecting rod, short connecting rod and pass through threaded swivelling joint formation supports the horizontal pole and runs through, and left diagonal hole is fixed through 0, and main clamping piece, vice clamping piece clamp formation tilt angle, and the fixing of one end is accomplished to the horizontal truss connecting piece that corresponds the clamp, and corresponds pole setting department, carries out the support of this department through the well bolt.
In a preferred embodiment, the outer surface of the lower end of the upright is movably connected with an upright fixing piece, and the outer surface of the upright fixing piece is welded with a scaffold board.
Through adopting above-mentioned technical scheme, pole setting mounting, scaffold board form an organic wholely, when increasing physical resistance, have reduced traditional many bolt fixed mounting's loaded down with trivial details.
In a preferred embodiment, the outer surfaces of the main clamping piece and the auxiliary clamping piece are provided with short bolts, and the outer surfaces between the scaffold boards are also provided with short bolts.
Through adopting above-mentioned technical scheme, the short bolt is used when each adjacent two spare parts are fixed, and convenient fixed distance is shorter scene.
In a preferred embodiment, the side surfaces of the poles are provided with middle bolts which are fixed to both side fixing holes of the single pole.
Through adopting above-mentioned technical scheme, well bolt inserts in the both sides of pole setting, conveniently carries out fixed mounting to spare part.
In a preferred embodiment, the side surfaces of the poles are provided with long bolts fixed to both side fixing holes of the adjacent two poles.
Through adopting above-mentioned technical scheme, when the vertical support spare part both sides of pole setting are fixed, when accomplishing spare part fixed, two adjacent pole settings are fixed through long bolt and are formed an organic wholely, and then better completion climbs a frame and support.
In a preferred embodiment, the side surface of the upright is movably connected with a fixing piece, and the outer surface of the fixing piece is welded with a Z-shaped support.
Through adopting above-mentioned technical scheme, stationary blade, Z shape support are assisted to climb the degree of depth of frame and are supported, and then increase the stability of climbing the frame.
In a preferred embodiment, the outer surface of the upright rod is movably connected with a mesh fixing piece, and the outer surface of the mesh fixing piece is movably inserted with a protective mesh.
By adopting the technical scheme, the net piece fixing piece and the protective net piece are connected to the outer side, and personal safety of constructors is protected on the outer side.
In summary, due to the adoption of the technical scheme, the beneficial effects of the application are as follows:
According to the application, the vertical rod is used as a main supporting part of the climbing frame, the whole vertical support of the climbing frame is ensured, the transverse single-layer support is connected by each accessory to provide each functional effect, the horizontal truss is used as a side protection function for personnel walking, the optimization points are that the inserted support rod, the long connecting rod and the short connecting rod are rotationally connected into a whole through threads to form a single-layer support cross rod, the whole layer support is formed by penetrating through the vertical rod and the horizontal truss connecting piece, further the side auxiliary fixing can be performed only once bolt fixing, single-side bolt fixing of each adjacent part is not required, and the installation efficiency is increased.
Drawings
FIG. 1 is a front elevational view of the apparatus of the present application;
FIG. 2 is a reverse side view of the apparatus of the present application;
FIG. 3 is a bottom view of the apparatus of the present application;
FIG. 4 is a schematic view of a horizontal truss connection in accordance with the present application;
Fig. 5 is a schematic view of a horizontal truss structure according to the present application.
The drawing comprises a vertical rod, a horizontal truss connecting piece, a horizontal truss, a 4, a screw, a 5, an inserting support rod, a 6, a long connecting rod, a 7, a short connecting rod, a 8, a threaded rod, a 9, a nut, a 10, a main clamping piece, a 11, an auxiliary clamping piece, a 12, a reference block, a 13, a vertical rod fixing piece, a 14, a scaffold board, a 15, a middle bolt, a 16, a long bolt, a 17, a fixing piece, a 18, a Z-shaped support, a 19, a net piece fixing piece, a 20, a protective net piece, a 21 and a short bolt.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present application more apparent, the technical solutions in the embodiments of the present application will be clearly and completely described in the following in conjunction with the embodiments of the present application, and it is apparent that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
Examples:
Referring to fig. 1-5, a building frame is climbed to convenient equipment, including pole setting 1, pole setting 1 one side surface swing joint has horizontal truss connecting piece 2, horizontal truss connecting piece 2 surface swing joint has horizontal truss 3, horizontal truss connecting piece 2 corresponds horizontal truss 3 side surface swing joint has screw 4, screw 4 runs through horizontal truss connecting piece 2 fixed mounting at horizontal truss 3, horizontal truss connecting piece 2 corresponds pole setting 1 surface activity grafting has insert bracing piece 5, insert bracing piece 5 surface activity has cup jointed long connecting rod 6, long connecting rod 6 has kept away from inserting bracing piece 5 one end surface activity and has cup jointed short connecting rod 7, horizontal truss connecting piece 2 surface welding has threaded rod 8, threaded rod 8 surface swing joint has nut 9.
The pole setting 1 is as climbing the frame main support spare part, for climbing the whole vertical support of frame and providing the assurance, and horizontal individual layer supports, then by each accessory connection provide each functional effect, horizontal truss 3 is as providing personnel walking side protect function, the optimizing point lies in inserting bracing piece 5, long connecting rod 6, short connecting rod 7 forms integratively through screw thread swivelling joint, form the individual layer and support the horizontal pole, form whole layer support through running through pole setting 1, horizontal truss connecting piece 2, and then the side is supplementary fixed can only carry out once bolt fastening, need not every adjacent spare part and carry out unilateral bolt fastening, installation effectiveness has been increased.
Referring to fig. 1 to 5, a main clamping piece 10 is movably connected to the outer surface of one side of the horizontal truss connecting piece 2, an auxiliary clamping piece 11 is movably connected to the outer surface of the other side of the horizontal truss connecting piece 2, and a reference block 12 is welded to the outer surface of the main clamping piece 10.
The hole of auxiliary clamping piece 11 is gone into to main clamping piece 10's one end benchmark piece 12 card, and the hole of diagonal angle corresponds let the individual layer support horizontal pole that inserts bracing piece 5, long connecting rod 6, short connecting rod 7 through screw swivelling joint formation runs through, and left diagonal hole is fixed through 022, and main clamping piece 10, auxiliary clamping piece 11 clamp and form the inclination, and the fixing of one end is accomplished to the horizontal truss connecting piece 2 that corresponds the clamp, and in the department of corresponding pole setting 1, carries out the support of this department through well bolt 15.
Referring to fig. 1-3, the outer surface of the lower end of the upright 1 is movably connected with an upright fixing piece 13, and the outer surface of the upright fixing piece 13 is welded with a scaffold board 14.
The upright rod fixing piece 13 and the scaffold board 14 are integrated, so that physical resistance is improved, and meanwhile, complexity of traditional multi-bolt fixing and installing is reduced.
Referring to fig. 1 to 3, the main jaw 10 is provided with a short bolt 21 corresponding to the outer surface of the sub-jaw 11, and the outer surface between the scaffold plates 14 is also provided with a short bolt 21.
The short bolts 21 are used when two adjacent parts are fixed, so that a scene with a short fixed distance is convenient.
Referring to fig. 1 to 3, the side surfaces of the poles 1 are provided with middle bolts 15, and the middle bolts 15 are fixed to both side fixing holes of the single pole 1.
The middle bolts 15 are inserted into the two sides of the vertical rod 1, so that the parts can be conveniently and fixedly installed.
Referring to fig. 1 to 3, the side surfaces of the poles 1 are provided with long bolts 16, and the long bolts 16 are fixed to both side fixing holes of the adjacent two poles 1.
When the two sides of the vertical supporting parts of the vertical rods 1 are fixed, the two adjacent vertical rods 1 are fixed into a whole through the long bolts 16 while the parts are fixed, and then the climbing frame support is completed better.
Referring to fig. 1-3, a fixing plate 17 is movably connected to the side surface of the upright 1, and a Z-shaped support 18 is welded to the outer surface of the fixing plate 17.
The fixing piece 17 and the Z-shaped support 18 assist in supporting the depth of the climbing frame, so that the stability of the climbing frame is improved.
Referring to fig. 1-3, a mesh fixing piece 19 is movably connected to the outer surface of the upright 1, and a protective mesh 20 is movably inserted to the outer surface of the mesh fixing piece 19.
The net piece fixing piece 19 and the protective net piece 20 are connected to the outer side, and personal safety of constructors is protected on the outer side.
The embodiment of the building climbing frame convenient to assemble is implemented by the following principle:
In this application, only relate to main part and climb the relevant content of frame individual layer main part, similar with traditional installation, the optimizing point lies in inserting bracing piece 5, long connecting rod 6, short connecting rod 7 forms integratively through screw thread swivelling joint, constitute the individual layer bracing piece, through running through pole setting 1, horizontal truss connecting piece 2 forms whole layer support, and then side auxiliary fixation can only carry out once bolt fastening, need not every adjacent spare part and carry out unilateral bolt fastening, installation effectiveness has been increased, the hole of auxiliary clamping piece 11 is gone into to the one end benchmark piece 12 card of main clamping piece 10, the hole correspondence of diagonal angle lets insert bracing piece 5, long connecting rod 6, short connecting rod 7 runs through the individual layer support horizontal pole that screw thread swivelling joint formed, left diagonal hole is fixed through short bolt 21, main clamping piece 10, auxiliary clamping piece 11 clip forms the inclination angle, the fixed of one end is accomplished to corresponding the horizontal truss connecting piece 2 of clamp, and in corresponding pole setting 1 department, support that carries out this department through well bolt 15.
The foregoing embodiments are merely for illustrating the technical solution of the present application, but not for limiting the same, and although the present application has been described in detail with reference to the foregoing embodiments, it will be understood by those skilled in the art that modifications may be made to the technical solution described in the foregoing embodiments or equivalents may be substituted for parts of the technical features thereof, and that such modifications or substitutions do not depart from the spirit and scope of the technical solution of the embodiments of the present application in essence.